A07-W56ZTN-19-R-0005-0004.docx

DOCX document 277 KB Posted

Attached to
Post-Wide Construction
Solicitation number
W56ZTN-19-R-0005
Issued by

About this file

This is a pre-solicitation notice for a multiple award task order contract to provide post-wide construction services at Aberdeen Proving Ground in Maryland. The Army Contracting Command intends to award five indefinite-delivery, indefinite-quantity contracts with a minimum guarantee of $2,500 up to a maximum of $100 million over a base year and four option years. Services will include interior and exterior renovations, electrical and HVAC work, plumbing, fire suppression and alarms, communications, and environmental remediation. The North American Industry Classification System code is 236220 with a $33.5 million small business size standard. The solicitation will be posted on FedBizOpps on April 15, 2019 under number W56ZTN-19-R-0005 as a 100% competitive 8(a) set-aside. A pre-proposal site visit will be held. Proposals are due in summer 2019 with awards by late 2019.

Amendment 0004 (MS Word version)

View the file

Other files

File Type Posted
A07-W56ZTN-19-R-0005-0013 (post-closing update).pdf PDF
A07-W56ZTN-19-R-0005-0012.pdf PDF
A07-W56ZTN-19-R-0005-0011.pdf PDF
W91ZLK-12-R-0002 Amendment 10.pdf PDF
A07-W56ZTN-19-R-0005-0009.docx DOCX document
W56ZTN-19-R-0005_-_Missing_Amendment_0008_MFR.pdf PDF
A07-Section_00010-Revised_(after_Amendments).docx DOCX document
A07-W56ZTN-19-R-0005-0009.pdf PDF
A07-W56ZTN-19-R-0005-0007.pdf PDF
A07-W56ZTN-19-R-0005-0006.pdf PDF
A07-W56ZTN-19-R-0005-0005.pdf PDF
A07-W56ZTN-19-R-0005-0005.docx DOCX document
A07-W56ZTN-19-R-0005-0004.pdf PDF
A07-W56ZTN-19-R-0005-0003.docx DOCX document
A07-W56ZTN-19-R-0005.docx DOCX document
A07-W56ZTN-19-R-0005-0003.pdf PDF
A07-W56ZTN-19-R-0005-0002.pdf PDF
Site_Visit_Sign-in_List_(revised).pdf PDF
A07-W56ZTN-19-R-0005-0001.pdf PDF
A07-W56ZTN-19-R-0005.pdf PDF
A07-Attachment_2_-_Past_Performance_Questionnaire_(RFP_W56ZTN-19-R-0005).docx DOCX document
Site_Visit_Sign-in_List.pdf PDF
A07-Attachment_2_-_Past_Performance_Questionnaire_(Draft_RFP).docx DOCX document
A07-Solicitation_W56ZTN19R0005-v3Sept19_(2nd_Draft_doc).docx DOCX document
W56ZTN-19-R-0005_(MATOC_draft_RFP-v16Aug19).pdf PDF
Site_Visit_Notice.pdf PDF
A01_PWS_6th_Draft_MATOC4430_11_July.doc DOC document
A01_Sample_of_MATOC-MiniTOC_Contract_List.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56ZTN-19-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

The purpose of this Amendment 0004 is as follows:

a.) Extend the due date of proposals until 31 October 2019 at 11:00AM ET.

b.) Add Seed Project Task Order PWS and new Minimum Guarantee section.

c.) Incorporate updated PWS, dated 18 October 2019.

d.) Provide revisions to the Instructions and Basis for Award sections.

NOTE: Some of the changes made by this Amendment address RFI/Questions received by the Government. The Government’s responses to questions received will be posted in a subsequent Amendment. The Government now anticipates releasing that Amendment during the week of 21 October 2019. The Government is adding a MS Word version of this Amendment to better allow potential offerors to compare changes to document sections. Please do not submit additional questions at this point. Offerors will be provided with an opportunity to submit follow-on questions after the issuance of Amendment 0005.

The following have been deleted:

AMENDMENT 0003 CONTINUATION

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 24-Oct-2019 11:00 AM to 31-Oct-2019 11:00 AM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BASIS FOR AWARD

BASIS FOR AWARD AND FACTORS/SUB-FACTORS TO BE EVALUATED

A. BASIS FOR AWARD

Awards will be made to the offerors who provide the best proposals that are determined to be the most beneficial to the Government, with appropriate consideration given to the following three (3) evaluation factors: Technical (Factor I), Past Performance (Factor II), and Price (Factor III). Technical (Factor I) and Past Performance (Factor II), when combined are significantly more important than Price (Factor III). Technical is more important than Price, but slightly less important than Past Performance. The Technical subfactors are all weighted equally. Past Performance is the most important factor. The Government will complete its evaluation by performing a best value trade-off among Technical, Past Performance, and Price. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Technical factor and the Past Performance factor must be rated at least Neutral. Offerors are cautioned that the awards may not necessarily be made to the offerors offering the lowest pricing. Price will be evaluated in accordance with FAR 15.404-1. The Government will not conduct price realism on the coefficient or price. The Government intends to evaluate proposals and make awards without discussions.

