LEUT_Type_II_RFP_W56HV-16-R-0210_Questions_Set_1,_1-12.pdf
PDF 352 KB Posted
- Attached to
- Light Engineer Utility Trailer (LEUT) Type II
- Solicitation number
- W56HZV-16-R-0210
About this file
LEUT Type II RFP W56HV-16-R-0210 Questions Set 1, 1-12
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question
Number Phase
Date
Received
Date
Answered
1 PRESOL 2/7/2018 3/13/2018
2 SOL 2/27/2018 2/27/2018
3 SOL 3/6/2018 3/13/2018
4 SOL 3/7/2018 3/13/2018
5 SOL 3/7/2018 3/13/2018
6 SOL 3/7/2018 3/13/2018
7 SOL 3/7/2018 3/13/2018
8 SOL 3/7/2018 3/13/2018
9 SOL 3/7/2018 3/13/2018
10 SOL 3/13/2018
11 SOL 3/13/2018
12 SOL 3/13/2018
Questions Answers
LIGHT ENGINEER UTILITY TRAILER (LEUT) - TYPE II
Regarding the Light Engineer Utility Trailer (LEUT) Type II, Solicitation Number:
W56HZV-16-R-0210, is there an incumbent on this effort?
Thank you for your inquiry. There is not an incumbent for this requirement.
I am trying to find out if the Light Engineer Utility Trailer (LEUT) program has any logistics deliverables?
Yes, CDRL A001 Obsolescence Alert Notice, CDRL A010 LORA Report, CDRL
A011 Tools and Test Equipment, CDRL A012 -13&P Operator & Field
Maintenance TM including RPSTL, A014 Product Support Analysis Package List, CDRL A028 Critical Stockage List, CDRL A037 Authorized Stockage List, CDRL
A039 Provisioning Parts List, A040 Provisioning and Procurement Screening
Data, A042 Validation Plan, A048 Provisioning Performance Schedule, A049
Validation Report, A050 Validation Certificate
Within MIL-STD 40051-2C there is a matrix that will give you an idea of what is going to be in the manual. Upon the Start of Work Meeting, the Publications
Manager will have a matrix filled out and it will be given to the contractor as
GFI
...would like to ask if there is a Technical Manual Contracts Requirement (TMCR) for this project?
The Technical Manual Requirement for the LEUT Type II is CDRL A012
Per CDRL A012 Technical Manual - Please confirm contractor format “Maintenance
Task List” due at the SOWM – is for format review only and not content.
This requirement is for content and format. The contractor shall provide an initial list of the maintenance tasks which they intend to include in the TM.
This will give the USG an opportunity to make sure that we are not over-simplifying, or complicating the TM.
DISTRUBUTION STATEMENT "A": Approved for public release; distribution unlimited
How or will the Federal Government consider adjusting the specified program cost limitation considering recent Federal Government mandated steel tariffs and effects on the steel costs over the program life enacted after the RFP release?
The Government will not adjust the affordability limits due to the steel tariffs.
We would like to request a 30-day extension to the submittal deadline of March 28, 2018 to a new deadline of April 28, 2018. This request is based upon the complexity of the technical and modeling data required for Attachment 18 of the RFP. Much of the data we need to complete the engineering analysis and modeling is dependent upon sub tier suppliers. Many of our suppliers have been slow in providing the data, putting us behind our plan required to meet the March 28, 2018 submittal deadline. We are requesting the extension in order to ensure we are able to submit a quality package for the Government’s review.
Amendment 0001 extends the solicitation closing date from 28 March 2018 to
06 April 2018.
Per SOW C.8.4 Provisioning – reference to enter LMI Data into “Genesis” – Will the government provide contractor access to Genesis?
After contract award, Powerlog J software will be provided to the contractor.
Genesis will not be utilized. The SOW Section C.8.4 Provisioning will be amended to reflect this change.
The RFP specifies specific LEUT steering capability with the RFP specified prime movers including 5, 10 and 20-ton dump trucks, 5-ton cargo trucks, HEMTT cargo trucks, Engineering Squad Vehicle (ESV), Medium Mine Protected Vehicle (MMPV), and M113 APC.
...from the RFP:
3.5.6 Turning ability. The LEUT Type II with BHL with armor weighing at least
9852.03 kg (21720 lb) and an assumed CG height of 110.24 cm (43.4 inches) above the bed, being towed by its prime movers, shall be able to negotiate a right angle turn posed by an intersection of two roads 9.144 m (30 feet) wide (wall to wall)
(threshold) and 7.315 m (24 feet) wide (wall to wall) (objective) without stopping
(see 4.3.6).
Please provide steering characteristics and geometry for the specified prime movers including:
- Turning circle
- Overall vehicle dimensions, including locations of axles and pintle
- Maximum cramp angle for steered axles
Vendors are responsible for researching and determining the best options to meet the requirements.
Per CDRL A012 Technical Manual - Please confirm the “Maintenance Task list” identified in CDRL is the MAC
The Maintenance Task List is not the same as the Maintenance Allocation
Chart, although much of the information requested below will be included in the MAC. The maintenance task list also includes PMCS and lubrication requirements:
Per CDRL A039 Provisioning Parts List (PPL) - Will the Govt be providing a LMI Data
Elements Selection Sheet?
Provisioning requires three key elements: the Provisioning Parts List (PPL), the
Engineering Data for Provisioning (EDFP), and the Pre-procurements Screening
(PPS). The Contractor is responsible to provide data required for each element.
Per SOW C.8.1.1.1 reference to “Maintenance Analysis” CDRL A010, Please confirm this is referring to the LORA
The Contractor will ensure that all information provided within the LSA-036 aligns with the maintenance analysis, LORA, MAC, and procedures presented in the technical manuals.
Per CDRL A012 Technical Manual - Will the Government provide a TMCR or 40051-
2C Tailored Table for Technical Manual requirements specifics?