DRAFT_CDRLS_A001-B025.pdf

PDF 739 KB Posted

Attached to
FMTV A2 Industry Day Announcement
Solicitation number
W56HZV16R0024
Issued by

About this file

DRAFT CDRLS A001-B025

View the file

Other files

File Type Posted
Draft_RFP_Q As_0001.pdf PDF
QAs_batch_6_TE_.docx DOCX document
DRAFT_CDRLS_C001-C093.pdf PDF
DRAFT_CDRLS_D001_-_E014.pdf PDF
QAs_batch_5v2_MTV_0005.DOCX DOCX document
QAs_batch_4v2_MTV_PCO_Revised.docx DOCX document
Draft_Attachments_(zipped)_Folder.zip ZIP file
FMTV_A2_ID-2_Attendee_List.xlsx XLSX spreadsheet
Industry_Day__2_Slides_-_Morning_Unclassified_Brief.pdf PDF
Signed_DD_254_and_Continuation_Sheets_FMTVA2_Solicitation_W56HZV-16-R-00....pdf PDF
DRAFT_Section_A.docx DOCX document
DRAFT_Section_M.docx DOCX document
DRAFT_Section_K.docx DOCX document
DRAFT_Section_H.docx DOCX document
DRAFT_Section_C.docx DOCX document
DRAFT_Section_D.docx DOCX document
DRAFT_Section_L.docx DOCX document
DRAFT_Section_E.docx DOCX document
TACOM_LCMC_Lease_Procedures.pdf PDF
PSPEC_Annex_R_-_Definitions.pdf PDF
Industry_Day__1_Q As_0003.pdf PDF
Technical_Demonstrator_Characteristics.xlsx XLSX spreadsheet
Industry_Day__1_Q As_0001.docx DOCX document
FMTV_Tech_Data_NDA.docx DOCX document
Industry_Day__1_Q As_0002.docx DOCX document
NDA.pdf PDF
FMTV_A2P2_Industry_Day_Attendees.pdf PDF
FMTV_A2P2_Industry_Day_Slides.pdf PDF
NATC_Travel_Information.pdf PDF
NATC_Visitor_Pass.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT CDRLS A001-B025

DD FORM 1423, FEB 2001

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X_

F. CONTRACTOR:

1. DATA ITEM NO: A001

2. TITLE: Agenda, Read Ahead, and Minutes

3. SUBTITLE:

4. AUTHORITY: DI-ADMN-81249A (T) and DI-ADMN-81505(T)

5. CONTRACT REFERENCE: See Block 16

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: LT

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ:

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See block 16

14. DISTRIBUTION:

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - DI-ADMN-81249A Tailored: Paragraph 10.2.L Pertainent Information:

Identify Name of Presenters; : PARA 10.2.1.2.D Include email and phone; Para

10.4 media requirements – MS Office Products (Combination of MS Word, Excel and Powerpoint). DI-ADMN-81505A Tailored: Paragraph 10.4 Deleted. File names will start with the funtional area responsible for the delivery (e.g.

LOG SOWM, PSMIPT). All deliveries shall be in MS Office format.

Block 5 – C.2.5.3, C.3.1.1.1, C.3.2.8.4, C.3.4.1.1.2, C.3.4.1.1.3, C.3.4.1.2, C.4.1.1.5, C.4.2, C.5.2.5, C.5.2.6, C.5.2.7, C.6.1, C.6.1.2, C.6.1.8, C.6.3.1.2, C.6.3.2.1, C.6.3.3, C.6.5.3.2, C.6.5.3.2, C.6.5.20.1, C.6.8.3, C.6.11.4, C.7.2.10, C.7.4.2.5, E.2.15, E.2., E.8.2.2

Block 8: Deliverable will be reviewed for technical content and format. If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 5 days.

Block 9 – The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their Contractors; information may contain proprietary information. Other requests for this document shall be referred to the Contracting Officer’s

Representative (COR).

Blocks 10 – This is a onetime submission.

Block 12 - No later than 7 days prior to the commencement of the meeting, conference, audit, review, or event, the Contractor shall submit a written meeting agenda and read ahead in Microsoft Word. All minutes shall be submitted 7 days following completion of the conference. The Government requires 3 days to review and comment. The Contractor shall submit final minutes, with Government comments incorporated, within 3 days of receipt of

Government comments.

Block 14 – Submission shall be uploaded into Windchill.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Erik Gorham

H: DATE:

I: APPROVED BY:

J: DATE:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A002

2. TITLE: Cost Data Summary Report (CDSR, DD Form 1921)

3. SUBTITLE: Contractor Cost Data Reporting (CCDR)

4. AUTHORITY: DI-FNCL-81565C

5. CONTRACT REFERENCE: C.1.2.1.1, C.1.2.1.1.4

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: See Block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION:

A. ADDRESSEE: DCARC See Block 16

B. COPIES:

DRAFT: 0

FINAL: 1

REG REPRO:

15. TOTAL COPIES: 1

Blocks 7,8, 10-13:

Submission dates and frequencies are as identified in the CSDR Plan

(reference Attachment 0034, “CSDR Plan”). DCARC and the Government Business

Management Office have approval/rejection authority for Cost Data Summary

Report submissions. Deliverables will be reviewed for technical content and/or format. If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 30 days.

Prepare and submit the Cost Data Summary Report IAW the CSDR

Plan (reference Attachment 0034, “CSDR Plan”) and Data Item Description

DI-FNCL-81565C (or the most recently approced version). The DID, DI-FNCL-

81565C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs.

Contractors shall be required to submit the Contractor Cost Data Reports

(CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan

(reference Attachment 0034, “CSDR Plan”)and in the contract. The contract

CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved

CSDR Plan.

All CCDRs shall be submitted electronically using the CSDR Submit-Review

System. The required form and file type for each CCDR is specified in its

Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content.

Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Subcontractor Reporting: The prime contractor is responsible for flowing down

CSDR requirements contained in this contract to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the

CDSR Plan (reference Attachment 0034, “CSDR Plan”). This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR

Submit-Review System.

The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.

The DCARC office will issue a letter stating if each Contractor Cost Data

Report submission to the DCARC website has been accepted or rejected.

G. PREPARED BY: Vanessa Sczomak

H: DATE: 03 May 2016

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A003

2. TITLE: Functional Cost - Hour Report (DD Form 1921-1)

3. SUBTITLE: Contractor Cost Data Reporting (CCDR)

4. AUTHORITY: DI-FNCL-81566C

5. CONTRACT REFERENCE: C.1.2.1.1, C.1.2.1.1.5

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: See Block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION:

A. ADDRESSEE: DCARC See Block 16

B. COPIES:

DRAFT: 0

FINAL: 1

REG REPRO:

(reference Attachment 0034, “CSDR Plan”). DCARC and the Government Business

Management Office have approval/rejection authority for Functional Cost -

Hour Report submissions. Deliverables will be reviewed for technical content

Prepare and submit the Functional Cost - Hour Report IAW the CDSR

DI-FNCL-81566C (or the most recently approced version). The DID, DI-FNCL-

81566C, is available from the Defense Cost and Resource Center (DCARC)

(reference Attachment 0034, “CSDR Plan”)and in the contract. The contract

CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review

Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content.

Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall the reporting thresholds specified in the DoDI 5000.02, or as required by the

CDSR Plan (reference Attachment 0034, “CSDR Plan”). This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR

G. PREPARED BY: Vanessa Sczomak

H: DATE: 03 May 2016

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV COMP A2 BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR:

1. DATA ITEM NO: A004

2. TITLE: Contractor Business Data Report (DD Form 1921-3)

3. SUBTITLE: Contractor Cost Data Reporting (CCDR)

4. AUTHORITY: DI-FNCL-81765B

5. CONTRACT REFERENCE: C.1.2.1.1, C.1.2.1.1.7

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: DCARC See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT: 0

FINAL: 1

REG REPRO:

Contractors shall be required to submit 1921-3 Contractor Business Data

Report on an annual basis within 60 days subsequent to the end of the contractor's fiscal year for the life of the contract in accordance with DI-

FNCL-81765B (or most recently approved version). Only one report is required to be completed and submitted by each FPR (Forward Pricing Rate) unit (e.g., plant, site, business unit) per year, independent of the number of contracts within the FPR unit which contain this CDRL item. The Contractor Business

Data Report is to be prepared by and for the business entity (e.g., plant, site, or business unit) responsible for submitting the Forward Pricing Rate

Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement

(FPRA) negotiations with the Government. In the absence of a FPR requirement, the term “FPR unit” should be interpreted for reporting purposes as “business unit” as defined in the FAR.

The Defense Cost and Resource Center (DCARC) is responsible for administration of this requirement. The DCARC website is located at http://cade.osd.mil/csdr.

All 1921-3 reports shall be submitted electronically using the 1921-3 & FPR

Submit-Review System. The required form and file type for each 1921-3 report is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

G. PREPARED BY: Vanessa Sczomak

H: DATE: 03 May 2016

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A005

2. TITLE: Contractor Work Breakdown Structure (CWBS)

3. SUBTITLE:

4. AUTHORITY: DI-MGMT-81334D

5. CONTRACT REFERENCE: C.1.2.1.1, C.1.2.1.1.3, C.5.2.2, C.5.2.4

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: See Block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION:

A. ADDRESSEE: DCARC See Block 16

B. COPIES:

DRAFT: 0

FINAL: 1

REG REPRO:

Blocks 10 - 13: Prepare the CWBS in accordance with DI-MGMT-81334D (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-MGMT-81334D, is available from the

Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit the CWBS Dictionary at frequencies specified in the OSD DDCA-approved contract CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.

The CWBS Dictionary shall be submitted electronically using the CSDR Submit-

Review System. Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or a DoD-issued CAC to obtain a

DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested role. All DCARC Portal accounts need to be renewed at least annually.

Subcontractor Reporting. Prime contractors are responsible for flowing down

CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the

DCARC for DDCA approval.

G. PREPARED BY: Vanessa Sczomak

H: DATE: 03 May 2016

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER __X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A006

2. TITLE: COST REIMBURSEMENT CLINs REPORT

3. SUBTITLE: Contractor Cost Data Reporting

4. AUTHORITY: DI-MGMT-81334

5.CONTRACT REFERENCE: C.1.2.1.3

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ:

8. APP CODE:

9. DIST. STATEMENT REQ:

10. FREQUENCY: QUARTERLY

11. AS OF DATE: ASREQ

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: WINDCHILL

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Prepare and submit in accordance with paragraph C.1.2.1.2

G. PREPARED BY: Erik Gorham

H: DATE: 15 Oct 15

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A007

2. TITLE: Progressive Curve Report (DD Form 1921-2)

3. SUBTITLE: Contractor Cost Data Reporting (CCDR)

4. AUTHORITY: DI-FNCL-81567C

5. CONTRACT REFERENCE: C.1.2.1.1, C.1.2.1.1.6

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: See Block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION:

A. ADDRESSEE: DCARC See Block 16

B. COPIES:

DRAFT: 0

FINAL: 1

REG REPRO:

(reference Attachment 0034, “CSDR Plan”). DCARC and the Government Business

Management Office have approval/rejection authority for Progressive Curve

Report submissions. Deliverables will be reviewed for technical content

Prepare and submit the Progressive Curve Report (PCR) IAW the CDSR

DI-FNCL-81567C (or the most recently approced version). The DID, DI-FNCL-

81567C, is available from the Defense Cost and Resource Center (DCARC)

(reference Attachment 0034, “CSDR Plan”)and in the contract. The contract

CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review

Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content.

Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall the reporting thresholds specified in the DoDI 5000.02, or as required by the

CDSR Plan (reference Attachment 0034, “CSDR Plan”). This includes requiring

G. PREPARED BY: Vanessa Sczomak

H: DATE: 03 May 2016

I: APPROVED BY:

DD FORM 1423, FEB 2001 D

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A008

2. TITLE: Resource Distribution Table (RDT)

3. SUBTITLE:

4. AUTHORITY: DI-FNCL-81565C – See Block 16

5. CONTRACT REFERENCE: C.1.2.1.1, C.1.2.1.1.8

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: See Block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION:

A. ADDRESSEE: DCARC See Block 16

B. COPIES:

DRAFT: 0

FINAL: 1

REG REPRO:

Block 4: Prepare and submit the Resource Distribution Table (RDT) IAW the

CSDR Plan (reference Attachment 0034, CSDR Plan), Data Item Description

DI-FNCL-81565C which is additionally tailored to include "RDT Instructions" found at http://dcarc.cape.osd.mil/CSDR/Planning.aspx and the following:

Requirements:

4. Implementation

a. Subcontractor Reporting: The prime contractor is responsible for flowing down RDT requirements contained in this contract to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the

CSDR Plan (reference Attachment 0034, CSDR Plan). This includes requiring

Preparation Instructions:

1. General Instructions

j. All RDTs shall be submitted electronically using the CSDR Submit-Review

System. Data submitters must register through the DCARC website and possess a

DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC

Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the

DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Block 7:

The DCARC office will issue a letter stating if each RDT submission to the DCARC website has been accepted or rejected.

Block 8: DCARC and the Government Business Management Office have approval/rejection authority for RDT submissions.

Deliverables will be reviewed for technical content and/or format. If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 30 days from disapproval notification.

Blocks 10 - 13: The RDT shall be delivered whenever the funded amount on the contract is modified, but shall be no more frequently than twice annually. Other submission dates and frequencies will be IAW the CSDR Plan (reference Attachment

0034, CSDR Plan).

G. PREPARED BY: Vanessa Sczomak

H: DATE: 04 May 2016

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: A009

2. TITLE: Priced Vehicle Indentured Bill of Materials (PVIBOM)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81903(T) - See Block 16

5. CONTRACT REFERENCE: C.1.2.1.2

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: See Block 16

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: B

10. FREQUENCY: See Block 16

11. AS OF DATE: See Block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION:

A. ADDRESSEE: DCARC, Procuring Contracting Officer (PCO) See Block 16

B. COPIES:

DRAFT: 0

FINAL: 2

REG REPRO:

15. TOTAL COPIES: 2

Block 4: Prepare and submit the Bill of Materials IAW the Contract CSDR Plan

(reference Attachment 034) and Data Item Description DI-SESS-81903 which is additionally tailored as follows:

The "Requirements" section of the DID is deleted and replaced with the following:

1. Content: The report shall contain an indentured list of any and all parts that are included in any FMTV variant configuration to include all ECOs, ECPs,VECPs, and other configuration modifications. Data shall be reported at all levels of assembly down to the piece-part level.

2. Required Information: The report shall be prepared in contractor format and must at a minimum include:

- Contract Number - Self-explanatory.

- Submission Number - Self-explanatory.

- Resubmission Number - A resubmission occurs if prior submission(s) for the submission event were rejected. Enter “0” (zero) for original submission. If the report is a resubmission, enter the resubmission number, starting with “1” for the first resubmission, “2” for the second resubmission, and so on.

- As of Date - Self-explanatory.

- Part Number (Prime Contractor) - The part number the prime contractor uses to identify, track, and manage the part.

- Part Number (Subcontractor/Manufacturer) - The part number the

Subcontractor/OEM uses to identify a part.

- Release Authorization Number - E.g. Change Order, Change Notice, ERR

- Part Nomenclature - Self-explanatory.

- Part CAGE Code - Self-explanatory.

- National Stock Number (NSN) - Self-explanatory and as applicable.

- Part Number Status - e.g. Active, Inactive, Obsolete.

- Unit of Measure - Self-explanatory.

- Quantity by Variant - The quantity of each item by variant.

- WBS Name - The name of the lowest applicable level Product Orientated

WBS element from the CSDR Plan (reference Attachment

0034, CSDR Plan).

- Adjustment from prior submission.

- Explanation for adjustment.

3. Format: The report must be submitted as a stand-alone Microsoft

Excel file. Report submissions shall not be locked, include macros, program executables, embedded objects, or external files.

(reference Attachment 0034, “CSDR Plan”). Deliverable will be reviewed for technical content and/or format. PdM FMTV and DCARC have approval/rejection authority of the final Bill of Materials submission. If the Bill of Materials final submission is not approved, the Contractor shall make appropriate corrections and resubmit within 30 calendar days from disapproval notification.

Block 14: All deliverables shall be submitted via windchill and shall be submitted electronically using the CSDR Submit-Review System. Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organization to the DCARC Portal and requesting a

CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC

Portal accounts need to be renewed at least annually.

G. PREPARED BY: Vanessa Sczomak

H: DATE: 04 May 2016

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMP BUY

B. EXHIBIT: E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER _X__

F. CONTRACTOR:

1. DATA ITEM NO: A010

2. TITLE: Cybersecurity Authorization Package

3. SUBTITLE: Technical Report-Study Services

4. AUTHORITY: DI-MISC-80508B

5. CONTRACT REFERENCE: C.9.1, C.9.4, C.9.8.1

6. REQUIRING OFFICE: SFAE-CSS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See block 16

14. DISTRIBUTION:

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Block 4 - In addition to the content of the DID, the Cybersecurity

Authorization Package shall include in contractor format the following items:

a) Security Plan (SP): The Contractor shall develop a security plan in accordance with DoDI 8510.01 using the template from the Risk Management

Framework (RMF) Knowledge Service (https://rmfks.osd.mil/) and include any external documentation required to document compliance with security controls.

Name of document and section of document that demonstrated compliance with security controls shall be listed in the comments column.

b) Evidence of applied Army Best Business Practices (BBPs), Security Readiness

Guides (SRGs), and Security Technical Implementation Guides (STIGs) as applicable based on architecture and software

c) Data Flow Diagram

d) Architecture (topology) Diagram

e) Hardware and Software List (included vendors, versions) (Attachment 0061)

f) System backup and restoration procedures

g) Products undergoing Information Assurance (IA) and IA enabled product certification, status and evaluating organization

h) Other artifacts as needed to meet risk management framework documentation requirements

i) Cyber supply chain risk management plan

Block 8: Comments from the Government shall be addressed in an updated re‐ submission by the Contractor within 30 business days of receipt of Government comments.

and their Contractors; information may contain proprietary information. Other requests for this document shall be referred to the Contracting Officer’s

Representative (COR).

Block 12 – Initial submission required at Allocated Baseline Review (ABR).

Block 13 - Subsequent submissions are due every six months. If no changes occur a submittal is not required, but the contractor shall submit a negative notification.

Block 14 – This information shall be submitted electronically to Windchill.

The Government IPT lead shall be notified when the data has been submitted.

All submissions shall be prepared and delivered in an editable and Microsoft

Office 2007 file format (MS Word, MS Excel).

G. PREPARED BY: Erik Gorham

H: DATE:

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMPETITIVE

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP __X__ TM ____ OTHER ____

F. CONTRACTOR: TBD

1. DATA ITEM NO: B001

2. TITLE: PRODUCT DRAWINGS AND ASSOCIATED LISTS

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81000 5. CONTRACT REFERENCE: C.2.5.1, C.2.6.1,

C.3.1.1.1.3

6. REQUIRING OFFICE: SFAE-CSS-TS-M 7. DD250 REQ: LT

8. APP CODE: A 9. DIST. STATEMENT REQ: D

10. FREQUENCY: AS REQ 11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: AS REQ

13. DATE OF SUBS. SUBMISSION: AS REQ

14. DISTRIBUTION: WINDCHILL

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Block 4 – Creo Parametric solid models and drawings (new & revised) of affected parts, components, assemblies, etc. are to be submitted with ECP/ERR packages and expected at a frequency of "as required". All parts, assemblies, drawings shall be submitted in one or all of the following formats upon request by the Government:

1. 3-D Solid Model in Creo Parametric & Windchill

2. Associated 2-D line drawings in Creo Parametric

3. Associated STEP neutral file format IAW ISO 10303

4. 2-D drawings and associated documents in PDF file format

All model & drawing creation along with revision is to be done in the

Government's Windchill system. All drawings & models are to be at Release level “IN WORK” prior to ECP submittal.

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DOD Contractors only; information may contain proprietary information.

Export Control Warning: Contains technical data whose export is restricted by the Arms Export Control Act or the Export Administration Act of 1979.

Other requests for this document shall be referred to the Contracting

Officer’s Representative (COR).

Block 13 – The Contractor shall submit subsequent revisions in Windchill as required for Government approval.

Block 14 – All CDRL submissions shall be uploaded into Windchill.

G. PREPARED BY:

H: DATE:

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMPETITIVE

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER __X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: B002

2. TITLE: Configuration Management Process Plan (CMPP)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-80858 5. CONTRACT REFERENCE: C.3.1

6. REQUIRING OFFICE: SFAE-CSS-TS-M 7. DD250 REQ: LT

8. APP CODE: A 9. DIST. STATEMENT REQ: C

10. FREQUENCY: AS REQ 11. AS OF DATE: AS REQ

12. DATE OF FIRST SUBMISSION: 60 DAC

13. DATE OF SUBS. SUBMISSION: AS REQ

14. DISTRIBUTION: WINDCHILL

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Block 4 - MIL-HDBK-61 or SAE EIA-649-1 may be used for guidance and their Contractors; information may contain proprietary information. Other requests for this document shall be referred to the Contracting Officer’s

Representative (COR).

Block 12 – The Contractor shall submit a copy of their CMPP in PDF format 60 days after contract award. The Government will have 30 days to review and provide comments or approve. The Contractor shall update the CMPP to include

Government comments. Once approved the Contractor shall provide an update in the Monthly Management Review meetings to discuss changes to the CMPP. Once changes have been agreed upon, the Contractor shall submit a revised CMPP in

PDF format.

Block 14 – All CDRL submissions shall be uploaded into Windchill electronically.

G. PREPARED BY:

H: DATE:

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMPETITIVE

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP __X__ TM ____ OTHER ____

F. CONTRACTOR: TBD

1. DATA ITEM NO: B003

2. TITLE: ENGINEERING CHANGE PROPOSALS (ECP)

3. SUBTITLE: ECP

4. AUTHORITY: DI-SESS-80639(T), DI-SESS-80642 5. CONTRACT REFERENCE: C.2.5.2,

C.2.6.5, C.3.1.1.1.4, C.3.2.2.1, C.3.2.2.8, C.4.2, C.6.5.17.2, C.6.5.17.2.6, C.6.7.2.5.4.1

6. REQUIRING OFFICE: SFAE-CSS-TS-M 7. DD250 REQ: LT

8. APP CODE: A 9. DIST. STATEMENT REQ: D

10. FREQUENCY: ASREQ 11. AS OF DATE: ASREQ

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: WINDCHILL

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Block 4 - DID DI-SESS-80639 SHALL BE TAILORED AS FOLLOWS:

1. USES, RELATIONSHIPS: Data Item Submittal - Delete paragraph

2. FORMAT AND CONTENT: Delete first sentence.

The Contractor shall prepare Engineering Change Proposals (ECP) in accordance with paragraphs listed in Block 5 and the forms and instructions in

Attachment 6. The Contractor shall prepare and include one Notice or Revision

(NOR) or redline for each affected drawing and Specification Change Notice

(SCN) when the proposed change affects the performance specifications for

FMTV.

The Contractor shall submit as part of the ECP package, redlines, proposed drawings, 3D Creo Parametric solid models, impact statements addressing effects of production, fielding, retrofit, spare/repair parts, fielded

A0/A1/A1R/A1P2/A2 configurations, performance, manufacturing, quality, reliability, availability, maintainability, MANPRINT, Logistics, Safety, transportability, and cost. The Contractor shall submit directly to

Windchill for Government CCB action.

G. PREPARED BY:

H: DATE:

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMPETITIVE

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP __X__ TM ____ OTHER ____

F. CONTRACTOR: TBD

1. DATA ITEM NO: B004

2. TITLE: VALUE ENGINEERING CHANGE PROPOSALS (VECP)

3. SUBTITLE: VECP

4. AUTHORITY: DI-CMAN-80639(T), DI-SESS-80642 5. CONTRACT REFERENCE: C.3.2.3

6. REQUIRING OFFICE: SFAE-CSS-TS-M 7. DD250 REQ: LT

8. APP CODE: A 9. DIST. STATEMENT REQ: D

10. FREQUENCY: AS REQ 11. AS OF DATE: AS REQ

12. DATE OF FIRST SUBMISSION: AS REQ

13. DATE OF SUBS. SUBMISSION: AS REQ

14. DISTRIBUTION: WINDCHILL

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Block 4 - DID DI-CMAN-80639C SHALL BE TAILORED AS FOLLOWS:

1. USES, RELATIONSHIPS: Data Item Submittal - Delete paragraph

2. FORMAT AND CONTENT. - Delete first sentence.

The Contractor shall prepare Value Engineering Change Proposals (VECP) in accordance with SOW paragraphs in Block 5 and the forms and instructions in

Attachment 0006, “Instructions for Preparing ECP Forms”. The Contractor shall prepare and include one redline for each affected drawing and Specification

Change Notice (SCN) when the proposed change affects the performance specifications for FMTV or the TDP.

The Contractor shall submit as part of the VECP package, redlines, proposed drawings, 3D Creo Parametric solid models, impact statements addressing effects of production, fielding, retrofit, spare/repair parts, fielded

A0/A1/A1R/A1P2/A2 configurations, performance, manufacturing, quality, reliability, availability, maintainability, MANPRINT, Logistics, Safety, transportability, cost.

G. PREPARED BY:

H: DATE:

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMPETITIVE

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP ____ TM ____ OTHER __X__

F. CONTRACTOR: TBD

1. DATA ITEM NO: B005

2. TITLE: Subcontractor Flowdown Plan

3. SUBTITLE: Technical Report – Study/Services

4. AUTHORITY: DI-MISC-80508 5. CONTRACT REFERENCE: C.3.2.4.2

6. REQUIRING OFFICE: SFAE-CSS-TS-M 7. DD250 REQ: LT

8. APP CODE: A 9. DIST. STATEMENT REQ: C

10. FREQUENCY: AS REQ 11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: 60 DAC

13. DATE OF SUBS. SUBMISSION: AS REQ

14. DISTRIBUTION: WINDCHILL

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

Block 4 – The Contractor shall provide the Government with a copy of the

Contractor’s plan and procedure for implementing contract requirements on its

Subcontractors IAW with C.3.2.4.2 and below. The Contractor shall use the format of their choice (e.g. Microsoft Word or Adobe Acrobat).

The plan shall address how the Contractor imposes contract requirements on its Subcontractors through subcontracting and production part purchase orders. The plan shall address how the Subcontractor informs the Contractor of potential changes and includes the Contractor in the Subcontractor’s change process. The Contractor’s plan shall address monitoring of the

Subcontractor’s configuration management, information technology, and quality process.

and their Contractors; information may contain proprietary information. Other

Block 12 – The Subcontractor Flowdown Plan is to be submitted 60DAC.

G. PREPARED BY:

H: DATE:

I: APPROVED BY:

J: DATE:

DD FORM 1423, FEB 2001

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM: FMTV A2 COMPETITIVE

B. EXHIBIT: A E. CONTRACT/PR NO.: W56HZV-16-R-0024

C. CATEGORY:

TDP __X__ TM ____ OTHER ____

F. CONTRACTOR: TBD

1. DATA ITEM NO: B006

2. TITLE: REQUEST FOR VARIANCE (RFV)

3. SUBTITLE: RFV

4. AUTHORITY: DI-SESS-80640(T), DI-SESS-80642 5. CONTRACT REFERENCE: C.3.2.5

6. REQUIRING OFFICE: SFAE-CSS-TS-M 7. DD250 REQ: LT

8. APP CODE: A 9. DIST. STATEMENT REQ: D