Approximately five (5) awards are anticipated, but the Government reserves the right to make greater than or fewer than five awards if appropriate. Offerors should ensure the completeness of their proposals and offer their best terms and conditions with their initial proposals. If negotiations are considered necessary, they will be conducted with those offerors in a competitive range. The determination of the competitive range will be the responsibility of the Contracting Officer and the Source Selection Authority.

If appropriate and necessary to reach the desired number of MATOC awards, the Government reserves the right to make initial awards to the most qualified offerors and then to establish a competitive range with additional unawarded offeror(s) who would be given an opportunity to submit a revised proposal for a Phase 2 evaluation and award. Any offeror receiving a Phase 2 award would be added to the MATOC.

Factors and sub-factors under this solicitation are not numerically weighted.

In order to be considered for award, offerors must be registered in the System for Award Management (SAM) under NAICS 236220 (Size Standard $33.5M) prior to contract award.

B. FACTORS AND SUB-FACTORS TO BE EVALUATED

Awards will be made to the offerors whose proposals are most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors described below.

Evaluation of the offeror’s proposal shall address each sub-factor as it applies to the Performance Work Statement (PWS). A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government evaluation team will review each subfactor. Strengths, Weaknesses, and Deficiencies will be documented for Subfactors a, b, and d. Subfactor c - Key Personnel will only be evaluated for deficiencies. It is a pass/fail subfactor.

For the Technical Factor, each sub-factor will be evaluated to determine if the information provided and the proposed approach associated with each factor meets or does not meet the minimum performance or capability requirement. To receive an overall “Acceptable” Technical factor rating, all sub-factors must not contain deficiencies. Numerous identified weaknesses, could cause the overall Technical Factor to be rated as Marginal or Unacceptable. Based on the evaluations of the technical subfactors and noted strengths, weaknesses, and deficiencies, the Government will then assign an overall color/adjectival rating for the Technical Factor.

Factor 1: The Technical factor is further divided into the following sub-factors:

a. Bonding Capacity

b. Safety

c. Selected Key Personnel

d. Contract Management Plan (CMP)

Factor 2: Past Performance: Each offeror’s past performance will be reviewed to determine relevancy and confidence assessment.

Factor 3: Price: Price will be evaluated per FAR 15.404. Examples of methods that may be used include a comparison to the other competitive pricing received in response to the solicitation, comparison to previous prices paid, and a comparison to the IGCE pricing. For evaluation purposes, Offeror’s pricing will be evaluated based on the total amount proposed for CLIN 1001, 1004, 2001, 3001, 4001, and 5001. Pricing must be balanced between years and CLINs, and the pricing for the Seed Project Task Order proposed in CLIN 1004 must be reasonable.

C. EVALUATION APPROACH

All proposals shall be subject to evaluation by the Source Selection Team (SST). The SST will first evaluate Technical Subfactors a and b from below. Any proposal containing a deficiency for Subfactor a or Subfactor b may not be evaluated further.

1. The overarching evaluation approach for all factors and subfactors is as follows:

Technical Evaluation Method:

2. The Technical factor is divided into the following sub-factors and will be evaluated on an overall basis using the following color/adjectival ratings:

Table A – Combined Technical/Risk Rating Method (ref. DoD Source Selection Procedures Guide)

Color Rating
Adjectival Rating
Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

a. Subfactor a: Bonding Capacity

The Government will evaluate the offeror’s ability to provide documentation from a certified and approved Surety demonstrating that it currently has or can obtain $5 Million of payment and performance bonds per year specifically for this MATOC.

The minimum (threshold) amount of bonding required is $5M. Offerors who can demonstrate significantly greater than $5M of bonding capacity/ability may earn an evaluated strength which could increase the Technical Factor rating.

NOTE: Surety companies utilized for the proposal and contract must be listed on the U.S. Department of the Treasury website.

Reference https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html

b. Subfactor b: Safety

The Government will evaluate the offeror’s (to include major subcontractors and both JV partners, if a JV is proposed) record of safe operations based on its Experience Modification Rate (EMR) for the previous three (3) year operating period. NOTE: An EMR of greater than 1.0 during any portion of the previous three (3) year operating period will be considered unacceptable (a deficiency). A major subcontractor is defined as a subcontractor which is expected to perform 20% or more of the total work on the contract.

