Attachment_0027,_Request_for_use_of_Prohibited_Materials_-_LEUT.doc
DOC document 69 KB Posted
- Attached to
- Light Engineer Utility Trailer (LEUT) Type II
- Solicitation number
- W56HZV-16-R-0210
About this file
Attachment 0027, Request for use of Prohibited Materials - LEUT
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 0027 Request for Use of Prohibited Materials Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the LEUT Security Class Guide for proper distribution statement/markings)
1. General Information
Requesting Company
Date of Request
Point of Contact
LEUT Prohibited material for which waiver is requested
2. Explanation of Use
Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard
Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives
Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.
5. Technical Justification
Instructions: Provide technical justification for the use of LEUT prohibited material. Explain why it is necessary and why it cannot be eliminated.
6. Program Risk
Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan
Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.
The following Sections will be filled in by the Government
8. Environmental Safety and Occupational Health Working Group (ESOH WG) Evaluation/ Recommendation
Instructions: Government ESOH WG will to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.
9. Concurrence
I concur that use of {prohibited material} as described above under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:
{Name2}
{Date2}
LEUT, LEAD ENGINEER Date {Name4}
{Date4}
Product Director, AWS Date
10. Approval
Upon the basis of the findings above, I hereby determine that use of {prohibited material} in the parts identified in Section 1 for {Contractor Name} Contract {Contract Number}is acceptable and justified.
{Name5}
{Date5}
Project Manager Date
UNCLASSIFIED
File details come from the government source that posted it.