Attachment_0026,_LEUT_SOW_to_CLIN_Crosswalk_20180118_Clean.xlsx
XLSX spreadsheet 2 MB Posted
- Attached to
- Light Engineer Utility Trailer (LEUT) Type II
- Solicitation number
- W56HZV-16-R-0210
About this file
Attachment 0026, LEUT SOW to CLIN Crosswalk 20180118 Clean
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title
UNCLASSIFIED//FOR OFFICIAL USE ONLY
| As of MOD: |
| W56HZV-16-R-0210 |
| Last Modified: |
| 1/17/18 |
| DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only (Reason: Administrative or Operational Use) (16 Mar 2016). Other requests for this document shall be referred to the attention of the JLTV Project Security Manager, G2, US Army TACOM, 6501 East 11 Mile Rd, Warren, Mail Stop #640, MI 48397-5000, DSN 786-5395/3491 or Commercial (586) 239-3495/3491. | |
| This document contains information exempt from mandatory disclosure under FOIA. Exemption 4 applies. | |
| UNCLASSIFIED//FOR OFFICIAL USE ONLY |
&10FOUO_x000D_UNCLASSIFIED - USG ONLY
&6Original File: &F Tab: &A
| UNCLASSIFIED - USG ONLY | |
| FOUO | &6Printed at: &T; &D |
Page &P of &N
Light Engineer Utility Trailer (LEUT) Type II
Change Log
| Attachment 0026 Change Log | |||||
| # | Date Changed | Effective MOD | Worksheet(s) Changed | Description of Change | Reason Change Was Made |
&10FOUO_x000D_UNCLASSIFIED
&6Original File: Attachment 0060 - Option Pricing Matrix (DDMMMYYYY).xlsx_x000D_&6Tab: &a_x000D_ UNCLASSIFIED_x000D_&10FOUO &6Printed at: &t; &d_x000D_Page &p of &n
SOW to CLIN Crosswalk
| UNCLASSIFIED//FOR OFFICIAL USE ONLY | |||||||||||||||
| Applicable Period(s) | |||||||||||||||
| SOW Paragraph Number | SOW Paragraph Title | CLIN | Unit of Issue | CLIN Type | CDRL Evoked | Attachment Reference | Base Award | OP1 | OP2 | OP3 | OP4 | OP5 | OP6 | CLIN Code | |
| Auto Fill | Auto Fill | Auto Fill | Auto Fill | Auto Fill | Used to Auto Fill | ||||||||||
| C.1 | GENERAL | N/A | N/A | N/A | N/A | ||||||||||
| C.1.1 | INTRODUCTION | N/A | N/A | N/A | N/A | ||||||||||
| C.1.2 | System Requirements | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.1.3 | Data | 0141 | LO | FFP | ü | ü | ü | ü | ü | ü | ü | CDRL | |||
| C.1.3.1 | Applicable Documents | N/A | N/A | N/A | N/A | ||||||||||
| C.2 | HARDWARE AND MATERIAL | N/A | N/A | N/A | N/A | ||||||||||
| C.2.1 | Type II LEUT | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.2.2 | Product Support Package | N/A | N/A | N/A | N/A | ||||||||||
| C.2.2.1 | PSP Aberdeen | 0101 | EA | FFP | ü | PSP_A | |||||||||
| C.2.2.2 | Reserved | N/A | N/A | N/A | N/A | ||||||||||
| C.2.2.3 | PSP TARDEC | 0101 | EA | FFP | ü | PSP_T | |||||||||
| C.2.2.4 | PSP OEM | 0101 | EA | FFP | ü | PSP_O | |||||||||
| C.2.2.5 | PSP Follow-On Testing | 0102-0107 | EA | FFP | ü | PSP_F | |||||||||
| C.2.3 | Basic Issue Items | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.2.4 | Authorized Stockage List | 0131AA-0131AB | |||||||||||||
| 0132-0137 | Month | FFP | A037 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||||
| C.2.5 | Technical Manuals (TM) | N/A | N/A | N/A | N/A | ||||||||||
| C.3 | MEETINGS, REVIEWS, AND CONFERENCES | N/A | N/A | N/A | N/A | ||||||||||
| C.3.1 | Participation and Administration | 0021-0027 | Month | FFP | A024, A025 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.3.1.1 | Meeting and Conferences | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.3.2 | Start of Work Meeting | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.2.1 | SOWM Presentation | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.2.2 | Preliminary Design Review (PDR) | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.2.2.1 | PDR Completion Criteria | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.3 | Critical Design Review (CDR) | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.3.1 | CDR Completion Criteria | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.4 | Test Readiness Review (TRR) | 0051 | Month | FFP | ü | Test_Spt_A | |||||||||
| C.3.5 | Production Readiness Review (PRR) | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.6 | Program Management Integrated Product Team (IPT) Meetings | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.3.7 | Program Management Reviews (PMRs) | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.3.8 | Integrated Product Support In-Process Reviews (IPSIPRs) | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.8.1 | Provisioning Conference | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.3.9 | Test Meetings | N/A | N/A | N/A | N/A | ||||||||||
| C.3.10 | System Safety and Environmental Working Group | N/A | N/A | N/A | N/A | ||||||||||
| C.4 | INTEGRATED MASTER SCHEDULE (IMS) | 0021-0027 | Month | FFP | A013 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.5 | CONFIGURATION MANAGEMENT | N/A | N/A | N/A | N/A | ||||||||||
| C.5.1 | Configuration Management (CM) | 0021-0027 | Month | FFP | A005 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.5.1.1 | Configuration Management Standards | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2 | Configuration Identification and Data Management (DM) | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2.1 | Data Management | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2.2 | Version Control and Traceability | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2.3 | Configuration Baseline and Release | 0021-0027 | Month | FFP | A047 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.5.2.3.1 | Design Freeze for Test | N/A | N/A | N/A | N/A | ||||||||||
| C.5.2.4 | Product and Enterprise Identifiers | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.5.2.5 | Existing Products | 0021-0027 | Month | FFP | A002 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.5.2.6 | Re-identification | N/A | N/A | N/A | N/A | ||||||||||
| C.5.2.7 | Military and Industry Standard Parts | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2.7.1 | Part Numbering Convention | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2.7.2 | Vendor Part Numbers | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.5.2.8 | National Stock Numbers (NSNs) and Part or Identifying Numbers (PINs) | N/A | N/A | N/A | N/A | ||||||||||
| C.5.2.8.1 | PIN | N/A | N/A | N/A | N/A | ||||||||||
| C.5.2.8.2 | PIN/CAGE Conflict | N/A | N/A | N/A | N/A | ||||||||||
| C.5.2.9 | Indentured Bill of Material (IBOM) | 0021-0027 | Month | FFP | A047 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.5.3 | Configuration Status Accounting | 0021-0027 | Month | FFP | A002 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.5.4 | Change Management/Configuration Control | N/A | N/A | N/A | N/A | ||||||||||
| C.5.4.1 | Configuration Control | N/A | N/A | N/A | N/A | ||||||||||
| C.5.4.2 | Engineering Changes | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A004 | 0002 | ü | ü | ü | ü | ü | ü | ü | HW | |||
| C.5.4.2.1 | Value Engineering Change Proposal | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A004 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.5.4.2.2 | Supporting Data | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A002, A004, A047 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.5.4.2.3 | Government Proposed ECPs | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A004 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.5.4.3 | Government Review and Approval | N/A | N/A | N/A | N/A | ||||||||||
| C.5.4.4 | Responsibility for Failure Due to Changes | N/A | N/A | N/A | N/A | ||||||||||
| C.5.4.5 | Responsibility for Cost of Changes | N/A | N/A | N/A | N/A | ||||||||||
| C.5.4.5.1 | Cost for Trailer Deficiencies | N/A | N/A | N/A | N/A | ||||||||||
| C.5.4.6 | Requests for Variance | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A002, A006 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.5.5 | Configuration Audits | N/A | N/A | N/A | N/A | ||||||||||
| C.5.5.1 | Physical Configuration Audit (PCA) | N/A | N/A | N/A | N/A | ||||||||||
| C.5.5.1.1 | PCA Plan | 0021 | Month | FFP | A045 | ü | SEPM | ||||||||
| C.5.5.1.2 | PCA Support | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.5.5.2 | Configuration Audit Summary Report | 0021 | Month | FFP | A046 | ü | SEPM | ||||||||
| C.5.6 | Production Government Format Technical Data Package (TDP) | 0011AA-0011AB | EA | FFP | A047 | 0020 | ü | HW | |||||||
| C.5.6.1 | Identification and Assertion of Restrictions | 0011AA-0011AB | EA | FFP | ü | HW | |||||||||
| C.6 | CORROSION | N/A | N/A | N/A | N/A | ||||||||||
| C.6.1 | Materials | 0021 | Month | FFP | A007 | 0001, 0029 | ü | SEPM | |||||||
| C.6.2 | Paint | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.6.2.1 | Topcoat | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.6.2.2 | Rustproofing of Interior Surfaces | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.6.3 | Steam and Water Jet Cleaning | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.6.4 | Corrosion Prevention and Control | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.6.4.1 | Corrosion Life | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.6.4.2 | Collection and Entrapment | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.6.4.3 | Cleaning and Maintenance | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.6.4.4 | Dissimilar Metals | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.7 | ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH (ESOH) | N/A | N/A | N/A | N/A | ||||||||||
| C.7.1 | ESOH Program | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.7.2 | Environmental Compliance | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.7.3 | Safety Assessment Report (SAR) | 0021-0027 | Month | FFP | A008 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.7.4 | Hazard Tracking System (HTS) | 0021-0027 | Month | FFP | A020 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.7.5 | Radioactive and Hazardous Materials Management | N/A | N/A | N/A | N/A | ||||||||||
| C.7.5.1 | Restrictions on Radioactive Material | N/A | N/A | N/A | N/A | ||||||||||
| C.7.5.2 | Restrictions on Hazardous Material | N/A | N/A | N/A | 0027 | N/A | |||||||||
| C.7.6 | Hazardous Materials Management Program (HMMP) Report | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.7.6.1 | HMMP | 0021-0027 | Month | FFP | A009 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.7.7 | System Safety and Environmental Working Group (SSEWG) | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.8 | INTEGRATED PRODUCT SUPPORT (IPS) | N/A | N/A | N/A | N/A | ||||||||||
| C.8.1 | Technical Manual (TM) Development | 0041 | LO | FFP | A012 | 0014 | ü | CDRL | |||||||
| C.8.1.1 | Logistics Management Information (LMI) Updates | N/A | N/A | N/A | N/A | ||||||||||
| C.8.1.1.1 | LMI Development | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.8.1.1.2 | Operator and Development; Logistics Demonstration; and TM Verification | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.2 | Logistics Support Analysis | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.8.2.1 | Logistics Product Data | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.8.2.1.1 | Product Support Analysis (PSA) | 0021 | Month | FFP | A014 | ü | SEPM | ||||||||
| C.8.2.2 | Special Equipment Tools and Test Equipment | 0021 | Month | FFP | A011 | 0028 | ü | SEPM | |||||||
| C.8.2.3 | New Test Measurement and Diagnostic Equipment (TMDE) Items | N/A | N/A | N/A | N/A | ||||||||||
| C.8.3 | Integrated Product Support Analysis | N/A | N/A | N/A | N/A | ||||||||||
| C.8.3.1 | Maintenance Analysis | 0021-0027 | Month | FFP | A012 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.8.3.2 | Maintenance Planning and Management | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.8.3.3 | Level of Repair Analysis | 0021-0027 | Month | FFP | A010 | 0011 | ü | ü | ü | ü | ü | ü | ü | SEPM | |
| C.8.3.4 | Maintenance Analysis Summary | 0021 | Month | FFP | A012 | ü | SEPM | ||||||||
| C.8.3.5 | Maintenance Task List | 0021 | Month | FFP | A012 | ü | SEPM | ||||||||
| C.8.4 | Provisioning | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.4.1 | Provisioning and Pre-Procurement Screening (PPS) | 0021 | Month | FFP | A040, A048 | ü | SEPM | ||||||||
| C.8.4.2 | Provisioning Parts List (PSL) | 0021 | Month | FFP | A039 | 0013 | ü | SEPM | |||||||
| C.8.4.3 | Critical Stockage List (CSL) | 0021 | Month | FFP | A028 | 0012 | ü | SEPM | |||||||
| C.8.4.4 | Engineering Data for Provisioning (EDFP) | 0021 | Month | FFP | A038 | ü | SEPM | ||||||||
| C.8.4.5 | Engineering Drawing Tree | 0021 | Month | FFP | A041 | 0015 | ü | SEPM | |||||||
| C.8.4.6 | Logisitics Support Analysis (LSA-036) | 0021 | Month | FFP | A039 | ü | SEPM | ||||||||
| C.8.4.7 | PLISN | N/A | N/A | N/A | N/A | ||||||||||
| C.8.4.8 | Obsolescence | 0021 | Month | FFP | A001 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.8.5 | Logistics Demonstration | N/A | N/A | N/A | N/A | ||||||||||
| C.8.5.1 | Government Conducted Logistics Demonstration | 0121 | LO | FFP | A042 | ü | Log | ||||||||
| C.8.5.1.1 | Soldier Interaction Test Event | 0121 | LO | FFP | ü | Log | |||||||||
| C.8.5.2 | LEUT Manual Corrections | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.5.3 | TM Verification | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.5.4 | TM Validation and Verification | N/A | N/A | N/A | N/A | ||||||||||
| C.8.5.4.1 | Validation | 0021 | Month | FFP | A042 | ü | SEPM | ||||||||
| C.8.5.4.2 | Validation Report and Certificate | 0021 | Month | FFP | A049, A050 | ü | SEPM | ||||||||
| C.8.5.4.3 | Verification | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.5.5 | Design Change Notices/Engineering Change Proposals (DCN/ECP) | 0021-0027 | Month | FFP | A004, A005, A006 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.8.5.6 | Technical Manual Deliverables | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.8.6 | Training and Training Product Development | 0011AA-0011AB | |||||||||||||
| 0012-0017 | Month | FFP | A033 | ü | SEPM | ||||||||||
| C.8.6.1 | Instructor & Key Personnel Training (I&KPT) | 0111 | LO | FFP | A033 | ü | Trng | ||||||||
| C.8.6.1.1 | OPNET | 0111 | LO | FFP | A033 | ü | Trng | ||||||||
| C.8.6.1.2 | FLMNET | 0111 | LO | FFP | A033 | ü | Trng | ||||||||
| C.8.6.2 | Training and Training Support Package (TSP) | N/A | N/A | N/A | N/A | ||||||||||
| C.8.6.2.1 | Training Support Plan | 0021 | Month | FFP | A033 | ü | SEPM | ||||||||
| C.8.6.2.2 | Operator New Equipment Training | 0111 | LO | FFP | A033 | ü | Trng | ||||||||
| C.8.6.2.3 | Field Level Maintenance New Equipment Training | 0111 | LO | FFP | A033 | ü | Trng | ||||||||
| C.8.7 | Product Support Package | N/A | N/A | N/A | N/A | ||||||||||
| C.8.7.1 | PSP Items | N/A | N/A | N/A | N/A | ||||||||||
| C.8.7.2 | PSP Items (PQT, TM, LD) | N/A | N/A | N/A | N/A | ||||||||||
| C.8.7.3 | PSP List Due | 0021 | Month | FFP | A014 | 0006 | ü | SEPM | |||||||
| C.8.7.4 | PSP Location | N/A | N/A | N/A | N/A | ||||||||||
| C.8.8 | Packaging, Handling, Storage, and Transportation (PHS&T) | N/A | N/A | N/A | N/A | ||||||||||
| C.8.8.1 | Packaging | N/A | N/A | N/A | N/A | ||||||||||
| C.8.8.2 | Packaging Data Development | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.8.3 | Item Classification | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.8.3.1 | Selective Group Item | N/A | N/A | N/A | N/A | ||||||||||
| C.8.8.3.2 | Special Group Item | N/A | N/A | N/A | N/A | ||||||||||
| C.8.8.4 | Logistics Product Data - Packaging | 0021 | Month | FFP | A015 | ü | SEPM | ||||||||
| C.8.8.5 | Special Packaging Instruction | 0021 | Month | FFP | A016 | ü | SEPM | ||||||||
| C.8.8.5.1 | Validation Testing of Packaging | 0021-0027 | Month | FFP | A017 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.8.8.6 | Shipping and Storage Instructions (SSI) | 0021 | Month | FFP | A016 | ü | SEPM | ||||||||
| C.8.8.6.1 | Short Term Transportation/Storage Instructions | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.8.6.2 | Long Term Storage Instructions | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.8.6.3 | Validation of Shipping and Storage Instructions | 0021 | Month | FFP | A017 | ü | SEPM | ||||||||
| C.8.9 | Item Unique Identification (IUID) Implementation | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A019 | 0007 | ü | ü | ü | ü | ü | ü | ü | HW | |||
| C.8.9.1 | IUID Markings | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.8.9.2 | IUID Marking Plan | 0021 | Month | FFP | A018 | 0007, 0008 | ü | SEPM | |||||||
| C.8.9.3 | IUID Review Session | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.8.9.4 | IUID Component Assessment | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.8.9.5 | IUID Technical Data | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.8.9.6 | IUID Validation and Verification Report | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A019 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.8.9.7 | Equipment Control Record, Department of Army Form 2408-9 | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0009 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| C.9 | TEST SERVICE REPRESENTATIVE (TSR) | N/A | N/A | N/A | N/A | ||||||||||
| C.9.1 | TSR Test Sites | N/A | N/A | N/A | N/A | ||||||||||
| C.9.1.1 | TSR Aberdeen | 0051 | LO | FFP | ü | Test_Spt_A | |||||||||
| C.9.1.2 | TSR Yuma | 0061 | LO | FFP | ü | Test_Spt_Y | |||||||||
| C.9.1.3 | TSR Defense Ammunition Center | 0071 | LO | FFP | ü | Test_Spt_D | |||||||||
| C.9.1.4 | TSR TARDEC | 0081 | LO | FFP | ü | Test_Spt_T | |||||||||
| C.9.1.5 | TSR Follow-on Production Testing | 0091-0096 | LO | FFP | ü | ü | ü | ü | ü | ü | Test_Spt_F | ||||
| C.9.2 | Maintainence and Repairs | N/A | N/A | N/A | N/A | ||||||||||
| C.9.3 | Maintenance Facilities | N/A | N/A | N/A | N/A | ||||||||||
| C.10 | MODELING AND SIMULATION (M&S) | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.10.1 | M&S Data Sheets Package | 0021 | Month | FFP | A043 | 0017, 0018 | ü | SEPM | |||||||
| C.10.2 | CAD/CAE Technical Data Deliveries | N/A | N/A | N/A | N/A | ||||||||||
| C.10.2.1 | Simulation-based Design Model Data | 0021 | Month | FFP | A044 | 0019 | ü | SEPM | |||||||
| C.11 | GOVERNMENT FURNISHED EQUIPMENT AND INFORMATION | N/A | N/A | N/A | 0016 | N/A | |||||||||
| C.11.1 | Maintaining GFE | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.12 | WARRANTY | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| C.13 | TRANSPORTABILITY REPORT | 0021-0027 | Month | FFP | A036 | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | SEPM | |
| C.14 | PRODUCTION DATABASE | 0021-0027 | Month | FFP | A034 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.15 | FEDERAL RETAIL EXCISE TAX (FRET) EXPENSES | 0031AA-0031AB | |||||||||||||
| 0032-0037 | LO | FFP | ü | ü | ü | ü | ü | ü | ü | FRET | |||||
| C.16 | SECURITY REQUIREMENTS | N/A | N/A | N/A | N/A | ||||||||||
| C.16.1 | Controlled Unclassified Information (CUI) | 0021-0027 | Month | FFP | 0023 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.16.1.1 | Encryption | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.16.2 | OPSEC Standard Operating Procedure or Plan | 0021-0027 | Month | FFP | A035 | 0022 | ü | ü | ü | ü | ü | ü | ü | SEPM | |
| C.16.3 | Operations Security (OPSEC) | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.16.3.1 | Public Release | N/A | N/A | N/A | N/A | ||||||||||
| C.16.3.2 | Examples of OPSEC Sensitive Information | N/A | N/A | N/A | N/A | ||||||||||
| C.16.4 | Protection and Disclosure of Government Information - Public Release Requests | 0021-0027 | Month | FFP | 0024 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| C.16.5 | Release of Information | N/A | N/A | N/A | N/A | ||||||||||
| C.16.6 | Information Flow Down | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.16.7 | Common Access Card (CAC) and Installation Access Identification | N/A | N/A | N/A | N/A | ||||||||||
| C.16.7.1 | Contractor CAC | N/A | N/A | N/A | N/A | ||||||||||
| C.16.7.2 | Handling of ID Cards | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.16.7.3 | Returning of Badges | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.17 | PROGRAM PROTECTION PLAN (PPP) | N/A | N/A | N/A | N/A | ||||||||||
| C.17.1 | Development of PPP | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.17.2 | Critical Program Information Assessment (CPIA) | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.17.3 | Critical Function Analysis (CFA) | 0021 | Month | FFP | ü | SEPM | |||||||||
| C.17.4 | Component Control | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| C.18 | Contractor Manpower Reporting | 0142 | LO | FFP | ü | ü | ü | ü | ü | ü | ü | CMR | |||
| E.1 | QUALITY MANAGEMENT SYSTEM (QMS) REQUIREMENT | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A026 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.1.1 | Minimum QMS Standards | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2 | QUALITY REQUIREMENTS | N/A | N/A | N/A | N/A | ||||||||||
| E.2.1 | Inspection Records | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| E.2.1.1 | Inspection Records Control | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| E.2.2 | End Item/Component Inspection | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.2.1 | Sampling and Acceptance | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.3 | Inspection Equipment | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.4 | Certifications | N/A | N/A | N/A | N/A | ||||||||||
| E.2.4.1 | Certification Supporting Data | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.4.2 | Updated Certification | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.4.3 | Certifications and Subcontracting | N/A | N/A | N/A | N/A | ||||||||||
| E.2.4.4 | Process Certification | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A026 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.4.5 | Material Certification | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A026 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.4.6 | Test Certification | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A026 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.4.7 | Compliance Certification | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A026 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.5 | Process Audits | N/A | N/A | N/A | N/A | ||||||||||
| E.2.6 | Final Inspection Records (FIR) Preparation | N/A | N/A | N/A | N/A | ||||||||||
| E.2.6.1 | FIR Submittal | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A027 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.6.2 | FIR Updates | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7 | Welding Requirements | N/A | N/A | N/A | N/A | ||||||||||
| E.2.7.1 | Welding Procedures | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| E.2.7.1.1 | Welding Requirements | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.1.2 | Welder Qualification | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.2 | Previously Qualified Procedures | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A021, A022, A023 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.2.1 | Qualified Weld Procedure | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.2.2 | Certified Welders | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.2.3 | Break in Production | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.2.4 | Favorable Quality History | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.3 | Weld Repair Procedures | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A021 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.4 | Weld Equipment | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.5 | Welding Inspectors | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A023 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.5.1 | American Weld Society | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.5.2 | Canadian Welding Bureau | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.5.3 | Weld Experience/Education | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.5.4 | Armed Forces | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.6 | Welder, Welding Operators and Tack Welders | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.6.1 | Armed Forces | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.7 | Welding Design | N/A | N/A | N/A | N/A | ||||||||||
| E.2.7.7.1 | Structural Welding Design | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A021, A022 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.8 | Nondestructive Testing (NDE) | N/A | N/A | N/A | N/A | ||||||||||
| E.2.7.8.1 | Visual Inspection | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | 0001, 0029 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.8.2 | Nondestructive Critical Weld Joint Inspection | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A022 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.2.7.8.3 | Nondestructive Inspectors | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.2.7.8.4 | Nondestructive Testing Acceptance Criteria for Structural Material(s) | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | A022 | ü | ü | ü | ü | ü | ü | ü | HW | ||||
| E.3 | INSPECTION | N/A | N/A | N/A | N/A | ||||||||||
| E.4 | FIRST ARTICLE APPROVAL REQUIREMENTS | N/A | N/A | N/A | N/A | ||||||||||
| E.4.1 | First Article Approval | N/A | N/A | N/A | N/A | ||||||||||
| E.4.2 | Low Rate Initial Production Trailers | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.4.3 | Configuration | 0021AA | Month | FFP | 0001, 0029 | ü | SEPM | ||||||||
| E.4.4 | First Production Vehicle Inspection | N/A | N/A | N/A | N/A | ||||||||||
| E.4.4.1 | FPVI | 0011 | LO | FFP | A027 | ü | CDRL | ||||||||
| E.4.4.2 | Government FPVI | 0011 | LO | FFP | ü | CDRL | |||||||||
| E.4.4.3 | FPVI Trailer | 0011 | EA | FFP | ü | HW | |||||||||
| E.4.4.4 | FPVI Report | 0011 | LO | FFP | A029 | ü | CDRL | ||||||||
| E.4.4.5 | FPVI Disapproval | N/A | N/A | N/A | N/A | ||||||||||
| E.4.5 | PMBS/VIPER/SPIDER/ Testing | N/A | N/A | N/A | N/A | ||||||||||
| E.4.5.1 | Pintle Motion Base Simulator (PMBS)/Shaker Test | N/A | N/A | N/A | N/A | ||||||||||
| E.4.5.1.1 | Shaker Test | N/A | N/A | N/A | N/A | ||||||||||
| E.4.5.2 | Vehicle Inertial Properties Evaluation Rig (VIPER) Test | N/A | N/A | N/A | N/A | ||||||||||
| E.4.5.3 | Suspension Parameter Identification Evaluation Rig (SPIDER) Test | N/A | N/A | N/A | N/A | ||||||||||
| E.4.6 | LRIP Vehicle Acceptance | N/A | N/A | N/A | N/A | ||||||||||
| E.4.6.1 | Conditional Acceptance Prior to First Article Test (FAT) Article Approval | 0011AA-0011AB | EA | FFP | ü | HW | |||||||||
| E.4.6.2 | Final Acceptance | N/A | N/A | N/A | N/A | ||||||||||
| E.5 | PRODUCTION QUALIFICATION TEST | 0011AA-0011AB | EA | FFP | ü | HW | |||||||||
| E.6 | SHIPMENT OF LRIP TRAILERS | N/A | N/A | N/A | N/A | ||||||||||
| E.6.1 | Transportation Charges | 0011AA | EA | FFP | ü | HW | |||||||||
| E.6.1.1 | LRIP Trailer Shipment Restrictions | N/A | N/A | N/A | N/A | ||||||||||
| E.6.1.1.1 | FPVI Completion | N/A | N/A | N/A | N/A | ||||||||||
| E.6.1.1.2 | FPVI and Shaker Deficiencies | 0011AA | EA | FFP | ü | HW | |||||||||
| E.6.2 | Shipping Addresses | N/A | N/A | N/A | N/A | ||||||||||
| E.6.3 | Shipping Documentation | 0011AA | EA | FFP | 0001, 0029 | ü | HW | ||||||||
| E.7 | PQT REQUIREMENTS | N/A | N/A | N/A | N/A | ||||||||||
| E.7.1 | Government Conducted PQT | N/A | N/A | N/A | N/A | ||||||||||
| E.7.1.1 | PQT | N/A | N/A | N/A | N/A | ||||||||||
| E.7.2 | Course Profiles | N/A | N/A | N/A | N/A | ||||||||||
| E.7.2.1 | Primary Roads | N/A | N/A | N/A | N/A | ||||||||||
| E.7.2.2 | Secondary Roads | N/A | N/A | N/A | N/A | ||||||||||
| E.7.2.3 | Trails | N/A | N/A | N/A | N/A | ||||||||||
| E.7.2.4 | Cross Country | N/A | N/A | N/A | N/A | ||||||||||
| E.7.3 | Test Meetings | 0021 | Month | FFP | ü | SEPM | |||||||||
| E.7.4 | Manuals for Test | 0011AA | EA | FFP | ü | HW | |||||||||
| E.7.5 | Test Deficiencies for Failures | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.1 | Failure Definition | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.2 | Deficiency Definition | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.3 | Test Period | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.4 | Failures During Testing | 0011AA | EA | FFP | ü | HW | |||||||||
| E.7.5.5 | Deficiencies During Test | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.6 | Test Work Authorization Document (TWAD) | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.6.1 | TWAD Submittal | 0011AA | EA | FFP | A030 | ü | HW | ||||||||
| E.7.5.6.2 | Errors and Inconsistencies TWAD | N/A | N/A | N/A | N/A | ||||||||||
| E.7.5.7 | Modifications Requiring ECP | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.7.6 | Failure Analysis Corrective Action Reports | N/A | N/A | N/A | N/A | ||||||||||
| E.7.6.1 | TIRs During Test | 0021 | Month | FFP | A031 | ü | SEPM | ||||||||
| E.7.6.2 | FACARS Requiring ECP | N/A | N/A | N/A | N/A | ||||||||||
| E.7.6.3 | FACARS and Scoring Conference | N/A | N/A | N/A | N/A | ||||||||||
| E.7.6.4 | FACAR Criteria | 0021 | Month | FFP | ü | SEPM | |||||||||
| E.7.6.5 | FACAR Implementation | N/A | N/A | N/A | N/A | ||||||||||
| E.7.6.6 | FACAR Revisions | N/A | N/A | N/A | N/A | ||||||||||
| E.7.6.7 | Test Markings | 0021 | Month | FFP | ü | SEPM | |||||||||
| E.7.7 | CARB Meetings | N/A | N/A | N/A | N/A | ||||||||||
| E.7.7.1 | Schedules | N/A | N/A | N/A | N/A | ||||||||||
| E.7.7.2 | CARB Preparation/Notification | N/A | N/A | N/A | N/A | ||||||||||
| E.7.8 | Scoring Conference | N/A | N/A | N/A | N/A | ||||||||||
| E.7.8.1 | Government Conducted Scoring Conference | N/A | N/A | N/A | N/A | ||||||||||
| E.7.8.2 | Incident Classifications | N/A | N/A | N/A | N/A | ||||||||||
| E.7.8.3 | Scoring Conference Schedule | 0021 | Month | FFP | ü | SEPM | |||||||||
| E.7.9 | First Production Vehicle Inspection | N/A | N/A | N/A | N/A | ||||||||||
| E.7.9.1 | Notification of FAT | N/A | N/A | N/A | N/A | ||||||||||
| E.7.9.2 | FAT Disapproval | N/A | N/A | N/A | N/A | ||||||||||
| E.7.9.3 | Refurbishment of all LRIP Trailers | 0041 | EA | FFP | ü | VRE | |||||||||
| E.7.9.4 | FAT | N/A | N/A | N/A | N/A | ||||||||||
| E.7.9.4.1 | Final Inspection of Refurbished LRIP Trailer | 0041 | EA | FFP | ü | VRE | |||||||||
| E.7.9.4.2 | Removal and Disposal of FAT Items | 0041 | EA | FFP | ü | VRE | |||||||||
| E.8 | PRODUCTION QUALITY | N/A | N/A | N/A | N/A | ||||||||||
| E.8.1 | Production Quality Requirements | N/A | N/A | N/A | N/A | ||||||||||
| E.8.1.1 | In-Process Inspection | 0011AA-0011AB | |||||||||||||
| 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||||
| E.8.1.2 | Conformance Inspection (CI) | 0021-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | HW | ||||
| E.8.1.3 | Control Tests | N/A | N/A | N/A | N/A | ||||||||||
| E.8.1.3.1 | Control Test Procedure | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| E.8.1.3.2 | Control Test Failure | N/A | N/A | N/A | N/A | ||||||||||
| E.9 | FOLLOW ON PRODUCTION TESTING (FPT) | N/A | N/A | N/A | N/A | ||||||||||
| E.9.1 | FPT Duration | N/A | N/A | N/A | N/A | ||||||||||
| E.9.2 | FPT Failure | N/A | N/A | N/A | N/A | ||||||||||
| E.9.3 | FPT Test Requirements | N/A | N/A | N/A | N/A | ||||||||||
| E.9.3.1 | Inspection Requirement | 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | HW | ||||
| E.9.3.2 | Trailer Transportation | 0012-0017 | EA | FFP | ü | ü | ü | ü | ü | ü | ü | HW | |||
| E.9.3.3 | TWAD Submittals | N/A | N/A | N/A | N/A | ||||||||||
| E.9.3.4 | Test Support | 0091-0096 | LO | FFP | ü | ü | ü | ü | ü | ü | Test_Spt_F | ||||
| E.9.3.5 | PSP | 0102-0107 | LO | FFP | ü | ü | ü | ü | ü | ü | PSP_F | ||||
| E.9.3.6 | FACAR Submittal | N/A | N/A | N/A | N/A | ||||||||||
| E.9.3.7 | Test Meetings | N/A | N/A | N/A | N/A | ||||||||||
| E.9.4 | Refurbishment of FPT Trailers | 0041-0047 | EA | FFP | ü | ü | ü | ü | ü | ü | VRE | ||||
| E.9.5 | Product Quality Deficiency Reports (PQDR) | N/A | N/A | N/A | N/A | ||||||||||
| E.9.5.1 | PQDR - PDREP Access | 0021 | Month | FFP | ü | SEPM | |||||||||
| E.9.5.1.1 | Category I PQDR | N/A | N/A | N/A | N/A | ||||||||||
| E.9.5.1.2 | Category II PQDR | N/A | N/A | N/A | N/A | ||||||||||
| E.9.5.2 | PQDR Reporting | 0021-0027 | Month | FFP | A032 | ü | ü | ü | ü | ü | ü | ü | SEPM | ||
| E.9.5.3 | PQDR Corrective Actions | 0021-0027 | Month | FFP | ü | ü | ü | ü | ü | ü | ü | SEPM | |||
| E.10 | Inspection and Acceptance of System Engineering / Program Management (SEPM) | N/A | N/A | N/A | N/A | ||||||||||
| E.10.1 | SEPM | N/A | N/A | N/A | N/A | ||||||||||
| UNCLASSIFIED//FOR OFFICIAL USE ONLY |
&10FOUO_x000D_UNCLASSIFIED
&6Original File: A&F Tab: &A
| UNCLASSIFIED | |
| FOUO | &6Printed at: &T; &D |
Page &P of &N
Crosswalk Codes
| Codes and Symbols Used on "SoW to CLIN Crosswalk" | ||||||
| CLIN Code | CLIN Title | CLIN(s) | Contract Type | Basis of Issue | ||
| HW | LEUT Hardware Cost | 0011AA-0011AB | ||||
| 0012-0017 | FFP | EA | ||||
| FRET | Federal Retail Excise Tax (FRET) Expenses | 0031AA-0031AB | ||||
| 0032-0037 | FFP | Lot | ||||
| VRE | LEUT - Refurbishment | 0041-0047 | FFP | EA | ||
| Test_Spt_A | Test Support Representative - Aberdeen | 0051 | FFP | Lot | ||
| Test_Spt_Y | Test Support Representative - Yuma | 0061 | FFP | Lot | ||
| Test_Spt_D | Test Support Representative - Defense Ammunition | 0071 | FFP | Lot | ||
| Test_Spt_T | Test Support Representative - TARDEC | 0081 | FFP | Lot | ||
| Test_Spt_F | Test Support Representative - (Follow-on Test) - Aberdeen/Yuma | 0091-0096 | FFP | Lot | ||
| PSP_A | Product Support Package - Aberdeen | 0101 | FFP | EA | ||
| PSP_T | Product Support Package - TARDEC | 0101 | FFP | EA | ||
| PSP_O | Product Support Package - OEM | 0101 | FFP | EA | ||
| PSP_F | Product Support Package - (Follow-on Test) - Aberdeen/Yuma | 0102-0107 | FFP | EA | ||
| Trng | Operator/Maintainer Training | 0111 | FFP | Lot | ||
| Log | Logistics Demonstration/Soldier Interaction Test Event | 0121 | FFP | Lot | ||
| SEPM | System Engineering / Program Management (SEPM) | 0021-0027 | FFP | Month | ||
| CDRL | Contract Data Requirements List | 0141 | FFP | Lot | ||
| CMR | Contractor Manpower Reporting | 0142 | FFP | Lot | ||
| NA | Instruction/General/Parent | N/A | N/A | N/A | ||
| Symbols Used in the "SOW to CLIN Crosswalk" | ||||||
| ü | A checkmark symbol indicates that the SOW paragraph must be performed by the contractor if an associated CLIN has been awarded or exercised during the base award or option period. For example, if the Government exercises a SEPM CLIN in Ordering Period 3, the contractor must perform all SOW paragraphs that are listed against the SEPM CLIN that have a check box in Ordering Period 3. |
UNCLASSIFIED//FOR OFFICIAL USE ONLY
&10FOUO_x000D_UNCLASSIFIED
&6Original File: Attachment 0060 - Option Pricing Matrix (12DEC2014).xlsx_x000D_&6Tab: &a_x000D_ UNCLASSIFIED_x000D_&10FOUO &6Printed at: &t; &d_x000D_Page &p of &n image1.png
File details come from the government source that posted it.