Offerors who can demonstrate EMRs of less than 1.0 during the previous three (3) operating period with an emphasis on the most recent operating years may earn evaluated strength(s) which could increase the Technical Factor rating.

The Government will evaluate the offeror’s (to include major subcontractors) recent record of safe and regulatory compliant operations based on its OSHA recordable injuries/illnesses reports for the previous three (3) years. NOTE: The offeror’s DART rate shall be at or below the industry average for NAICS code 236220 for the previous two years. A major subcontractor for this subfactor is defined as a subcontractor which is expected to perform 20% or more of the total work on the contract.

Offerors who are able to demonstrate lower than industry average DART rating may earn evaluated strength(s) which could increase the Technical Factor rating.

Subfactor c: Selected Key Personnel (Reference PWS paragraph 1.6.11 and subparagraphs)

(IMPORTANT NOTE: Qualifications, education, and other information as outlined below and in the "Proposal Submission Requirements" must be clearly demonstrated by documentation submitted or by information provided in resumes. The Government will not make assumptions or fill-in the blanks)

Quality Control Manager (QCM):

The Government will evaluate the offeror’s ability to provide at least one prime contractor Quality Control Manager (QCM) that possesses the following experience/qualifications:

· Minimum of ten (10) years of experience in the construction field and five years’ experience as a QCM on industrial, Governmental, or commercial construction contracts.

· QCM experience on at least three (3) projects in excess of $500,000 or for projects such as new building construction or building renovations which encompass multi-discipline requirements.

· Possesses a current OSHA 30 hrs Safety Inspection Certification

Project Manager (PM):

The Government will evaluate the offeror’s ability to provide at least one prime contractor PM that possesses the following experience/qualifications:

· Minimum of eight years’ experience in construction projects with five years’ experience as a manager of construction projects on industrial, Governmental, and/or commercial construction contracts which included simultaneous multi-disciplined requirements. Provide proof of PM experience on projects at least three (3) of which were in excess of $1,000,000 per project. The projects cited shall be for new building construction or building renovations in which multiple discipline work was performed.

· Possess one of the following: engineering degree, construction science or construction management degree, architectural degree, or be a Certified Construction Manager (CCM) or equivalent experience of a minimum total of 8 years on construction projects of which 5 years is in construction management as described above.

· Has 1 year experience in a construction estimation software program and scheduling software.

Superintendents:

The Government will evaluate the offeror’s ability to provide at least two (2) prime contractor superintendents that possess the following experience/qualifications:

· Three years’ experience as a site supervisor or superintendent on industrial, Governmental, or commercial construction contracts. Provide proof of site supervisor or site superintendent experience on at least two (2) projects in excess of $500,000. The projects shall be for new building construction and/or building renovations.

· Possess a journeyman level certification in a construction trade by a Trade Union, The Associated Builders and Contractors, or other recognized trade certifier. Equivalent military experience with documentation may be used as a substitute as outlined in the Q&A from the RFP Amendments.

Contract Safety Manager/Safety Consultant*:

The Government will evaluate the offeror’s ability to provide a Contract Safety Manager/Safety Consultant that possesses the following experience/qualifications:

· 30-hour OSHA Construction Industry safety class completion

· Five (5) years of continuous construction industry safety experience in supervising/managing general construction (managing safety programs or processes or conducting hazard analyses and developing controls) within the past decade.

· 5 years’ experience managing safety on multi-disciplinary projects exceeding $500,000. Must have experience managing safety in the following high risk areas: excavations, fall-protection, HAZWOPER, confined space, scaffolding, lead abatement, asbestos, hazardous energy procedures, and load handling.

NOTE: If the offeror is proposing key personnel who are not currently employees of the prime contractor, but are willing to work for the new prime contractor and are being proposed to work for the new contractor, this must be clearly discussed/noted in the proposal. Furthermore, the organizational chart, as required elsewhere in the proposal, must clearly show that the key personnel are being proposed as employees of the prime contractor.

*This position is not required to be an employee of the prime contractor. See PWS paragraph 1.6.11.5 for additional information.

Subfactor d: Contract Management Plan (CMP)

The Government will evaluate the offeror’s ability to perform based on its submitted information for the CMP. The evaluation will be based on the adequacy and quality of response for the following items:

· Description of the overall company structure related to the performance and PWS.

· General overview of planned contract execution.

· Organization and ability to manage multiple projects through adequate and qualified on-site staffing to support at least 7 ongoing task orders.

