ATT0009.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Enhanced Heavy Equipment Transport System (EHETS) Trailer
Solicitation number
W56HZV21R0169
Issued by

About this file

This document contains information regarding an upcoming federal contract opportunity for the acquisition of Enhanced Heavy Equipment Transport System (EHETS) trailers. The Department of the Army Materiel Command TACOM Life Cycle Management Command will issue a solicitation on or after November 24, 2021 for a five-year firm-fixed-price requirements contract to acquire 466 EHETS trailers to be delivered between fiscal years 2022 through 2027. The EHETS trailer is an eight axle, flatbed trailer capable of carrying 82 tons and meeting European road permits at 78.5 tons when towed by an M1300 Enhanced Heavy Equipment Transporter tractor. The solicitation will utilize full and open competition with a best value tradeoff source selection based on technical factor, price factor, and small business participation. The technical factor is most important and will evaluate payload capacity, maneuverability, and payload safe transport. Price is significantly more important than small business participation. Delivery for test trailers will be six months after award, with production deliveries of 15 trailers per month beginning 180 days after order receipt.

View the file

Other files

File Type Posted
W56HZV21R0169-0003.pdf PDF
W56HZV21R0169-0002.pdf PDF
ATT 0018 - EHETS TRAILER QA LOG.pdf PDF
W56HZV21R0169 Amendment 0002.pdf PDF
ATT 0018 - EHETS TRAILER QA LOG.pdf PDF
ATT0002 18Jan2022.xlsx XLSX spreadsheet
W56HZV21R0169-0001.pdf PDF
ATT0046.xlsx XLSX spreadsheet
ATT0008.XLSX XLSX spreadsheet
ATT0049.pdf PDF
ATT0019.pdf PDF
ATT0047.pdf PDF
ATT0020.pdf PDF
ATT0036.xlsx XLSX spreadsheet
ATT0042.docx DOCX document
ATT0002.xlsx XLSX spreadsheet
ATT0048.pdf PDF
ATT0037.xlsx XLSX spreadsheet
ATT0007.pdf PDF
ATT0038.xlsx XLSX spreadsheet
W56HZV21R0169.pdf PDF
ATT0010.xlsx XLSX spreadsheet
ATT0028.pdf PDF
ATT0040.xlsx XLSX spreadsheet
ATT0026.pdf PDF
ATT0041.pdf PDF
ATT0030.pdf PDF
ATT0027.pdf PDF
ATT0043.pdf PDF
EXHA.pdf PDF
ATT0017.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

W56HZV-21-R-0169
Attachment 0009 - Use of Existing Government-Furnished Property
Instructions
- Offerors are not to provide any inputs within this Attachment.
- If the offeror is proposing to utilize Government-Furnished Property (GFP) that it received on another Government contract in performance of this contract on a rent-free basis , then the offeror shall calculate the GFP Price Adjustment (which is for evaluation purposes only) in accordance with the instructions detailed below. The offeror is to also provide all supporting calculations to the Government with its proposal.

a) Rent-free use of existing facilities, special test equipment, and/or special tooling, title to which is in the Government or to which the Government has the right to take title (all of which is herein described as property), including rent-free use by prospective subcontractors, will be a consideration in the evaluation of responses to this solicitation. The offeror shall provide with its proposal, the list of Government Furnished Property (GFP), the acquisition cost, age, and type of GFP.

b) For purposes of evaluation only, the GFP Price Adjustment for each classification of property, computed as follows, shall be added by the Government to the Proposed Price. The GFP Price Adjustment shall be computed by multiplying the acquisition cost of each item of property by the rental rates specified below, and then multiplying the product obtained by the number of months of use proposed. A minimum of one month of use shall be required for purposes of evaluation. Fractional portions of a month shall be counted as a full month. The final GFP Price Adjustment shall be separately set forth by the offeror under the proposed price.

c) Monthly Rental Rates:

(1) For land and land preparation, buildings, building installations, and land installations other than those items specified in (2) below: the prevailing commercial rate.

(2) For industrial plant equipment of the types covered by Federal Supply Classification Code Numbers 3405, 3408, 3410, 3411 through 3419 (machine tools), and 3441 through 3449 (secondary metal forming and cutting machines), the following rates shall apply:

Age of Equipment Monthly Rental Rates 0-2 years 3.00% Over 2 to 3 years 2.00% Over 3 to 6 years 1.50% Over 6 to 10 years 1.00% Over 10 years 0.75%

(3) For personal property and equipment not covered in (1) and (2) above (including all production equipment not in the Federal Supply Classification Codes set forth above, and including special tooling and special test equipment), the following rates shall apply:

-- Two percent (2.00%) per month for electronic test equipment and automotive equipment;

-- One percent (1.00%) per month for special tooling and for all other property and equipment.

d) If any item of property is to be used on other work for which use has been authorized during the period such property is requested for use on any contract resulting from this solicitation, the GFP Price Adjustment shall be calculated in accordance with the following: the acquisition cost of each item of property shall be multiplied by the rental rates specified for the applicable classification of property set forth above, and the product obtained shall then be multiplied by the number of months of rent-free use requested. The resulting product shall be multiplied by a fraction, the numerator of which is the amount of use of the property proposed under this solicitation, and the denominator of which is the sum of the previously authorized use of the property during the period of proposed use and the use proposed under this solicitation. The measurement unit for determining the amount of use to be considered in establishing the fraction referred to in the foregoing calculation shall be direct labor hours, sales, hours of use, or any other measurement unit which will result in an equitable apportionment of the GFP Price Adjustment. The measurement unit used and the amount of respective uses shall be set forth in sufficient detail to support the proration for each item of property.

e) For the purposes of determining the GFP Price Adjustment set forth above, the following definitions apply:

(1) The term acquisition cost means the total cost to the Government for an item of property, including the cost of (i) transportation, (ii) installation, (iii) accessories to be used with the item, and (iv) any rebuilding and modernization which has enhanced the original capability of the item;

(2) The age of an item of property shall be based on the year in which it was manufactured, with an annual birthday on 1 January of each year thereafter. On 1 January following the date of manufacture, the item shall be considered one year old; and on each succeeding January 1st, it shall become one year older (thus, an item manufactured on 15 July 1978 would be one year old on 1 January 1979, and over two years old on and after 1 January 1980).

f) Where this solicitation provides that the property is offered for use on an as-is basis, F.O.B. loading dock at present location, the Government shall add to the Evaluated Cost, in addition to the GFP Price Adjustment described above, an adjustment, for purposes of evaluation, which will be composed of the costs to the Government of making such property available at the F.O.B. point, including the costs of disconnection, preparation for shipment, and placement on the loading dock.

Distribution Statement A - Approved for public release.

File details come from the government source that posted it. Updated .