QAs_batch_6_TE_.docx

DOCX document 16 KB Posted

Attached to
FMTV A2 Industry Day Announcement
Solicitation number
W56HZV16R0024
Issued by

About this file

Industry Day 2 Questions

View the file

Other files

File Type Posted
Draft_RFP_Q As_0001.pdf PDF
DRAFT_CDRLS_C001-C093.pdf PDF
DRAFT_CDRLS_A001-B025.pdf PDF
DRAFT_CDRLS_D001_-_E014.pdf PDF
QAs_batch_5v2_MTV_0005.DOCX DOCX document
QAs_batch_4v2_MTV_PCO_Revised.docx DOCX document
Draft_Attachments_(zipped)_Folder.zip ZIP file
FMTV_A2_ID-2_Attendee_List.xlsx XLSX spreadsheet
Industry_Day__2_Slides_-_Morning_Unclassified_Brief.pdf PDF
Signed_DD_254_and_Continuation_Sheets_FMTVA2_Solicitation_W56HZV-16-R-00....pdf PDF
DRAFT_Section_A.docx DOCX document
DRAFT_Section_M.docx DOCX document
DRAFT_Section_K.docx DOCX document
DRAFT_Section_H.docx DOCX document
DRAFT_Section_C.docx DOCX document
DRAFT_Section_D.docx DOCX document
DRAFT_Section_L.docx DOCX document
DRAFT_Section_E.docx DOCX document
TACOM_LCMC_Lease_Procedures.pdf PDF
PSPEC_Annex_R_-_Definitions.pdf PDF
Industry_Day__1_Q As_0003.pdf PDF
Technical_Demonstrator_Characteristics.xlsx XLSX spreadsheet
Industry_Day__1_Q As_0001.docx DOCX document
FMTV_Tech_Data_NDA.docx DOCX document
Industry_Day__1_Q As_0002.docx DOCX document
NDA.pdf PDF
FMTV_A2P2_Industry_Day_Attendees.pdf PDF
FMTV_A2P2_Industry_Day_Slides.pdf PDF
NATC_Travel_Information.pdf PDF
NATC_Visitor_Pass.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRY DAY #2 QUESTIONS FOR BATCH 6+ ANSWERS:

Test & Evaluation (TE)

16. [REF E.3.3.1 (b)(1)] E.3.3.1 (b) (1) references fit up per E.2.13.2, which does not exist. Is the intended para E.2.12.2?

Answer: Correct, the intended paragraph is E.2.12.2. The referenced section will be updated.

17. [REF E.1.1.1.1]

What program time fences were considered to arrive at the 450 DAC for vehicle delivery? What is the assumed contract award date to begin to plan to build these production-representative vehicles?

Answer: 1.) 450 DAC was developed as a reasonable time for design, build, and delivery of test vehicles by the PM. 2.) The Government is anticipating contract award near the end of 4QFY17, but this is subject to change.

18. Will data and analysis results be provided to the contractor after verification test events?

Answer: Test results that do not meet automotive performance requirements or reliability/maintainability incidents will generate Test Incident Reports (which are available to the contractor) and require Failure Analysis and Corrective Action Reports. Classified event data from Live Fire testing will be released at Government’s discretion following OPSEC review.

File details come from the government source that posted it. Updated .