· Scheduling methodology and criteria for selecting and qualifying subcontractors.

· Description of the offeror’s plan to ensure Quality control of the contract and projects.

· Method for managing multiple projects simultaneously.

· Method to meet peak workload demands, identify resources, availability and time frames.

· Plan for providing additional resources, manpower and technical expertise for support of the field office to cover peak workloads, special projects and urgently required projects. Response time shall be not more than one hour from notification of emergency projects.

· Description of how multiple projects in the security areas will be staffed to ensure timely completion.

· Documentation and discussion of how the offeror has the ability to or plans to provide a sufficient quantity of qualified personnel, i.e. U.S. Citizens, who can obtain mobility access badges for the security areas of Aberdeen Proving Ground.

3. Past Performance Factor.

The Government will evaluate the offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the PWS and RFP. Past Performance factor considers each offeror’s demonstrated recent and relevant record of performance in providing services that meet the contract requirements. Recent past performance is considered to be efforts awarded during the past five (5) years, from the issue date of this RFP.

Relevant efforts are defined as services that are the same as or similar services as compared to the North American Industry Classification System (NAICS) Code 236220 (Commercial and Institutional Building Construction). Work may include new work, additions, alterations, maintenance and repairs performed for commercial or Governmental clients. The size, scale, and type of work of the projects provided will also be considered when determining relevancy.

A relevancy determination of the offeror’s (including joint venture partner(s), major and critical subcontractor(s) past performance) will be made by the Government. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated.

An assessment of the information will be made to determine if it is recent. Offerors shall supply a list (maximum of 20) task orders or contracts that contain a relevant renovation or construction component with a value of at least $50,000.00 and the type of work specified in the scope of work must be ongoing or must have been performed during the last five (5) years from the date of issuance of this solicitation. Offerors must include at least 5 task order or contracts valued at greater than $250K, and at least two additional task orders or contracts valued at greater than $1M. This information must include those contracts used for the Past Performance Questionnaires required below. Numerous Task Orders (TO) combined to meet the minimum construction dollar value identified herein is not acceptable for Indefinite-Delivery, Indefinite Quantity (IDIQ) Contracts.

Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires set forth in Attachment 2. The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all the information available.

The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files (i.e., CPARs) or data obtained through interviews with personnel familiar with the contractor and their current and past performance. Data used in conducting past performance assessments shall not extend past five years prior to the issue date of the RFP, but may include performance data as a prime. The Government reserves the right to limit the number of references it decides to contact and to contact references other than those provided by the Offeror including sources outside the Government.

The Government will evaluate the offeror’s proposal against the above requirements to determine the offeror’s appropriate rating for the Past Performance factor, using the ratings and descriptions outlined in the Table below.

Adjectival Rating
Description
Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully performance the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

4. Price Factor. Offeror pricing will be evaluated per FAR 15.404. Examples of methods that may be used include a comparison to the other competitive pricing received in response to the solicitation, comparison to previous prices paid, and a comparison to the IGCE pricing. For evaluation purposes, Offeror’s pricing will be evaluated based on the total amount proposed for CLIN 1001, 1004, 2001, 3001, 4001, and 5001. Pricing must be balanced between years and CLINs, and the pricing for the Seed Project Task Order proposed in CLIN 1004 must be reasonable.

NOTE: After award, task orders will be issued on a competitive basis. The Government will establish the contract total ("ceiling") in the amount of $99.5M.

INSTRUCTIONS TO OFFERORS

PROPOSAL SUBMISSION REQUIREMENTS (INSTRUCTIONS TO OFFERORS):

1. Introduction. The offeror’s proposal shall be submitted electronically, as set forth below. Submit proposals to:

U.S. Army Contracting Command – Aberdeen Proving Ground
Tenant Division – Facilities Branch
Attn: Lane M. Gary, Contracting Officer

The offeror’s proposal shall consist of four (4) clearly marked and separated Volumes. The Volumes are I – Technical, II – Past Performance, III – Price, IV – Solicitation, Offer and Award Documents and Certifications/Representations, Teaming, Joint Venture documentation (if applicable). Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. The Government is establishing a 150 page limit on proposals. Only one proposal per offeror will be accepted.

NOTE: Volume IV does not count against the page limitation. If potential offerors believe that an expansion of the page limit is warranted, they must submit a request in writing to the Government during the Question and Answer/Request for Information period of the solicitation. Pages that exceed the required page limitations will not be evaluated.

2. PROPOSAL SUBMISSION REQUIREMENTS

1. Electronic offers shall be submitted via the DOD SAFE Service site (preferred method), https://safe.apps.mil. Proposals shall be sent to Ms. Barbara D. Cousins, barbara.d.cousins.civ@mail.mil and Mr. Lane M. Gary, lane.m.gary.civ@mail.mil. NOTE: Offerors are encouraged to test the DoD SAFE site in advance of the due date of proposals to familiarize themselves with the system. A “drop-off” code is required for non-DoD offerors. Offerors who do not have a CAC must submit a request for the “drop-off” code to Ms. Barbara Cousins five (5) days prior to the proposal due date.

Due to the fact that the DoD SAFE site is new and has not been tested by this office, proposals may also be mailed via FEDEX or UPS overnight delivery in a CD/DVD format. One CD/DVD is acceptable as long as the Volumes are broken into separate files as outlined above. The sealed packages must be received by the due date outlined in the RFP. The Government is not responsible for lost or late deliveries by FEDEX or UPS. The address for delivery is 6565 Surveillance Loop, Bldg. 6001, 2nd Floor – Rm C2102, Attn: Lane Gary and Barbara Cousins, Aberdeen Proving Ground, Maryland 21005. The Government will also make a representative available in the lobby of Bldg 6001 for 90 minutes prior to the due date and time for offerors who wish to hand deliver their sealed proposals in electronic form. USB/thumb drives will not be accepted. Offerors must ensure that they arrive at APG early to avoid delays at the visitor’s gate. Late proposals will not be accepted.

3. PROPOSAL FILES

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. The file submission shall use MS Word 2013 (or previous version) or Adobe PDF as the file type. The file submission shall use Arial, Calibri, or Times New Roman font, minimum of 12 font size, maximum of 14. Margins of between 1-1.25 inch. Text in graphics or tables and scanned documents (e.g. OSHA forms, training certs) may be smaller than 12 font, but must be legible/readable by the Government, including by a person who is reviewing a hard copy printout of the proposal of standard 8.5 x 11 paper.

b. File Packaging. Zip files are not permitted. Files shall be in Adobe PDF or MS Word 2013 (or previous version). Any price breakdown information submitted to aide in the price evaluation shall be submitted in unlocked Microsoft Office Excel Read/Write format.

c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Offerors are cautioned that “parroting” of the Performance Work Statement (PWS) with a statement of intent to perform does not reflect an understanding of the requirement or indicate the ability to perform any task in the PWS and will be rated as “Unacceptable”. Proprietary information shall be clearly marked. The following shall be included in the Volumes:

(i) VOLUME I – Technical. The volume shall be organized into the following sections:

Subfactor a: Bonding Capacity

Offeror shall provide a signed letter from its chosen Surety demonstrating that it can obtain at least $5M of performance and payment bonds or evidence that it currently has at least $5M of spare performance and payment bond capacity per year for this contract. The Offeror shall also provide contact information for the surety so that the Government can at its discretion verify the information provided.

NOTE: Surety companies utilized for the proposal and contract must be listed on the U.S. Department of the Treasury website.

Reference https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html

Subfactor b: Safety

The offeror shall provide the Experience Modification Rate (EMR) for itself (to include for Joint Venture (JV) mentor and protégé, if JV proposed) and all major subcontractors/teaming partners for the previous three (3) year operating period. A major subcontractor is defined as a subcontractor which is expected to perform 20% or more of the total work on the contract. The required EMR information shall be provided in a letter format from the insurance companies of the prime and major subcontractors. The Offeror shall also provide contact information for the insurance companies so that the Government can at its discretion verify the information provided.

The offeror shall provide the Occupational Safety and Health Administration (OSHA) recordable injuries/illnesses reports for itself (to include for JV mentor and protégé, if JV proposed) and all major subcontractors/teaming partners for the previous three (3) years. A major subcontractor is defined as a subcontractor which is expected to perform 20% or more of the total work on the contract. The offeror’s OSHA Days Away, Restricted, or Transferred (DART) rate shall be at or below the industry average for NAICS Code 236220 for each of the previous three (3) years.

Subfactor c: Selected Key Personnel (Reference PWS paragraph 1.6.11 and subparagraphs)

Project Manager (PM):

Offeror shall provide resume(s), including training certificates for at least one prime contractor employee that will perform the Project Manager duties. The documentation submitted shall demonstrate the following for the PM:

· Minimum of eight years’ experience in construction projects with five years’ experience as a manager of construction projects on industrial, Governmental, and/or commercial construction contracts which included simultaneous multi-disciplined requirements. Provide proof of management experience on at least three (3) construction projects that were in excess of $1,000,000 per project. The projects cited shall be for new building construction or building renovations in which multiple discipline work was performed.

