This document is a request for information and draft statement of work for Stryker sustainment services. The Army is seeking industry feedback on the draft scope of work ahead of a planned solicitation in the first quarter of 2018 for an indefinite delivery/indefinite quantity contract with a base year and four option years. The services required include new equipment training, fielding, field level maintenance, and field service representative support for Stryker vehicles. Questions are due by April 30, 2018 and should address the ability to surge operations during contingencies and experience with advanced troubleshooting and cost and software data reporting. Only the draft scope of work is provided at this time for review.
Attached are the Government responses to industry questions submitted in support of the RFP. A forthcoming amendment will follow.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
| Question No. | QUESTION | ANSWERS | ||
| Section | Para. | |||
| 1 | SECTION J: LIST OF ATTACHMENTS | Attachment 0013 Density Schedule | Attachment 0013, Density Schedule is significantly different than the updated GFPM. There is a delta of approximately 500k hours. It is believed that attachment 0013 has not been updated. Q: Please provide an updated Attachment 0013 | |
| A: Attachment 0022- Government Furnished Pricing Model (GFPM) accounts for the the total IDIQ contract maximum, which includes the Offeror's Phase In and the quantity of hours defined in Section B.2, which will be utilized in the Cost/Price Factor. Attachment 0013 will be updated as part of the forthcomming RFP amendment., however, Attachment 0013 "Density Schedule" is linked to the Phase In requirements and the estimated requirements for Ordering Period 1. It will be utilized as part of the Managment Factor evaluation, which only represents a portion of estimated hours in the GFPM Ordering Period 1. |
| 2 | SECTION J: LIST OF ATTACHMENTS | Attachment 0022 Government Furnished Pricing Model. | The prior GFPM did not have cells locked. Q: requesting a copy of the Government Format Pricing Model, attachment 0022, with unlocked cells to function as an analysis tool. | A: The final version of the GFPM will remained locked. |
| 3 | H - SPECIAL CONTRACT REQUIREMENTS | H.6 | Section H.6, states that “ At no time during contract performance shall the contractor invoice the Government at a rate which exceeds this ceiling rate, applicable to the period during which the performance was rendered, regardless of actual cost incurred.” |
Q: Is the referenced ceiling rate a composite rate based on the CLIN level funding in Section B (Cost funded/negotiated hours)? Or is it required that invoicing be limited to the rate per hour designated in section B.7. through B.11 for each labor hour billed by category?
| A: The ceiling rates question (H.6) refer to the ceiling rates in the GFPM ceiling rate tabs 'Ceiling Rates Prime" and "Ceiling Rates Subcontractor", which will be incorporated into final contract upon award as a new Attachment 0023. NOTE: Section H narratives have undergone renumbering in the forthcomming RFP Amendment. | |||||
| 4 | H - SPECIAL CONTRACT REQUIREMENTS | H.4 | Q: Section H- is Sumner warehouse scope part of this competition? If not, will the language be updated in the final RFP? | A: Section H.4 was revised to reflect that only the GOCO facility at JBLM will be utilized for this contract effort. NOTE: Section H narratives have undergone renumbering in the forthcomming RFP Amendment. | |
| 5 | SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT | ||||
| Q: Is DVH-1/training material part of this solicitation? | A: Please clarify the question. | ||||
| 6 | B-SUPPLIES OR SERVICES AND PRICES/COSTS | Throughout the solicitation there are multiple references to Section B.2.1.1, which does not exist. | |||
| Q: Can the Government please update the references accordingly? | A. Reference has been corrected to B.2 in the forthcoming RFP amendment. | ||||
| 7 | B-SUPPLIES OR SERVICES AND PRICES/COSTS | B.5.1.1 | B.5.1.1 for Contingency Operations states Ordering Period One begins on 01 March 2020. All other sections reference contractor-defined phase in as the beginning of Ordering Period 1. | ||
| Q: Is it the Government intent that contingency operations start on 1 March or consistent with the contractor's proposed phase-in period? | A. Contingency Operations will not be ordered unless and until a military contingency is occurring. Further, there will be no performance required to begin until the commencement of the Phase In period. Section B.5.1.1 has been amended in the forthcoming RFP amendment to reflect a start date of no sooner than the end of the proposed Phase In period. | ||||
| 8 | Attachment 0013 - OP1 Field Level Maintenance Tab | On Attachment 0013 – OP1 Field Level Maintenance tab, the top schedule shows a total count of 87 yet the bottom labor category summary shows a total count of 119. | |||
| Q: Can the government please update the numbers as appropriate? | A. Yes, the Attachment has been updated to reflect the current density schedule estimates and will be posted as part of the forthcoming RFP amendment. | ||||
| 9 | L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | L.4.3.5.4.2 | Section L states: Subcontractors that have fixed price agreements with Prime Offerors may propose Subcontractor fully burdened labor rates (FBLRs) that are fixed ceiling rates that are not to be exceeded regardless of actual cost. However, these fixed Rates shall not exceed the calculated Subcontractor Labor composite ceiling rates discussed in section L.4.3.5.4.1. In addition, if subcontractor Fixed Ceiling Rates are proposed, the Prime Offeror shall provide its price analysis of all subcontractor proposals, including data showing the degree of competition and the basis for establishing the source and price reasonableness. Prime Offerors shall also provide proof that any subcontractor that has agreed not to exceed the proposed Fixed Ceiling Rate(s), agrees, regardless of actual cost (a letter from the subcontractor may serve as proof that the subcontractor has agreed to the Fixed Ceiling Rates. ) All proposed subcontractor FBLRs (whether Fixed Ceiling Rates or not) shall be justified by a full labor buildup, detailing all elements of cost that comprise the proposed FBLRs in accordance with all instructions contained within this Section L. Any proposed subcontractor Fixed Ceiling Rates and associated hours will be added to Section H, Special Instructions, of the resulting task order. | ||
| Q: With the above statement, is the government stating that any proposed subcontractors will not be given the opportunity for price adjustments per FAR 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS) if the proposed AWD rates are updated. | A. No. L.4.3.5.4.2 has been updated in the forthcoming RFP Amendment to include the following statement: |
"However, In Accordance With (IAW) FAR 52.222-43, the wage determination, issued under the Service Contract Labor Standards statute, (41 U.S.C. chapter 67), by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, current on the anniversary date of a multiple year contract or the beginning of each renewal ordering period, shall apply to this contract and supersede corresponding ceiling rates (if applicable)."
| 10 | L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | L.4.3.4.2. | The RFP states that All formulas used in the GFPM (MS Excel spreadsheets) shall be clearly visible in the individual cells and verifiable. Whereas linking among the spreadsheets is necessary, use of external links (source data not provided) of any kind is prohibited. The GFPM and all its associated workbooks/files shall not be locked/protected or secured by passwords. | |
| Q: Will the government adjust the formatting in cells (Ordering Period 1; C58, AB8:AB44, AD8:AD44, Ordering Period 2; C59, AB9:AB45, AD9:AD45, Ordering Period 3; C59, AB9:AB45, AD9:AD45, Ordering Period 4; C59, AB9:AB45, AD9:AD45, Ordering Period 5; C59, AB9:AB45, AD9:AD45) to allow for multiple decimal places to show? This will allow the offeror to validate the consistency of the GFPM with the OFPM. | A. Yes, the government has amended the GFPM to display up to two decimal places within the requested cells. The updated GFPM will be a part of the forthcoming RFP amendment. | |||
| 11 | L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | L.4.3.4.2. | The RFP states that All formulas used in the GFPM (MS Excel spreadsheets) shall be clearly visible in the individual cells and verifiable. Whereas linking among the spreadsheets is necessary, use of external links (source data not provided) of any kind is prohibited. The GFPM and all its associated workbooks/files shall not be locked/protected or secured by passwords. | |
| Q: Was it the intent of the government to not allow the offeror to utilize a rate for the Prime Contractor CPFF Labor(Prime Labor OH 1, Prime G&A, Prime FCCOM & Prime Fee per Hour), Subcontractor Labor (Prime G&A & Prime Fee per Hour)? | A. For the purposes of ordering, the Government will bind the offeror to the proposed composite rate per ordering period per labor category (GFPM - Tab "Composite Labor Rates") that does not differentiate between prime or sub (see Composite Labor Rate Tab), although the GFPM does allow for the offeror to input values for both prime and subcontractor rates into the proposed composite rates. | |||
| 12 | L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | L.2.2.1.1 | The RFP states that "Each volume shall include a (i) title page, (ii) table of contents, and (iii) list of tables and figures. | |
| Q: Will the Government confirm that the front matter is excluded from the page count in Volume 2? | A. That is correct. The pages referenced will not be counted as part of the page limit. The forthcoming RFP amendment will address this issue. | |||
| 13 | B-SUPPLIES OR SERVICES AND PRICES/COSTS |
L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS B.3.1.1; L.4.2; Attachment 22 RFP para B.3.1.1. states: “Ordering Period One: The Order for NET, Fielding and Deprocessing Services to be performed in the period of performance between the end of the Phase in Period awarded according to B.2.1.1. and 28 FEB 2021 may be placed on a unilateral basis according to the established CPFF hourly rates as identified in Section B.7, provided that the order is issued 60 days prior to the PoP start date.”
RFP para L.4.2 states: “For evaluation purposes of this Factor, the Government will assume 3 February 2020 base contract award date, and the Government Ordering Period 1 contract requirements are estimated in RFP attachments: Ordering Period 1 Density Schedule (Attachment 0013) and Ordering Period 1 NET Plan (Attachment 0009), however the offerors proposed Phase-In schedule will be taken into account.” [emphasis added]
By these two references, Ordering Period 1 does not begin until the end of the Phase-In, which can be any period at the bidder’s choice. Consequently, if a bidder were to propose 120 days transition, which begins on 3 Feb 2020, the bidder’s Ordering Period 1 does not begin until approx. 1 June 2020. That gives the bidder an Ordering Period 1 of 9 months (beginning of June 2020 through to end of Feb 2021).
However, Attachment 22, Government Furnished Price Model, in the Ordering Period 1 tab no provision is made to allow the above bidder to adjust the number of hours such that they exclude those hours that are part of the proposed 120-day Phase-In schedule as described in RFP para L.4.2 shown above.
Q: Is it the Government’s intention that the Ordering Period 1 hours encompass all 12 months of the potential Ordering Period 1 (in conflict with RFP para L.4.2 above), or will the Government update the Atch 22 spreadsheet such that bidders can adjust the Ordering Period 1 hours to reflect the decrease associated with their proposed Phase-In schedule? A: Attachment 0022- Government Furnished Pricing Model (GFPM) accounts for the the IDIQ contract maximum, which includes the quantity of hours defined in Section B.2 estimated across all five ordering periods, which is not separated by month. All hours defined in Section B.2 will be utilized in the Cost/Price Factor as set forth in the GFPM. No adjustments to the Ordering Period 1 hours in the GFPM will be made during the evaluation of the Cost/Price Factor as a result of the offeror's proposed Phase In schedule.
14 H - SPECIAL CONTRACT REQUIREMENTS
L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS 1. In the RFP, Sections H.3.1, L.4.3.5.5 and L.4.3.8 each state: “**For the purposes of the solicitation, the composite hourly rates for each labor category shall utilize Wage Determination 2015-5539 ‘Pierce County, Washington’**.” In addition, in the September 12, 2019 Answers to Industry Questions, the responses to questions 7, 8, 9, and 14(e) include similar statements about applying WD 2015-5539 for evaluation purposes. Please confirm that these RFP provisions and Q&A responses mean the following:
a. Solely for RFP evaluation, offerors must use the prevailing wage rates in Service Contract Act Wage Determination 2015-5539 as the minimum wage rates for all labor hours in RFP Attachment 22, Government Furnished Price Model. This evaluation requirement to use WD 2015-5539 as the minimum wage applies regardless of whether offeror expects particular hours be performed at Joint Base Lewis-McChord, performed at other locations in the United States (as defined at FAR 22.1001), or performed at locations outside the United States (as defined at FAR 22.1001).
b. For example, offerors must propose composite labor rates for the Supply/Procurement Specialist described in RFP Section H.3.1.2 using the prevailing wage rates in Wage Determination 2015-5539 for Supply Technician (Occupation Code 01410) as the minimum wage for all in RFP Attachment 22 for this labor category, regardless of how many hours the offeror expects the Supply/Procurement Specialist to perform at Joint Base Lewis-McChord, other locations in the United States, or locations outside the United States.
2. For clarity, the successful offeror may charge its actual costs of labor for contract performance. Service employees must be paid at least the prevailing wages stated in Wage Determination 2015-5539, except for:
a. Labor hours for personnel on TDY outside of Joint Base Lewis-McChord for a period greater than 179 days continuously will be subject to Wage Determination 1999-0316 for the period of the TDY (but will be subject to Wage Determination 2015-5539 for hours worked in the United States before and after the TDY period).
b. Any labor performed at locations outside the United States will not be subject to any Service Contract Act requirements, including the prevailing wages specified in Wage Determinations 2015-5539 and 1999-0316 (See 29 C.F.R. 4.112(b)). The government provides the following clarifications:
Offerors are instructed to utilize WD 2015-5539 for all labor categories subject to a SCA wage determination as detailed in Section H.3.1 in their proposal.
After award, the contractor will be authorized to bill actual labor costs incurred subject to the rate ceiling limit as defined in Section H.6.
H.3.1 Further defines what constitutes membership to the Contractor Field Teams. After award, once a contractor meets the definition of Contract Field Team, they must adhere to the requirements of WD 99-0316 for the entirety of the ordering period of which services are rendered, regardless of where they spend the non TDY hours.
NOTE: Section H narratives have undergone renumbering in the forthcoming RFP Amendment.
| 15 | H - SPECIAL CONTRACT REQUIREMENTS | Request that Section H.3.1 be revised to state: “If a contractor is on CONUS TDY in a United States location outside of JBLM and/or Pierce County, Washington for a period greater than 179 days continuously, they will be considered part of the contract field teams and subject to Nationwide WD 99-0316.” We request this revision because performance in certain OCONUS locations such as Alaska and Hawaii are considered inside the United States (as defined at FAR 22.1001) and therefore subject to the Service Contract Act.” We also request this revision to provide that labor performed near JBLM in Pierce County remain subject to the Pierce County wage determination (2015-5539) instead of the nationwide wage determination (1999-0316). | A. Section H will be revised to identify all locations that are subject to the Department of Labor Service Contract Act in the forthcoming RFP amendment. |
| 16 | SECTION I | FAR 22.1006(c) directs that FAR 52.222-43 and -44 be inserted in “fixed-price, time-and-materials, or labor-hour service” type solicitations and contracts. Please accordingly confirm that if FAR 52.222-43 and/or -44 are incorporated into the contract resulting from this solicitation, the clauses will apply only to CLIN 0001, a firm-fixed-price CLIN, and not any other CLINs, all of which are cost-type. | A. The subject clauses apply to CLIN 0001 as well as the ceiling rates to be defined in Attachment 0023 of the awarded contract. |
| 17 | L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | Please confirm that even though FAR 52.222-43 does not apply to cost-type contract CLINs, under Section L.4.3.5.4.1, each time a new/revised wage determination is incorporated into the contract resulting from this solicitation, the prevailing wages in the new/revised wage determination will supersede the then-existing ceiling rates under the contract. We request that this clarification be confirmed with the following revision to Section L.4.3.5.4.1: “However, In Accordance With (IAW) FAR 52.222-43, the wage determination, issued under the Service Contract Labor Standards statute, (41 U.S.C. chapter 67), by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, current on the anniversary date of a multiple year contract or the beginning of each renewal ordering period, shall apply to this contract and supersede corresponding ceiling rates (if applicable).” | A. The subject clauses apply to CLIN 0001 as well as the ceiling rates to be defined in Attachment 0023 of the awarded contract. |
| 18 | SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT |
| L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | Sections C.2.1.5.3.1 and L.4.3.5.4.1 provide outdated URLs for the SAFE file-transfer system. Please update the URLs in these sections to https://safe.apps.mil/ [safe.apps.mil]. Please also update the name from AMRDEC SAFE to DoD SAFE. | A. References will be corrected accordingly in the forthcoming RFP amendment. . | ||
| 19 | SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | L.4.3.5.8 | Ref: The solicitation contains a number of labor categories that are required to be priced that are not subject to the Service Contract Act based on the geographical place of performance. These labor categories specifically include all labor categories included in Attachment# 22 under OCONUS Contingency. Section L.4.3.5.8 of the solicitation indicates that offerors are to propose all rates in accordance with Wage Determination 2015-5539 “Pierce County, Washington.” |
Q1: Please confirm that this requirement only applies to positions that are covered under the Service Contract Act and that offerors may propose realistic wages (hourly rates) for performance on OCONUS Contingency Work that may be different than Wage Determination 2015-5539 “Pierce County Washington”?
Q2: Is it the Government's intent to use Wage Determination 2015-5539 “Pierce County, Washington” as the base wage for the Contingency CLIN Contingency (Deployment) Personnel? Per the Department of Labor: The SCA applies to all work performed within the United States. For purposes of the SCA, the term "United States" includes any State, the District of Columbia, Puerto Rico, the Virgin Islands, Outer Continental Shelf lands as defined in the Outer Continental Shelf Lands Act, American Samoa, Guam, Wake Island, Johnston Island, and the Commonwealth of the Northern Mariana Islands. The SCA does not apply to work performed in any other territory under the jurisdiction of the United States or any United States base or possession within a foreign country. Also, the SCA does not apply to work performed on ships operating in international or foreign waters. If a portion of the contract services is performed within the United States and a portion is performed outside the United States, the SCA applies to the portion performed in the United States.