ATT0002 18Jan2022.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
Enhanced Heavy Equipment Transport System (EHETS) Trailer
Solicitation number
W56HZV21R0169
Issued by

About this file

This document contains a pricing workbook and instructions for an upcoming solicitation seeking proposals for an Enhanced Heavy Equipment Transporter System. The Army is soliciting proposals for a five-year firm-fixed-price requirements contract to acquire 466 Enhanced Heavy Equipment Transporter trailers over five ordering periods, with delivery of five test trailers within six months of award. Offerors must provide unit pricing and estimated quantities for the production trailers by quantity range for each ordering period, as well as pricing for logistics data, training, and other contract line items. The evaluation factors are technical capability, price, and small business participation, with technical capability being most important. The technical factors are payload capacity, maneuverability, and payload safe transport. The Army intends to issue this solicitation on or after November 24, 2021.

View the file

Other files

File Type Posted
W56HZV21R0169-0003.pdf PDF
W56HZV21R0169-0002.pdf PDF
ATT 0018 - EHETS TRAILER QA LOG.pdf PDF
W56HZV21R0169 Amendment 0002.pdf PDF
ATT 0018 - EHETS TRAILER QA LOG.pdf PDF
W56HZV21R0169-0001.pdf PDF
ATT0046.xlsx XLSX spreadsheet
ATT0008.XLSX XLSX spreadsheet
ATT0049.pdf PDF
ATT0019.pdf PDF
ATT0047.pdf PDF
ATT0020.pdf PDF
ATT0036.xlsx XLSX spreadsheet
ATT0042.docx DOCX document
ATT0002.xlsx XLSX spreadsheet
ATT0048.pdf PDF
ATT0037.xlsx XLSX spreadsheet
ATT0007.pdf PDF
ATT0038.xlsx XLSX spreadsheet
W56HZV21R0169.pdf PDF
ATT0009.xlsx XLSX spreadsheet
ATT0010.xlsx XLSX spreadsheet
ATT0028.pdf PDF
ATT0040.xlsx XLSX spreadsheet
ATT0026.pdf PDF
ATT0041.pdf PDF
ATT0030.pdf PDF
ATT0027.pdf PDF
ATT0043.pdf PDF
EXHA.pdf PDF
ATT0017.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Enhanced Heavy Equipment Transporter System (EHETS)
Solicitation W56HZV-21-R-0169
Attachment 0002 - Pricing Workbook
INSTRUCTIONS TO OFFERORS:
1. Cells that require inputs are highlighted in yellow.
2. All cells that are highlighted in yellow must be completed.
3. If an offeror intends to price a CLIN/ELIN at no cost, enter the number 0 in the approporiate yellow cell.
4. The required inputs are used to auto calculate the Total Proposed Price on the "Summary" tab.
5. The 12% Federal Retail Excise Tax (FRET) is automatically calculated within the Pricing Workbook and added to the total for each Ordering Period.
6. Do not adjust formulas or otherwise manipulate any of the other (non-yellow highlighted) cells.
7. Do not add worksheets to this Attachment.
Distribution Statement A - Approved for Public Release.

Summary Offeror:

SUMMARY (SOLICITATION W56HZV-21-R-0169)

First Ordering Period$ - 0
Second Ordering Period$ - 0
Third Ordering Period$ - 0
Fourth Ordering Period$ - 0
Fifth Ordering Period$ - 0
CDRLs$ - 0

Total Proposed Price: $ - 0

First Ordering Period

First Ordering Period
Offeror is required to fill in the unit price for each CLIN IAW sections of the solicitation listed in column B of this worksheet.

For production trailers, the offeror is required to fill in the unit price for each quantity range.

Range Pricing
Quantity RangeCLIN 1004 - Unit PriceCLIN 1008 FRET - Unit PriceWeighting
1 - 15$ - 010%
16 - 40$ - 040%
41 - 70$ - 010%
71 - 120$ - 030%
121+$ - 010%
CLINRFP RefDescriptionUnit of IssueUnit PriceEst QtyTotal Est Price
1001C.1.3(a)EHETS Trailer Test Assets - PVT/OTEA2$ - 0
1002C.1.3(b), C.6.1.10EHETS Trailer Test Assets - Logistics DevelopmentEA2$ - 0
1003C.1.3(c )EHETS Trailer Test Asset - Production StandardEA1$ - 0
1004C.1.1Ordering Period 1 - EHETS Production Trailers*EA$ - 018$ - 0
1005H.3Ordering Period 1 - FRET 12% CLIN 1001EA$ - 02$ - 0
1006H.3Ordering Period 1 - FRET 12% CLIN 1002EA$ - 02$ - 0
1007H.3Ordering Period 1 - FRET 12% CLIN 1003EA$ - 01$ - 0
1008H.3Ordering Period 1 - FRET 12% CLIN 1004*EA$ - 018$ - 0
1009D.1.3.1Ordering Period 1 - Trailer Care and StoragePer Day3240$ - 0
1010C.6.5.3.1Ordering Period 1 - Product Support Package - System Support ItemsEA3$ - 0
1011C.6.9.4.2Ordering Period 1 - ME Operator Training EventLO1$ - 0
1012C.6.9.4.2Ordering Period 1 - ME Maintainer Training EventLO1$ - 0
1013C.6.9.4.4Ordering Period 1 - TM Verification Training EventLO1$ - 0
1014C.6.9.4.5Ordering Period 1 - IKPT Training EventLO1$ - 0

*Weighted average unit price calculated from range prices for evaluation purposes only Total $ - 0

Second Ordering Period

Second Ordering Period
Offeror is required to fill in the unit price for each CLIN IAW sections of the solicitation listed in column B of this worksheet.

For production trailers, the offeror is required to fill in the unit price for each quantity range.

Range Pricing
Quantity RangeCLIN 2001 - Unit PriceCLIN 2002 FRET - Unit PriceWeighting
1 - 15$ - 010%
16 - 40$ - 010%
41 - 70$ - 010%
71 - 120$ - 045%
121+$ - 025%
CLINRFP RefDescriptionUnit of IssueUnit PriceEst QtyTotal Est Price
2001C.1.1Ordering Period 2 - EHETS Production Trailers*EA$ - 0146$ - 0
2002H.3Ordering Period 2 - FRET 12% CLIN 2001*EA$ - 0146$ - 0
2003D.1.3.1Ordering Period 2 - Trailer Care and StoragePer Day120$ - 0
2004C.6.4.17.1Ordering Period 2 - Maintenance Tool KitEA2$ - 0
2005C.6.5.3.1Ordering Period 2 - Product Support Package - System Support ItemsEA1$ - 0
2006C.6.9.4.2Ordering Period 2 - ME Operator Training EventLO1$ - 0
2007C.6.9.4.2Ordering Period 2 - ME Maintainer Training EventLO1$ - 0
2008C.6.9.4.4Ordering Period 2 - TM Verification Training EventLO1$ - 0
2009C.6.9.4.5Ordering Period 2 - IKPT Training EventLO1$ - 0

*Weighted average unit price calculated from range prices for evaluation purposes only Total $ - 0

Third Ordering Period

Third Ordering Period
Offeror is required to fill in the unit price for each CLIN IAW sections of the solicitation listed in column B of this worksheet.

For production trailers, the offeror is required to fill in the unit price for each quantity range.

Range Pricing
Quantity RangeCLIN 3001 - Unit PriceCLIN 3002 FRET - Unit PriceWeighting
1 - 15$ - 040%
16 - 40$ - 015%
41 - 70$ - 015%
71 - 120$ - 015%
121+$ - 015%
CLINRFP RefDescriptionUnit of IssueUnit PriceEst QtyTotal Est Price
3001C.1.1Ordering Period 3 - EHETS Production Trailers*EA$ - 0122$ - 0
3002H.3Ordering Period 3 - FRET 12% CLIN 3001*EA$ - 0122$ - 0
3003D.1.3.1Ordering Period 3 - Trailer Care and StoragePer Day120$ - 0
3004C.6.4.17.1Ordering Period 3 - Maintenance Tool KitEA3$ - 0
3005C.6.5.3.1Ordering Period 3 - Product Support Package - System Support ItemsEA1$ - 0
3006C.6.9.4.2Ordering Period 3 - ME Operator Training EventLO1$ - 0
3007C.6.9.4.2Ordering Period 3 - ME Maintainer Training EventLO1$ - 0
3008C.6.9.4.4Ordering Period 3 - TM Verification Training EventLO1$ - 0
3009C.6.9.4.5Ordering Period 3 - IKPT Training EventLO1$ - 0

*Weighted average unit price calculated from range prices for evaluation purposes only Total $ - 0

Fourth Ordering Period

Fourth Ordering Period
Offeror is required to fill in the unit price for each CLIN IAW sections of the solicitation listed in column B of this worksheet.

For production trailers, the offeror is required to fill in the unit price for each quantity range.

Range Pricing
Quantity RangeCLIN 4001 - Unit PriceCLIN 4002 FRET - Unit PriceWeighting
1 - 15$ - 020%
16 - 40$ - 020%
41 - 70$ - 020%
71 - 120$ - 020%
121+$ - 020%
CLINRFP RefDescriptionUnit of IssueUnit PriceEst QtyTotal Est Price
4001C.1.1Ordering Period 4 - EHETS Production Trailers*EA$ - 0120$ - 0
4002H.3Ordering Period 4 - FRET 12% CLIN 4001*EA$ - 0120$ - 0
4003D.1.3.1Ordering Period 4 - Trailer Care and StoragePer Day120$ - 0
4004C.6.4.17.1Ordering Period 4 - Maintenance Tool KitEA12$ - 0
4005C.6.5.3.1Ordering Period 4 - Product Support Package - System Support ItemsEA1$ - 0
4006C.6.9.4.2Ordering Period 4 - ME Operator Training EventLO1$ - 0
4007C.6.9.4.2Ordering Period 4 - ME Maintainer Training EventLO1$ - 0
4008C.6.9.4.4Ordering Period 4 - TM Verification Training EventLO1$ - 0
4009C.6.9.4.5Ordering Period 4 - IKPT Training EventLO1$ - 0

*Weighted average unit price calculated from range prices for evaluation purposes only Total $ - 0

Fifth Ordering Period

Fifth Ordering Period
Offeror is required to fill in the unit price for each CLIN IAW sections of the solicitation listed in column B of this worksheet.

For production trailers, the offeror is required to fill in the unit price for each quantity range.

Range Pricing
Quantity RangeCLIN 5001 - Unit PriceCLIN 5002 FRET - Unit PriceWeighting
1 - 15$ - 020%
16 - 40$ - 020%
41 - 70$ - 020%
71 - 120$ - 020%
121+$ - 020%
CLINRFP RefDescriptionUnit of IssueUnit PriceEst QtyTotal Est Price
5001C.1.1Ordering Period 5 - EHETS Production Trailers*EA$ - 055$ - 0
5002H.3Ordering Period 5 - FRET 12% CLIN 5001*EA$ - 055$ - 0
5003D.1.3.1Ordering Period 5 - Trailer Care and StoragePer Day120$ - 0
5004C.6.4.17.1Ordering Period 5 - Maintenance Tool KitEA12$ - 0
5005C.6.5.3.1Ordering Period 5 - Product Support Package - System Support ItemsEA1$ - 0
5006C.6.9.4.2Ordering Period 5 - ME Operator Training EventLO1$ - 0
5007C.6.9.4.2Ordering Period 5 - ME Maintainer Training EventLO1$ - 0
5008C.6.9.4.4Ordering Period 5 - TM Verification Training EventLO1$ - 0
5009C.6.9.4.5Ordering Period 5 - IKPT Training EventLO1$ - 0

*Weighted average unit price calculated from range prices for evaluation purposes only Total $ - 0

CDRLs

CDRLs
Offeror is required to fill in the lot price for each separately priced CDRL in Column C of this worksheet IAW Exhibit A and associated statement of work.
CDRLs are built under CLIN 6000, are not tied to any particular ordering period and can be ordered at any time during the five year ordering life of the contract.
ELINDescriptionLot Price
A001Conference AgendaNSP
A002Meeting MinutesNSP
A003Program ScheduleNSP
A004ECP/VECPNSP
A005Request for VarianceNSP
A006Indentured Bill Of Materials (IBOM)NSP
A007Equipment Tie-Down ReportNSP
A008Corrosion Prevention and Control Plan (CPCP)NSP
A009Configuration Status Accounting (CSA) InformationNSP
A010Logistics Product Data
A011Error-Proofing Audits Results and Corrective Actions
A012Logistics Quality Plan
A013Technical Manual Plan
A014Logistic Configuration Summary Report
A015Maintenance Support Plan
A016Product Supportability Analysis Plan
A017Failure Mode, Effects and Criticality Analysis (FMECA) (LSA-056)
A018Reliability Centered Maintenance (RCM) (LSA-050)
A019PMCS and Scheduled Based Services Analysis (LSA-033)
A020Critical Maintenance Task Summary (LSA-006)
A021Task Inventory
A022Level of Repair Analysis (LORA) Report
A023Maintenance Task Analysis (MTA) (LSA-019)
A024Final Inspection Record (FIR)NSP
A025Summary of Non-Conforming RequestsNSP
A026Final Non-Conformance ReportNSP
A027Welding ProceduresNSP
A028Previously Qualified Welding ProceduresNSP
A029Manpower Requirements Criteria (MARC) (LSA-065)
A030Safety Assessment Report (SAR)NSP
A031Hazardous Materials Management Program (HMMR) Report FormatNSP
A032First Production Vehicle Inspection (FPVI) ReportNSP
A033Annual Man-Hour by Skill Specialty Code and Level of Maintenance (LSA-001)
A034Maintenance Allocation Chart (MAC) (LSA-004)
A035Transportability Report (LSA-085)
A036Demilitarization (DEMIL) & Disposal Plan
A037Hazardous Material Summary Report (LSA-078)
A038Long Lead Time Item (LLTI) List
A039Authorization List Items Report (LSA-040)
A040Mandatory Replacement Parts (MRP) List
A041Support Items List (LSA-009)
A042Tool Layout Plan
A043Maintenance Tool Kit Component List
A044Digital Tool Images
A045Copyright Release
A046Calibration Procedures
A047Calibration and Measurement Requirements Summary (CMRS) LSA-076
A048Diagnostic Testability Analysis
A049Recommended Spare Parts List for Spare Acquisition Integrated with Production (SAIP) Report (LSA-155
A050Product Support Package Plan (PSPP)
A051Product Support Package List (PSPL)
A052Technical Manual
A053Discrepancy Report
A054Fault Insertion Plan
A055Engineering Data for Provisioning (EDFP)
A056Provisioning Requirements Report (PRR) (LSA-036)
A057Provisioning Pre-procurement Screening (PPS)
A058Clean or Green Parts Exception List
A059Foreign Sources of Supply Notice
A060Provisioning Requirements for Conference
A061Indentured Parts List Report Specification (LSA-030)
A062Bill of Materials (BOM) Report (LSA-080)
A063Commonality List
A064Technical Manual Source Data
A065Validation Plan
A066Validation Records, Reports and Certificates
A067NMWR Delivery
A068LDP Coded Data Products Packaging
A069Special Packaging Instruction (SPI)NSP
A070Special Packaging Validation Test ReportNSP
A071Equipment Preservation Data Sheet (EPDS)NSP
A072EPDS ValidationNSP
A074Repair Cost Report
A075Critical Task Analysis Report
A076Learning Analysis Report
A077Training Support Packages (TSP)
A078Student Guides
A079Instructor Guides
A080Lesson Plans
A082Class Demographic Data
A083Training Program Development and Management Plan (TPDMP)
A084Item Unique Identification (IUID) Candidate List-IUID Marking Plan
A085Item Unique Identification (IUID) Marking Activity, Validation and Verification Report-Raw Scan Report
A086Sample IUID Data Plate Report
A087DMSMS Management Plan
A088DMSMS Quarterly Status Report
A089DMSMS Health Status Report
A090DMSMS GIDEP Annual Status Report
A091Logistics Product Data Summary
A093Systems Engineering Management PlanNSP
A094Transportability ReportNSP
A095Performance Specification ReportNSP
A096Failure Analysis and Corrective Action ReportNSP
A097Engineering Release RecordNSP
A098Test System Support Package List (TSSPL)NSP
A099Work Authorization Document (WAD)NSP
A100Mobile Office RequestNSP
A101Configuration Management PlanNSP
A102Notice of Revision (NOR)NSP
A103Finish SpecificationNSP
A104TDP For EHETS Trailer Unique Components
A105Advanced Manufacturing Candidate List
A106Advanced Manufacturing Technical Data Package

Total $ - 0

File details come from the government source that posted it. Updated .