· Possesses one of the following: engineering degree, construction science or construction management degree, architectural degree, or be a Certified Construction Manager (CCM) or equivalent experience of a minimum total of 8 years on construction projects of which 5 years is in construction management as described above.

· Has 1 year experience in a construction estimation software program and scheduling software.

Superintendents:

Offeror shall provide resume(s), including training certificates for at least two prime contractor employees that will perform site Superintendent duties. The submitted documentation shall demonstrate the following:

· Three years’ experience as a site supervisor or superintendent on industrial, Governmental, or commercial construction contracts. Provide proof of site supervisor or site superintendent experience on at least two (2) projects in excess of $500,000. The projects shall be for new building construction and/or building renovations.

· Possesses a journeyman level certification in a construction trade by a Trade Union, The Associated Builders and Contractors, or other recognized trade certifier. Equivalent military experience with proper documentation is acceptable as noted in Q&A with RFP Amendment.

Quality Control Manager (QCM):

Offeror shall provide resume(s), including training certificates for at least one prime contractor employee that will perform the QCM duties. The documentation submitted shall demonstrate the following for the QCM:

· Ten years of experience in the construction field and five years’ experience as a QCM on industrial/Governmental and or commercial construction contracts. Demonstrate QCM experience on multiple projects in excess of $500,000 and higher for projects such as new building construction and/or building renovations which encompass multi-discipline requirements.

· Possesses a current OSHA 30hrs Safety Inspection Certification.

Contract Safety Manager/Safety Consultant*:

Offeror shall provide resume(s), including training certificates for at least one contractor employee that will perform the Contract Safety Manager/Safety Consultant duties. The submitted documentation shall demonstrate the following:

· 30-hour OSHA Construction Industry safety class completion

· Five (5) years of continuous construction industry safety experience in supervising/managing general construction (managing safety programs or processes or conducting hazard analyses and developing controls) within the past decade.

· 5 years’ experience managing safety on multi-disciplinary projects exceeding $500,000. Must have experience managing safety in the following high risk areas: excavations, fall-protection, HAZWOPER, confined space, scaffolding, lead abatement, asbestos, hazardous energy procedures, and load handling.

NOTE: If the offeror is proposing key personnel who are not currently employees of the prime contractor, but are willing to work for the new prime contractor and are being proposed to work for the new contractor, this must be clearly discussed/noted in the proposal. Furthermore, the organizational chart, as required elsewhere in the proposal (in the Contract Management Plan subfactor), must clearly show that the key personnel are being proposed as employees of the prime contractor.

*This position is not required to be an employee of the prime contractor. See PWS paragraph 1.6.11.5 for additional information.

Subfactor d: Contract Management Plan (CMP)

Offeror shall provide information that demonstrates/substantiates the following:

· Describe the overall company structure related to the performance and PWS.

· Provide general overview of planned contract execution.

· Specifically address the relationship of the Quality Control Manager and the Superintendent and how they will interact in performance of each project

· Organization: Provide an organizational chart by title/position showing how offeror plans to execute this contract. Address the ability to manage multiple projects through adequate and qualified on-site staffing to support at least 7 ongoing task orders.

· Scheduling methodology: Describe the scheduling techniques and project planning methodology. Describe the criteria for selecting and qualifying subcontractors. Name major subcontractors that your firm plans to utilize for the MATOC.

· Describe the offeror’s plan to ensure Quality control of the contract and projects.

· Discuss method for managing multiple projects simultaneously. (List all reports, programs scheduling software, databases etc. that will be employed for this purpose.)

· Discuss method to meet peak workload demands, identify resources, availability and time frames. Describe how multiple projects in the security areas will be staffed to ensure timely completion.

· Provide plan for providing additional resources, manpower and technical expertise for support of the field office to cover peak workloads, special projects and urgently required projects. Response time shall be not more than one hour from notification of emergency projects.

· Describe how multiple projects in the security areas will be staffed to ensure timely completion.

· Provide discussion and documentation/evidence of how the offeror has the ability to provide a sufficient quantity of qualified personnel, i.e. U.S. Citizens, who can obtain mobility access badges for the security areas of Aberdeen Proving Ground.

(ii) VOLUME II – Past Performance. This volume shall contain past performance information regarding similar contracts and task orders. Offerors shall submit Government and/or commercial contracts or task orders for the prime offeror and each major subcontractor in performance or awarded during the past five years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Maximum of 20. Relevant efforts are defined as services/efforts that are the same as or similar to the effort (as compared to NAICS code 236220 required by the RFP and PWS. Work may include new work, additions, alterations, maintenance and repairs performed for commercial or Governmental clients. The size and scale of the projects provided will also be considered when determining relevancy. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Major subcontractors are defined members of an offeror’s overall team who are expected to perform 20% or more of the proposed effort. Offerors shall supply a list (maximum of 20) task orders or contracts that contain a relevant renovation or construction component with a value of at least $50,000.00 and the type of work specified in the scope of work must be ongoing or must have been performed during the last five (5) years from the date of issuance of this solicitation. Offerors must include at least 5 task order or contracts valued at greater than $250K, and at least two additional task orders or contracts valued at greater than $1M. This information must include those contracts used for the Past Performance Questionnaires required below. Numerous Task Orders (TO) combined to meet the minimum construction dollar value identified herein is not acceptable for Indefinite-Delivery, Indefinite Quantity (IDIQ) Contracts.

This volume shall be organized into the following sections:

(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format.

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.

(c) Government’s technical representative/COR and current email address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative Contracting Officer’s name, and current e-mail address, telephone and fax number.

(e) Government contract administration activity’s Pre-Award Monitor’s name, and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

(h) Awarded price/cost.

(i) Final or projected final price/cost.

(j) Original delivery schedule, including dates of start and completion or work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1, Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor. The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) Past Performance Questionnaire. For all contracts identified in Section 1, Contract descriptions, Offerors are encouraged to make a reasonable attempt to have a Past Performance Questionnaire (Solicitation Attachment 2) completed and submitted by the client. The offeror shall complete Part I of the Past Performance Questionnaire and email the questionnaire to both the Army contracting activity and technical representative responsible for the past/current contract. The POC's shall be instructed to electronically complete Part II of the questionnaire and directly email the entire questionnaire to the Contracting Office no later than the proposal due date to Barbara D. Cousins, barbara.d.cousins.civ@mail.mil and Lane Gary at lane.m.gary.civ@mail.mil. The offeror shall also include a list of all the POC’s who were sent a questionnaire in the proposal.

The POC List shall include the following information: Solicitation Number; Company Name; Contract Number; Army Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail Address; Date E-mailed to POC (month/day).

The Government will focus its inquiries on the offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including cost, schedule, performance and management of subcontractors. A significant achievement, problem(s), or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, offerors are reminded that they must, at a minimum, include the most recent and relevant efforts (performance within the past five (5) years) in their proposal. Absent any recent and relevant past performance history or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. In some circumstances Past Performance may receive a neutral rating. Therefore, when a neutral rating is assigned, it shall be assumed that the offeror will perform in an acceptable manner.

(ii) VOLUME III – Price. Offerors shall provide a fully executed Standard Form 1442, including the coefficient rate multiplied by the total dollar amount for each of Contract Line Item Numbers (CLIN) 1001, 2001, 3001, 4001, and 5001. Offerors shall propose a coefficient rate for each of the base year and 4 option periods. Offerors may elect to have different rates for each year. However, once the contract is awarded, the proposed coefficient rates become capped during each contract ordering period.

Offerors shall also propose a firm fixed price amount for the Seed Project Task Order which will be issued shortly after award of the base contracts. Refer to the Seed Project Task Order which is included in the solicitation.

This solicitation directs the contractor to utilize the Baltimore City Cost Index of RSMeans Cost Works using the RSMeans Facilities Construction Cost Data, a nation-wide cost estimating source. Cost Works estimates already have profit and overhead contained in the unit prices, known as burdened prices. Contractors have to decide whether the burdened unit prices sufficiently cover all of the contractor’s indirect costs. If in the view of the contractor, the burdened unit prices do not sufficiently cover all of the firm’s indirect costs associated with such things as office space and storage, then the contractor shall adjust the proposed coefficient rate. The coefficient is an adjustment used to decrease, increase or maintain the total cost of the estimate that Cost Works creates. To maintain the estimate without change, the contractor would propose a coefficient of 1.0. If the contractor desires to increase the estimate by 10%, the contractor would propose a coefficient of 1.10; to decrease the estimate by 10%, the contractor would propose a coefficient of 0.90 The coefficient proposed shall include the following: Contractor’s overhead and profit; Subcontractors’ overhead and profit; Insurance, Employee payroll taxes, insurance, and fringe benefits; Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.); Sales tax on material and equipment costs; Clean up; Mobilization and close out for the total contract and each task order; Compliance with environmental laws (overhead [indirect] costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.); Project management and supervision; Quality control; Office management and equipment; Depreciation of mobile office(s); Interest associated with funding of equipment and payroll; Submittal preparation; As built drawings; Permits, licenses, and fees; Other risks of doing business (i.e. risk of a lower than expected contract dollar value, risk of poor subcontractor performance)

NOTE: The Government will establish the MATOC contract total ("ceiling") in the amount of $99.5M.

