DRAFT_CDRLS_C001-C093.pdf

PDF 1 MB Posted

Attached to
FMTV A2 Industry Day Announcement
Solicitation number
W56HZV16R0024
Issued by

About this file

DRAFT CDRLS C001-C093

View the file

Other files

File Type Posted
Draft_RFP_Q As_0001.pdf PDF
QAs_batch_6_TE_.docx DOCX document
DRAFT_CDRLS_A001-B025.pdf PDF
DRAFT_CDRLS_D001_-_E014.pdf PDF
QAs_batch_5v2_MTV_0005.DOCX DOCX document
QAs_batch_4v2_MTV_PCO_Revised.docx DOCX document
Draft_Attachments_(zipped)_Folder.zip ZIP file
FMTV_A2_ID-2_Attendee_List.xlsx XLSX spreadsheet
Industry_Day__2_Slides_-_Morning_Unclassified_Brief.pdf PDF
Signed_DD_254_and_Continuation_Sheets_FMTVA2_Solicitation_W56HZV-16-R-00....pdf PDF
DRAFT_Section_A.docx DOCX document
DRAFT_Section_M.docx DOCX document
DRAFT_Section_K.docx DOCX document
DRAFT_Section_H.docx DOCX document
DRAFT_Section_C.docx DOCX document
DRAFT_Section_D.docx DOCX document
DRAFT_Section_L.docx DOCX document
DRAFT_Section_E.docx DOCX document
TACOM_LCMC_Lease_Procedures.pdf PDF
PSPEC_Annex_R_-_Definitions.pdf PDF
Industry_Day__1_Q As_0003.pdf PDF
Technical_Demonstrator_Characteristics.xlsx XLSX spreadsheet
Industry_Day__1_Q As_0001.docx DOCX document
FMTV_Tech_Data_NDA.docx DOCX document
Industry_Day__1_Q As_0002.docx DOCX document
NDA.pdf PDF
FMTV_A2P2_Industry_Day_Attendees.pdf PDF
FMTV_A2P2_Industry_Day_Slides.pdf PDF
NATC_Travel_Information.pdf PDF
NATC_Visitor_Pass.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT CDRLS C001-C093

DD FORM 1423, FEB 2001

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C001

2. TITLE: Source Data

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81758A(T)

5. CONTRACT REFERENCE: C.6.1.8, C.6.11.4.3, C.7.4.5.1

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 – Add to Requirements: 2. Format as detailed below. Deliver source data as an electronic editable files. Source data includes illustrations, photos, and MS Office Products.

Block 8 - Deliverable will be reviewed for technical content and format. If deliverable is not approved, the Contractor shall make appropriate corrections and resubmit within 30 days from notice of disapproval.

Block 12 - The Contractor shall submit source data 30 days after the

Government accepts final delivery of the logistic product or service.

Block 14 – Submissions shall be uploaded into Windchill.

Block 16 – Total Packaging Fielding source data shall be submitted in a

Microsoft Excel workbook in Contractor format. The workbook shall have tabs to segregate periods of performance by year. The Contractor shall format a table on each tab with a column heading for each of the data elements listed in paragraph C.6.11.4.3 of the contract and ensure the data can be sorted by a filter. The Contractor shall submit the proposed format 10 days after the

Start of Work Meeting. The COR will notify the Contractor of format acceptability. The TPF Source data shall consist of a MS Office database with the planning and execution data including the following:

End Items:

National Stock Number (NSN)

Line Item Number (LIN)

Serial Number

United States Army (USA) Registration number

Receiving Units Army Command (ACOM) and Their Corresponding Department of Defense Activity Address Code (DoDAAC)

Receiving Units’ Unit Identification Code (UIC)

Receiving Units’ Location (city or installation and state)

Shipping Document Number (Military Standard Requisitioning and Issue

Procedures (MILSTRIP))

Property Book Unit Supply Enhanced (PBUSE) or Global Combat Support

System-Army (GCSS-A) Control Number

Platform Deprocessing Date

Platform Hand-Off Date

Platform Model Number

Recapitalization Depot

Platform mileage

Missing, damaged or unserviceable at time of equipment de-processing

Associated Support Items of Equipment (ASIOE)

Special Tools and Test Equipment (STTE)Initial Issue Spare/Repair Parts

(i.e. ASL)

Kits mounted on/in vehicles (i.e. B-kit/Arctic kits)

Shortages with document number until filled

Warranty claim number until vehicle repair

Shipping damage part(s) document number(s) through repair

Block 16 –If modifications are required that impact the schedule, the

Contractor shall provide a “Get Well Plan” that meet the requirements of the

Logistic Integrated Master Schedule.

17. PRICE GROUP: IV

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

J: DATE:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C002

2. TITLE: IPS Cost Report

3. SUBTITLE:

4. AUTHORITY: DI‐MISC‐80508B (T)

5. CONTRACT REFERENCE: C.6.1.10, C.6.1.10

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4: DI‐MISC‐80508B (T) Delete Requirements: Paragraph 2 in its entirety.

The report shall be a MS Office file in Contractor format. In addition to the DID, the cost will be broken out separating the different publications developed under this contract. Determine and record the actual costs of technical publications. Cost breakouts should include amounts used to prepare drafts for Logistic Demonstration, validation, and verification efforts.

Breakout the cost to provision in the report. Breakout the cost for the

Contractor to support Logistic Demonstration and TM Verification (include associated hardware e.g., MRP, EDIL, and repairs)

Block 8: Deliverable will be reviewed for technical content and format. If corrections and resubmit within 30 days from notice of disapproval.

Block 12 - The Contractor shall deliver the Technical Publications, Provisioning and Related ILS Cost Report at 60 days before Logistic

Demonstration; 60 days before TM Verification; 30 days after TM verification;

30 days after TM Authentication.

Block 13 - Contractor shall make required updates to the Technical

Publications, Provisioning and Related ILS Cost Report for the MPP conferences.

Block 14 – Delivery will be loaded in Windchill

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

J: DATE:

DD FORM 1423, FEB 2001

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C004

2. TITLE: Logistic Quality Plan

3. SUBTITLE:

4. AUTHORITY: DI-QCIC-81722 and DI-TMSS-81817

5. CONTRACT REFERENCE: C.6.2.2, C.7.2.8

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES: 2

16. REMARKS:

Block 8 - Deliverable will be reviewed for technical content and/or format.

If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 30 days from notification of disapproval.

Block 12 - The Contractor shall submit an initial Quality Plan in Microsoft

Office format 60 days after the Start of Work Meeting.

Block 10/13 – This is a onetime submission unless plan modifications are required to address a quality issue. The Contractor shall submit Quality

Plan modifications in Microsoft Word within 14 days of the identification of the quality issue.

Block 16 - If modifications are required that impact the schedule, the

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C005

2. TITLE: Technical Manual Plan

3. SUBTITLE:

4. AUTHORITY: DI-TMSS-81812

5. CONTRACT REFERENCE: C.6.2.3

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 8 - Deliverable will be reviewed for technical content format and

MILSTD compliance. If deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 30 days following notification of disapproval.

Block 12 - The Contractor shall submit an initial Technical Manual Plan in

Microsoft Word 60 days after the Start of Work Meeting.

Block 10/13 – This is a onetime submission unless plan modifications are required to address a Technical Manual Development issue.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C006

2. TITLE: Logistic Configuration Summary Report

3. SUBTITLE:

4. AUTHORITY: DI-MISC-80508B(T)

5. CONTRACT REFERENCE: C.6.2.4

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 tailored: DI-MISC-80508B (Tailoring) Delete Requirements: Paragraph 2 in its entirety. All submissions shall be prepared and delivered in an editable MS Excel. In addition to the DID, The IPS Configuration Management

Control Log shall be developed in Contractor format.

deliverable is not approved, the contractor shall make appropriate corrections and resubmit within 30 days from the disapproval notice.

Block 12/13 - First delivery 6 months after Contract award, subsequent delivery within 14 days of configuration updates with operational or maintenance impact.

Block 16 - The Contractor shall develop and deliver an Executive Summary detailing updates to operation or maintenance impacting the FMTV trucks and trailers, including the legacy fleet, resulting from configuration changes.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C007

2. TITLE: TPF Monthly Cost and Status Report

3. SUBTITLE:

4. AUTHORITY: DI-MGMT-81466A

5. CONTRACT REFERENCE: C.7.4.3.3

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: No

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: 10th calendar day of the Month following DO award

13. DATE OF SUBS. SUBMISSION: 10th calendar day of the Month

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES: 1

16. REMARKS:

Block 4: DI‐MGMT-81466A In addition to DID; the delivery shall be in a Government approved Contractor format. The list shall include the following:

Summarize TPF and NET Accomplishments for the following:

Period of Performance of the reported data

Total CLIN value

Total CLIN hours

Total Material ODC Dollars

Total Sub-Contractor Dollars (where applicable)

Total Percentage of CLIN expended

Actuals reported during the report period

Cumulative Actual Costs expended

Projection of when all funds will be expended

Total Contractor and Sub-Contractor personnel working on the TPF and NET efforts

Number of personnel gains or losses

Number of vehicles (Trucks and Trailers) fielded

Number of units fielded

Number of NET classes conducted and the number of students in the classes

Block 9 – The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their Contractors; information may contain proprietary information. Other requests for this document shall be referred to the Contracting Officer’s

Representative (COR).

Block 12 - This is a monthly submission to capture task order execution on a calendar-month-by-calendar-month basis. After task order award, the initial submission shall be made NLT the 10th calendar day of the subsequent calendar month.

Block 13 – The Contractor shall make subsequent submissions NLT the 10th calendar day of the subsequent month.

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C008

2. TITLE: Vehicle Tracking and Shipping Report

3. SUBTITLE:

4. AUTHORITY: DI-MISC-80508B (T)

5. CONTRACT REFERENCE: C.6.4

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: See Block 16

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - DI-MISC-80508B (Tailoring) Delete Requirements: Paragraph 2 in its entirety. In addition to the DID, the delivery shall be in Contractor format submitted sortable by any of the columns of information and in Microsoft

Excel format. The report data shall be maintained current for each day’s production as additive to the master file. This report shall also include all vehicle shipments and be submitted the day after the shipment of the first vehicle and shall be thereafter submitted daily for the previous days shipment. The report will contain the following information:

Vehicle Serial No.

CLIN No.

Model

Registration No.

Build Date

Color

DD250#.

DD250 Submittal Date

DD250 Date Signed

Government Bill of Lading (B/L) Ship Date Government B/L No.

Customer (Mark For) / Purpose (such as PM-JSTARS, 519 Bat/IOT&E Vehicle)

MILSTRIP# (Document Number)

Total MILSTRIP Quantity

Destination (Ship-to City/State)

Method of Shipment (Rail/Truck)

Carrier Name

Vehicle Type (Production or Prototype)

Contract Mod for shipping instructions

Port Destination for OCONUS Shipments

DCMA Document Number

Port Call Cut-off Date

Kit DD250#

Kit DD250 Submittal Date

Kit DD250 Date Signed

Shipping Instructions Control Number

Ship Date

Required Delivery Date (RDD)

Lot #

Delivery Order and Contract #

Manufacture Release Date

Procurement Request Order Number (PRON)

Accounting Classification Reference Number (ACRN)

National Stock Number (NSN)

Customer Sales Order (CSO)

Department of Defense Activity Address Code (DODAAC)

Transportation Allotment Code (TAC)

Loaned vehicles: Including who vehicle is loaned to, duration, date the vehicle is scheduled for return & purpose of the loan.

Returned Vehicles: The Contractor shall also prepare and deliver a report for all vehicles returned to the Contractors site, containing the following information:

CLIN

Vehicle Serial No.

Model No.

Registration No.

Ship from City/State

Vehicle Type (production or prototype)

Any retrofits, reworks or modifications required and schedule for completion.

Block 8 - Deliverable will be reviewed for technical content and format. If corrections and resubmit within 14 days from the notice of unacceptance.

Block 10/12/13 – The first report shall be submitted the day of the first vehicle delivery. The Contractor will submit the report in Microsoft Excel format. Starting with the first vehicle delivery, report shall be provided each day that vehicles are shipped.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C009

2. TITLE: Maintenance Support Plan

3. SUBTITLE:

4. AUTHORITY: DI-ILSS-81225(T)

5. CONTRACT REFERENCE: C.6.5

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4: DI-ILSS-81225; Delete Blocks 10.i through 10.k. Format: Data shall an editable MS Office product.

Block 8: Deliverable will be reviewed for technical content and/or format. If corrections and resubmit within 30 days from the disapproval notice

Block 10 and 13 - This CDRL is a life of contract delivery; The Maintenance

Plan shall be maintained by the Contractor. The Contractor shall submit the plan within 5 days of a revision. The Government will provide comments within 14 days of receipt. The Contractor shall make all corrections and return within 7 days of receipt. The Government may request to review the plan at any time and the Contractor shall make it available within 5 days of notice.

Block 12 - The Contractor shall submit an initial Maintenance Support Plan in

Microsoft Word 60 days after the Start of Work Meeting.

Logistic Integrate Master Schedule.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C010

2. TITLE: Product Supportability Analysis Plan

3. SUBTITLE:

4. AUTHORITY: DI-MGMT-81797 (T)

5. CONTRACT REFERENCE: C.6.5.1.1, C.6.8.1, C.6.11.1

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: See Block 16

9. DIST. STATEMENT REQ: See Block 16

10. FREQUENCY: ONE/R 16 11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 – Add to paragraph 3.c. Outline the Provisioning Plan to include schedule of assemblies and components presented during each provisioning conference. The Provisioning plan shall address any requirement for

Demilitarization & Disposal.

corrections and resubmit within 14 days from the disapproval notification.

Block 12 - The Contractor shall submit an initial Product Support Analysis

Plan in an editable Microsoft Office product 60 days after the Start of Work

Meeting.

Block 10 and 13 – 30 Days after Contractor’s Validation, Performance Vehicle

Testing (PVT), Reliability, Availability & Maintainability (RAM) testing, Logistics Demonstration, (LD), Operational Testing (OT), TM Verification and

Instructor, Key Personnel Training (IKPT).

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

F. CONTRACTOR: TBD

1. DATA ITEM NO: C011

2. TITLE: Failure Mode, Effects and Criticality Analysis (FMECA) (LSA-056)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.2.1

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - Tailored: Executive summary shall be in an editable MS Office, Government approved, Contractor format. LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary report. Reference DODI 5000.02 and ANSI/AIAA Standard S-102.2.4-2009.

Contents of data shall be indicted by SAE TA-HB-0007-1™and Attachment 0014, “Attribute Selection Worksheet”. Deliver results in a digital readable format IAW SAE GEIA-STD-0007. Contractor shall deliver data that can be loaded into Government Logistic Product Data System with no PowerLog-J errors.

corrections and resubmit within 30 days from the disapproval notification.

Block 12 - The Contractor shall submit the initial FMECA 330 days after contract award. Final FMECA submission will be 180 days prior to Logistic

Demonstration.

Block 10/13 – When updates to the FMECA are required to address changes that are a result of testing, logistic analysis or development.

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C012

2. TITLE: Reliability Centered Maintenance (RCM) (LSA-050)

3. SUBTITLE:

4. AUTHORITY: DI-MISC-80508B (T), DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.3

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - Block 4 DI-MISC-80508B (Tailoring) Delete Requirements: Paragraph 2 in its entirety. In addition to the DID, the delivery shall include an

Executive summary shall be in an editable MS Office, Government approved, Contractor format. The Executive Summary shall detail suggested RCM intervals and tasks. DI-SESS-81758A and DI-SESS-81759A (T) LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary report. (Reference, MIL-STD-2173 and MIL-STD-3034). Contents of data shall be indicted by SAE TA-HB-0007-1™and Attachment 0014, “Attribute

Selection Worksheet”. Deliver results in a digital readable format IAW SAE

GEIA-STD-0007. Contractor shall deliver data that can be loaded into

Government Logistic Product Data System with no PowerLog-J errors.

corrections and resubmit within 5 days from the disapproval notification.

Block 10, 12 and 13 – Not later than 60 days prior to the start of testing and again 120 days after the start of testing. The Contractor shall update and submit the final RCM report 30 Days after LD. Additional deliveries may be required to the RCM (LSA-050) to address changes that are a result of testing, logistic analysis or development.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C013

2. TITLE: Preventive Maintenance Checks and Services Report (LSA-033)

3. SUBTITLE:

4. AUTHORITY: DI-MISC-80508B (T), DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.3.3, C.6.5.3.4

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 DI-MISC-80508B (Tailoring) Delete Requirements: Paragraph 2 in its entirety. In addition to the DID, the delivery shall include an Executive summary that shall be in an editable MS Office, Government approved, Contractor format. The Executive Summary shall detail suggested PMCS intervals and tasks. DI-SESS-81758A and DI-SESS-81759A (T) LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary report (Reference MIL-HDBK-2079A, AR700-18 and DoDD4151-18).

Contents of data shall be indicted by SAE TA-HB-0007-1™and Attachment 0014, “Attribute Selection Worksheet”. Deliver results in a digital readable format IAW SAE GEIA-STD-0007. Contractor shall deliver data that can be loaded into Government Logistic Product Data System with no PowerLog-J errors.

corrections and resubmit within 30 days from disapproval notification.

Block 10, 12 and 13 – Not later than 60 days prior to the start of testing and again 120 days after the start of testing. The Contractor shall update and submit the final PMCS report 30 Days after LD. Additional deliveries may be required to the Preventive Maintenance Checks and Services Report (LSA-

033) to address changes that are a result of testing, logistic analysis or development.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

DD FORM 1423, FEB 2001

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval OMB

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C014

2. TITLE: Critical Maintenance Task Summary (LSA-006)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.4

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - Tailored: The Executive summary shall be in an editable MS Office, Government approved, Contractor format; LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary report. (Reference MIL-HDBK-2097A, MIL-STD-46855A). Contents of data shall be indicted by SAE TA-HB-0007-1™and Attachment 0014, “Attribute Selection

Worksheet”. Deliver results in a digital readable format IAW SAE GEIA-STD-

0007. Contractor shall deliver data that can be loaded into Government

Logistic Product Data System with no PowerLog-J errors.

Block 12 - The Contractor shall submit the initial Critical Maintenance Task

Summary 330 days after contract award. Final Critical Maintenance Task

Summary submission will be 180 days prior to Logistic Demonstration.

Block 10 and 13 – When updates to the Critical Maintenance Task Summary are required to address changes that are a result of testing, Logistic analysis or development.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C015

2. TITLE: Task Inventory

3. SUBTITLE:

4. AUTHORITY: DI‐MISC‐80508B (T)

5. CONTRACT REFERENCE: C.6.5.5

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4: DI‐MISC‐80508B (T) Delete Requirements: Paragraph 2 in its entirety.

In addition to DID; the delivery shall be in MS Excel, in a Government approved Contractor format, and include all Work Packages within the TMs.

The list shall include the following:

Task designation (Operator, Maintenance, Troubleshooting, PMCS)

Tool requirements

Special Tools and Test Equipment

MAC times

Mandatory Replacement Parts

Expendable Durable Items corrections and resubmit within 30 days from the disapproval notice.

Block 12 - The Contractor shall submit the Task Inventory 330 days after contract award.

Block 10/13 – When updates to the Task Inventory are required to address changes that are a result of testing, Logistic analysis or development.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C016

2. TITLE: Level of Repair Analysis (LORA)

3. SUBTITLE:

4. AUTHORITY: DI-PSSS-81872A

5. CONTRACT REFERENCE: C.6.5.6, C.6.5.6.2

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 tailored: Adjust para 2 – The Executive summary shall be in an editable MS Office, Government approved, Contractor format. The summary report shall detail the LORA results, NMWR Candidates, recommended repair programs, and all of the high cost drivers.

The Contractor shall submit the National Maintenance Work Requirement (NMWR)

Candidate list in a MS Office format. The Contractor shall develop a NMWR candidate list based on the Maintenance Task Analysis, Product Supportability

Analysis, and LORA results. The Contractor shall use the projected annual demand rate for each component based on Mean Time between Failure (MTBF).

Attachment 0013, “NMWR Candidate List” identifies specific requirements for the candidate list.

The Contractor shall deliver COMPASS input and output data files to include

COMPASS Access database tables used in the assessment. The Contractor shall deliver source data as a Compass file format that loads directly into Compass without error or any changes to the data.

Block 12 - The Contractor shall deliver 330 days after Contract award. The

Contractor shall update the LORA and resubmitted 180 days prior to Logistic

Demonstration. The Contractor shall complete final updates and submit the

LORA 30 Days after NMWR Verification. Corresponding source data files shall be due at time of LORA delivery.

Block 10 and 13 – The LORA shall be maintained by the Contractor. The

Contractor shall make the LORA available at MPP reviews and provisioning conferences. The Government may request to review the analysis at any time and the Contractor shall make it available within 5 days of notice.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

1. DATA ITEM NO: C017

2. TITLE: Maintenance Task Analysis (MTA) (LSA-019)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.7

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - Tailored: The Executive summary shall be in an editable MS Office, Government approved, Contractor format. LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary

(Reference DI-HFAC-81894, MIL-STD-46855, MIL-STD-1472). Contents of data shall be indicted by SAE TA-HB-0007-1™and Attachment 0014, “Attribute

Selection Worksheet”. Deliver results in a digital readable format IAW SAE

Block 12 - The Contractor shall submit 330 days after Contract award. The

Contractor shall update the MTA and resubmit 180 days prior to Logistic

Demonstration; 30 days after Logistic Demonstration; 30 days after Technical

Manual (TM) Verification. The Contractor shall complete final updates and submit the MTA 30 Days after National Maintenance Work Requirement (NMWR)

Verification.

Block 10/13 – When updates to the Maintenance Task Analysis (MTA) are

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

C. CATEGORY:

TDP ____ TM ____ OTHER _X___

F. CONTRACTOR: TBD

1. DATA ITEM NO: C018

2. TITLE: Manpower Requirements Criteria (MARC) (LSA-065)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.8

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - Tailored: Executive summary in MS Excel Contractor format. LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary report (Reference DODI-5001.1, DODI 5001.2, 10

U.S.C 2434(n), DODD1100.4., MIL-STD-1472G, AR 700-127 and AR 71-32).

Contents of data shall be indicted by GEIA-STD-0007 Attribute Selection

Worksheet. Deliver results in a digital readable format IAW SAE GEIA-STD-

0007. Contractor shall deliver data that can be loaded into Government

Logistic Product Data System with no PowerLOGJ errors.

corrections and resubmit within 30 days.

Block 12 - The Contractor shall submit the initial MARC 330 days after

Contract award. The Contractor shall update the MARC and resubmit 180 days prior to Logistic Demonstration. The Contractor shall update and resubmit the MARC 30 Days after LD. The Contractor shall update and resubmit the

Final MARC 30 Days after TM Verification.

Block 10/13 – When updates to the MARC are required to address changes that are a result of testing, Logistic analysis or development.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing

Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: D. SYSTEM/ITEM:

B. EXHIBIT: E. CONTRACT/PR NO.:

1. DATA ITEM NO: C019

2. TITLE: Annual Man-Hour by Skill Specialty Code and Level of Maintenance (LSA-

001)

3. SUBTITLE:

4. AUTHORITY: DI-SESS-81758A and DI-SESS-81759A

5. CONTRACT REFERENCE: C.6.5.9

6. REQUIRING OFFICE: SFAE-CS-TS-M

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: See Block 16

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBS. SUBMISSION: See Block 16

14. DISTRIBUTION: See Block 16

A. ADDRESSEE:

B. COPIES:

DRAFT:

FINAL:

REG REPRO:

15. TOTAL COPIES:

16. REMARKS:

Block 4 - Tailored: The Executive summary shall be in an editable MS Office, Government approved, Contractor format. ; LSA source data shall be delivered as a full file in SAE GEIA-STD 0007 XML format along with the LSA summary report. Contents of data shall be indicted by SAE TA-HB-0007-1™and

Attachment 0014, “Attribute Selection Worksheet”. Deliver results in a digital readable format IAW SAE GEIA-STD-0007. Contractor shall deliver data that can be loaded into Government Logistic Product Data System with no

PowerLog-J errors.

Block 12 - The Contractor shall submit the initial Annual Man-Hour by Skill

Specialty Code and Level of Maintenance 330 days after contract award. Final

Annual Man-Hour by Skill Specialty Code and Level of Maintenance submission will be 180 days prior to Logistic Demonstration.

Block 10/13 – When updates to the Annual Man-Hour by Skill Specialty Code and

Level of Maintenance are required to address changes that are a result of testing, Logistic analysis or development.

G. PREPARED BY: Ernest Eiler

H: DATE: 21 Aug 15

I: APPROVED BY:

No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .