This pre-solicitation notice announces the Army Contracting Command's intent to issue a solicitation for multiple award task order contracts for design/build, construction, and renovation and repair services at Aberdeen and Edgewood Proving Grounds in Maryland. The total estimated value is a minimum guarantee of $2,500 but not more than $100 million over a base year and four option years. The solicitation will be posted on April 15, 2019 on FedBizOpps as a 100% competitive 8(a) small business set-aside. The North American Industry Classification code is 236220 with a $33.5 million size standard. The solicitation number is W56ZTN-19-R-0005. A pre-proposal site visit will be held with attendance instructions in an amendment. Technical data required to respond will be provided with the solicitation. All offerors must register in the System for Award Management database prior to award.
Amendment 0005 (MS Word version)
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56ZTN-19-R-0005
W56ZTN-19-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005 CONTINUATION
The purpose of this Amendment 0005 is as follows:
a.) Provide answers to additional questions received in response to the solicitation. See attached Q&A, dated 23 October 2019. If offerors have follow-up questions or additional questions, they must be submitted via email by 11:00AM ET on 28 October 2019. If additional relevant questions are received, the Government will provide answers and determine if any further extension of the due date of proposals is warranted.
b.) Make additional revisions to the Instructions to Offerors and Basis for Award sections of the RFP. These changes are limited to the Subfactor b: Safety portion and to Subfactor c - Site Superintendents requirements. Offerors may provide EMR and DART data for beyond three (3) years and could potentially earn a strength. For the proposed site superintendents, experience and a degree in lieu of a journeyman level trade certification is permitted.
c.) Update the PWS, paragraph 1.6.11.4 Site Superintendents (SSs) under 1.6.11 Key Personnel to allow for experience and a degree in lieu of a journeyman level trade certification. No other changes are made to the PWS via this Amendment.
d.) The due date and time for receipt of proposals remains unchanged.
QUESTIONS - 10232019
| Questions |
| Answers |
| 1. The most successful superintendents are experienced in supervising and managing work in multiple construction trades. Although some superintendents worked in one trade or another earlier in their career, the most experienced superintendents have not performed trade work for some time. It is unusual for construction contracts to require that superintendents to possess a journeyman level certification in a construction trade. Consider reviewing the minimum requirements for superintendents. |
| Please see updated PWS and Instructions to Offerors and Basis for Award sections which have been updated via Amendment 0005. |
2. Ref. Volume II: Past Performance, Section 1:
What is a Government Contract Admin Pre-Award Monitor person, and why so you need to know who they were, and what could that possibly have to do with a contractor’s performance on a project?
COR or Technical Representative.
| 3. Will the government be providing a template for Section 1: Contract Descriptions? |
| No. |
| 4. Will the government allow for text in graphics and tables to be less than 12pt provided that the text is legible? |
| Yes. All documentation submitted must be legible, including if the Government evaluators print out pages. See Amendment 0004 which made changes to the Instructions to Offerors section. |
| 5. Ref. Proposal Submission Requirements. The solicitation states that the use of hyperlinks in the proposal is prohibited. As tables of contents in Microsoft Word are typically created with hyperlinks for the benefit of readers, we request this as an exceptions for TOCs. |
| Hyperlinks in a table of contents that lead to other pages/sections in the proposal are acceptable. Hyperlinks which lead to outside webpages or embedded documents are not acceptable. Everything in your proposal must be legible for a person who is printing out a hard copy of the proposal. See Amendments 0004 and 0005 which make changes to the Instructions section. |
6. Ref. Proposal Submission Requirements / Amendment 1, Question 3; Gov’ts Answer/DoD SAFE Drop-Off Requirements
In Amendment 1 Q&A 3 regarding Proposal Submission Requirements from RFP, Pg. 17: “ACC-APG will not accept proposals from AMRDEC SAFE. DoD SAFE has replaced it as of 15 August 2019”. In order to submit our proposal via DOD Safe as an outside or unauthenticated user, a request code has to be provided by the recipient [i.e. the Government], according the DOD Safe website. When can the contractor request this code, who do we submit a request to and for how long is the code valid?
All those who are "outside or unauthenticated users" should submit their names and email address to us not later than 5 days prior to the solicitation due date. The Government will submit a Drop-off Request from SAFE who will issue a link to submit the file. The link will be valid for 14 days. See Amendment 0004 which made changes to the Instructions section allowing for other proposal delivery methods.
| 7. In the DoD SAFE Drop-Off Requirements instructions. It brings up “Encrypting a Drop-Off”. Will the Government require the contractor to encrypt our final proposal documents before “dropping” off the items at the DoD SAFE site? |
| Encryption is not required. |
| 8. Please confirm if we are able to submit Past Performance Questionnaires on previous APG MATOC projects from the current contract? Will these be completed by APG? |
| Offerors may submit PPQs for the previous (2013) MATOC. The ACC-APG Contracting Office cannot guarantee that all customers will complete the questionnaires sent to them, but we have encouraged the customers who have asked us about PPQs to comply with requests made to them by potential offerors. |
| 9. The current contract requirements for the Site Superintendent mandate a journeyman level certification in a construction trade by a Trade Union, The Associated Builders and Contractors, or other recognized trade certifier. This is extremely limiting and excludes many experienced Superintendents with significant experience. Can you please confirm if there is an experience equivalent to qualify for this position on the APG MATOC as on other key positions? |
| See response to Question 1. |
| 10. Will follow-up prebid questions be allowed assuming the answers to these questions will spark additional ones or require further clarification? |
| Yes. Noted in Amendments. |
| 11. Ref. Volume III – Price. Section 00010 - Solicitation Contract Form; Please confirm that is the only contract documentation that will be included in the Volume III. |
| Yes. Note changes made by Amendment 0003. |
| 12. Ref. Bonding Capacity & Rate. The Govn’t has added an evaluation factor pertaining to our bonding rate based on $1,000,000 and listed 1% as the industry standard we are being benchmarked against. Typically, bonding rates do not go below 1% until the project is larger (i.e. $2M +). Please confirm that a bonding rate of over 1% on $1,000,000 would be considered a perceived weakness. Can it be based on the $5,000,000 we are being asked to verify for bonding capacity instead which is more applicable? |
| Bonding will be required on a task order level for those task orders that meet FAR thresholds for bonding. Reference Amendment 0003. Bonding rates are no longer being evaluated with the solicitation. |
| 13. Ref. Bonding Capacity & Rate. As a follow-up to above, bonding rates decrease over the term of the contract as additional bonding is added bc the Surety companies consider it all as one contract. Would APG like to see an additional bonding rate at $10,000,000 for proper evaluation? |
| See response to Question 12. |
| 14. Ref. Bonding Capacity & Rate. Should the proposed bond rate be based on Standard Rates or Design Build Rates? |
| See response to Question 12. |
| 15. Ref. Subfactor d: Contract Management Plan (CMP). Please confirm that we do not need to include letters of approval from major subcontractors allowing us to utilize their names in our CMP. |
| That is not a requirement of the solicitation. |
| 16. Ref. Subfactor d: Contract Management Plan (CMP). In response to providing the evidence of experience and qualifications required in the CMP, are we allowed to provide specific examples of accomplishing this requirement at APG? |
| Yes. |
| 17. Ref. Past Performance Questionnaire. This section states, “For all contracts identified in Section 1, Contract descriptions, Offerors must make a reasonable attempt to have a Past Performance Questionnaire (Solicitation Attachment 2) completed and submitted by the client.” Section 1 states a maximum of 20 projects/contracts. Please confirm that the Govn’t does not want 20 PPQs and confirm the quantity at 5 of the 20 we elect to list. |
| It's up to each offeror to make the strongest case for its past performance submittal. Note changes made by Amendments 0003 and 0004. |
| 18. Ref. Price. In evaluating the coefficients provided, when the Govn’t takes into account historic coefficients on this and similar contracts, will they make a determination if any abnormally low coefficients are considered out of range (below the mean) and disqualify? |
| Price realism is not being conducted per the RFP. Historically offered coefficients that did require the same inputs as those required on this RFP would not be comparable. |
| 19. Ref. Proposal Submission Requirements. Are Title Pages and Table of Contents included in the 150 page limit? |
| Yes. |
| 20. Ref. Volume III – Price. In Amendment 1 – SF 1442 was removed from Volume III. Please confirm if Section 00010 - Solicitation Contract Form is the only contract documentation needed in the Volume III for compliance. |
| This was a typo, the volume numbering has been corrected. Also note changes made by Amendment 0003. |
| 21. Are the all PPQs forms supposed to be submitted with the proposal? |
| Yes, or directly by the client. |
| 22. What kind of project proof is needed? If contract number, what if we are unable to supply it due to the fact it’s been in the past? |
| Some form of a written agreement or contract proof will be required. |
| 23. On the DOD SAFE Service site it says “In order for an outside user to create a drop-off, they must receive a drop-off request from an inside user. When the inside user generates a drop-off request for you, you will receive an email with a link to submit your drop-off. Optionally, the recipient may provide you with a request code. In that case, click the Drop-off button on the SAFE home page and enter the Request code.” Will you be generating a drop-off request or a request code? |
| See response to Question 6. |
| 24. For the QCM if a certification has just been renewed do we need to supply the expired certifications as well? |
| The current active certification is sufficient. |
| 25. If our LWDI is zero do we still need to supply this information? If so, what form needs to be submitted for 0 lost days within the last 2 years? |
| Yes, submit the required forms OSHA 300 (DART) for the applicable NAICS code, 236220, even those that state zero. Please note changes made via Amendment which require three years of DART rates to be submitted at a minimum. |
| 26. Are construction dumpsters considered part of the coefficient submitted by the contractor for this proposal or can they be inserted into the line item estimate for added cost to the project when the task requires such? |