(iv) VOLUME IV – SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS

Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the solicitation. An authorized official of the firm shall sign the SF1442 and all certifications requiring original signature. Offerors are required to acknowledge all amendments (SF 30) in accordance with (IAW) FAR 52.215-1. Offerors also must complete Online Representations and Certifications Application (ORCA) registration IAW FAR 52.212-3. An Acrobat PDF file shall be created to capture the signatures for submission.

Joint Venture (JV) Offerors: If the offeror is a joint venture, the offers shall provide a copy of the signed joint venture agreement with the proposal. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the joint venture. If the joint venture is comprised of 8(a) firms, you shall provide a copy of the Small Business Administration (SBA) approval letter with your solicitation. If the offeror is proposing a new Joint Venture, then the JV Company must be entered and active in the System for Award Management (SAM.gov) at time of proposal submittal.

NOTE: ACC-APG understands that some SBA District offices will not approve new JVs until proposals are submitted and the contracting agency submits a written request for JV review and approval and an eligibility determination. For newly proposed JVs where this is the case with the offeror’s SBA office, SBA JV approval is not required prior to proposal submittal. However, the Government reserves the right to make initial MATOC awards to other offerors while awaiting the SBA’s decision. Once approved, a successful JV offeror selected for the MATOC will be awarded a contract and may begin competing on task orders. The Period of Performance of the contract (e.g. end of base year PoP) will not be extended for any offerors whose entry onto the MATOC was delayed pending SBA action.

Teaming Offerors: If the offer is based on a teaming/partnering relationship, the offeror shall provide all required solicitation information for all parties including a copy of the teaming/partnership agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering relationship.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

MINIMUM GUARANTEE

Offerors shall also propose a firm fixed price amount for the Seed Project Task Order. See enclosed Seed Project Task Order PWS included via Amendment 0004. The minimum guarantee is $10,000/contract awarded or the amount of the first issued Seed Project Task Order if it is greater than $10,000.00.

PWS AND SPECS-V18OCT2019

Performance Work Statement (PWS)

SPECIFICATION FOR POSTWIDE CONSTRUCTION

MULTIPLE AWARD TASK CONTRACT (MATOC)

SPECIFICATION NO. IE0000U7J

Rev. October 18, 2019

1.0 GENERAL: This is a non-personnel services contract to provide post wide construction. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform post wide construction as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.1.1 Start-up Period: Within thirty (30) calendar days after receipt of contract award, the Contractor shall be fully operational and capable of immediately starting work on any awarded task order.

1.2 Background/History: The types of structures, age and use are widely varied and range from temporary wood framed barracks, three story metal framed office buildings to large masonry industrial process buildings from pre-World War I to facilities presently under construction.

1.3 Objectives: The objective of this type of contract is to provide: real property maintenance, alteration, renovation, new construction, building demolition and repair; base utility maintenance and repair; environmental related services such as asbestos abatement, lead paint abatement, industrial hygienist’s services, soil and gas laboratory analysis, UXO testing and monitoring, that is incidental to performing task orders. Some projects will require certification by a professional engineer. Examples of such projects include, but are not limited to, fire protection systems, sediment and erosion and storm water management plans, analysis of existing facility structures, connections to utilities, and pre-engineered buildings. If certification is required, the Government will specify the requirement in the Task Order Request for Proposal (RFP).

1.4 Scope: The Contractor, as an independent agent and not as an agent of the Government, shall provide all services, materials and supplies, and perform all labor necessary for performing construction work at Aberdeen Proving Ground to include the Aberdeen Area, Edgewood Area, Graces Quarters, Carroll Island, Churchville Test Area, Atkisson Dam and other areas located in Harford and Baltimore Counties in Maryland in accordance with the specifications herein and within the terms of the contract.

1.5 Ordering Period: The contract ordering period shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Ordering Period reads as follows:

· Base YearDate TBD (Estimated start: January/February 2020)
· Option Year IDate TBD
· Option Year IIDate TBD
· Option Year IIIDate TBD
· Option Year IVDate TBD

1.6 General Information:

1.6.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After the contract is awarded and within the thirty (30) calendar day start-up period, and before construction operations are started, the Contractor shall provide a final version of its Quality Control Plan (QCP). Reference “Seed” Task Order Project. Also see Paragraph 5.37.2.

1.6.2 Quality Assurance: The Government will provide quality assurance on each task order.

1.6.2.1 Government remedies: The Contracting Officer (KO)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .