QAs_batch_5v2_MTV_0005.DOCX

DOCX document 15 KB Posted

Attached to
FMTV A2 Industry Day Announcement
Solicitation number
W56HZV16R0024
Issued by

About this file

Program related questions

View the file

Other files

File Type Posted
Draft_RFP_Q As_0001.pdf PDF
QAs_batch_6_TE_.docx DOCX document
DRAFT_CDRLS_C001-C093.pdf PDF
DRAFT_CDRLS_A001-B025.pdf PDF
DRAFT_CDRLS_D001_-_E014.pdf PDF
QAs_batch_4v2_MTV_PCO_Revised.docx DOCX document
Draft_Attachments_(zipped)_Folder.zip ZIP file
FMTV_A2_ID-2_Attendee_List.xlsx XLSX spreadsheet
Industry_Day__2_Slides_-_Morning_Unclassified_Brief.pdf PDF
Signed_DD_254_and_Continuation_Sheets_FMTVA2_Solicitation_W56HZV-16-R-00....pdf PDF
DRAFT_Section_A.docx DOCX document
DRAFT_Section_M.docx DOCX document
DRAFT_Section_K.docx DOCX document
DRAFT_Section_H.docx DOCX document
DRAFT_Section_C.docx DOCX document
DRAFT_Section_D.docx DOCX document
DRAFT_Section_L.docx DOCX document
DRAFT_Section_E.docx DOCX document
TACOM_LCMC_Lease_Procedures.pdf PDF
PSPEC_Annex_R_-_Definitions.pdf PDF
Industry_Day__1_Q As_0003.pdf PDF
Technical_Demonstrator_Characteristics.xlsx XLSX spreadsheet
Industry_Day__1_Q As_0001.docx DOCX document
FMTV_Tech_Data_NDA.docx DOCX document
Industry_Day__1_Q As_0002.docx DOCX document
NDA.pdf PDF
FMTV_A2P2_Industry_Day_Attendees.pdf PDF
FMTV_A2P2_Industry_Day_Slides.pdf PDF
NATC_Travel_Information.pdf PDF
NATC_Visitor_Pass.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Program

93. As we understand it, there is a 5 year base contract that is awarded in 3QFY17 with FRP not starting until FY20. So are there 5 full years of production years of at least 48 trucks/month or will production in the base contract only have essentially 2.25 years of ramp up followed by full rate production, where the first 2.75 years of the contract are devoted to ECP development, test, TM validation etc.?

Answer: Yes, there is a 5 year base contract planned for award in 3Q FY17. Yes, Full Rate Production (FRP) is not expected until FY20. Whether there are 5 full years of production would depend on many factors including, but not limited to:

i. Availability of funding

ii. Satisfactory completion of testing

iii. Execution of contract options

iv. Production readiness of prime contractor There is no guarantee of a minimum 48 trucks/month for FRP; that number is notional, and subject to change, based on Gov’t estimates of funding and vehicle affordability. The first three years of the contract may include ECP development, test vehicle production, testing, logistics product development, STS tasks, amongst other things.

94. Will the USG be bailing vehicles to potential OEMs to help reduce the design and manufacturing risk?

Answer: No, it is not possible to provide FMTV A1P2 production bailment to potential prime bidders; however, an alternative Government leasing procedure of current FMTV A1P2 production vehicles will be posted to FBO (one of each are available to potential prime bidders; M1078A1P2 and M1083A1P2). In addition, one new production M1078A1P2 and M1083A1P2 will be made available during normal business hours at the Detroit Arsenal for physical examination, upon request. These vehicles will be displayed onsite at Industry Day #2 on 22JUNE.