E2FDS_Attachment_0002_Technical_Verification_Requirements.docx

DOCX document 30 KB Posted

Attached to
Early Entry Fluid Distribution System (E2FDS)
Solicitation number
W56HZV15R0221
Issued by

About this file

E2FDS Attachment 0002 Technical Verification Requirements

View the file

Other files

File Type Posted
Instructions_for_Interested_Subcontractors.pdf PDF
List_of_Interested_Potential_Subcontractors.pdf PDF
E2FDS_Contractor_Solicitation_Questions_-_Set4.pdf PDF
E2FDS_W56HZV-15-R-0221_0004.pdf PDF
E2FDS_Attachment_0031_Price_Evaluation_Sheet.xlsx XLSX spreadsheet
E2FDS_Attachment_0032_Ordering_Period_2_PES.xlsx XLSX spreadsheet
A073_Certification_Report.doc DOC document
E2FDS_Attachment_0025_Integrated_Master_Schedule.pdf PDF
E2FDS_W56HZV-15-R-0221_0002.pdf PDF
E2FDS_Attachment_0030_Cross-Reference_Matrix_for_Experience.docx DOCX document
W56HZV15R0221-0003.pdf PDF
E2FDS_Contractor_Solicitation_Questions29FEB2016_-_Set2_FINAL.pdf PDF
E2FDS_Attachment_0001-_ATPD_2417.pdf PDF
E2FDS_Attachment_0031_Price_Evaluation_Sheet.xlsx XLSX spreadsheet
E2FDS_Attachment_0032_Ordering_Period_2_PES.xlsx XLSX spreadsheet
E2FDS_Attachment_0025_Integrated_Master_Schedule.pdf PDF
W56HZV-15-R-0221_Amendment_0001.pdf PDF
ATPD-2306_-_Suspension_Kit _Collapsible_Hoseline.pdf PDF
Drawing_13228E3612_001.pdf PDF
E2FDS_Contractor_Solicitation_Questions_-_Set1.pdf PDF
E2FDS_CDRLs.zip ZIP file
Exhibit_A_-_E2FDS_Contract_Data_Requirements_List.pdf PDF
E2FDS_Solicitation_W56ZHV-15-R-0221.pdf PDF
E2FDS_Attachments.zip ZIP file
E2FDS_Q A_v2.pdf PDF
Instructions_Q A.pdf PDF
E2FDS-Industry-Day-16Jun2015.pdf PDF
Attendees-E2FDS_Industry_Day_UPDATED.pdf PDF
13219E0462.pdf PDF
11674728.pdf PDF
E2FDS-Market_Survey2_-_FollowOn.pdf PDF
E2FDS-Market-Survey1-Initial.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Verification Methods.

Technical requirements in Section 3 will be verified as defined in Section 4 using the following verification methods:

1.1. Analysis (A)

Analysis shall consist of technical evaluations through either mathematical models, simulations, algorithms, charts, diagrams, representative data, or other appropriate means to demonstrate compliance with the Section 3 technical requirement.

1.2. Certification (C)

Certifications are defined as contractor-furnished documents certifying compliance with specific Section 3 technical requirement criteria. Certifications shall be signed by the contractor’s certifying official or responsible party, and shall include all supporting performance, inspection, and analytical data, as applicable. As directed by the PCO, certifications may be used in lieu of additional verification methods.

1.3. Inspection (I)

Inspections shall constitute those activities to verify system attributes and characteristics are compliant with Section Technical Requirements of the E2FDS system PD. Verification shall be accomplished by visual or physical examination of the end item, subsystems and/or components, and may include but are not limited to recording measurements, evaluating physical characteristics and interfaces with respect to form, fit, and function, and reviewing descriptive documentation.

1.4. Test (T)

Testing shall be accomplished through the systematic physical operation of the E2FDS system, its systems, subsystems or components, under the appropriate and specified conditions, with or without instrumentation, and the collection, analysis, and evaluation of resulting data.

1.5. Demonstration (D)

Demonstration shall be accomplished through physical operation of the E2FDS system, its systems, subsystems or components, under the appropriate and specified conditions, with or without instrumentation, and with the collection and analysis, but without the evaluation of resulting data.

2. Verification Events System technical requirements will be verified in each phase of the E2FDS contract as follows:

2.1. Engineering, Manufacturing and Development (EMD) Phase

2.1.1. Contractor Demonstration (CD)

Prior to Government acceptance of the EMD PRS, the contractor shall conduct a CD at the contractor’s facility in accordance with the requirements specified in Table 1.

2.1.2. Acceptance, Inspection and Test (AI&T)

Prior to delivery of the E2FDS EMD PRS to the Government, the contractor shall conduct an AI&T at the contractor’s facility in accordance with the requirements specified in Table 1.

2.1.3. Engineering Development Test (EDT)

After completion of the CD and the AI&T, the Government will test or analyze the E2FDS EMD PRS at a Government test site in accordance with the requirements specified in Table 1. The Government reserves the right to waive any testing requirements.

2.2. Production and Deployment (P&D) Phase

2.2.1. Acceptance, Inspection and Test (AI&T)

Prior to deliveries of the E2FDS P&D PRS and of the 50-mile production system to the Government for test, the contractor shall conduct an AI&T at the contractor’s facility in accordance with the requirements specified in Table 1.

2.2.2. Production Qualification Test (PQT)

After completion of the AI&T, the Government will test or analyze the E2FDS P&D PRS at a Government test site in accordance with the requirements specified in Table 1. The Government reserves the right to waive any testing requirements.

A = Analysis, C = Certification, I = Inspection, T = Test, D = Demonstration

E2FDS

Summary of Technical and Verification Requirements

Test Description
Technical Requirement Section 3
Verification Requirement Section 4
EMD
P&D
CD
AI&T
EDT
LUT
AI&T
PQT
IOT&E
101
Materials
3.2 – 3.2.4
4.1.2.1
C
AC
C
AC
102
Welding
3.2.5
4.2.5
C
AC
C
AC
103
Flow capacity/consumption
3.3.1.1 – 3.3.1.1.1
4.3.1.1 – 4.3.1.1.1
D
AT
T
AT
T
104
Hoseline length
3.3.1.2
4.3.1.2
A
AI
A
AI
105
Displacement and evacuation
3.3.1.3 – 3.3.1.3.2
4.3.1.3
D
IT
T
IT
T
106
Mobility
3.3.1.4 – 3.3.1.4.2
4.3.1.4 – 4.3.1.4.2
CT
T
CT
T
107
ISO containerization
3.3.1.5 – 3.3.1.5.2
4.3.1.5 – 4.3.1.5.2
IC
IC
IC
IC
108
Container quantity
3.3.1.5.3
4.3.1.5.3
I
I
I
I
109
Set packaging
3.3.1.5.4
4.3.1.5.4
A
AI
I
AI
I
110
Pressure reduction
3.3.1.6
4.3.1.6
I
CIT
I
CIT
111
Service and storage life
3.3.1.7
4.3.1.7

C

C

112
Hose
3.3.2
4.3.2
I
IC
I
IC
I
113
Hose diameter
3.3.2.1
4.3.2.1
I
I
I
I
I
114
Working pressure
3.3.2.2
4.3.2.2
D

T

T

115
Burst pressure
3.3.2.3
4.3.2.3
D

T

T

116
Proof pressure
3.3.2.4
4.3.2.4
D

T

T

117
End fittings
3.3.2.5 – 3.3.2.5.3
4.3.2.5
IC
I
IC
I
118
Pull strength
3.3.2.6
4.3.2.6
D

T

T

119
Cycles, deployment and retrieval
3.3.2.7
4.3.2.7

T

T

120
Section length
3.3.2.8
4.3.2.8
I
I
I
I
121
Elongation
3.3.2.9
4.3.2.9

T

T

122
Twist
3.3.2.10
4.3.2.10

T

T

123
Physical and chemical properties
3.3.2.11
4.3.2.11
C
C
C
C
124
Color
3.3.2.12
4.3.2.12
I
I
I
I
125
Hose marking
3.3.2.13
4.3.2.13
I
I
I
I
126
Hose support equipment
3.3.2.14
4.3.2.14
IC
I
IC
I
127
Hose Repair Kit
3.3.2.14.1
4.3.2.14.1
I
I
I
I
128
Pinch clamps
3.3.2.14.1.1
4.3.2.14.1.1
I
I
I
I
129
Extra clamps and end fittings
3.3.2.14.1.2
4.3.2.14.1.2
I
I
I
I
130
Spill cleanup kit
3.3.2.14.1.3
4.3.2.14.1.3
I
I
I
I
131
Hose repair time
3.3.2.14.1.4
4.3.2.14.1.4
D
T
T
T
T
132
Flow Control Kit
3.3.2.14.2
4.3.2.14.2
I
I
I
I
133
Gap Crossing Kit
3.3.2.14.3
4.3.2.14.3
I
T
T
I
T
T
134
Culvert Kit
3.3.2.14.4
4.3.2.14.4
I
I
I
I
I
135
Emplacement and Retrieval System (ERS)
3.3.3
4.3.3
A
A
A
A
136
Emplacement rate
3.3.3.1
4.3.3.1
D
T
T
T
T
137
Retrieval rate
3.3.3.2
4.3.3.2
D
T
T
T
T
138
Duty cycle
3.3.3.3
4.3.3.3
D

T

T

139
Power source
3.3.3.4
4.3.3.4
D

T

T

140
Hose storage
3.3.3.5
4.3.3.5
DI

T

T

141
Control unit
3.3.3.6 – 3.3.3.6.3
4.3.3.6 – 4.3.3.6.3
IC
IT
T
IT
T
142
ERS handling equipment
3.3.3.7
4.3.3.7
D
IT
T
IT
T
143
Hydrostatic pressure
3.3.4.1
4.3.4.1
T
T
T
T
144
Capacity
3.3.4.2
4.3.4.2
D
T
T
T
T
145
Tilting
3.3.4.2.1
4.3.4.2.1

T

T

146
Pump priming
3.3.4.2.2
4.3.4.2.2
T
T
T
T
147
Pump assembly characteristics and components
3.3.4.4
4.3.4.4
I
IC
I
IC
148
Pump housing
3.3.4.4.1
4.3.4.4.1
IC
IT
IC
IT
149
Piping and fittings
3.3.4.4.2
4.3.4.4.2
IC
IC
IC
IC
150
Suction and discharge components
3.3.4.4.3
4.3.4.4.3
IC
IC
IC
IC
IC
151
Removed
152
Engine
3.3.4.5
4.3.4.5
D
IC
ICT
IC
ICT
153
Electrical system
3.3.4.6 – 3.3.4.6.3
4.3.4.6
I
IC
ICT
IC
ICT
154
Control and Instrument panels
3.3.4.7 – 3.3.4.7.3
4.3.4.7
D
IC
ICT
T
IC
ICT
T
155
Pump limits controller
3.3.4.8 – 3.3.4.8.4
4.3.4.8
D
IC
IC
IC
IC
156
Fuel system
3.3.4.9 – 3.3.4.9.4
4.3.4.9
D
IC
IC
IC
IC
157
Container frame
3.3.4.10 – 3.3.4.10.2
4.3.4.10
I
IC
IC
IC
IC
158
Command and control module
3.3.5 – 3.3.5.8
4.3.5
D
C
ICT
T
C
ICT
T
159
Transportability
3.4.1
4.4.1
C
CT
C
CT
160
Tiedown provisions
3.4.1.1
4.4.1.1
IC
C
IC
C
161
Slinging provisions
3.4.1.2 – 3.4.1.2.4
4.4.1.2 – 4.4.1.2.4
IC
ICT
IC
ICT
162
Rail transport
3.4.1.3
4.4.1.3

AC

AC

163
Rail impact
3.4.1.3.1
4.4.1.3.1

T

T

164
Highway transport
3.4.1.4
4.4.1.4

A

A

165
Marine transport
3.4.1.5
4.4.1.5

AC

AC

166
Fixed wing aircraft
3.4.1.6.1
4.4.1.6.1

AC

AC

167
Rotary wing aircraft
3.4.1.6.2
4.4.1.6.2

AC

AC

168
Forklift
3.4.1.7
4.4.1.7
IC
AI
IC
AI
169
NATO intervehicle receptacle
3.4.2
4.4.2
I
IC
I
IC
170
Fuel
3.4.3
4.4.3
C
CT
C
CT
171
Lubricants
3.4.4
4.4.4
C
ACT
C
ACT
172
Dimensional and weight limits
3.4.5
4.4.5
D
I
I
I
I
173
Center of gravity
3.4.5.1
4.4.5.1
D
I
I
I
I
174
Safety
3.5.1
4.5.1
AC
CT
T
AC
CT
T
175
Human factors engineering
3.5.2 – 3.5.2.1
4.5.2
AC
CT
T
AC
CT
T
176
Environmental hazard prevention
3.5.3
4.5.3
AC
CT
T
AC
CT
T
177
Hazardous material restrictions
3.5.3.1
4.5.3.1
I
I
I
I
178
Pumping assembly spill control kit
3.5.3.2
4.5.3.2
I
I
I
I
179
Pumping assembly shutoff valve
3.5.3.3
4.5.3.3
D
I
IT
T
I
IT
T
180
Removed
181
Lighting
3.5.4 – 3.5.4.2
4.5.4
D
IC
CT
T
IC
CT
T
182
Grounding and bonding
3.5.5 – 3.5.5.2
4.5.5
IC
IC
IC
IC
183
Reliability-ERS
3.5.6.1
4.5.6.1

T

T

184
Reliability-Pump assembly
3.5.6.2
4.5.6.2

AT

AT

185
Maintainability
3.5.7
4.5.7
AT
T
AT
T
186
Maintenance ratio
3.5.7.1
4.5.7.1
T
T
T
T
187
Operator equipment
3.5.8
4.5.8
IC
IT
TT
IC
IT
TT
188
Storage container
3.5.9 – 3.5.9.2
4.5.9
IC
IC
IC
IC
189
Active fire suppression
3.5.10 – 3.5.10.1
4.5.10
IC
ICT
IC
ICT
190
Adapters
3.5.11 – 3.5.11.9
4.5.11
IC
IC
IC
IC
191
Software development
3.5.12 – 3.5.12.2
4.5.12
C
ACT
C
ACT
192
IETM
3.5.13
4.5.13
I
AIT
T
193
Trace planning tool
3.5.14 – 3.4.14.3.6
4.5.14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
194
Operational and storage temperature
3.6.1 – 3.6.2
4.6.1 – 4.6.2

T

T

195
Sand
3.6.3
4.6.3

T

T

196
Dust
3.6.4
4.6.4

T

T

197
Humidity
3.6.5
4.6.5

T

T

198
Solar radiation
3.6.6
4.6.6

T

T

199
Rain
3.6.7
4.6.7

T

T

200
Salt fog
3.6.8
4.6.8

T

T

201
Altitude
3.6.9
4.6.9

T

T

202
Noises limits
3.6.10
4.6.10

T

T

203
Electromagnetic interference (EMI)
3.6.11
4.6.11

T

T

204
High-altitude Electromagnetic Pulse (HEMP)
3.6.12
4.6.12

T

T

205
Near Strike Lightning (NSL)
3.6.13
4.6.13

T

T

206
Personnel Electrostatic Discharge (PESD)
3.6.14
4.6.14

T

T

207
Helicopter Electrostatic Discharge (HESD)
3.6.15
4.6.15

T

T

208
Hazards of Electromagnetic Radiation to Fuel (HERF)
3.6.16
4.6.16

T

T

209
C2M ruggedization
3.6.17 – 3.6.17.3
4.6.17 – 4.6.17.3
D
C
T
T
C
T
T
210
Human systems integration (HSI)
3.7
4.7
CT
T
CT
T
211
Identification, marking and information
3.8 – 3.8.5
4.8
IC
IC
IC
IC
212
Corrosion control performance
3.9
4.9

AC

AC

213
Treatment and painting
3.9.1
4.9.1
IC
IC
IC
IC
214
NBC decontamination survivability
3.9.2
4.9.2
IC
IC
IC
IC

File details come from the government source that posted it. Updated .