W564KV-18-R-0003-0001.pdf

PDF 370 KB Posted

Attached to
Installation Maintenance Services for USAG-Stuttgart
Solicitation number
W564KV-18-R-0003
Issued by

View the file

Other files

File Type Posted
CONFORMED_W564KV-18-R-0003-0006.pdf PDF
W564KV-18-R-0003-0006.pdf PDF
W564KV-18-R-0003_Amendment_5_Q&A.pdf PDF
W564KV-18-R-0003-0005.pdf PDF
03-13-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
Amendment_W564KV-18-R-0003-0004.pdf PDF
W564KV-18-R-0003_Amendment_4_Q&A_12_March_18.pdf PDF
03-12-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
02-22-2018_Deliverables.xlsx XLSX spreadsheet
02-26-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
W564KV-18-R-0003_Amendment_3_Q&A.pdf PDF
AER_604-1_Local_National_Screening_Program_in_Germany.pdf PDF
GFEBS_Entry_Requirements_Chart.pdf PDF
Kelley_Barracks_Water-Rights_Permit_Map.pdf PDF
Appendix_R_-_Lighting_Exterior.pdf PDF
GFEBS_Maintenance_Order_Entry_Chart.pdf PDF
W564KV-18-R-0003-0003.pdf PDF
Appendix_R_-_Exit_Signs.pdf PDF
Maintenance-PV-_Kelley_Barracks.pdf PDF
AE_Reg_190-16_Installation_Access_Control_(April_2017).pdf PDF
Appendix_R_-_Lighting_Occupancy_Sensors.pdf PDF
DRAFT_Army_Installation_Design_Standards_AUG_2012.pdf PDF
W564KV-18-R-0003_Performance_Work_Statement_27Feb18.pdf PDF
W564KV-18-R-0003-0002.pdf PDF
W564KV-18-R-0003_Performance_Work_Statement.pdf PDF
W564KV-18-R-0003_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
W564KV-18-R-0003_Government_Furnished_Property_Listing.pdf PDF
W564KV-18-R-0003_Past_Performance_Questionnaire.docx DOCX document
W564KV-18-R-0003.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to advertise the site visit and to add FAR Clause 52.217-8, Option to Extend Services.

No other Changes are made.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W564KV-18-R-0003

X 9B. DATED (SEE ITEM 11)

25-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jan-2018

CODE

TCC-KAISERSLAUTERN

THEATER CONTRACTING CENTER

BLDG. 3233, KLEBER KASERNE

MANNHEIMER STR. 238

67657 KAISERSLAUTERN

GERMANY

W564KV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W564KV-18-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor not later than 30 days prior to contract expiration.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

SITE VISIT

Site Visit Invitation

A site visit will be held on 6 February 2017. Any prospective offerors may request attendance via email to richard.vandelinde.civ@mail.mil Not Later Than 14:00 CEST 1 February 2018. Attendance is limited to two representatives from each firm.

Please provide the following information for access to the installation:

Visitor's Name, Date of Birth, Location of Birth, and Firm.

Visitors with installation access will provide their installation pass number.

Meeting location has not been finalized at this time, but will be provided to attendees NLT 12:00 CET, 5 February 2018.

Transportation will be provided from the meeting location to the sites, and return to the meeting location.

Tentative schedule 09:00 through 15:00 and the projected itinerary is:

1. AFH building visit

2. GFOQ site visit

3. UPH site visit

4. Patch Power Plant

5. Patch Heat Plant

W564KV-18-R-0003

(End of Summary of Changes)