Early Entry Fluid Distribution System (E2FDS) Industry Day
16 June 2015
Distribution A: Approved for public release;
distribution is unlimited
Distribution A: Approved for public release; distribution is unlimited
Agenda Day One
Time Topic Presenter 0800-0900 Check-In / Registration
0900-0910 Welcome/ Admin/ Ground Rules Bryan McVeigh / Craig Riedel
0910-0915 Security / OPSEC Matthew Hedrick
0915-0920 Acquisition Insights Matthew Hedrick
0920-1000 E2FDS Overview/Strategy Matthew Hedrick
1000-1010 Contracting Strategy Mike Thomas
1010-1020 Break
1020-1200 ATPD 2417 Ken Walther/Dave Green/Dan Watson/ Tom Bugg/ Kris Pradeep /Dan Kosinski
1200-1210 Closing Remarks Bryan McVeigh / Craig Riedel
1210-1310 Lunch
1310-1700 Break Out Room (per schedule)
Distribution A: Approved for public release; distribution is unlimited 3
Agenda Day Two
Time Topic Presenter
0900-1140 Break Out Room (per schedule)
1140-1240 Lunch
1240-1700 Break Out Room (per schedule)
Welcome Bryan McVeigh
Project Manager, Force Projection
Craig Riedel Assistant Product Manager, PM PAWS
Distribution A: Approved for public release; distribution is unlimited 5
Industry Day Purpose
Update participants on the Army's vision (CDD requirements and Acquisition Strategy) for the E2FDS program
Promote networking among potential program participants
Provide an overview of the E2FDS draft ATPD 2417
Receive feedback from industry on the draft ATPD
Distribution A: Approved for public release; distribution is unlimited 6
Ground Rules
Today's information is for update purposes only
No questions answered today
Questions may be written on the 3x5 comment cards and will be posted with answers to the website
RFP language takes precedence over anything said here today
Instructions for obtaining the briefings presented here and future updates will be posted to:
https://contracting.tacom.army.mil/majoracq/E2FDS.htm
All information on the E2FDS program is subject to change https://contracting.tacom.army.mil/majoracq/E2FDS.htm
Security Information Matthew Hedrick
Distribution A: Approved for public release; distribution is unlimited 8
Security Rules for Conference (U)
The Conference Room has been cleared for discussions or information up to PUBLIC RELEASABLE
NAME TAGS: Must be worn at all times while in the conference area.
Late arrivals to briefings will be directed to registration in order to check in
In the event of an emergency, you will receive direction on what actions to take
Distribution A: Approved for public release; distribution is unlimited 9
Security Rules for Conference (U)
Cell phones & electronic devices are to be turned off or on vibrate during briefings
Please do not leave hand-outs/materials unattended
Photography is not permitted during the event without special approval
Return your Name Tag upon departure
Acquisition Insights
Acquisition Insights
Distribution A: Approved for public release; distribution is unlimited 11
Full Support by Stakeholders ‒ Army & OSD Committed to E2FDS
Early entry petroleum throughput capability is listed on the Integrated Priority Lists for PACOM and CENTCOM ‒ E2FDS is ranked #392 (2nd quintile) on the 17-21 Capability Needs Analysis
Part of the Inland Petroleum Distribution System (IPDS) Operational Project in support of COCOM requirements.
‒ Provides the commander early entry capability to distribute large quantities of bulk petroleum prior to the establishment of IPDS pipeline ‒ E2FDS relieves main supply route congestion by reducing petroleum line haul and allowing movement of units, equipment and other critical supplies Schedule Matters!
Industry Feedback is critical in developing a sufficient RFP
Acquisition Overview/Strategy
E2FDS Operational View
• E2FDS compliments the Inland Petroleum Distribution System (IPDS) by providing a rapidly emplaced early entry capability with minimal engineer support .
• 50-miles of conduit emplaced in 2 days vs IPDS 6-miles in 2 days.
• Fully Mission Capable in 3 days vs IPDS 22 days.
• Throughput: 850,000 gallon per day of fuel (650,000 raw water).
• Reduces Main Supply Route Congestion by reducing 170 sorties of 5K tankers daily.
• If IPDS pipeline is constructed, E2FDS is used to extend the pipeline trace or relocated.
E2FDS 5 Major Sub-Systems/Modules:
• 50 miles flexible conduit
• Employment & Retrieval System (ERS)
• Centralized Command and Control Module (C2M)
• Automated Pump Stations
• Trace Planning
QM Pipeline Platoon
Distribution A: Approved for public release; distribution is unlimited 14
Pipeline Operating Platoon Total = 38)
3 4
Pipeline Operating Platoon
• Organization in final stage of Force Design Update (FDU) approval
• Designed to operate 45 miles of IPDS pipeline
• Possible changes based on E2FDS configuration (automation and operating pressure)
• Platoon would be split to operate in two 10-hour shifts
ATLAS 10K Forklift (x2) HEMTT-LHS (x4)PLS Trailers (x4) HEMTT CGO w/MHE (x2)
As so ci at ed S up po rt
Ite m s o f E qu ip m en t
2 per HEMTT LHS = 8 2 per HEMTT CGO = 4 1 per 10K forklift = 2 1 per HMMWV = 1 Hose Deployment Team = 5
Total to Employ 20
E2FDS Personnel
Critical Operational Issues and Criteria (COIC)
COI #1: Can 50 miles of E2FDS be employed in 48 hours and be fully operational in 72 hours in order to support early entry operations?
The E2FDS shall be capable of being emplaced at a minimum rate of 25 miles per day.
The E2FDS has an automated expeditionary trace planning capability that enables the rapid determination for a suitable route.
The E2FDS receives fuel from and distributes fuel to all Army and NATO large bulk storage systems.
E2FDS has all the necessary components to enable a QM Pipeline Operating Platoon, using it’s organic equipment, to construct up to a fifty mile trace.
Distribution A: Approved for public release; distribution is unlimited 15
COIC Cont…
COI #2: Does the E2FDS configuration and reliability enable sustained throughput operations in accordance with the Operational Mode Summary- Mission Profile (OMS/MP)?
The E2FDS shall be capable of transferring a minimum of 850,000 gallons of fuel or 650,000 gallons of raw/non-potable water per 20-hour operational day.
The E2FDS has an Ao of 83% and maintainability is sufficient to meet the sustained throughput of 850,000 gallons of fuel per operational day.
The E2FDS has supervisory controls and data acquisition capabilities that enables centralized real time monitoring and control of E2FDS operations.
The E2FDS has capability to repair or replace damaged sections of conduit.
Distribution A: Approved for public release; distribution is unlimited 16
COIC Cont…
COI #3: Can 50 miles of E2FDS be retrieved in five days in order to support follow-on missions?
The E2FDS is retrieved/recovered at a rate of 10 miles per day.
E2FDS components are packaged for transport within standard ISO twenty foot equivalent units.
Distribution A: Approved for public release; distribution is unlimited 17
Program Overview
Distribution A: Approved for public release; distribution is unlimited 18
Enter At MS B
HQDA G8 Hardware Division reaffirmed support for this funding profile and schedule at recent POM
17-21 Program Review
Full and Open Competition with best value Award
Contract Structure:
‒ Fair Opportunity Firm Fixed Price (FFP) – Indefinite Delivery/Indefinite Quantity (IDIQ) ($57.2M)
Engineering and Manufacturing Development (EMD) /Production (5 years) contract.
‒ Competition strategy reduces risk by carrying two vendors through EMD
‒ Fair Opportunity Decision to select one vender to finish production (Best Value decision)
The largest Risk and Schedule driver in EMD is development of the C2M and associated software
Trace Planning Tool will not be part of the solicitation
Army Acquisition Objective (AAO): 1ea 50 mile capability (10ea - 5 mile sets)
IOC/FOC: consists of 2ea (5 mile training sets) and 10ea (5 mile sets) = total of 60 miles
POR Program Schedule Program Baseline (current schedule)
Distribution A: Approved for public release; distribution is unlimited 19
EMD Production & Deployment O&S
FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
PM
Engineering
Contracting
Logistics
Test & Evaluation
Contractor 2 – Ordering Period 1
Contractor 1 – Ordering Period 1
SSEB OP 2
MDD MS B
RFP Approval
CDD Approval
MS C / TC LP FRP/TC-STD
Production (50 Miles)PVT Units (10 Miles)
PQT
Technical Manual Development
Training Material Development
LD
IOT
IOC/FOC
TRR
System Design
CDR
Performance Spec Development
I&KPT
TM Verification
RFP
PRR
Fab PRS Test Unit (5 miles)PDR
Fair Opportunity Decision - Production
EDT LUT
RDTE Contract Award
Technical Data (Maintenance Analysis)
TM Authentication
FMECA, LORA, Maint
LCSP
EDT Manuals
CPD Approval
Start of Work
FMR
FMECA DEP -10, -23P
TRR
Key Program Events since MDD
Distribution A: Approved for public release; distribution is unlimited 20
Material Development Decision (MDD) approved 10 March
CDD Approved May 2015
Program is funded for RDTE & OPA
Industry Day – 16-17 June 2015
Release RFP – estimated 4QFY15
Contracting Strategy Mike Thomas
Contracting Strategy
Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract
FFP IDIQ contracts will be awarded to up to two contractors for the EMD phase.
The minimum quantity for the contract (first delivery order) will be the EMD test articles.
The selection of the offeror to proceed into the P&D phase will be made under fair opportunity using a best value approach and the criteria for decision will be clearly stated in section H of the RFP.
The Offerors will only be given the opportunity to adjust their prices (downward only) prior to the fair opportunity decision.
The Government intends to include options in the second delivery order for the follow-on procurements.
Distribution A: Approved for public release; distribution is unlimited 22
ARMY-TACOM Purchase Description
(ATPD) 2417
Ken Walther
Optimization Options
Flow, pressure, and hose diameter are variable, to allow system optimization (performance and/or cost).
‒ Flow and pressure values are minimums. Can be higher;
affects system reliability requirements.
‒ Hose diameter is a limited range.
Minimum flow of 708 gpm is carried over from the 20-hour operational day, and daily flow average of 850,000 gals.
‒ Lower minimum would not allow enough available downtime.
Minimum pressure of 200 psi is reasonably commercially available.
‒ If lower pressure allowed, a larger logistics burden of pumps.
ISO Packing
ISO containerization ‒ All ISO twenty-foot equivalent (TEU) packed.
‒ All TEU are PLS, LHS, and PLS trailer compatible.
‒ Pump assemblies may be 20 ft ISO or 10 ft BICON.
Two BICONs connected to make ISO TEU.
Design option for packing optimization, or redundancy of pumps in a TEU.
No TRICON packing allowed.
Weight and center-of-gravity limits PLS trailer compatible rail on bottom
25Distribution A: Approved for public release; distribution is unlimited
Other General
Use of ANSI/HI 1.6 is only for measuring head and pressure.
‒ Not restrictive to use of centrifugal pumps.
Minimum of 3 spare pumps required.
‒ Simulation runs with at least 95% availability of a spare.
‒ Assumes system reliability is met.
26Distribution A: Approved for public release; distribution is unlimited
ARMY-TACOM Purchase Description
(ATPD) 2417
Hose David Green
Hose Assembly
Distribution A: Approved for public release; distribution is unlimited
Commercial hose versus developmental -- ATPD doesn’t specify
Hose diameter shall be a minimum of 6-inch and maximum of 10 inch – Purpose of range is system optimization
Minimum pressure of 200 psi is reasonably commercially available.
Burst to working pressure ratio of 3 to 1
End Fittings ‒ Reusable without use of special tools ‒ Sexless interfaces – does not require dry break
Hose Assembly
Distribution A: Approved for public release; distribution is unlimited
End fitting gasket not of cork or cork/rubber End fitting coupling clamp shall not require the use of special tools to install and remove Cycling, deployment and retrieval – Will be tested as part of
ERS RAM
Minimum length of 500 feet Physical and chemical properties per MIL-PRF-370 Table III, E2FDS ATPD doesn’t specify type from the MIL-PRF-370 Support Equipment
– Hose Repair Kit
– Extra Clamps and end fittings
– Hose repair time shall not exceed 30 minutes.
ARMY-TACOM Purchase Description
(ATPD) 2417
Employment and Retrieval System (ERS) Dan Watson
E2FDS Employment and Retrieval System (ERS)
The E2FDS shall have the capability to employ and retrieve the hoseline of 3.3.1.2 and 3.3.2
The ERS shall be operable by the prime mover operators and three additional personnel (for testing purposes)
The hose may be stored separately from the employment/retrieval device; if so, the employment/retrieval device and hose storage are considered the ERS
At least one ERS per 5 mile set
31Distribution A: Approved for public release; distribution is unlimited
ERS Deployment
25 miles per 20-hour day (threshold) 30 miles per 20-hour day (objective) All equipment staged at trace start ERS shall be capable of deploying without powered assistance Deployment includes placement and connection of pump assemblies
32Distribution A: Approved for public release; distribution is unlimited
ERS Retrieval
10 miles per 20-hour day (threshold) 15 miles per 20-hour day (objective) All hose storage starts and ends at same location (trace start) Disconnection and retrieval of pump assemblies included
33Distribution A: Approved for public release; distribution is unlimited
ERS Power Source and Duty Cycle
Powered by prime mover electrical supply (assume worst case low idle w/lights and accessories on) OR self-contained onboard power source Shall be rated for continuous retrieval and or employment of hose stored by ERS
– If hose storage is separate from ERS, ERS shall be rated for maximum amount of hose prime mover can transport
34Distribution A: Approved for public release; distribution is unlimited
ERS Hose Storage
The hose shall be able to store back to the ERS storage upon retrieval Hose shall be stored without kinking, crimping, or damaging hose or end fittings Hose secured during transport Volume and Weight reserve for <250’ additional hose including up to 2 repairs
35Distribution A: Approved for public release; distribution is unlimited
ERS Controls and MHE
Control unit shall provide operators with the capability to perform all operations necessary to employ and retrieve hose and include a deadman type switch to stop ERS operation when released.
Military Handling Equipment (MHE) is limited to prime movers along the trace, two 10k forklifts available at the staging area.
36Distribution A: Approved for public release; distribution is unlimited
ARMY-TACOM Purchase Description
(ATPD) 2417
Communications Thomas Bugg
E2FDS OV-1
38Distribution A: Approved for public release; distribution is unlimited
Concept of Possible Communications between C2M and Pump Stations
C2M Messages:
• Pump On/Off
• Set Pressure Set Point
• Set Operating Mode
• Request status report
• Request Maintenance
Report
• Set Monitoring thresholds
Status Report:
• Digital ID Tag
• Engine Oil Pressure
• Fuel Level
• Fuel Tank Temperature
• Engine Oil Temperature
• Engine Coolant Temperature
• Pump Suction Pressure
• Pump Discharge Pressure
• Voltage
• Current
• Operating Mode
• Pump Operating Condition (GYR)
• Diag/Prog Information
• Maintenance Report
Control Manager
Pump Controller
Pump
C2M
Co m m s
Co m m sController
Inputs
Se ns or
Da ta
E2FDS Comms Requirements
Wired or wireless communications Communication between C2M and each Pump Station Data
– Command & Control, Status reports, Alarms
Quick/Easy configuration and setup Cybersecurity
– Classification: Sensitive but Unclassified
– FIPS 140-2 encryption certified
Validated under the NIST Cryptographic Module Validation Program (CMVP)
• Electromagnetic Environmental Effects (E3) Compliant Spectrum Management
– Comply with Military spectrum guidelines supporting CONUS and OCONUS operations
40Distribution A: Approved for public release; distribution is unlimited
E2FDS Communications Considerations
All Terrain and Environments Pump stations may be in unsecured areas No guarantee of LOS between Pump Stations Communications network setup be quick and easy to meet the system 2-day deployment requirement
Shelf life of 15 years Operational temperature range: -25°F to 130°F CONUS and OCONUS Military operation
41Distribution A: Approved for public release; distribution is unlimited
ARMY-TACOM Purchase Description
(ATPD) 2417
Software Kris Pradeep
E2FDS Software
Software Development Process:
The processes applied to develop software should be at-least equivalent to CMMI-DEV ML3.
If your process has not been certified by SEI as ML3 or higher, show evidence that your process is equivalent to it.
If you do not have a CMMI-DEV ML3 equivalent process, show the current process and the intended plans to mature your processes to be equivalent.
ARMY-TACOM Purchase Description
(ATPD) 2417
Reliability Dan Kosinski
Reliability Considerations Overview
Requirements Development
– Dealing with reliability for E2FDS is tricky due to the fact that reliability traces back to operational availability and this operational availability traces back to the pumping capacity of the system
– A system incorporating larger pumps and thus having a larger pumping capacity requires a lower operational availability and hence a lower reliability than a system incorporating smaller pumps
– As such, a single operational availability or reliability requirement for the system is not appropriate due to the dependence of these metrics on the system design
– Instead, a system level reliability requirement that is dependent on the system pumping capacity needs to be defined
– This requirement along with the required number of pump stations yields an estimated reliability that each pump station will need to achieve
Distribution A: Approved for public release; distribution is unlimited 45
Reliability Considerations Overview
This presentation covers an approach to address the issues present with requirements development
– An assessment of testing performed on a similar system was done to determine a realistic range for individual pump reliability to help gauge the likelihood of a given design being able to meet the system requirement
– A formulaic model for determining what the reliability of the pumping system should be given a certain pumping capacity and assumed mean downtime was developed
Distribution A: Approved for public release; distribution is unlimited 46
Reliability Considerations Realistic Individual Pump Reliability
From assessed test data, a 279.3 hour MTBEFF value is likely on the low end of what can be expected for pump reliability as the historical test data was treated very conservatively (some EFFs could be attributable to the mobility portion of the mission which is not as applicable for E2FDS but it was assumed that they were not)
A 681 hour MTBEFF is likely on the high end of what can be expected for pump reliability as this depends largely on a small subset of test data during extended RAM testing which showed no repeats of failure modes, even those for which no fixes were made
Feasible reliability of a pump in the E2FDS system is likely in the range of about 350 to 500 hours MTBEFF
As E2FDS is expected to be NDI, no improvement over currently available pumps is expected so system designs that require higher individual pump reliabilities than this would be high risk
Distribution A: Approved for public release; distribution is unlimited 47
Dynamic AO Permits Design Flexibility
Different designs will need different AOs and hence different overall system MTBEFFs in order to satisfy the mission
– The mission is to pump 850,000 gallons per day of fuel
– With a greater pumping rate the system needs to remain operationally available a lower amount of the time
The previously evaluated range of realistic reliabilities for pumps can be used as a guide towards the likelihood of various designs being able to meet the overall system reliability requirement and therefore the AO as well
– i.e. If a system requires so many pump stations that each pump needs an MTBEFF of 1000 hours, the system as a whole is unlikely to meet its MTBEFF requirement hours
GPM
GT
60*
000,850)000,850( =
)000,850( GTAO =
%8.73800 %3.83708
O
O
AGPM
AGPM
Distribution A: Approved for public release; distribution is unlimited 48
System MTBEFF From Pumping Capacity
The mission is fully defined per the OMS/MP
The total allowable downtime during a mission is a function of the pumping capacity, pumping requirement and the mission length
The allowable number of EFFs during the specified mission is a function of the assumed mean downtime and the total allowable downtime during a mission
The system MTBEFF requirement is the minimum necessary to ensure a 90% probability of no more than the allowable number of EFFs are observed
The required operational availability is calculated from the MTBEFF requirement and the assumed mean downtime
The daily capacity of the system is calculated from the required operational availability and the pumping capacity
Distribution A: Approved for public release; distribution is unlimited 49
Implementation of Design and MTBEFF Relationship
700 800 900 1000 1100 1200 M
TB
EF
F (H ou rs
Pumping Capacity (GPM)
MTBEFF Requirement's Dependence on Pump Capacity
Distribution A: Approved for public release; distribution is unlimited 50
Closing Remarks Bryan McVeigh
Project Manager, Force Projection
Craig Riedel Assistant Product Manager, PM PAWS
Contact Information
E2FDS website:
https://contracting.tacom.army.mil/majoracq/E2FDS.htm
− All questions and answers will be posted here
All E2FDS Program correspondence will be handled through the Contract Specialist: michael.g.ivkov.civ@mail.mil or Michael.d.thomas449.civ@mail.mil
Distribution A: Approved for public release; distribution is unlimited 52 https://contracting.tacom.army.mil/majoracq/E2FDS.htm mailto:michael.g.ivkov.civ@mail.mil mailto:Michael.d.thomas449.civ@mail.mil
Distribution A: Approved for public release; distribution is unlimited 53
Questions
Fill out question cards – answers to be posted to website
| Early Entry Fluid Distribution System (E2FDS)�Industry Day |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Acquisition Insights |
| Slide Number 12 |
| E2FDS Operational View |
| QM Pipeline Platoon |
| Critical Operational Issues and Criteria (COIC) |
| COIC Cont… |
| COIC Cont… |
| Program Overview |
| POR Program Schedule�Program Baseline (current schedule) |
| Key Program Events since MDD |
| Slide Number 21 |
| Contracting Strategy |
| Slide Number 23 |
| Optimization Options |
| ISO Packing |
| Other General |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| E2FDS Employment and Retrieval System (ERS) |
| ERS Deployment |
| ERS Retrieval |
| ERS Power Source and Duty Cycle |
| ERS Hose Storage |
| ERS Controls and MHE |
| Slide Number 37 |
| E2FDS OV-1 |
| Concept of Possible Communications between C2M and Pump Stations |
| E2FDS Comms Requirements |
| E2FDS Communications Considerations |
| Slide Number 42 |
| E2FDS Software |
| Slide Number 44 |
| Reliability Considerations Overview |
| Reliability Considerations Overview |
| Reliability Considerations�Realistic Individual Pump Reliability |
| Reliability Considerations�Dynamic AO Permits Design Flexibility |
| Reliability Considerations �System MTBEFF From Pumping Capacity |
| Reliability Considerations �Implementation of Design and MTBEFF Relationship |
| Slide Number 51 |
| Contact Information |
| Slide Number 53 |
File details come from the government source that posted it. Updated .