DRAFT_Section_L.docx

DOCX document 47 KB Posted

Attached to
FMTV A2 Industry Day Announcement
Solicitation number
W56HZV16R0024
Issued by

About this file

Draft Section L

View the file

Other files

File Type Posted
Draft_RFP_Q As_0001.pdf PDF
QAs_batch_6_TE_.docx DOCX document
DRAFT_CDRLS_C001-C093.pdf PDF
DRAFT_CDRLS_A001-B025.pdf PDF
DRAFT_CDRLS_D001_-_E014.pdf PDF
QAs_batch_5v2_MTV_0005.DOCX DOCX document
QAs_batch_4v2_MTV_PCO_Revised.docx DOCX document
Draft_Attachments_(zipped)_Folder.zip ZIP file
FMTV_A2_ID-2_Attendee_List.xlsx XLSX spreadsheet
Industry_Day__2_Slides_-_Morning_Unclassified_Brief.pdf PDF
Signed_DD_254_and_Continuation_Sheets_FMTVA2_Solicitation_W56HZV-16-R-00....pdf PDF
DRAFT_Section_A.docx DOCX document
DRAFT_Section_M.docx DOCX document
DRAFT_Section_K.docx DOCX document
DRAFT_Section_H.docx DOCX document
DRAFT_Section_C.docx DOCX document
DRAFT_Section_D.docx DOCX document
DRAFT_Section_E.docx DOCX document
TACOM_LCMC_Lease_Procedures.pdf PDF
PSPEC_Annex_R_-_Definitions.pdf PDF
Industry_Day__1_Q As_0003.pdf PDF
Technical_Demonstrator_Characteristics.xlsx XLSX spreadsheet
Industry_Day__1_Q As_0001.docx DOCX document
FMTV_Tech_Data_NDA.docx DOCX document
Industry_Day__1_Q As_0002.docx DOCX document
NDA.pdf PDF
FMTV_A2P2_Industry_Day_Attendees.pdf PDF
FMTV_A2P2_Industry_Day_Slides.pdf PDF
NATC_Travel_Information.pdf PDF
NATC_Visitor_Pass.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution Approved for Public Release; Distribution Unlimited

DRAFT Section L - Instructions, conditions, and notices to offerors or respondents.

L.1 General Proposal Information

L.1.1 The proposal, subject to the Submission, Modification, Revision, and Withdrawal paragraph of Instructions to Offeror(s) Competitive Acquisitions (FAR Provision 52.215-1, ALT I) contained in Section L of the solicitation, shall be submitted in the format and quantities set forth below. All information necessary for the review and evaluation of a proposal is to be contained in the proposal volumes set forth below. Section M of the solicitation sets forth the evaluation criteria and delineates the Factors to be evaluated and their relative order of importance. The Offeror’s proposal, as required by this section, shall be evaluated as set forth in Section M of this solicitation. The Government will not assume the offeror possesses any capability, understanding, or commitment not specified in its proposal. It is an Offerors responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates an understanding of and the ability to comply with the solicitation requirements to allow for a meaningful evaluation. The Government does not assume the duty to search for data to cure problems it finds in proposals.

L.1.2 Export Controlled Information

This solicitation contains Export Controlled information in Controlled Unclassified Attachments and within the Classified Annexes to this solicitation. It is the responsibility of the Offeror, not the Government, to obtain the appropriate export licenses, or process the appropriate export license exemption, necessary for authorization to share any such information with subcontractors who are foreign persons as defined in applicable export laws and regulations, or to obtain access to the files themselves. The failure or inability of an Offeror to obtain the appropriate export compliance documentation may be considered as grounds for rejection in accordance with M.2.

L.2 Proposal Content, Format and Instructions

L.2.1 Proposal Content

The Offeror's proposal shall be submitted in seven separate volumes as set forth below. The Offerors proposal shall consist of the following volumes:

(a) Volume 1: Technical Factor. Submit three identical sets of CD-ROMs or DVDs.

(b) Volume 2: Technical Maturity Factor. Submit three identical sets of CD-ROMs or DVDs.

(c) Volume 3: Total Evaluated Cost/Price (TEC/P) Factor. Submit three identical sets of CD-ROMs or DVDs.

(d) Volume 4: Past Performance Factor. Submit three identical sets of CD-ROMs or DVDs.

(e) Volume 5: Small Business Participation Factor. Submit three identical sets of CD-ROMs or DVDs.

(f) Volume 6: Proposal Terms and Conditions Volume. Submit three identical sets of CD-ROMs or DVDs.

(e) Volume 7: Classified Volume. Submit three identical sets of CD-ROMs or DVDs.

L.2.1.1 All proposals shall be in English (American Standard) and shall be in US dollars. The proposal shall include all information specified and address all requirements outlined in Section L.

L.2.1.2 A Proposal Executive Summary or transmittal letter is optional. It will neither be considered as part of the volumes required, nor will it be evaluated. If a Proposal Executive Summary is submitted, it must be submitted as a separate volume from the seven volumes set forth above and it should be no more than five pages in length.

L.2.1.3 Offerors are not authorized to include in the proposal citations for, or linkages to websites.

L.2.2 Proposal Format and Instructions

L.2.2.1 Each volume listed above shall be submitted on a separate set of CD-ROMs or DVDs. The offeror shall submit three identical sets of CD-ROMs or DVDs for each volume. One set of media shall be labeled as the primary copy and signed by a representative of the company authorized to submit proposals. In the case of discrepancies between the sets of media, the primary copy will take precedence.

