This document contains an amendment to a solicitation for multiple award task order contracts for construction services at Aberdeen Proving Ground, Maryland. The Army Contracting Command, Aberdeen Proving Ground Tenant Division is seeking proposals for the award of up to five indefinite-delivery/indefinite-quantity contracts for a base period plus four option years with a total estimated value of $99.5 million. Services will include design/build, construction, renovation and repair projects at Aberdeen and Edgewood areas and may involve electrical, HVAC, plumbing, roofing and other construction work. The solicitation response date is October 17, 2019. The amendment provides answers to contractor questions to clarify requirements such as the incumbent contractors, contract value, use of past performance questionnaires and CPARS, and proposal formatting guidelines.

View the file

Other files

File Type Posted
A07-W56ZTN-19-R-0005-0013 (post-closing update).pdf PDF
A07-W56ZTN-19-R-0005-0012.pdf PDF
A07-W56ZTN-19-R-0005-0011.pdf PDF
W91ZLK-12-R-0002 Amendment 10.pdf PDF
A07-W56ZTN-19-R-0005-0009.docx DOCX document
W56ZTN-19-R-0005_-_Missing_Amendment_0008_MFR.pdf PDF
A07-Section_00010-Revised_(after_Amendments).docx DOCX document
A07-W56ZTN-19-R-0005-0009.pdf PDF
A07-W56ZTN-19-R-0005-0007.pdf PDF
A07-W56ZTN-19-R-0005-0006.pdf PDF
A07-W56ZTN-19-R-0005-0005.pdf PDF
A07-W56ZTN-19-R-0005-0005.docx DOCX document
A07-W56ZTN-19-R-0005-0004.pdf PDF
A07-W56ZTN-19-R-0005-0004.docx DOCX document
A07-W56ZTN-19-R-0005-0003.docx DOCX document
A07-W56ZTN-19-R-0005.docx DOCX document
A07-W56ZTN-19-R-0005-0003.pdf PDF
A07-W56ZTN-19-R-0005-0002.pdf PDF
Site_Visit_Sign-in_List_(revised).pdf PDF
A07-W56ZTN-19-R-0005.pdf PDF
A07-Attachment_2_-_Past_Performance_Questionnaire_(RFP_W56ZTN-19-R-0005).docx DOCX document
Site_Visit_Sign-in_List.pdf PDF
A07-Attachment_2_-_Past_Performance_Questionnaire_(Draft_RFP).docx DOCX document
A07-Solicitation_W56ZTN19R0005-v3Sept19_(2nd_Draft_doc).docx DOCX document
W56ZTN-19-R-0005_(MATOC_draft_RFP-v16Aug19).pdf PDF
Site_Visit_Notice.pdf PDF
A01_PWS_6th_Draft_MATOC4430_11_July.doc DOC document
A01_Sample_of_MATOC-MiniTOC_Contract_List.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is as follow s:

a.) Add a response date to the solicitation to match w hat is currently in FBO. The response date is 17 October 2019 at 11:00AM, Eastern Time.

b.) Add a due date for Questions related to the Solicitation. Questions/RFIs are due by 2 October 2019 at 11:00AM, Eastern Time.

c.) Provide answ ers to initial questions received from potential offerors.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W56ZTN-19-R-0005

X 9B. DATED (SEE ITEM 11)

17-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2019

CODE

ACC-APG - GARRISON DIVISION (W56ZTN)

ACC-APG GARRISON DIVISION

BLDG 6001

6565 SURVEILLANCE LOOP

ABERDEEN PROVING GROUND MD 21005-3013

W56ZTN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W56ZTN-19-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS - 09192019

Questions:

W56ZTN-19-R-0005, DPW Post-Wide Construction Multiple Award Task Order Contract

(MATOC), APG, MD

1. Is there an incumbent contractor currently providing these services? If yes, please provide us with the contract details.

ANSWER: This solicitation is a re-compete. The 2013 MATOC was awarded to five (5) vendors.

NAME CONTRACT NUMBER

Akima Construction Services, LLC.

3901 Old International Airport Rd, STE Anchorage, AK 99502-0000

W91ZLK-13-D-0026

Banneker Ventures, LLC.

2514 Maryland AVE Baltimore, MD 21218-4510

W91ZLK-13-D-0027

Bering Straits Technical Services, LLC.

3600A Deer Creek Loop Aberdeen Proving Ground, MD 21005

W91ZLK-13-D-0028

Patriot Construction, LLC 3140 W. Ward Rd STE 203 Dunkirk, MD 20754-3047

W91ZLK-13-D-0029

Wycliffe Enterprises, Inc.

47 E. South ST STE 201 Frederick, MD 21701-5617

W91ZLK-13-D-0030

The previous acquisition W91ZLK-12-R-0002 was solicited as an 8(a) set-aside using the procedures identified in Federal Acquisition Regulation (FAR) Part 19. The ceiling value of the previous contract was $230M. There are currently two remaining contractors performing on the 2013 MATOC: Bering Straits Technical Services and Patriot Construction, LLC. Information pertaining to spending on the previous contract can be found by searching by contract number on https://www.usaspending.gov. The ordering periods for the existing contract ends at the end of September 2019.

2. What will be the contract value for this opportunity?

ANSWER: The ceiling value of this contract is estimated at $99.5 million for a period of up to five (5) years. This will include a base period plus four (4) option ordering periods.

3. We also would like to request a code for AMRDEC SAFE SITE in order for us to submit the proposal.

Answer: ACC-APG will not accept proposals from AMRDEC SAFE. DoD SAFE has replaced it as of 15 August 2019. You can access the site via https://safe.apps.mil. The service is for UNCLASSIFIED information only. Please review the website for directions and warnings before using. Reference page 17 of the Solicitation, “Proposal Submission Requirements”.

4. Would you please consider accepting CPARS evaluations in lieu of PPQs?

ANSWER: The Government will not remove the requirement for PPQs from the RFP. The Government will be utilizing CPARs in the evaluation of Past Performance. The Government understands that getting PPQs completed by KOs and CORs can be a challenge but PPQs are a way that firms with lower dollar experience that was not with the Federal Government can demonstrate their past performance. CPARS is only used for the federal Government and for larger dollar awards. It is up to each firm to determine the quantity of information they want to submit for the Past Performance Factor to make the strongest case for their proposal.

5. Will the site visit attendee list be posted on the FedBizOps page for this solicitation?

ANSWER: The list was posted on 9 September 2019.

6. Was the site visit mandatory?

ANSWER: No, the site visit was not mandatory, but offered to allow potential contractors to view the post and the type of projects that may be required on a new MATOC.

7. Thank you for the attached document posted on FBO, just wanted to ask you why there is not emails printed on the last two pages.

ANSWER: The email addresses were inadvertently omitted. A revision will be posted with this amendment.

8. I am reaching out to inquire on the process for setting up a site visit for the referenced project.

ANSWER: The Government held a site visit for W56ZTN-19-R-0005 on 7 August 2019 that was announced on FBO and attended by around 80 individuals. If the Government receives a sufficient number of additional requests, we will definitely consider holding another site visit which would mirror the first one. In August, we toured around APG and pointed out or visited currently ongoing projects and ones that had been completed within the past couple of years. The idea was to provide a representative sampling of the type of work that might be required in the future on APG. Since the contract being competed is an ID/IQ we are not in a position to tour upcoming projects because they are not known or approved. We will note your interest in the Government conducting a second site visit.

https://www.usaspending.gov/

9. Are the PPQs included in the 150 page limit?

ANSWER: Yes.

10. On page 15 and page 24 of the 2nd draft of the RFP there is a reference Volume V. Is Solicitations, Offer and Award Documents Volume V or Volume IV?

ANSWER: Volume IV.

11. Do the SF 1442 and amendments belong in Volume III (Price) or Volume IV (V?)

(Solicitations, Offer and Award Documents and Certifications/Representations)?

ANSWER: The SF 1442 and amendments belong in Volume IV.

12. Is there a minimum font size?

ANSWER: Yes, Arial, Calibri, or Times New Roman, minimum of 12 font size. This will be added to the “Proposal Submission Requirements” section in a subsequent Amendment.

13. Is there a minimum margin size.

ANSWER: Minimum 1” margins all around. This will be added to the “Proposal Submission Requirements” section in a subsequent Amendment.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time 17-Oct-2019 11:00 AM has been added.

The Issued By organization has changed from

ACC-APG - GARRISON DIVISION (W56ZTN)

ACC-APG GARRISON DIVISION

BLDG 6001

6565 SURVEILLANCE LOOP

ABERDEEN PROVING GROUND MD 21005-3013

to

ACC-APG - TENANT DIVISION (W91ZLK)

ACC-APG TENANT DIVISION

BLDG 6001, 2ND FLOOR, ROOM C2-101

6565 SURVEILLANCE LOOP

ABERDEEN PROVING GROUND MD 21005-3013

(End of Summary of Changes)