Attachment_0023_Risk_Mgt_Scoring_Criteria_and_Reporting_Template.xlsx

XLSX spreadsheet 184 KB Posted

Attached to
Common Robotic System (Individual) CRS(I)
Solicitation number
W56HZV-16-R-CRSI
Issued by

About this file

Draft Attachment 0023

View the file

Other files

File Type Posted
Synopsis_-_CRS(I).pdf PDF
FCL_Orientation_Handbook_18FEB15.pdf PDF
FCL_Sponsorship_Letter_MAY16.pdf PDF
FBO_Notice_FCL.docx DOCX document
Attachment_0047_-_Copyright_Release_Letter.docx DOCX document
Attachment_0028_CRS(I)_GFP_List.pdf PDF
Attachment_0009_-_Equipment_Publications_Defects_List.doc DOC document
Attachment_0019_-__MIL_Grade_Connector_Waiver_Form.xlsx XLSX spreadsheet
Attachment_0050_-_Technical_Review_Criteria.pdf PDF
Attachment_0039_-_RAS-G_IOP_V2_-_JAUS_Profiling_Rules.pdf PDF
Attachment_0079_-__Example_Critical_Stockage_List_Worksheet.docx DOCX document
Attachment_0052_-_ATEC_Policy_Bulletin_13-12_Software_Safety_Verification_Policy_and_Guid.pdf PDF
Attachment_0012_-_DD1494_PreparationGuide.pdf PDF
Attachment_0042_-__RAS-G_IOP_Control_Profile.pdf PDF
Attachment_0011_-_TM_Matrix_MIL-STD_40051-2C_Appendix_A.pdf PDF
Attachment_0004_-_VDLS_Account_Access.docx DOCX document
Attachment_0013_-_DD1494_Frequency_Alocation_Form.doc DOC document
Attachment_0027_-_TRR_Checklist.docx DOCX document
Attachment_0040_-__RAS-G_IOP_V2_Overarching_Profile_Custom_Services,_Messages,_Transports.pdf PDF
Attachment_0005_-__Integrated_Mast_Plan_(IMP).pptx PPTX presentation
Attachment_0049_-_SSv_Severity_Scale.pdf PDF
Attachment_0002_Non_Disclosure_Agreement_(NDA).docx DOCX document
Attachment_0032-_CRS(I)_Work_Breakdown_Structure_(WBS).xlsx XLSX spreadsheet
Attachment_0046_-_Human_Engineering_Systems_Analysis_(HESA)_Instructions.docx DOCX document
Attachment_0003_-__Statement_Of_Work_Applicable_Documents.docx DOCX document
Attachment_0024_-_GEIA_STD_0007_ATTRIBUTE_SELECTION_WORKSHEET.xlsx XLSX spreadsheet
Attachment_0036_-_RAS-G_IOP_V2_-_Overarching_Profile.pdf PDF
Attachment_0044_-_Summary_of_Changes_-_IOP_V1_to_V2.xlsx XLSX spreadsheet
Attachment_0075_-_Running_Sheet.xls XLS spreadsheet
Attachment_0038_-_RAS-G_IOP_V2_-_Payloads_Profile.pdf PDF
Attachment_0081_-_Transaction_Format.doc DOC document
Attachment_0015_Required_Supplementation_from_MIL-PRF-32216A.pdf PDF
Attachment_0077_-_Example_Data_for_Battery_Modeling.pdf PDF
Attachment_0016_-__Publications_Style_Guide.pdf PDF
Attachment_0051_-_Joint_Software_Systems_Safety_Engineering_Handbook.pdf PDF
Attachment_0072_-_Supplier_RFI_Form.xlsx XLSX spreadsheet
Attachment_0043_-_RAS-G_IOP_V2_Applique_Profile.pdf PDF
Attachment_0080_-_Logistics_Product_Data.doc DOC document
Attachment_0078_-_Request_for_Use_of_Prohibited_Materials.doc DOC document
Attachment_0014__-Publications_General_Requirements.doc DOC document
Attachment_0041_-__RAS-G_IOP_V2-JAUS_Instantiation_Helper.pdf PDF
Attachment_0037-_RAS-G_IOP_V2_Comms_Profile.pdf PDF
Attachment_0010_-_Start_of_Work_Meeting_1_(SOWM1)_Agenda.xlsx XLSX spreadsheet
Attachment_0035_-_UGV_Interoperability_Profile_(IOP)_Capabilities_Plan_V2.pdf PDF
Attachment_0007_Run-Off_TRR_Checklist.docx DOCX document
SECTION_D_DRAFT.docx DOCX document
SECTION_C_DRAFT.docx DOCX document
SECTION_E_DRAFT.docx DOCX document
CRS_(I)_Special_Notice.pdf PDF
Special_Notice_5_Aug_16.docx DOCX document
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title

UNCLASSIFIED

ATTACHMENT 0023
CRS(I) Risk Scoring Criteria and Reporting Template

23 June 2016

Distribution Statement A* - Approved for Public Release; distribution unlimited.

(*Distribution Statement A only applies when form is not filled in)

(*Distribution Statement A only applies when form is not filled in.

Once filled check the UGV Security Classification Guide for proper distribution statement/markings)

UNCLASSIFIED

Criteria Definitions

Analysis
Risk analysis is an evaluation of the identified risk event to determine possible outcomes, the probability of those events occurring, and the severity of the outcomes should the risk event occur. Once this has been determined, the risk event is rated against the program criteria, and an assessment of red, yellow, or green assigned.
Probability (Likelihood)Severity (Consequence)Overall Risk Assessment
The probability (likelihood) rating for each risk is determined by asking the following question: “What is the probability the root cause will happen?” Five levels of probability will be used for the JLTV Program. Figure 1 shows these levels and their likelihood of occurrences. The contractor will assign one of these values to each identified risk event based on their analysis of the event.For each risk identified, the following question must be answered: “Assuming the event occurs, what is the magnitude of the consequence?” For the JLTV Program, severity will be determined in each of three risk areas: performance, cost, and schedule. Guidance for ranking the severity is given in Figure 2.Probability and severity of risks will be displayed on a color coded chart, as depicted in Figure 3. Every risk will be rated for all three severity areas (performance, cost, and schedule), with the highest ranking determining the overall severity for that risk. Risks that fall within the red and yellow zones require development of mitigation plans, green risks require monitoring.

UNCLASSIFIED

Risk Reporting Instructions

1) Evaluate the risk and score via the guidance in the tab "Criteria Definitions"
2) For each risk use a different tab based on the "Risk Reporting Template". Use the risk number / ID to label the tab. (EX. Risk 2010)
3) Populate the cells in the tab per instructions.
4) If the risk becomes closed or assumed add a "-CLOSED" or "-ASSUMED" to the tab name. (EX. Risk 2010 - CLOSED)
UNCLASSIFIED

Risk Reporting Template

UNCLASSIFIED//FOR OFFICIAL USE ONLY
Risk IDStatusCurr. Con/LikImpactTitleConditionContextConsequence if RealizedClose-Out RationaleRisk LeadOpen DateLast Rev. Date
Internal ID NumberColor Coded R/Y/GConsequence / Likelihood ScoreList (C,S,P) for Cost, Schedule, or Performance Impacts. Can be more that one, but the risk is written around the worst situationRisk TitleIf / Then statement describing if the risk comes to pass what will happen.In this section describe how the Likelihood number was determined. It must include enough logic to justify the score.In this section describe the Consequence and how the number was determined. It must include enough logic to justify the score.When closing please fill this out
Mitigation Plan
STEP #DESCRIPTIONSTART DATEESTIMATED COMPLETION DATESTATUSCON/LIKESTEP OWNER
IDDescription of mitigation step. If it lowers the CON/LIK score state so and why it does.Date the Mitigation StartsETCOn Schedule, Off Schedule, Complete and explainScore at this stepWho is the POC for the mitigation

UNCLASSIFIED//FOR OFFICIAL USE ONLY

image1.png image2.png image3.png

File details come from the government source that posted it. Updated .