L.2.2.1.1 Each CD-ROM or DVD shall be labeled so it is easily identifiable for evaluation purposes (example: Volume III, Cost/Price Factor, Set 1 of 3, CD 1 of X), and shall also include the offerors name and the solicitation number. Each volume shall include a (i) title page, (ii) table of contents, and (iii) list of tables and figures. Each page of the proposal shall be numbered, and each paragraph of the proposal shall have a reference number. Provide a list of all attachments and substantiating data in the table of contents. The table of contents shall be organized as set forth below. The table of contents shall include the following information for each Factor, attachment, and for all substantiating data listed:

(a) Cross-reference to related Section L paragraph number

(b) Page number

(c) CD-ROM or DVD Volume and number

(d) File name

(e) Classification

L.2.2.1.2 Acceptable File Formats. All electronic information provided in response to the solicitation must be provided in Microsoft (MS) Office 2013 or PDF compatible format or except as noted in instructions for individual volumes.

L.2.2.1.3 Unless otherwise specified, it is recommended that proposal be formatted for 8.5” x 11” paper with a minimum font size of 10 pt. and with a minimum of 0.5” margins. Schedules, drawings and other documents more appropriate to larger size shall be formatted for no larger than 11” x 17” dimensions. All spreadsheets must include all formulas, function, macros, computations, or equations used to compute the proposed amounts. For each workbook, all Rows, Columns, Cells, and Worksheets must be visible. Zero height and zero width rows and columns in Worksheets are not acceptable. Worksheet cells formatted with the font color equal to the fill color are not acceptable. If Workbooks or Worksheets are password protected, then the passwords must be provided. Print image files or pictures or files containing only values are not acceptable. Failure to provide fully functional excel spreadsheets in the proposal may result in your proposal being rejected.

L.2.2.2 Submission Due Date

The offeror must ensure its proposal, in its entirety, reaches its intended destination before the date and time set for closing of the solicitation set forth in Block 9 on the Standard Form (SF) 33, front page of the solicitation.

L.2.2.2.1 Lateness

The lateness rules for submitted proposals are outlined in FAR 52.215-1 "Instructions to Offerors-Competitive Acquisition," and are incorporated in to this solicitation.

L.2.3 Unclassified Proposal Submission Address

Submit the UNCLASSIFIED proposal to the address below. All proposals delivered in response to this solicitation, whether hand-carried or submitted via U.S. mail, shall be addressed as follows:

U.S. Army Contracting Command - Warren Attention: FMTV Proposal, Vicki Misiak Bldg 231, Mail Stop 416 6501 E. Eleven Mile Rd.

Warren, MI 48397-5000

Solicitation Number: W56HZV-16-R-0024 Date & Time: Refer to SF 33 (Pg. 1), Block 9 TO BE DELIVERED UNOPENED (Offerors name)

Exterior envelopes must identify the solicitation number, as well as the time and date specified for receipt of proposals in block nine of the SF 33.

L.2.4 Method of Submission for Unclassified Proposal

Proposals may be hand-carried or submitted via US mail. The unclassified proposal must be received and time stamped by the time and date specified for receipt of proposals in block nine of the Standard Form (SF) 33, subject to the late proposal conditions in FAR Provision 52.215-1 ALT 1. Electronic mail or facsimile of proposals and amendments are not authorized. Hand-carried submissions* include proposals delivered by commercial carriers such as FedEx, UPS, or services other than the US Postal Service. Hand-carried proposals must be delivered to the Detroit Arsenal (DTA) Mail Handling Facility (Building 255) between the hours of 8:00AM and 1:00PM local Warren, MI time. The package(s) will be dated and time stamped at the Mail Handling Facility and the Government will be responsible for forwarding the package(s) to the appropriate personnel. If the proposal is hand-carried by other than a commercial carrier, the delivery person (even if an employee of the Offeror) must be a US citizen.

*Directions to DTA: From Van Dyke Avenue, travel west on East Eleven Mile road to railroad track. Immediately after crossing railroad track turn right into DTA main gate and follow security officer directions to the Mail Handling Facility (Building 255). It may be necessary for the delivery person to obtain a visitors badge prior to being allowed to enter the installation. If so, the security officer will advise the delivery person of the procedures to follow.

Offerors are cautioned that approval to enter the installation must be obtained from Detroit Arsenal security prior to the closing date and time for receipt of proposals.

Due to security procedures, delays are probable at the entry point and Offerors must plan to accommodate them. It is the Offerors responsibility to plan sufficient time to clear Detroit Arsenal security and ensure proposals reach the intended destination.

L.2.5 Procedure for Submitting Classified Information:

Classified information shall be submitted separately. Do not submit any classified information with the UNCLASSIFIED volumes listed above. The classified information must be received by the time and date specified for receipt of proposals in block nine of the Standard Form (SF) 33, subject to the late proposal conditions in FAR Provision 52.215-1 ALT 1. When submitting classified information, follow the NISPOM Chapter 5 instructions and DD Form 254 (Attachment 0035) using the below mailing address:

Outer Envelope:

PEO Combat Support & Combat Service Support Program Security Manager Transportation Systems

AMST-CSS/MS 105

6501 E. Eleven Mile Road Warren, MI 48397-5000

Inner Envelope:

PM TS Security Manager ATTN: Matthew Curis

(586) 282-5862

AMSTA-CSS/MS 105

6501 E. Eleven Mile Road Warren, MI 48397-5000

Solicitation Number: W56HZV-16-R-0024 Date & Time: Refer to SF 33 (Pg. 1), Block 9 TO BE DELIVERED UNOPENED (Offerors Name)

Offerors are cautioned that a proposal is not considered received without the classified submission portion of it having been received. This RFP includes one classified annex - Annex B. Offerors must have a copy of Annex B in order to meaningfully respond to the solicitation (Reference M.2.a). In order to receive a copy of Annex B, Offerors must provide proof of valid Industrial Facilities Security Clearance by sending an email to: (matthew.g.curis.civ@mail.mil) with the Company Name, address, CAGE Code, Facility CAGE Code as per the NISPOM DoD 5220.22-M, and basis of the need to know.

All requests for the Classified Annexes shall be received within 10 calendar days of RFP release. Requests received greater than 10 calendar days after the RFP release date may not be processed with enough time for the Offeror to submit a proposal which meaningfully responds to the RFP. The Offeror shall provide the contact information for the Facility Security Officer (FSO) in your response. Foreign respondents must provide the POC, phone number and address of their embassy in the U.S. to use for transfer of the classified documents. Verification of foreign respondent’s ability to access and store U.S. classified information is required prior to any classified information being sent.

L.2.6 Consistency

Each volume of the Offeror’s proposal shall be consistent with the other proposal volumes and shall demonstrate the understanding and ability to perform according to the statement of work of the contract. The Offeror should provide supporting documentation in sufficient detail to permit a complete evaluation of the proposal. The Government may conduct a crosswalk between the information provided in Offeror’s proposal volumes to assess whether the Offeror submits consistent proposal information.

L.2.7 Single Proposal Submission

Offerors are limited to submitting one proposal with one approach to meeting the requirements of this solicitation. An offeror is defined as an entity competing independently that does not share a common parent, does not have a parent/subsidiary relationship with any other offeror, and is not affiliated with any other offeror (as defined in Federal Acquisition Regulation (FAR) 19.101).

L.3 All or None

Offers in response to this solicitation must be submitted for all the requirements identified in the solicitation. Offers submitted for less than all the requirements called for by this solicitation may be rejected or ineligible for award.

L.4 Evaluation Factors

Offeror proposals shall address the following five Factors:

a. Technical

b. Technical Maturity

c. Total Evaluated Cost/Price

d. Past Performance

e. Small Business Participation

L.4.1 Volume I – Technical Factor

The Technical Factor includes the following four (4) Subfactors:

1) Payload – Performance Specification Requirement FMTV-PS-R-216

2) Survivability – Performance Specification Requirement FMTV-PS-R-125

3) Ride Quality – Performance Specification Requirement FMTV-PS-R-181-186,192

4) Mobility – Performance Specification Requirement FMTV-PS-R-177,178

The Technical Volume must be subdivided to address each FMTVA2 Technical Subfactor.

L.4.1.1 The Offeror shall provide a completed copy of the Performance Requirements Matrix (Attachment 0046) to include the proposed level of performance for each identified Technical Subfactor. The Technical Volume shall specifically identify the performance of the proposed FMTVA2 and describe how the offeror will meet or exceed the thresholds identified in Attachment 0046. The Offerors proposal shall consider the performance of the FMTV, IAW the definitions and requirements in the Performance Specification – FMTV (Attachment 0001).

The proposed performance provided in Attachment 0046, Performance Requirements Matrix, will be incorporated into any resultant contract and the proposed levels of performance will become contract requirements.

L.4.1.2 For each of the above four Technical Subfactors, the Offerors Technical Factor proposal shall include the following:

L.4.1.3 For Technical Subfactor 1 – Payload, the Offeror shall:

(a) Identify its proposed performance level as identified in Attachment 0046, Performance Requirements Matrix, (Threshold; Objective; Achievement between Threshold and Objective - provide the exact performance level if between Threshold and Objective), and

(b) Provide substantiating data to support the proposed level of performance. Substantiating data shall include the proposed axle loads for each vehicle variant as identified in Attachment 0046, Performance Requirements Matrix, and OEM and component manufacturer certifications for the primary load bearing components: axles, suspension system, steering, brakes, wheels, and tires. Substantiating data may also include test data, Modeling and Simulation, or engineering analysis to support the proposed payload.

L.4.1.4 For Technical Subfactor 2 – Survivability, the Offeror shall:

(a) Completely fill out Attachment 0056 – Proposed Survivability Performance and provide with any of the substantiating data referenced below. Identify the proposed performance level (Threshold; Objective; Achievement between Threshold and Objective - provide the exact performance level if between Threshold and Objective).

(b) Provide substantiating data, which may include vehicle test data, coupon test data, Modeling and Simulation, and engineering analysis, to support the proposed level of performance.

L.4.1.5 For Technical Subfactor 3 – Ride Quality, the Offeror shall:

(a) Completely fill out the Vehicle Dynamics Data Sheets (Attachment 0052) for the M1078 and M1083 Cargo Variants at Vehicle Curb Weight (VCW).

(b) Provide substantiating data to support the model inputs in Attachment 0052, which shall include specification sheets or supplier data clearly identifying components and the model input values.

(c) Provide any test data, modeling and simulation, or engineering analysis to support the proposed performance levels.

(d) The Government will assemble a vehicle dynamics model of the Offeror’s proposed design to evaluate the risk of meeting the threshold ride quality requirement and any proposed performance between threshold and objective or at the objective level. The Government model will be developed with the data provided by the Offeror in Attachment 0052. Failure to provide the requested data could result in a rejection of offer in accordance with Section M.2.

L.4.1.6 For Technical Subfactor 4 – Mobility, the Offeror shall:

(a) Completely fill out the Vehicle Mobility Data Sheet (Attachment 0051 – Vehicle Cone Index (VCI) Data Requirements Matrix) for each variant at Gross Vehicle Weight (GVW) in armored configuration.

(b) Provide substantiating data to support the model inputs in Attachment 0051, which shall include specification sheets or supplier data clearly identifying components and the model input values.

(c) Provide any test data or modeling and simulation outputs to support the proposed configuration performance levels.

(d) The Government will assemble a mobility model of the Offerors proposed design to evaluate the risk of meeting the threshold mobility requirement and any proposed performance between threshold and objective or at the objective level. The Government model will be developed with the data provided by the Offeror in Attachment 0051.

L.4.1.7 Specification Sheets

The Offeror shall provide a completed specification sheet Attachment 0048 (Proposed Spec Sheet) for each of the proposed FMTV base vehicle platforms. The specification sheets will not be evaluated. The proposed performance provided in the specification sheets (Attachment 0048) may be incorporated into any resultant contract and the proposed levels of performance become contract requirements.

L.4.1.8 Substantiating Data

The Offeror shall provide data to substantiate the performance of the proposed design for each technical subfactor identified in Section L.4.1.3, L.4.1.4, L4.1.5 and L4.1.6. Substantiating data shall be complete, specific, and relevant only to the specific performance levels proposed to be achieved by the Offeror for each requirement. If the substantiating data for one requirement is the same as data cited for another requirement, then reference the previously provided data and do not provide duplicate data.

Where the Offeror submits substantiating data for a design configuration that varies from the offered design configuration, the Offeror shall explain the extent of the variance and the impact such variances have on the credibility of the substantiating data.

L.4.2 Volume II – Technical Maturity Factor

The Offerors Technical Maturity Factor Volume shall include the following:

L.4.2.1 Technical Maturity Self-Assessment. The Offeror shall self-assess the extent of maturity of its proposed technical approach against each level and characteristic of maturity described in the Technical Maturity Rubric, Attachment 0050. The Offeror shall indicate whether its proposed technical approach meets the requirement for each level and characteristic. The offeror shall indicate by file name which data (submitted in response to L.4.2.2) substantiates its self-assessment for each level and characteristic.

L.4.2.2 Substantiating Data. The self-assessment described in L.4.2.1 shall be accompanied by substantiating data supporting the Offerors asserted extent of maturity. The offeror shall provide substantiating data for each characteristic achieved within each level identified in the Technical Maturity Rubric, Attachment 0050. The resulting technical information, documentation, test data, rationale, or other data shall be complete, specific, and relevant to the specific characteristics of the Offerors self-assessment assertions. If the substantiating data is from a design created for a vehicle other than a FMTV, the offeror shall discuss the extent of the variance and the impact such variance has on the credibility of the substantiating data.

L.4.3 Volume III: Total Evaluated Cost/Price (TEC/P)

The TEC/P Volume is comprised of the Offerors Proposed Contract Cost/Price and Technical Data Package Adjustment inputs.

In accordance with FAR 15.306, the Government reserves the right to request additional or more detailed information to support its evaluation of the TEC/P Factor in addition to the information requested in L.4.3.

L.4.3.1 Offerors Proposed Contract Cost/Price

The Offerors Cost/Price Factor shall include the following:

a. Submission of all proposed prices on Attachment 0036, Pricing Matrix, in accordance with the instructions in the attachment. By entering proposed per-unit prices there, the Total Contract Cost/Price (not including any cost realism adjustments) is automatically calculated by the Excel formulas in the attachment. The workbook will round all proposed unit prices to the nearest penny ($0.01). All proposed prices shall be in U.S. Dollars, including costs and prices for any subcontractors. If the basis for the proposal is in any other currency, the Offeror shall state the exchange rate(s) being used to convert any currency to the U.S. Dollar and how the exchange rate was developed. The Offeror must also explain how they intend to mitigate the risk of exchange rate fluctuation for this prospective contract.

b. Submission of Offeror-constructed Excel spreadsheets providing cost element breakdowns supporting proposed prices, as set forth in L.4.3.1.2 through L.4.3.1.4.9 below. The Offeror must also provide associated rationale required by L.4.3.1.1 through L.4.3.1.4.9.

L.4.3.1.1 Attachment 0036 – Pricing Matrix

The Offeror shall fill in the Government-provided Excel spreadsheet found in Attachment 0036, Pricing Matrix. Attachment 0036, Pricing Matrix, shall contain all of the Offeror’s prices as indicated in the attachment. The Offeror shall not enter any proposed prices in Section B. The prices populated by the Offeror in Attachment 0036 shall be in Then-Year dollars (TY$). Then-Year dollars reflect the actual price paid by the Government for goods or services at the time of the base award or at the time of the option award.

The Offeror shall propose range pricing for vehicles and the applicable kits identified in Attachment 0036, Pricing Matrix, for base ordering years 3-5 and for option ordering years 6-7, using the format in Attachment 0036, Pricing Matrix. The Offeror may enter the same or different unit prices for all ranges in each Ordering Period. The Offeror shall propose vehicle pricing for each test vehicle identified in Attachment 0036, Pricing Matrix, for vehicle test ordering years 1 and 2.

L.4.3.1.1.1 Pricing Matrix – Additional Information

Since this is a Requirements contract, the Government can only provide the offeror with an estimated number of vehicles, by variant in each ordering year. The offeror shall propose a unit price for each vehicle CLIN in ordering years 1-2 and range pricing for each vehicle CLIN in ordering years 3-5 and option ordering years 6-7 using the format in Attachment 0036, Pricing Matrix. The offeror shall provide one firm fixed-price for each variant and for each projected quantity range in each ordering year when range pricing is applicable. When range pricing is applicable, the offeror may enter the same unit price for each quantity range for each variant in a particular ordering year.

For vehicle options such as kits, different paint configurations, and application of CPC, the offeror shall insert a fixed unit price for each option as stipulated in Attachment 0036, Pricing Matrix.

For STS and TPF efforts, the offeror shall submit estimated hourly costs, with a fixed fee per hour. The number of estimated hours is identified in Section H.9.1 and Attachment 0036, Pricing Matrix.

For the STS and TPF Cost-Reimbursement efforts of this solicitation, the Offeror shall develop composite hourly rates for each separate Ordering Year. For evaluation purposes, the Offeror shall compute a composite hourly rate based on 20% Logistics, 60% Engineering, and 20% Configuration Management. Upon contract award, the Government will utilize the estimated composite hourly rate when issuing task orders. For estimation purposes only, the projected amount of hours per year are as follow:

STS Ordering Year 01: 5,000 Hours STS Ordering Year 02: 7,000 Hours STS Ordering Year 03: 12,000 Hours STS Ordering Year 04: 100,000 Hours STS Ordering Year 05: 100,000 Hours STS Ordering Year 06: 100,000 Hours STS Ordering Year 07: 100,000 Hours

TPF Ordering Year 03: 90,065 Hours TPF Ordering Year 04: 90,065 Hours TPF Ordering Year 05: 90,065 Hours TPF Ordering Year 06: 90,065 Hours TPF Ordering Year 07: 90,065 Hours

For MTR Cost-Reimbursement efforts of this solicitation, the Offeror shall propose a man-day rate and a fixed fee per day for CONUS destinations and separate man date rates and fixed fee for OCONUS and Southwest Asia (SWA) destinations as specified in Attachment 0036, Pricing Matrix. These MTR man-day rates will include all costs including air travel, lodging, rental car, and per diem necessary for the MTR to perform the mission provided that these costs are in accordance with the Joint Travel Regulations (JTR), with the exception of the SWA MTR which will only contain the daily labor costs. The Government will negotiate ODCs for SWA (e.g. travel, lodging and meals and incidentals expenses (M&IE)) for each individual SWA MTR and they will be added via contract modification. For estimation purposes only, the projected amount of man-days per year are as follow:

MTR CONUS Ordering Year 01 Man-days: 500 Days MTR CONUS Ordering Year 02 Man-days: 500 Days MTR CONUS Ordering Year 03 Man-days: 1,000 Days MTR CONUS Ordering Year 04 Man-days: 1,000 Days MTR CONUS Ordering Year 05 Man-days: 1,000 Days MTR CONUS Ordering Year 06 Man-days: 1,000 Days MTR CONUS Ordering Year 07 Man-days: 1,000 Days

MTR OCONUS Ordering Year 01 Man-days: 50 Days MTR OCONUS Ordering Year 02 Man-days: 50 Days MTR OCONUS Ordering Year 03 Man-days: 100 Days MTR OCONUS Ordering Year 04 Man-days: 1,000 Days MTR OCONUS Ordering Year 05 Man-days: 1,000 Days MTR OCONUS Ordering Year 06 Man-days: 1,000 Days MTR OCONUS Ordering Year 07 Man-days: 1,000 Days

The Offeror shall submit a Firm Fixed-Price monthly price for Program Support, Logistics Program Management, Integrated Product Support, and Logistics Test Support. Program Support is defined in C.3 and Logistics Program Management, Integrated Product Support, and Logistics Test Support are defined in C.6.

The Offeror shall submit a Firm Fixed-Price to conduct all testing as required in Attachment 0036, Pricing Matrix and defined in E.XX.

The Offeror shall submit a Firm Fixed-Price for vehicle care & storage as required in Attachment 0036 and defined in H.12.3. The Contractor shall propose a firm fixed price vehicle daily rate, regardless of the vehicle mix, for care and storage as set forth in Attachment 0036 “Pricing Matrix” The vehicle daily rate shall include any and all costs associated with labor, material, and ODCs required to perform all the requirements of the Contractor’s Storage Exercise and Maintenance Plan, CDRL E010, “Care, Storage, Exercise, and Maintenance Plan and Modifications”.

Pursuant to the Federal, State and Local Taxes clause (FAR 52.229-3)(I-55), Offerors are responsible for making the determination as to applicability of FRET for any given configuration of truck or trailer being proposed. FRET will not be evaluated during this source selection and should not be included in Attachment 0036, Pricing Matrix.

L.4.3.1.2 Table of Contents

The Offeror and each Major Subcontractor as defined in L.4.3.1.4.2 shall provide a Table of Contents showing each file submitted as part of the Offerors Proposed Cost/Price with a short description of the contents of the file. Each of these entries in the Table of Contents shall be hyperlinked to the respective files.

L.4.3.1.3 Supporting Narratives

When supporting narratives are required as indicated below, including BOE sheets, they shall be submitted in files, which are MS Excel or MS Word 2007 compatible. BOEs and its supporting rationale may not be submitted as a picture.

L.4.3.1.4 Top-Level Spreadsheets

The Offeror shall provide a top-level spreadsheet organized by cost element (e.g., Direct Labor, Subcontracts, Direct Material, Other Direct Costs, Overhead/Indirect Costs, or Profit/Fee) consistent with the Offeror’s accounting system for each Major CLIN as identified on the Contract Cost Price Summary worksheet within Attachment 0036 for each contract period (i.e., a separate top-level spreadsheet for the Test Vehicles in Ordering Years 01 and 02, Production Ordering Years 03-05 and Option Ordering Years 06-07). For CLINs with range pricing the spreadsheets are to support prices in the highest quantity range. Where prices for other ranges vary significantly from the high quantity range Offerors may provide brief explanatory narratives. Provide the following information in support of each top-level spreadsheet:

L.4.3.1.4.1 Direct Labor

Support for costs related to direct labor shall include the following:

(a) A yearly time-phased breakout of the direct labor hours, by labor category.

(b) A description of each labor hour category. This description shall include sufficient information to allow the Government to distinguish between the different labor categories used in the proposal.

(c) The labor rate for each category of direct labor and any escalation used.

L.4.3.1.4.2 Major Subcontracts

L.4.3.1.4.2.1 For FFP CLINS:

Offer will provide a list identifying subcontractors, showing total amounts for each, brief descriptions of work, and method for determining prices fair and reasonable.

L.4.3.1.4.2.2 For CPFF CLINs:

If there are major non-hardware subcontractors (those with a total labor cost expected to be greater than 50% of the STS, MTR, or TPF efforts of the contract), provide pricing information from the subcontractor equivalent to that required in Section L.4.3.1 of the prime Offeror.

(a) Include the analysis of the subcontractor's submission required by subcontract pricing considerations (FAR 15.404-3 (b)), and rationale for determining that the subcontract price is fair and reasonable. Also state the type of subcontract the Offeror anticipates (e.g., firm-fixed price, or cost-plus-fixed-fee).

(b) For major subcontractors as defined above, if the offeror can demonstrate the subcontract item either is based on adequate price competition or is commercial, cost information from the subcontractor is not required. However, copies of competitive subcontractor price quotes, or the kind of information in FAR 52.215-20(a)(1)(ii) must be provided.

(c) If the major subcontractor declines to provide complete price proposals to the Offeror or higher-tier subcontractor, then those subcontract proposals may be submitted by the subcontractor directly to the PCO using the same submission instructions noted above. The Government will not communicate with any subcontractor directly to request information or to clarify information received. Failure of the subcontractor to submit the necessary cost or pricing data to the Government, at or prior to the solicitation close date, may render the prime Offeror non-responsive.

L.4.3.1.4.3 Inter-Organizational Transfers

The same kind of information as described in L.4.3.1.4.2 shall be provided for inter-organizational transfers, regardless of dollar value, except the Offeror need not provide its analysis of the submission. Inter-organizational transfer includes transfers between divisions, subdivisions, subsidiaries, or affiliates of the Offeror under a common control.

L.4.3.1.4.4 Material Cost

For all components, the Offeror shall provide a narrative which explains the method used to develop proposed cost, including information about the extent to which the cost is based on such as vendor quotes, purchase order history, estimates, or any other information necessary to substantiate the proposal.

The Offeror shall provide a complete priced BOM with the following information:

1) NSN, as applicable

2) Part Number

3) Item Name and Description

4) Vendor

5) Unit Cost (purchase price to Offeror)

6) Quantity used

7) Extended Cost (unit cost multiplied by quantity used)

8) Basis for cost (engineering estimate, vendor quote, purchase history, etc.)

9) Indicate whether component is sole-source, competitive, or commercial

10) For material and subcontract costs based on engineering estimates, please provide rationale and methodology for how the estimate was developed

11) Identify the next higher assembly

L.4.3.1.4.5 Other Direct Costs

Depending on the Offerors accounting system, Other Direct Costs may include costs such as computing charges, shipping, or other types of direct costs. The Offeror shall identify each category of proposed Other Direct Cost, and the dollar amount for each category. Provide an explanation of what is included in each category and how the cost was estimated.

L.4.3.1.4.6 Travel

For each proposed trip for FFP CLINs, provide the purpose of the trip, the trip origin, the trip destination, the number of travelers, the number of days, and the proposed hotel cost, M&IE cost, rental car cost, and any other costs associated with the trip. The Offeror may use a Cost Estimating Relationship (CER) for Travel as an alternative estimating methodology. If a CER is used to estimate Travel, please provide a detailed explanation supporting how the CER was developed. Include information such as the programs used and associated Travel costs, amounts included in the base (e.g. number of labor hours, labor costs), and the calculation showing how the CER factor was derived. In addition, the Offeror shall provide the calculation showing how the CER factor is applied to estimate the proposed Travel cost for this effort.

L.4.3.1.4.7 Rates

The Offeror shall provide a list of direct and indirect rates (e.g. Direct Labor rates, Material Overhead, Direct Labor Overhead, General & Administrative), by category and by year, used by the Offeror to develop its proposal. These rates shall be consistent with the Offerors accounting system. Identify the proposal allocation base and calculation. The Offeror shall identify the impact the award of this contract will have on its business volume, including the effects upon the rate pools and bases. The Offeror shall include the following:

(a) The date of the current Cost Accounting Standards Board (CASB) Disclosure Statement.

(b) The effective date of the rates or the data that formed the basis for the rates (the date of the burden study analysis or payroll run), and state whether or not the rate package has been submitted to Defense Contract Audit Agency (DCAA) for review.

(c) The ending month for the Offeror's fiscal year.

(d) A narrative explaining the basis for the estimated rates. Specifically identify any escalation factors used.

(e) State whether these rates represent a Forward Pricing Rate Submission (FPRS) or a Forward Pricing Rate Agreement (FPRA) and note the date of the agreement.

(f) State whether or not the business volume that would be generated if a contract was awarded to your firm as a result of this RFP has been included in the proposed rate package.

(g) For each of the rate categories, provide both the prior and current fiscal year's Incurred Cost rates. Indicate if the prior year rates have been audited. For the current year's Incurred Cost rates, provide the month ending for those rates.

L.4.3.1.4.8 Facilities Capital Cost of Money (FCCM)

The Offeror shall state the total amount estimated for FCCM and if applicable, provide FCCM categories.

L.4.3.1.4.9 Profit/Fee

The Offeror shall state the profit/fee rate as applicable and the total dollar amount included.

L.4.3.1.4.10 Cost Decrements

In the event the proposed pricing reflects any form of cost decrement, to include cost discounting, expected negotiation decreases, corporate investment or management challenges, the Offeror shall identify such decrements in the proposal. Where cost decrements are proposed, identify the nature, amount and basis for the decrement, and any accounting treatment implications. In addition, the Offeror shall provide supporting data to substantiate how the decrement will be achieved. In the event of corporate investment or management challenges that may result in the contract being performed at a loss, provide corporate level substantiating information which both recognizes the potential for performance at a loss and supports the ability of the offeror to finance contract performance in a loss position.

L.4.3.1.5 DCAA and DCMA Contact Information

The Offeror and each Major Subcontractor as defined in L.4.3.1.4.2 shall provide the address, email, and telephone number of the cognizant DCAA Field Audit Office and DCMA office.

L.4.3.2 Technical Data Package (TDP) Adjustment

It is the Governments objective to acquire rights in technical data (see DFARS 227.7103-1) to permit the Government to use, modify, reproduce, release, perform, display, or disclose technical data to support future full and open competitive acquisitions of the FMTV and all its components. The Offeror shall identify a proposed option to deliver rights (or comply with L.4.3.2.2) in technical data greater than or equal to the rights to which the Government is already entitled under applicable law, regulation, or contract. The optional rights shall be sufficient to support future full and open competitive acquisitions for the entire FMTV.

L.4.3.2.1 Attachment 0049 - TDP BOM

The Offeror shall complete Attachment 0049 (TDP BOM) for its proposed Production Level FMTV Government Technical Data Package and submit it in Microsoft Excel 2007 format as described in Sections L.4.3.3.1.1 and L.4.3.3.1.2 below. If proposed, the TDP shall meet the TDP Purchase Option language contained within Section C.2.5 of this solicitation. Attachment 0049 is a Microsoft Excel spreadsheet with tabs corresponding to each FMTV Configuration, Trailers, and Kits. Proposing an incomplete TDP for any of the unique FMTV end items due to failure to propose the components which comprise that end item, or proposing a single controlled part number for high level assemblies or vehicle subsystems does not constitute a Production Level TDP.

The following items from Attachment 0003, TDP Option Selection Worksheet, Box 5 are applicable to the TDP Evaluation and shall be proposed: Product Drawings (as defined in MIL-STD-31000A Paragraph 3.1.26), Special Inspection Equipment (SIE) Drawings (as defined in MIL-STD-31000A Paragraph 3.1.30), Special Tooling Drawings (as defined in MIL-STD-31000A Paragraph 3.1.32), Quality Assurance Provisions (as defined in MIL-STD-31000A Paragraph 4.4), Special Packaging Instructions (SPI) (as defined in MIL-STD-31000A Paragraph 4.4), and software (as defined in Section C.2.5.7). If any of these items are not applicable to the proposed design the Offeror must assert this in writing.

L.4.3.2.1.1 Part 1 – Indentured TDP Bill of Material (Attachment 0049)

For Part 1 of each tab, the Offeror shall provide a complete accounting of each unique part number of the proposed FMTV design, to include all components, assemblies (and all of the down-level components which comprise them), installations (and all of the down-level components which comprise them), top level drawings, and software files. Down-level parts do not need to be proposed for Controlled components which meet the definitions below. Software files shall be treated as a unique part number for the purpose of completion of Attachment 0049. Instructions for each column are as follows.

(a) BOM LEVEL: The contractor shall identify the level of the Indentured BOM corresponding to the component.

(b) PART/DRAWING NUMBER: The contractor shall enter the part/drawing number for the individual software or hardware component pertaining to that line item of the BOM. For example: 12345678.

(c) NOMENCLATURE: The contractor shall enter the nomenclature of the part. For example BOLT, METRIC CLASS 10.9.

(d) DESCRIPTION: The offeror shall provide a description of the part which conveys the usage, function, and location of the part. For example, in the case of a pressure relief valve, a description would be "Pressure relief safety valve mounted to the pneumatic system air tanks. The offeror may attach a pictorial representation of the component to aid in clarity (e.g. 3D model screenshot, or picture), but this representation must convey the function and usage clearly and concisely.

(e) TYPE OF COMPONENT: The offeror shall choose from one of the following choices for drawing type. For the purposes of this BOM, unique vehicle software shall be given a unique part number and entered in the table accordingly. For the purposes of this column, software is included as a component.

(i) COMPETITIVE RIGHTS COMPONENT - A component which is proposed to be delivered and released into the Government TDP with Unlimited or Government Purpose Rights as defined in DFARS 252.227-7013, 252.227-7014, and 252.227-7015, which can be openly and competitively procured by the Government for Government purposes without restriction.

(ii) CONTROLLED OEM COMPONENT - A component with data rights or software rights owned and retained by the Offeror (including its parent, affiliate, or subsidiary companies) documented on a Control Drawing as defined in ASME Y14.24 Section 10.

The controlled component must be delivered and released into the Government TDP on a Government format control drawing which identifies the Offeror (including its parent, affiliate, or subsidiary companies) as the sole approved source of supply and provides the FMTV form, fit, function, interface, and minimum performance requirements. The Offeror shall provide unlimited rights for this type of drawing.

(iii) CONTROLLED COMMERCIAL COMPONENT - A component with data rights or software rights owned and retained by the commercial manufacturer documented on a Control Drawing as defined in ASME Y14.24 Section 10.

The controlled component must be delivered and released into the Government TDP on a Government format control drawing which identifies the Offeror (including its parent, affiliate, or subsidiary companies) as the sole approved source of supply and provides the FMTV form, fit, function, interface, and minimum performance requirements. The Offeror shall provide unlimited rights for this type of drawing.

(f) IDENTIFIED SOURCE(S) FOR CONTROLLED COMPONENTS: The contractor shall provide the source(s) of supply for all components which are identified as CONTROLLED COMPONENTS. For components specified as COMPETITIVE RIGHTS COMPONENTS with UNLIMITED or GOVERNMENT PURPOSE RIGHTS, enter “N/A” in this cell.

L.4.3.2.1.2 Part 2 - A Listing of Assertion of Restrictions for Items Included in the TDP Option

For Part 2 of each tab, the Offeror shall assert any restrictions on the Government's rights to use, release, or disclose each unique part identified on Part 1 of Attachment 0049 after the option is exercised.

For each item identified as a Competitive Rights Component in Part 1 of Attachment 0049, the Offeror shall specify the Government will be given either Government Purpose Rights or Unlimited Rights upon exercise of the option. This information shall be identified within the Asserted Rights column of Part 2.

For each item identified as a Source Controlled OEM Component or Source Controlled - Commercial Component in Part 1 of Attachment 0049, the Offeror shall specify the Government will be given either Limited Rights to the component with Unlimited Rights to the FMTV source controlled drawing, or Restricted Rights to the component with Unlimited Rights to the FMTV source controlled drawing upon exercise of the option. This information shall be identified within the Asserted Rights column of Part 2.

For each item identified as a having restricted or limited rights in Part 2, the Offeror shall specify the Basis for Assertion. Generally, development at private expense, either exclusively or partially, is the only basis for asserting restrictions. For technical data, other than computer software documentation, development refers to development of the item, component, or process to which the data pertain. The Government's rights in computer software documentation generally may not be restricted. For computer software, development refers to the software. Indicate whether development was accomplished exclusively or partially at private expense. If development was not accomplished at private expense, or for computer software documentation, enter the specific basis for asserting restrictions.

Part 2 of Attachment 0049 shall be dated and signed by an official authorized to contractually obligate the Offeror.

Part 2 of Attachment 0049 will not be evaluated in the Source Selection; however it will be incorporated as an attachment in Section J of the resulting contract. If the TDP Option is exercised, the information provided in Part 2 of Attachment 0049 will replace the Assertion of Restrictions submitted IAW DFARS 252.227-7017.

L.4.3.2.2 Declining to Propose

Should the Offeror elect to decline to propose an option for the Government to acquire additional data rights sufficient to support competition, the Offeror shall submit this intent in writing in place of Attachment 0049. In accordance with 10 USC 2320 and DFARS 227.7103-1, an Offeror will not be deemed non-responsive if it declines to propose an option for competitive rights in technical data greater than the rights to which the Government is already entitled; nor is the Governments goal of acquiring data rights to support future full and open competitive acquisitions a condition of award, rather it will be considered in the source selection decision.

L.4.3.2.3 Incorporation of Proposed TDP Data Rights

The Offeror selected for award will have its proposed TDP Option BOM in Attachment 0049 incorporated into Section J of the Contract. If the TDP Option is exercised, then the Contractor shall deliver a TDP with markings conforming to its proposed option rights in Attachment 0049.

L.4.4 Volume IV – Past Performance Factor

The Offerors Past Performance Factor Volume shall include the following:

L.4.4.1 For the Past Performance Factor, provide information for a total of up to three recent and relevant contracts. These may include foreign, federal, state, local and private industry commercial contracts. The Government will not consider the past performance of subcontractors or any individuals or key personnel; only corporate past performance will be considered. Recent contracts are those performed within three years of the date of issuance of this RFP.

For the purposes of this Volume, contract shall be defined as:

(a) a single task or delivery order placed under a single-award or multiple-award IDIQ task order contract (FAR 16.501-1); or,

(b) a single work directive or similar instrument which contains a separate statement of work issued under a broader contract; or,

(c) a single order placed under a basic ordering agreement (BOA) (FAR 16.703); or,

(d) a single task order placed under a federal supply schedule (FSS) (FAR 8.405-2); or,

(e) a single task order placed under a single-award or multiple-award blanket purchase agreement (BPA) (FAR 8.405-3 or FAR 13.303

(f) a single Government or Commercial contract which does not include any of the types of instruments described in (a)-(e) above.

Relevant Past Performance will consider the extent to which the submitted contract efforts are comparable in scope and magnitude of effort and complexity to the following statement of work requirements:

a. Full rate production of a military wheeled ground vehicle of a type and complexity similar to the FMTV with a minimal monthly production rate of 80 vehicles.

b. Development or management of the development of logistics data (provisioning, technical manuals, and training materials).

For convenience in identifying the extent of Relevance of prior offeror contracts, a Past Performance Relevance Matrix is attached as Attachment 0059. The Offerors shall complete this matrix with the relevant information requested.

L.4.4.1.1 Contract Information: For each of the up to three recent and relevant contracts submitted under L.4.4.1 above, provide the following information:

(a) Contract Number (and delivery order number if applicable);

(b) Contract Type;

(c) Total Value of the Contract (beginning & ending value);

(d) Delivery or Performance Schedule;

(e) Government or commercial contracting activity address, telephone number and e-mail;

(f) PCO or Contract Specialist’s name, or point of contact for commercial entity responsible for signing or administering the contract, telephone number and e-mail;

(g) Government (DCMA) or commercial ACO, COR, performance certifier, or QAR, name, telephone number and email;

(h) A description of scope of work requirements and a discussion of the similarities between the cited contract scope and the relevance standards identified above in L.4.4.1(a-f);

(i) Contract period of performance;

(j) A description of work performed by the offeror and their subcontractor or teammates;

(k) Percentage of effort performed as a prime or subcontractor;

(l) For each of the contracts listed, provide a brief self-assessment of contract performance. Your self-assessment must address performance to meet Technical and Schedule requirements within estimated costs (for cost type contracts);

(m) Copies of the Statements of Work from each of the submitted contracts to establish the relevance of the contract to the scope of work activities listed in L.4.4.1 above.

L.4.4.1.1.1 Note: Regarding L.4.4.1.1 (l) above, and in evaluating each Offerors performance history, the Government will look at the Offerors delivery performance against the contract's original delivery schedule unless the delay was Government caused. Schedule extensions that were the fault of the Offeror, even if consideration was provided, will be counted against the Offeror.

L.4.4.1.2 Past Performance Questionnaire. A past performance questionnaire is provided in Attachment 0060.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .