Attachment_0011,_Sample_Level_Of_Repair_Analysis.docx

DOCX document 34 KB Posted

Attached to
Light Engineer Utility Trailer (LEUT) Type II
Solicitation number
W56HZV-16-R-0210
Issued by

About this file

Attachment 0011, Sample Level Of Repair Analysis

View the file

Other files

File Type Posted
Attachment_0029,_Superseding_Revisions_to_ATPD-2414B.PDF PDF
W56HZV16R0210-0004.pdf PDF
W56HZV16R0210-0003.pdf PDF
Attachment_0010_LEUT_PRICING_MATRIX_V15.xlsx XLSX spreadsheet
LEUT_Type_II_RFP_W56HV-16-R-0210_Questions_Set_3,_Question_30.xlsx XLSX spreadsheet
LEUT_Type_II_RFP_W56HV-16-R-0210_Questions_Set_2_(13-32_minus_30).pdf PDF
Attachment_0029,_Superseding_Revisions_to_ATPD-2414B.PDF PDF
W56HZV16R0210-0002.pdf PDF
LEUT_Type_II_RFP_W56HV-16-R-0210_Questions_Set_1,_1-12.pdf PDF
Type_II_LEUT_CDRLs_Signed_LATEST_VERSION_25Jan2018.pdf PDF
Attachment_0025_Past_Performance_Questionnaire_v2.doc DOC document
W56HZV-16-R-0210_0001_v3.pdf PDF
Attachment_0030,_Consolidated_GFP.pdf PDF
Attachment_0011,_Sample_Level_Of_Repair_Analysis.docx DOCX document
Attachment_0010_LEUT_PRICING_MATRIX_V15.xlsx XLSX spreadsheet
Attachment_0030,_Consolidated_GFP.pdf PDF
Attachment_0028,_General_Mechanics_Tool_Kit.pdf PDF
Attachment_0002,_DDD_for_ECPs_and_VECPs.doc DOC document
Attachment_0018,_Trailer_Vehicle_Dynamic_Data_Sheet_20170929_edits.xlsx XLSX spreadsheet
Attachment_0006,_DI-ILSS-80134A.pdf PDF
W56HZV16R0210.pdf PDF
Attachment_0007,_DoD_Guide_UID_v3.0.pdf PDF
Attachment_0010_LEUT_PRICING_MATRIX_V14.xlsx XLSX spreadsheet
Attachment_0011,_Sample_Level_Of_Repair_Analysis.docx DOCX document
Attachment_0021,_Performance_Summary_Matrix_Revised_06_Feb_2018_edits.xlsx XLSX spreadsheet
Attachment_0029,_Superseding_Revisions_to_ATPD-2414B.pdf PDF
Attachment_0023,_Controlled_Unclassified_Information_(CUI).pdf PDF
Attachment_0001,_ATPD-2414B_-_M1269_Type_II_LEUT.pdf PDF
Attachment_0014,_MIL-STD_40051-2C.pdf PDF
Attachment_0017,_VCI_Data_Requirements_for_Trailer_20170929_edits.xlsx XLSX spreadsheet
Attachment_0027,_Request_for_use_of_Prohibited_Materials_-_LEUT.doc DOC document
Attachment_0008,_SOP_Unique_Item_Traceability_Data_Integrity.pdf PDF
Attachment_0025_Past_Performance_Questionnaire.doc DOC document
Attachment_0012,_Sample_Critical_Stockage_List.doc DOC document
Attachment_0013,_Sample_Provisioning_Requirements_Statement.doc DOC document
Attachment_0015,_Sample_DrawingTree.pdf PDF
Attachment_0022,_JPO_JLTV_OPSEC_Plan.pdf PDF
Attachment_0020,_TDP_Requirements.docx DOCX document
Attachment_0016,_GFP_Tracker.xlsx XLSX spreadsheet
Attachment_0009,_2408-9_Instructions.docx DOCX document
Attachment_0019,_Simulation_based_Design_Model_Data_CAE.doc DOC document
Attachment_0010_LEUT_PRICING_MATRIX_V14.xlsx XLSX spreadsheet
Attachment_0030,_Consolidated_GFP.pdf PDF
Attachment_0026,_LEUT_SOW_to_CLIN_Crosswalk_20180118_Clean.xlsx XLSX spreadsheet
Attachment_0010_LEUT_PRICING_MATRIX_V14.xlsx XLSX spreadsheet
Attachment_0010_LEUT_Pricing_Matrix_20180215.xlsx XLSX spreadsheet
Attachment_0021,_Performance_Summary_Matrix_Revised_06_Feb_2018_edits.xlsx XLSX spreadsheet
Attachment_0020,_TDP_Requirements.docx DOCX document
Type_II_LEUT_CDRLs_Signed_LATEST_VERSION_25Jan2018.docx DOCX document
Attachment_0017,_VCI_Data_Requirements_for_Trailer_20170929_edits.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 005

LEVEL OF REPAIR ANALYSIS (LORA)

ATTACHMENT 0011

LEVEL OF REPAIR ANALYSIS (LORA)

1. COMPASS. COMPASS is the Army approved system-level LORA model. This program is available to all U.S. Government offices and their contractors working under a current contract. The Contractor may obtain the COMPASS software at: https://www.logsa.army.mil/lec/compass/

Software training is available to the contractor. The Contractor may schedule training by contacting Logistics Support Agency (LOGSA) at phone number (256) 955-9847.

Data elements for the input spreadsheet shall be completed as indicated below.

Field
Definition
Status
Applied To
Item
Item type to be created in

COMPASS database (must be LRU, NLRU, SRU, or NSRU)

Required
All
Nomenclature
Item nomenclature, required if name

preference is set to "Nomenclature" in input database

Required
All
LCN
Item LCN, required if name preference is set to LCN" in input database "
Required
All
Part Number
Item Part Number, required if name preference is set to Part Number" in input database "
Required
All
NIIN
Item NIIN, required if name preference is set to NIIN" in input database "
Required
All
CAGE
CAGE code
Required
All
Unit Price
Item unit price
Required
All
False Removal Rate
Item false removal rate
Required
All
Washout Rate
Item washout rate
Required
All
Unit Weight
Item packaged shipping weight
Required
All
Avg Price of Parts
Average price of piece (repair) parts for an item
Required
All
MTTR
Item Mean Time To Repair; part of item repair alternative
Required
All
Diagnostic Time
Item Diagnostic Time; part of item repair alternative
Required
All
TPS Dev Cost
Test Program Set (TPS) Development Cost; part of item repair alternative
Required
All
TPS Main Cost
TPS Maintenance Cost; part of item repair alternative
Required
All
Pages of Doc
Number of pages of technical documentation for an item; part of item repair alternative
Required
All
LRU Association
Name of LRU which the SRU/NSRU is associated
Required
SRU/NSRU
MTBF
Mean Time Between Failure for item
Required
NLRU/SRU/NSRU

2. Additional information for completing the LORA effort.

a. The first step in the process is to develop a LORA candidate list; initial candidate list shall all include repairable items/components, a copy of this list shall be provided to the Government.

b. The initial candidate list shall include all repairable items/components, when analyzed if they are determined not to be viable LORA candidates, these components will be annotated as not applicable (N/A).

c. Levels of Maintenance – For the purpose of this effort, the following levels shall be used: Field Maintenance (DS), Sustainment Maintenance (DEPOT and Contractor).

d. Remove/Replace and Repair Time - The current commercial repair/replace times will be used. If times are not available, times shall be estimated using MIL-HDBK-470A.

e. Failure Rates – The current commercial failure rates will be used for the initial/baseline results.

f. Unknown DATA - Elements that do not have current or known data shall use historical data for that item/component or a like item/component. Data shall be either commercial or military.

a. All data shall be entered in COMPASS and be as complete as possible to ensure that the evaluations are as correct as possible.

3. Evaluations to be completed for this effort

a. Economic Evaluation – To aid the Government in making repair determinations, include the following:

Material Cost Labor Cost Sustainment Cost

b. Sensitivity and Trend Analysis – The Parameters that are to be adjusted for these analyses, please see information below.

Mean Time Between Failure (MTBF) - shall be +/- 30 percent Operating Hours – Shall be +/- 120 percent Mean Time To Repair (MTTR) – shall be +/- 30 percent

For all Evaluations listed above the contractor shall provide a Front End Analysis (FEA) and Maintenance Policy for each evaluation completed, addition analysis’s and or policies may be required and will be specified below .

c. Analysis: Report will include information from this effort to aid in a final determination of LORA.

d. Policy: N/A

File details come from the government source that posted it.