| No. See required coefficient inputs outlined in Amendment 0003. |
| 27. Can the QCM & Superintendent oversee multiple task orders at a time or does each task order require a separate QCM & Super. |
| Yes, as long as daily oversight is provided for each project to adequately ensure compliance with the contract. Contractors are required to comply with EM 385-1. |
| 28. If a contractor is awarded a slot under this contract when will he or she have to provide an office with personnel, not knowing when task orders will be awarded to them? |
| Please reference paragraph 1.6.11.6 and 1.6.11.7 of the PWS. Some changes were made to the office staffing section via Amendment 0004. The Government is awarding ID/IQ contracts which provide no guarantee of work beyond the minimum guarantee. If an awardee decides to establish a brand new office solely because of this award, that is a business decision and a risk it is taking. |
| 29. Can any degree requirement for required personnel under this contract be waived based on experience? |
| No. Note that only the Project Manager requires a degree. |
| 30. Is Microsoft Project an acceptable form of schedule software for this contract? |
| Yes, please reference the PWS paragraph 5.37.3.2.6 for type of required schedule. |
| 31. For design build task orders will a licensed design engineering firm be required to seal / stamp all of this type of work or in some cases are shop drawings acceptable. |
| Yes, each task order RFP will identify the requirement. |
| 32. What has been the percentage of design build work under this contract previously? |
| Approximately 50%; however, this is not necessarily an indicator of future requirements. |
| 33. What means cost software is acceptable for us on this contract? |
| RSMeans Costworks. |
| 34. When a task order is sent out for bid to the selected contractors for this contract, is the contractor awarded the task typically the low bid? |
| The vast majority of task orders on the previous 2013 MATOC were awarded as either Low Price or Lowest Price Technically Acceptable. Less than five percent of task orders on the previous contract utilized tradeoffs which resulted in an award to a higher priced offeror. The Government cannot say for certain how future task order requirements will be competed, but it is unlikely that many trade-off task orders would be done which result in an award to a higher priced offeror. |
| 35. Will the selected contractors for this contact and their subcontractors be given ample time to secure security badges to perform any work awarded to them? |
| Please review the solicitation requirements regarding badging. The offeror must ensure that employees are qualified to obtain security to the installation within the required timelines. |
| 36. What percentages of work awarded on previous contracts have been Mechanical / Electrical / Architectural / Sitework / Renovations / New building work, etc.? |
| This information is not known. Hundreds of task orders have been issued over the past 5 years for all these types of work. |
| 37. For electrical & plumbing inspections under this contract will it be a requirement for the Superintendent or QCM to have a Master Electrical & or Plumbing License? |
| Please refer to the PWS, paragraph 1.6.8. |
| 38. For the pricing portion of the proposal we understand Line Items 1001 and 1002, in other words we know how to populate those lines but what is 1003? We do not understand what it is you are asking regarding additional funding for CLIN 0001. And the same question applies to the pricing for Option years 1 through 4. |
| The CLIN structure was renumbered in Amendment 0003. Please review for the new pricing structure. |
| 39. After the pricing for the base year and Option Years 1 through 4 there is a table with all the CLINs are we to populate this table and submit it with our price proposal? |
| No. |
| 40. Based on the required experience/qualifications for a superintendent, does the ACC-APG Garrison recognize the US military as being an “other recognized trade certifier”? We have several retired US Veterans on staff that have DD 214 (retirement papers) that state that our employees have experience at the Craftsman level at trade work. Specifically, we have employees with 14 years of experience as a 3E171 Heating, Ventilation, Air Conditioning, and Refrigeration Craftsman and 9 years of experience as a 3E071 Electrical Systems Craftsman. A 7 level Craftsman in the military is over the experience level of a journeyman level certification. Would those Craftsmen certifications qualify them for the Superintendent position? They can satisfy the proof of site supervisor on at least 2 projects in excess of $500,000 for new building construction and/or building renovation as well. |
| Yes, but documentation (e.g. DD214) must be submitted with proposals. The documentation must clearly show that the retired military person has equivalent experience. |
| 41. As listed in the requirements for a superintendent, the superintendent must possess a journeyman level certification in a construction trade by a trade union, the Associated Builders and Contractors, or other recognized trade certifier. A carpenter in this region may be a journeyman but there is no certification from a trade union, the Associated Builders and Contractors, or other recognized trade certifier. As such can a carpenter who is a journeyman from Maryland which does not have a trade union for carpenters be qualified as a superintendent? Can a certain number of years in the construction trade be qualification for a superintendent under this contract? APG is not in a union controlled area, and most workers in this area are non-union. We would suggest a minimum of 10 years in the construction trade similar to the quality control manager and project manager. |
| See response to Q1 and changes made via Amendment 0005. |
| 42. According to the Q&A in amendment 001, the PPQs are included in the 150 page count. Since the PPQs are being sent directly back to the client can the PPQs be excluded from the page count? |
| Yes. |
| 43. Is the offeror allowed to include projects in the past performance section for subsidiaries/sister companies whose name is not on the SF1442? |
| Yes. Please reference FAR 15.305(a)(2)(iii). |
| 44. We are concerned that the requirements for LWDI Report data using SIC codes is outdated and would like clarification based on the following evidence. The industry standard for safety benchmarking is DART rate, rather than Lost Work Day Incidence. Also, NAICS code is used by the Bureau of Labor and Statistics, rather than SIC code. We found an industry average of 1.4 DART for NAICS 236220 (the same NAICS as this RFP), but were unable to find benchmarking data for the SIC codes by LWDI. The most recent national average data available is 2017.Caution-https://www.bls.gov/web/osh/summ1_00.htm < Caution-https://www.bls.gov/web/osh/summ1_00.htm > |
| Reference Amendment 0003 which made changes to the evaluation criteria. |
| 45. Subfactor c. Selected Key Personnel: Under each position, the RFP states the offeror shall provide “at least” the number of employees for the stated position. Since this section is only being evaluated for deficiencies, and scored on a pass/fail basis, we do not see any merit to providing more than one resume for each position (except Superintendent, where two resumes are required). If the government desires more resumes per position, can you please clarify this in the evaluation criteria? |
| Offerors may submit more than one resume (or two for superintendent) if they choose to, but strengths wouldn’t be assigned for doing so. One individual (or two for the superintendent) must meet all solicitation and PWS requirements for the position. |
| 46. If our firm has not had a single safety incident in over 5 years, but our EMR was over 1.0 during the least recent of the last five years because of a prior minor incident, are we ineligible to compete or will we just receive a lower score? The criteria here is confusing, it states: “The minimum acceptable EMR is 1.0 for each of the previous 5 year operating period. Offerors who demonstrate EMRs of less than 1.0 during the previous 5 year operating period with an emphasis on the most recent operating years may earn evaluated strength(s) which could increase the Technical Factor rating.” |
| All 8(a) companies are eligible to compete but the EMR data provided must meet solicitation requirements or a deficiency would be noted in the evaluation. Please reference recently issued Amendments which did make revisions to the evaluation criteria to make the EMR and DART timelines the same at three years. |
| 47. Can previous PPQ’s be allowed for the past performance projects given 20 past performance projects (max) is requested. |
| Yes. |
| 48. Can the past performance projects be both design/build and/or bid/build |
| Yes. |
| 49. Does the RSMeans price book for this contract get updated when RS means releases Quarterly Updates? or Yearly Updates? |
| Yes, contractor can update rates in accordance with the latest RS Means Costworks data. Price books are not incorporated into the contract. |
| 50. Where RSMeans has a minimum, average, or maximum price range for work, what price will be used for task order estimates? |
| Task orders will be competed; therefore, it is up to the offeror to choose which rate is used for their bid. |
| 51. How will work items not found in RSMeans be priced and marked up? |
| A line item with description can be added for those items not found in RS Means. |
| 52. Will the Wage Scale be updated with each ordering period, with each task order, with each quarter, or some other way? |
| Wage determinations are updated each ordering period as discussed in FAR Part 22. Once a task order is issued, the wage determination remains the same until completion of the project. |
| 53. Will RSMeans Facilities Construction Cost Data be the only book that will be utilized? Will any other books (e.g. Electrical Costs Book) be included in the contract? If so, what others? |
| Yes. |
| 54. If other RSMeans books are included in the contract, then what is the order of preference for the books? |
| Contractors are required to use the electronic version of RS Means Costworks as indicated in the PWS. Other RS Means products may be purchased at the awardee’s discretion. |
| 55. RSMeans Facilities Construction Cost Data includes Division 1 general requirements unit costs. Will these costs be included for project estimates or is the coefficient to cover these costs? |
| Offeror’s coefficient should include the loaded rates. |
| 56. Does costs associated with eCMRA reporting (CLIN 6000) need to be included in the price coefficient? |
| Yes. |
| 57. Do CLINs 1003, 2003, 3003, 4003, 50003 (Additional Funding for option years) require pricing in the offeror's submission? |
| See previous answer #38. These CLINs are removed per Amendment 0003. |
| 58. The Solicitation number referenced above is the number shown on the 1442. However, item 1 under the heading FORMAL COMMUNICATIONS, OFFEROR EXPLANATIONS says to address all questions and RFI’s using the Subject Line: MATOC Reference No. W91ZLK-19-R-0005, which one is correct? |
| Typo. The correct solicitation number is W56ZTN-19-R-0005. Given the typo, RFIs will be accepted with either W91ZLK or W56ZTN DoDAAC. This typo was corrected via Amendment 0003. |
59. Ref. Price page. Item 1001. Task Order Price shall be priced using RS Means Cost works.
Will items not included in the Means Cost Works program be priced as “non prepriced items”?
Yes, see previous response.
60. Ref. Price page. Item 1001. Task Order Price shall be priced using RS Means Cost works.
Is the purpose of these price sheets to have both “prepriced and Non-Prepriced items” use the same coefficient for the price sheets?
Yes.
61. Ref. Volume III- (Price). Task Order Price shall be priced using Baltimore City Cost Index RS Means Cost works.
What “Indirect Cost Items” are to be included in the Coefficient multiplier?
See updates made via Amendment 0003.
62. Ref. Volume III- (Price). Task Order Price shall be priced using Baltimore City Cost Index RS Means Cost works.
Is Prime Contractor Overhead and Profit excluded from the “indirect Cost Items”?
See updates made via Amendment 0003.
63. Ref. Section A- Basis for Award. Third paragraph refers to a Phase 2 Evaluation and award.
Is the intent of this RFP to issue a two phase procurement?
No. The Government states in the RFP that it intends to make award without discussions; however, in order to reach the desired number of awards, approximately five (5), if negotiations are considered necessary, they will be conducted with those offerors in a competitive range. The determination of the competitive range will be the responsibility of the Contracting Officer and the Source Selection authority.
64. Ref. Section A- Basis for Award. Third paragraph refers to a Phase 2 Evaluation and award.
Will a Sample Task to be priced using Means Cost Works for contractors be given the opportunity to be evaluated in the second phase?
There is no sample task included in the RFP. See previous answer regarding a second phase. If the Government decides to utilize a Phase 2, those offerors still in the competitive range would be given an opportunity to make proposal revisions. For instance to correct deficiencies and weaknesses.
| 65. Under Security Requirements Section 1.6.7 it states that “Contractor personnel performing work under this Contract must have a NCIC III check at the time of the proposal submission” Where do we obtain an NCIC III check? |
| See changes made in Amendment 0004. The NCIC check is done when contractors apply for ID cards for base access. It usually takes about two weeks to obtain an ID card. |
| 66. Under Subfactor c: Selected Key Personnel you require that the offerors submit a Project Manager, 2 – Superintendents, a Quality Control Manger and a Contract Safety Manager. It also references PWS paragraph 1.6.11 and subparagraphs, and under those sections a Contract Manger is discussed. Do we need to also submit a Contract Manager? |
| A Contract Manager is not a required proposal submission per the RFP. |
| 67. In PWS 1.6.11 It states that the Contract Manger, the Project Manager and the Superintendent are all required to have a valid MDE Certification for Maryland Sediment and Erosion Control. Is that correct do all 3 positions need to hold the MDE certification? |
| Yes. |
| 68. In the PWS, Paragraph 1.6.7, Security Requirements, the RFP states that the “Contractor personnel performing work under this contract must have a NCIC III check at the time of proposal submission.” There is no mention of this requirement in Section L or Section M, so it is not clear what needs to be submitted. Can the government please clarify that this NCIC III check needs to be done "at the time of proposal submission"? If the NCIC III check is acceptable after award, please clarify this so there is no confusion for bidders in how the proposals will be evaluated. If it is indeed required at proposal submission, please provide additional information regarding the documentation that is required, and where this material is to be included in the proposal. |
| See response to question 65. |
| 69. In C. Evaluation Approach, b., Subfactor b: Safety Record, the RFP states: An EMR of greater than 1.0 during any portion of the previous five (5) year operating period will be considered unacceptable (a deficiency). The EMR rate is a measurement used by insurance companies to determine premiums, with 1.0 being the industry average. The EMR calculation is impacted by the size of a firm's payroll. This means that a large firm with millions of hours of payroll can record several incidents per year and still maintain an EMR under 1.0, while a small company with payroll from 50,000 to 100,000 hours will instantly go above 1.0 with a single incident. When evaluating small businesses and 8(a) firms in the case of this solicitation, the EMR cannot accurately reflect a pass/fail indicator for site safety, as insurance premiums will increase from any incident - not just workplace safety (including damage caused by third-party, uninsured drivers outside of the worksite, for example). Also, considering the number of payroll hours for small and 8(a) firms, and the 3-5 years it takes for EMR rates to decrease post-incident, it needs to be understood that any single incident will increase the EMR and keep it raised for a minimum of three years. Considering this factor, the RFP suggests that the EMR cannot be over 1.0 at any time during the last 5-year operating period. For an 8(a) company, this evaluation criteria will bring two possible outcomes: 1) a new company with no safety record at all, or a very limited one. 2) a company that has never had a single incident, or if they have, it was longer than 8 years ago in order to have time to get it off the last 5 years of EMR reports. We kindly ask that the government consider safety records of 8(a) firms that have not had an incident in over 5 years by submission of OSHA logs and a letter from the insurance carrier, and change the criteria from an unacceptable rating for over 1.0 EMR to a DART Rate based assessment. |
| See changes made by Amendment 0003-0005 to make some changes to the Evaluation Factors. A letter from an insurance carrier will not be used by the Government to override a noted deficiency for the required EMR in the solicitation. |
| 70. Regarding the Past Performance Questionnaire, the RFP states that "The offeror shall complete Part I of the Past Performance Questionnaire and email the questionnaire to both the Army contracting activity and technical representative responsible for the past/current contract." Can the government please clarify this? Specifically, do we send the PPQ to two separate Points of Contact for the project, or do we carbon copy the ACC-APG - Garrison Division on each PPQ that is sent out? It can be interpreted either way |
| The offeror shall complete Part I of the Past Performance Questionnaire and email the questionnaire to the customer whose input is being requested. |
| 71. The POC List for Past Performance Questionnaires includes "Army Agency" as one of the items to be included. Can you please clarify if this is intended to say "Army Agency" or just "Agency"? Both government and commercial projects are considered relevant according to the RFP. |
| It should read “Agency.” You are correct that the RFP is not limiting PPQs to past Army projects. |
| 72. Will the Government please confirm which qualifications are required for the Contractor's QCM, those listed on page 29 or those listed on page 30 of the solicitation? |
| The duplicate QCM position has been DELETED. See Amendment 0003. |
| 73. Will the government allow the contractor to submit CPARS evaluations in lieu of PPQ's for projects submitted in the Past Performance Volume? |
| That is allowable. See changes to the past performance and PPQ references made by Amendments 0003 and 0004. |
74. Under C. Evaluation Approach, the RFP states: "Any proposal containing a deficiency for Subfactor a or Subfactor b may not be evaluated further." Can you please clarify if the use of the word "may" in this situation? It is unclear if we are to interpret this as "might" or "will." Each word indicates a completely different meaning, yet both interpretations could be made.
If the Government decides discussions are necessary and a proposal contains a deficiency in Subfactor a and/or Subfactor b, the Government may continue evaluations of proposals that could have correctable deficiencies. Example: Offeror submits a letter from its Surety demonstrating its bonding capacity, but the letter is not signed as required by the RFP. If an Offeror has a deficiency which cannot possibly be corrected during proposal revisions, there Government would not continue with the evaluation.
| 75. Regarding Safety, if a company has a DART Rate of 0 for the last three years (indicating zero incidents during that time), but an EMR over 1.0, will the government consider a letter from the insurance carrier to explain any extenuating circumstances that caused this increase to prove a history of safe work performance? |
| No, the Government will not consider a letter from an insurance company as such a letter may be subject to varying interpretations depending on the rationale for the extenuating circumstances. See previous responses regarding EMR and DART and note changes to the criteria made by Amendment 0003-0005. |
| 76. Can the org chart be included in the proposal as of 11 * 17? |
| No. Please note the Instructions to Offerors section 3a. Format, which notes that everything provided must be legible/readable by the Government, including by an evaluator who is reviewing a hard copy printout of the proposal on standard 8.5 x 11 inch paper. If you organization chart which is relevant to this requirement is too large to reasonable fit on one page, you may provide it across multiple pages. |
| 77. Will Aberdeen provide a revised SF1442 with the correct Clins to price? |
| No. When the Government issues an Amendment to the solicitation, it changes the solicitation but a new SF1442 is not created. Please make sure to complete pricing for CLINs 1001, 1004, 2001, 3001, 4001, and 5001 which are on the SF1442 issued with the solicitation or in Amendments. Please note that CLIN 6000 is NSP or not-separately priced which means that it is no cost ($0.00) to the Government. |
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
BASIS FOR AWARD
BASIS FOR AWARD AND FACTORS/SUB-FACTORS TO BE EVALUATED
A. BASIS FOR AWARD
Awards will be made to the offerors who provide the best proposals that are determined to be the most beneficial to the Government, with appropriate consideration given to the following three (3) evaluation factors: Technical (Factor I), Past Performance (Factor II), and Price (Factor III). Technical (Factor I) and Past Performance (Factor II), when combined are significantly more important than Price (Factor III). Technical is more important than Price, but slightly less important than Past Performance. The Technical subfactors are all weighted equally. Past Performance is the most important factor. The Government will complete its evaluation by performing a best value trade-off among Technical, Past Performance, and Price. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Technical factor and the Past Performance factor must be rated at least Neutral. Offerors are cautioned that the awards may not necessarily be made to the offerors offering the lowest pricing. Price will be evaluated in accordance with FAR 15.404-1. The Government will not conduct price realism on the coefficient or price. The Government intends to evaluate proposals and make awards without discussions.
Approximately five (5) awards are anticipated, but the Government reserves the right to make greater than or fewer than five awards if appropriate. Offerors should ensure the completeness of their proposals and offer their best terms and conditions with their initial proposals. If negotiations are considered necessary, they will be conducted with those offerors in a competitive range. The determination of the competitive range will be the responsibility of the Contracting Officer and the Source Selection Authority.
If appropriate and necessary to reach the desired number of MATOC awards, the Government reserves the right to make initial awards to the most qualified offerors and then to establish a competitive range with additional unawarded offeror(s) who would be given an opportunity to submit a revised proposal for a Phase 2 evaluation and award. Any offeror receiving a Phase 2 award would be added to the MATOC.
Factors and sub-factors under this solicitation are not numerically weighted.
In order to be considered for award, offerors must be registered in the System for Award Management (SAM) under NAICS 236220 (Size Standard $33.5M) prior to contract award.
B. FACTORS AND SUB-FACTORS TO BE EVALUATED
Awards will be made to the offerors whose proposals are most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors described below.
Evaluation of the offeror’s proposal shall address each sub-factor as it applies to the Performance Work Statement (PWS). A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government evaluation team will review each subfactor. Strengths, Weaknesses, and Deficiencies will be documented for Subfactors a, b, and d. Subfactor c - Key Personnel will only be evaluated for deficiencies. It is a pass/fail subfactor.
For the Technical Factor, each sub-factor will be evaluated to determine if the information provided and the proposed approach associated with each factor meets or does not meet the minimum performance or capability requirement. To receive an overall “Acceptable” Technical factor rating, all sub-factors must not contain deficiencies. Numerous identified weaknesses, could cause the overall Technical Factor to be rated as Marginal or Unacceptable. Based on the evaluations of the technical subfactors and noted strengths, weaknesses, and deficiencies, the Government will then assign an overall color/adjectival rating for the Technical Factor.
Factor 1: The Technical factor is further divided into the following sub-factors:
a. Bonding Capacity
b. Safety
c. Selected Key Personnel
d. Contract Management Plan (CMP)
Factor 2: Past Performance: Each offeror’s past performance will be reviewed to determine relevancy and confidence assessment.
Factor 3: Price: Price will be evaluated per FAR 15.404. Examples of methods that may be used include a comparison to the other competitive pricing received in response to the solicitation, comparison to previous prices paid, and a comparison to the IGCE pricing. For evaluation purposes, Offeror’s pricing will be evaluated based on the total amount proposed for CLIN 1001, 1004, 2001, 3001, 4001, and 5001. Pricing must be balanced between years and CLINs, and the pricing for the Seed Project Task Order proposed in CLIN 1004 must be reasonable.
C. EVALUATION APPROACH
All proposals shall be subject to evaluation by the Source Selection Team (SST). The SST will first evaluate Technical Subfactors a and b from below. Any proposal containing a deficiency for Subfactor a or Subfactor b may not be evaluated further.
1. The overarching evaluation approach for all factors and subfactors is as follows:
Technical Evaluation Method:
2. The Technical factor is divided into the following sub-factors and will be evaluated on an overall basis using the following color/adjectival ratings:
Table A – Combined Technical/Risk Rating Method (ref. DoD Source Selection Procedures Guide)
| Color Rating |
| Adjectival Rating |
| Description |
| Blue |
| Outstanding |
| Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low. |
| Purple |
| Good |
| Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate. |
| Green |
| Acceptable |
| Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate. |
| Yellow |
| Marginal |
| Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high. |
| Red |
| Unacceptable |
| Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable. |
a. Subfactor a: Bonding Capacity
The Government will evaluate the offeror’s ability to provide documentation from a certified and approved Surety demonstrating that it currently has or can obtain $5 Million of payment and performance bonds per year specifically for this MATOC.
The minimum (threshold) amount of bonding required is $5M per year. Offerors who can demonstrate significantly greater than $5M of bonding capacity/ability may earn an evaluated strength which could increase the Technical Factor rating.
NOTE: Surety companies utilized for the proposal and contract must be listed on the U.S. Department of the Treasury website.
Reference https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html
b. Subfactor b: Safety
The Government will evaluate the offeror’s (to include major subcontractors and both JV partners, if a JV is proposed) recent record of safe operations based on its Experience Modification Rate (EMR). NOTE: An EMR of greater than 1.0 during any portion of the previous three (3) year operating period will be considered unacceptable (a deficiency). A major subcontractor is defined as a subcontractor which is expected to perform 20% or more of the total work on the contract.
Offerors who can demonstrate EMRs of less than 1.0 during the previous three (3) year operating period with an emphasis on the most recent operating years may earn evaluated strength(s) which could increase the Technical Factor rating. Offerors who can demonstrate EMRs which are less than 1.0 for additional operating years beyond the required three (3) year period may also earn an evaluated strength which could increase the Technical Factor rating.
The Government will evaluate the offeror’s (to include major subcontractors) recent record of safe and regulatory compliant operations based on its OSHA recordable injuries/illnesses reports and its Days Away Restricted or Transferred (DART) rate. The offeror’s DART rate shall be at or below the industry average for NAICS code 236220 for at least the previous three (3) year operating period. A major subcontractor for this subfactor is defined as a subcontractor which is expected to perform 20% or more of the total work on the contract.
Offerors who can demonstrate DART rates which are lower than industry average during the previous three (3) year operating period with an emphasis on the most recent operating years may earn evaluated strength(s) which could increase the Technical Factor rating. Offerors who can demonstrate DART rates which are lower than industry average for additional operating years beyond the required three (3) year period may also earn an evaluated strength which could increase the Technical Factor rating.
Subfactor c: Selected Key Personnel (Reference PWS paragraph 1.6.11 and subparagraphs)
(IMPORTANT NOTE: Qualifications, education, and other information as outlined below and in the "Proposal Submission Requirements" must be clearly demonstrated by documentation submitted or by information provided in resumes. The Government will not make assumptions or fill-in the blanks)
Quality Control Manager (QCM):
The Government will evaluate the offeror’s ability to provide at least one prime contractor Quality Control Manager (QCM) that possesses the following experience/qualifications:
· Minimum of ten (10) years of experience in the construction field and five years’ experience as a QCM on industrial, Governmental, or commercial construction contracts.
· QCM experience on at least three (3) projects in excess of $500,000 or for projects such as new building construction or building renovations which encompass multi-discipline requirements.
· Possesses a current OSHA 30 hrs Safety Inspection Certification
Project Manager (PM):
The Government will evaluate the offeror’s ability to provide at least one prime contractor PM that possesses the following experience/qualifications:
· Minimum of eight years’ experience in construction projects with five years’ experience as a manager of construction projects on industrial, Governmental, and/or commercial construction contracts which included simultaneous multi-disciplined requirements. Provide proof of PM experience on projects at least three (3) of which were in excess of $1,000,000 per project. The projects cited shall be for new building construction or building renovations in which multiple discipline work was performed.
· Possess one of the following: engineering degree, construction science or construction management degree, architectural degree, or be a Certified Construction Manager (CCM) or equivalent experience of a minimum total of 8 years on construction projects of which 5 years is in construction management as described above.
· Has 1 year experience in a construction estimation software program and scheduling software.
Superintendents:
The Government will evaluate the offeror’s ability to provide at least two (2) prime contractor superintendents that possess the following experience/qualifications:
· Three years’ experience as a site supervisor or superintendent on industrial, Governmental, or commercial construction contracts. Provide proof of site supervisor or site superintendent experience on at least two (2) projects in excess of $500,000. The projects shall be for new building construction and/or building renovations.
· Possess a journeyman level certification in a construction trade by a Trade Union, The Associated Builders and Contractors, or other recognized trade certifier. Equivalent military experience with documentation may be used as a substitute as outlined in the Q&A from the RFP Amendments. Four years of relevant experience and an engineering degree or construction management degree from an Accreditation Board for Engineering and Technology (ABET) college or university may be substituted for the journeyman level trade certification requirement.
Contract Safety Manager/Safety Consultant*:
The Government will evaluate the offeror’s ability to provide a Contract Safety Manager/Safety Consultant that possesses the following experience/qualifications:
· 30-hour OSHA Construction Industry safety class completion
· Five (5) years of continuous construction industry safety experience in supervising/managing general construction (managing safety programs or processes or conducting hazard analyses and developing controls) within the past decade.
· 5 years’ experience managing safety on multi-disciplinary projects exceeding $500,000. Must have experience managing safety in the following high risk areas: excavations, fall-protection, HAZWOPER, confined space, scaffolding, lead abatement, asbestos, hazardous energy procedures, and load handling.
NOTE: If the offeror is proposing key personnel who are not currently employees of the prime contractor, but are willing to work for the new prime contractor and are being proposed to work for the new contractor, this must be clearly discussed/noted in the proposal. Furthermore, the organizational chart, as required elsewhere in the proposal, must clearly show that the key personnel are being proposed as employees of the prime contractor.
*This position is not required to be an employee of the prime contractor. See PWS paragraph 1.6.11.5 for additional information.
Subfactor d: Contract Management Plan (CMP)
The Government will evaluate the offeror’s ability to perform based on its submitted information for the CMP. The evaluation will be based on the adequacy and quality of response for the following items:
· Description of the overall company structure related to the performance and PWS.
· General overview of planned contract execution.
· Organization and ability to manage multiple projects through adequate and qualified on-site staffing to support at least 7 ongoing task orders.
· Scheduling methodology and criteria for selecting and qualifying subcontractors.
· Description of the offeror’s plan to ensure Quality control of the contract and projects.
· Method for managing multiple projects simultaneously.
· Method to meet peak workload demands, identify resources, availability and time frames.
· Plan for providing additional resources, manpower and technical expertise for support of the field office to cover peak workloads, special projects and urgently required projects. Response time shall be not more than one hour from notification of emergency projects.
· Description of how multiple projects in the security areas will be staffed to ensure timely completion.
· Documentation and discussion of how the offeror has the ability to or plans to provide a sufficient quantity of qualified personnel, i.e. U.S. Citizens, who can obtain mobility access badges for the security areas of Aberdeen Proving Ground.
3. Past Performance Factor.
The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the PWS and RFP. Past Performance factor considers each offeror’s demonstrated recent and relevant record of performance in providing services that meet the contract requirements. Recent past performance is considered to be efforts awarded during the past five (5) years, from the issue date of this RFP.
Relevant efforts are defined as services that are the same as or similar services as compared to the North American Industry Classification System (NAICS) Code 236220 (Commercial and Institutional Building Construction). Work may include new work, additions, alterations, maintenance and repairs performed for commercial or Governmental clients. The size, scale, and type of work of the projects provided will also be considered when determining relevancy.
A relevancy determination of the offeror’s (including joint venture partner(s), major and critical subcontractor(s) past performance) will be made by the Government. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated.
An assessment of the information will be made to determine if it is recent. Offerors shall supply a list (maximum of 20) task orders or contracts that contain a relevant renovation or construction component with a value of at least $50,000.00 and the type of work specified in the scope of work must be ongoing or must have been performed during the last five (5) years from the date of issuance of this solicitation. Offerors must include at least 5 task order or contracts valued at greater than $250K, and at least two additional task orders or contracts valued at greater than $1M. This information must include those contracts used for the Past Performance Questionnaires required below. Numerous Task Orders (TO) combined to meet the minimum construction dollar value identified herein is not acceptable for Indefinite-Delivery, Indefinite Quantity (IDIQ) Contracts.
Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires set forth in Attachment 2. The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all the information available.
The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files (i.e., CPARs) or data obtained through interviews with personnel familiar with the contractor and their current and past performance. Data used in conducting past performance assessments shall not extend past five years prior to the issue date of the RFP, but may include performance data as a prime. The Government reserves the right to limit the number of references it decides to contact and to contact references other than those provided by the Offeror including sources outside the Government.
The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .