Attachment_0007_Run-Off_TRR_Checklist.docx

DOCX document 30 KB Posted

Attached to
Common Robotic System (Individual) CRS(I)
Solicitation number
W56HZV-16-R-CRSI
Issued by

About this file

Draft Attachment 0007

View the file

Other files

File Type Posted
Synopsis_-_CRS(I).pdf PDF
FCL_Orientation_Handbook_18FEB15.pdf PDF
FCL_Sponsorship_Letter_MAY16.pdf PDF
FBO_Notice_FCL.docx DOCX document
Attachment_0047_-_Copyright_Release_Letter.docx DOCX document
Attachment_0028_CRS(I)_GFP_List.pdf PDF
Attachment_0009_-_Equipment_Publications_Defects_List.doc DOC document
Attachment_0019_-__MIL_Grade_Connector_Waiver_Form.xlsx XLSX spreadsheet
Attachment_0050_-_Technical_Review_Criteria.pdf PDF
Attachment_0039_-_RAS-G_IOP_V2_-_JAUS_Profiling_Rules.pdf PDF
Attachment_0079_-__Example_Critical_Stockage_List_Worksheet.docx DOCX document
Attachment_0052_-_ATEC_Policy_Bulletin_13-12_Software_Safety_Verification_Policy_and_Guid.pdf PDF
Attachment_0012_-_DD1494_PreparationGuide.pdf PDF
Attachment_0042_-__RAS-G_IOP_Control_Profile.pdf PDF
Attachment_0011_-_TM_Matrix_MIL-STD_40051-2C_Appendix_A.pdf PDF
Attachment_0004_-_VDLS_Account_Access.docx DOCX document
Attachment_0013_-_DD1494_Frequency_Alocation_Form.doc DOC document
Attachment_0027_-_TRR_Checklist.docx DOCX document
Attachment_0040_-__RAS-G_IOP_V2_Overarching_Profile_Custom_Services,_Messages,_Transports.pdf PDF
Attachment_0005_-__Integrated_Mast_Plan_(IMP).pptx PPTX presentation
Attachment_0049_-_SSv_Severity_Scale.pdf PDF
Attachment_0002_Non_Disclosure_Agreement_(NDA).docx DOCX document
Attachment_0032-_CRS(I)_Work_Breakdown_Structure_(WBS).xlsx XLSX spreadsheet
Attachment_0046_-_Human_Engineering_Systems_Analysis_(HESA)_Instructions.docx DOCX document
Attachment_0003_-__Statement_Of_Work_Applicable_Documents.docx DOCX document
Attachment_0024_-_GEIA_STD_0007_ATTRIBUTE_SELECTION_WORKSHEET.xlsx XLSX spreadsheet
Attachment_0036_-_RAS-G_IOP_V2_-_Overarching_Profile.pdf PDF
Attachment_0044_-_Summary_of_Changes_-_IOP_V1_to_V2.xlsx XLSX spreadsheet
Attachment_0075_-_Running_Sheet.xls XLS spreadsheet
Attachment_0038_-_RAS-G_IOP_V2_-_Payloads_Profile.pdf PDF
Attachment_0081_-_Transaction_Format.doc DOC document
Attachment_0015_Required_Supplementation_from_MIL-PRF-32216A.pdf PDF
Attachment_0077_-_Example_Data_for_Battery_Modeling.pdf PDF
Attachment_0016_-__Publications_Style_Guide.pdf PDF
Attachment_0051_-_Joint_Software_Systems_Safety_Engineering_Handbook.pdf PDF
Attachment_0072_-_Supplier_RFI_Form.xlsx XLSX spreadsheet
Attachment_0043_-_RAS-G_IOP_V2_Applique_Profile.pdf PDF
Attachment_0023_Risk_Mgt_Scoring_Criteria_and_Reporting_Template.xlsx XLSX spreadsheet
Attachment_0080_-_Logistics_Product_Data.doc DOC document
Attachment_0078_-_Request_for_Use_of_Prohibited_Materials.doc DOC document
Attachment_0014__-Publications_General_Requirements.doc DOC document
Attachment_0041_-__RAS-G_IOP_V2-JAUS_Instantiation_Helper.pdf PDF
Attachment_0037-_RAS-G_IOP_V2_Comms_Profile.pdf PDF
Attachment_0010_-_Start_of_Work_Meeting_1_(SOWM1)_Agenda.xlsx XLSX spreadsheet
Attachment_0035_-_UGV_Interoperability_Profile_(IOP)_Capabilities_Plan_V2.pdf PDF
SECTION_D_DRAFT.docx DOCX document
SECTION_C_DRAFT.docx DOCX document
SECTION_E_DRAFT.docx DOCX document
CRS_(I)_Special_Notice.pdf PDF
Special_Notice_5_Aug_16.docx DOCX document
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Run-Off TRR Checklist

28 Jun 2016

Distribution Statement A – Approved for Public Release; distribution unlimited

UNCLASSIFIED

Purpose The Run-Off TRR process for the Common Robotic System (Individual) (CRS(I)) Program Management (PM) will assess the readiness of the CRS(I) to enter the formal Run-Off testing event. The Run-Off Test Readiness Review will assesses the status of planning for and capability to conduct a given test event, to include available resources and other requirements. This process allows key CRS(I) leadership and stakeholders to assess whether CRS(I) test systems, personnel, ranges, and test resources are ready to be committed to government testing with safe and manageable risks. The process begins with a meeting with the contractor and concludes with a formal government TRR meeting and a recommendation which is provided to the CRS(I) Product Managers to proceed (or not) into government testing.

Completion of Checklist The Run-Off TRR Checklist will be considered completed when the items in the Checklist have been satisfactorily completed, key issues addressed, and there are no unresolved items.

UNCLASSIFIED

Attachment 0007

UNCLASSIFIED Page 4 of 4

Run-Off Test Readiness Review (TRR) Checklist

System Test Readiness

Section
Criteria
Responsibility
Status
Comment/Mitigation
1.0
Introductions/Purpose
1.1
Test purpose
PDM Test
2.0
System Configuration
Contractor
2.1
Configuration of the system is consistent with the defined product baseline.
3.0
CDRLs Status
Contractor
3.1
All CDRL submissions and updates required by Run-Off TRR have been delivered.
4.0
System-Level Verification Test Results/Corrective Actions
Contractor
4.1
Break In tests are complete
4.3
All known residual catastrophic failures and safety issues identified during break in testing have been corrected.

5.0

5.1
Government Inspection Results/Certifications
5.2
The systems have been inspected (not tested) for adherence to the requirements in the contract. The systems must pass the inspections for these requirements to be deemed acceptable for test. Some of these inspections will need to occur during build.
DCMA/Contractor
5.3
Systems have been configured IAW (VEASAM) and prepared for shipment.
Contractor
5.4
All non-system hardware. The required timing of deliveries is specified in Section F.
Contractor
5.5
Kits have been inspected, are complete, and ready for shipment IAW VEASAM
DCMA/Contractor
5.6
System certifications, and analyses have been completed and submitted
DCMA/Contractor
5.7
Unapproved Hazardous Materials are not present in the CRS(I), IAW the materials detailed section of the contract addressing Hazardous Materials Management.UNCLASSIFIED

DCMA/Contractor

6.0

6.1
Test Support
Contractor
6.2
FSRs /SMEs are identified and ready to support testing at designated locations as identified in Attachment (VEASAM).
6.3
Logistics limitations and risks associated with them have been identified and mitigated.
6.4
All BII items are complete and ready for shipment with the system.
6.5
Tester Training packages/plans have been reviewed, approved and available.
6.6
Operators’ Manuals are complete, delivered, and adequate to support tests.
6.7
Vendor has addressed parts support strategy for each of the test sites identified in the VEASAM

7.0

7.1
Safety Assessment Reports/Concerns
Contractor
7.2
Contractors Safety Assessment has been completed and accepted by the Program Office
7.3
High voltage electrical safety for testing addressed and covered in both the tester training courses and the operators manuals.

8.0

8.1
System Delivery Schedule
Contractor
8.2
Delivery schedule has been provided and is on track with contract requirements.