Attachment_0027_-_TRR_Checklist.docx

DOCX document 26 KB Posted

Attached to
Common Robotic System (Individual) CRS(I)
Solicitation number
W56HZV-16-R-CRSI
Issued by

About this file

Draft Attachment 0027

View the file

Other files

File Type Posted
Synopsis_-_CRS(I).pdf PDF
FCL_Orientation_Handbook_18FEB15.pdf PDF
FCL_Sponsorship_Letter_MAY16.pdf PDF
FBO_Notice_FCL.docx DOCX document
Attachment_0047_-_Copyright_Release_Letter.docx DOCX document
Attachment_0028_CRS(I)_GFP_List.pdf PDF
Attachment_0009_-_Equipment_Publications_Defects_List.doc DOC document
Attachment_0019_-__MIL_Grade_Connector_Waiver_Form.xlsx XLSX spreadsheet
Attachment_0050_-_Technical_Review_Criteria.pdf PDF
Attachment_0039_-_RAS-G_IOP_V2_-_JAUS_Profiling_Rules.pdf PDF
Attachment_0079_-__Example_Critical_Stockage_List_Worksheet.docx DOCX document
Attachment_0052_-_ATEC_Policy_Bulletin_13-12_Software_Safety_Verification_Policy_and_Guid.pdf PDF
Attachment_0012_-_DD1494_PreparationGuide.pdf PDF
Attachment_0042_-__RAS-G_IOP_Control_Profile.pdf PDF
Attachment_0011_-_TM_Matrix_MIL-STD_40051-2C_Appendix_A.pdf PDF
Attachment_0004_-_VDLS_Account_Access.docx DOCX document
Attachment_0013_-_DD1494_Frequency_Alocation_Form.doc DOC document
Attachment_0040_-__RAS-G_IOP_V2_Overarching_Profile_Custom_Services,_Messages,_Transports.pdf PDF
Attachment_0005_-__Integrated_Mast_Plan_(IMP).pptx PPTX presentation
Attachment_0049_-_SSv_Severity_Scale.pdf PDF
Attachment_0002_Non_Disclosure_Agreement_(NDA).docx DOCX document
Attachment_0032-_CRS(I)_Work_Breakdown_Structure_(WBS).xlsx XLSX spreadsheet
Attachment_0046_-_Human_Engineering_Systems_Analysis_(HESA)_Instructions.docx DOCX document
Attachment_0003_-__Statement_Of_Work_Applicable_Documents.docx DOCX document
Attachment_0024_-_GEIA_STD_0007_ATTRIBUTE_SELECTION_WORKSHEET.xlsx XLSX spreadsheet
Attachment_0036_-_RAS-G_IOP_V2_-_Overarching_Profile.pdf PDF
Attachment_0044_-_Summary_of_Changes_-_IOP_V1_to_V2.xlsx XLSX spreadsheet
Attachment_0075_-_Running_Sheet.xls XLS spreadsheet
Attachment_0038_-_RAS-G_IOP_V2_-_Payloads_Profile.pdf PDF
Attachment_0081_-_Transaction_Format.doc DOC document
Attachment_0015_Required_Supplementation_from_MIL-PRF-32216A.pdf PDF
Attachment_0077_-_Example_Data_for_Battery_Modeling.pdf PDF
Attachment_0016_-__Publications_Style_Guide.pdf PDF
Attachment_0051_-_Joint_Software_Systems_Safety_Engineering_Handbook.pdf PDF
Attachment_0072_-_Supplier_RFI_Form.xlsx XLSX spreadsheet
Attachment_0043_-_RAS-G_IOP_V2_Applique_Profile.pdf PDF
Attachment_0023_Risk_Mgt_Scoring_Criteria_and_Reporting_Template.xlsx XLSX spreadsheet
Attachment_0080_-_Logistics_Product_Data.doc DOC document
Attachment_0078_-_Request_for_Use_of_Prohibited_Materials.doc DOC document
Attachment_0014__-Publications_General_Requirements.doc DOC document
Attachment_0041_-__RAS-G_IOP_V2-JAUS_Instantiation_Helper.pdf PDF
Attachment_0037-_RAS-G_IOP_V2_Comms_Profile.pdf PDF
Attachment_0010_-_Start_of_Work_Meeting_1_(SOWM1)_Agenda.xlsx XLSX spreadsheet
Attachment_0035_-_UGV_Interoperability_Profile_(IOP)_Capabilities_Plan_V2.pdf PDF
Attachment_0007_Run-Off_TRR_Checklist.docx DOCX document
SECTION_D_DRAFT.docx DOCX document
SECTION_C_DRAFT.docx DOCX document
SECTION_E_DRAFT.docx DOCX document
CRS_(I)_Special_Notice.pdf PDF
Special_Notice_5_Aug_16.docx DOCX document
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0027

Test Readiness Review(TRR) Checklist 25 Jul 2016

1 PURPOSE

The Test Readiness Review (TRR) process will assess the readiness of the CRS(I) Systems to enter the formal testing event. The TRR and TRR will assesses the status of planning for and capability to conduct a given test event, to include available resources and other requirements. This process allows key FP leadership and stakeholders to assess whether CRS(I) test assets, personnel, ranges, and test resources are ready to be committed to Government Testing with safe and manageable risks. The process begins with a TRR meeting with the contractor and concludes with a formal Government TRR meeting and a recommendation which is provided to Force Projection (FP) Product Manager (PdM) Unmanned Ground Systems (UGV).

1.1 COMPLETION OF CHECKLIST

The TRR Checklist will be considered completed when the items in the Checklist have been satisfactorily completed, key issues addressed, and there are no unresolved items.

Attachment 0027 Test Readiness Review (TRR) and Operational Test Readiness Review (OTRR) Checklist

CRS (I) Test Readiness

Section
Criteria
Responsibility
Status
Comment/Mitigation
1.0
Introductions/Purposes
1.1
Stated purpose of Government Test events
PdM T&E Lead
2.0
System Configuration
Contractor
2.1
Configuration of the System is consistent with the defined product baseline IAW CDRL A049(Configuration Audit Summary Report)
3.0
CDRLs Status
Contractor
3.1
All CDRL submissions and updates required by TRR have been delivered.
4.0
Contractor Verification Test Results/Corrective Actions
Contractor
4.1
Shakedown Testing is complete
4.2
All failures identified during shakedown have been addressed and documented in Contractor Test Inspection Report
4.3
All known residual catastrophic failures and safety issues identified during shakedown and CRS(I) system testing have been corrected.
4.4
Test Report of Contractor shakedown test results
5.0
Government Inspection Results/Certifications
5.1
The CRS(I) systems have been inspected (not tested) for adherence to the CRS(I) P-Spec requirements. The CRS(I) Systems must pass the inspections for these requirements to be deemed acceptable for test. Some of these inspections will need to occur during build.
DCMA/Contractor
5.2
CRS(I) Systems have been inspected IAW the CRS(I) P-Spec and prepared for shipment.
Contractor
5.4
CRS(I) systems with payloads in shipping containers have been inspected, are complete, and ready for shipment.
DCMA/Contractor
5.5
CRS(I) System inspections, certifications, and analyses have been completed and submitted.
DCMA/Contractor
5.6
Unapproved Hazardous Materials are not present in the CRS(I) Systems, IAW the materials detailed in SOW reference.
DCMA/Contractor
6.0
Test Support
Contractor
6.1
Field Service Representatives (FSRs) are identified and ready to support testing at designated locations.
6.2
Logistics limitations and risks associated with them have been identified and mitigated.
6.3
All Basic Issue Items (BII) are complete and ready for shipment with the system.
6.4
Program of Instruction has been reviewed, approved and available IAW CDRL A071(Program of Instruction)
6.5
Operators' Manuals are complete, delivered, and meet SOW to support tests.
7.0
Safety Assessment Reports/Concerns
Contractor
7.1
Contractors Safety Assessment has been completed and accepted by the Program Office.
8.0
System Delivery Schedule
Contractor
8.1
Delivery schedule has been provided and is on track with contract requirements.