02-22-2018_Deliverables.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Installation Maintenance Services for USAG-Stuttgart
Solicitation number
W564KV-18-R-0003
Issued by

About this file

02-22-2018 Deliverables

View the file

Other files

File Type Posted
CONFORMED_W564KV-18-R-0003-0006.pdf PDF
W564KV-18-R-0003-0006.pdf PDF
W564KV-18-R-0003_Amendment_5_Q&A.pdf PDF
W564KV-18-R-0003-0005.pdf PDF
03-13-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
Amendment_W564KV-18-R-0003-0004.pdf PDF
W564KV-18-R-0003_Amendment_4_Q&A_12_March_18.pdf PDF
03-12-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
02-26-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
W564KV-18-R-0003_Amendment_3_Q&A.pdf PDF
AER_604-1_Local_National_Screening_Program_in_Germany.pdf PDF
GFEBS_Entry_Requirements_Chart.pdf PDF
Kelley_Barracks_Water-Rights_Permit_Map.pdf PDF
Appendix_R_-_Lighting_Exterior.pdf PDF
GFEBS_Maintenance_Order_Entry_Chart.pdf PDF
W564KV-18-R-0003-0003.pdf PDF
Appendix_R_-_Exit_Signs.pdf PDF
Maintenance-PV-_Kelley_Barracks.pdf PDF
AE_Reg_190-16_Installation_Access_Control_(April_2017).pdf PDF
Appendix_R_-_Lighting_Occupancy_Sensors.pdf PDF
DRAFT_Army_Installation_Design_Standards_AUG_2012.pdf PDF
W564KV-18-R-0003_Performance_Work_Statement_27Feb18.pdf PDF
W564KV-18-R-0003-0002.pdf PDF
W564KV-18-R-0003-0001.pdf PDF
W564KV-18-R-0003_Performance_Work_Statement.pdf PDF
W564KV-18-R-0003_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
W564KV-18-R-0003_Government_Furnished_Property_Listing.pdf PDF
W564KV-18-R-0003_Past_Performance_Questionnaire.docx DOCX document
W564KV-18-R-0003.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Deliverable #PWS ParaDeliverableInitial SubmissionTask FrequencyTask Frequency DetailsData SourceMedium/FormatHow to submit deliverables
00011.6.1Quality Control PlanWith proposal package and within thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileInitial submission to the KO, thereafter upload updated Plan annually on Government shared drive
00021.6.8Installation Pass and CAC Inventory LogWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month.
00031.7Key Control and Inventory LogWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetKey Control and Inventory LogExcel SpreadsheetEnter updates to Key Control and Inventory Log spreadsheet, located on Government shared drive, NLT the 25th of each month.
00041.12.1Education and Training LevelWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month.
00051.18.Phase-In and Phase-Out Plan with milestones and timelineWith proposal package and within fifteen (15) calendar days after contract awardWord Document
PDF FileSubmit deliverable to KO thru COR; Post a copy on Government shared drive
1.18.1.1Phase-In Status Report with milestones and timelineStart of phase-In periodBi-WeeklyWord Document
PDF FileSubmit deliverable to KO thru COR; Post a copy on Government shared drive
1.18.1.2GFEBS accounts and CAC status with milestones and timelineTwo weeks from the start of Phase-In planBi-WeeklyWord Document
PDF FileSubmit deliverable on Government shared drive
Work order transfer from backup system to GFEBSWhen GFEBS enabledOne Time Occurrence during Phase-InInitiate Maintenance Orders - (20) calendar days after becoming GFEBS operational
Enter labor and materials NLT thirty (30) calendar days after becoming GFEBS operationalGFEBSGFEBS
Manual entry of all maintenance orders, labor and materials, etc. from backup system to GFEBS.Submit deliverable via GFEBS
00061.19Management PlanWith proposal package and within thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileSubmit initial deliverable to the KO, thereafter upload updated Plan annually on Government shared drive
00071.20.2
1.20.7Preventive Maintenance (PM) Plan
PM Work Completion Time, Frequency and DeviationsVariesPM Plan - Initial Annually, updates monthly
PM Orders - VariesChanges to Annual PM Plan NLT the 25th of each month - updates to spreadsheetGFEBS PMOPM Plan initial submission to the KO, thru the COR, within 30 days of option year being exercised. changes to annual work plan, monthly, NLT 20th, for the following month. Annual work plan shall list all facilities and equipment with scheduled PM date.

Perform PM work with acceptable deviations as specified below:

a. Annual, Bi-annual, Semi-Annual – 4 weeks after scheduled date

b. Quarterly – 2 weeks after scheduled date

c. Weekly – 1 day after scheduled date

d. Daily - anytime during the day shift each day of the year

e. Seasonal – during the month specified

f. Monthly, Bi-Monthly – 5 days after scheduled date

00081.20.8
For Priority 1 - Initiate a sub-order for deficiencies found during the PM Work.Immediately upon discovery and follow with the emailVariesVariesGFEBSInitiate sub-order for deficiencies found during the PM Work.
1.20.7
5.2.3For Priority 2&3 - Initiate sub-order for deficiencies found during the PM Work.Within three (3) calendar daysVariesGFEBS
00091.20.9Marking on-siteEvery time preventive maintenance is performed.Every time preventive maintenance is performed.Every time preventive maintenance is performed.Affix a Government approved label to individual equipment every time preventive maintenance is performed. The information on the label shall include, but not limited to:

a. GFEBS maintenance order number

b. GFEBS equipment ID number

c. Serial Number

d. Date and time

e. Technician name

00101.21.1Safety PlanWithin thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileInitial submission to the KO, thereafter upload updated Plan annually on Government shared drive
00111.21.4Safety TrainingWithin thirty (30) calendar days after contract award and prior to work assignmentAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00121.22.6.1
1.22.6.2Release of Hazardous Material or Substances Reportingwithin one (1) hourVariesfollow up with ROF within five (5) calendar days after the initial notificationVerbal Notification

Email

ROF

Descriptive, narrative document containing text, charts or tables. Can be submitted in PDF format.Send a notification to Fire Control Center thru COR; post a copy on Government shared drive
Environmental POL Spills ReportingAs requiredfollow up with ROF within five (5) calendar days after the initial notificationVerbal Notification/Email/ROFFire Control Center thru COR; post a copy on Government shared drive
1.22.6.3Incident Logwithin one (1) dayVariesIncident LogExcel SpreadsheetUpdate Incident Log
00131.24.3Contingency PlanWithin thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileSubmit initial deliverable to the KO, thereafter upload updated Plan annually on Government shared drive
00141.25.1AT Level I TrainingWithin thirty (30) calendar days after contract award or or thirty (30) calendar days after employment of new personnelAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
1.25.2OPSEC TrainingAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
1.25.3iWATCH TrainingOne Time OccurrenceNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00151.25.4Information Assurance TrainingWithin thirty (30) calendar days after contract award or or thirty (30) calendar days after employment of new personnelAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00161.25.5Evacuation Coordinator/Fire Prevention TrainingWithin thirty (30) calendar days after contract award or appontmentAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00171.25.6Energy Monitor TrainingWithin thirty (30) calendar days after contract award or appointment.AnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00181.25.7Building Coordinator TrainingWithin thirty (30) calendar days after contract award or prior to work assignmentAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00191.25.8GFEBS TrainingImmediately upon the AKO account approval and CAC issuance by the Government, NLT 60 days of Contract award dateVariesNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00203.4.3FlagsWithin thirty (30) calendar days after contract awardMonthlyWhen equipment is replacedGFEBSGFEBS WarehouseMaintain GOCO equipment inventory in GFEBS warehouse.
3.4.4Housing Replacement Refrigerators InventoryWithin thirty (30) calendar days after contract awardMonthlyWhen equipment is replacedGFEBSGFEBS WarehouseMaintain GOCO equipment inventory in GFEBS warehouse.
3.4.6Locks
3.4.7Fire Extinguishers
00213.5Property Management PlanWithin thirty (30) calendar days after contract awardAnnuallyWord Document and Excel SpreadsheetSubmit Initial deliverable to the COR, and upload it to the Government shared drive; thereafter, post updated plan to the drive; the Plan shall meet FAR Clause 52.245-1, Government Property and AR 735-5, Policies and Procedures for Property Accountability;
00224.4.9

5.3.5.1

5.5.2 Mobile Telephone Numbers Within ten (10) calendar days after contract award Varies Email Word Document

PDFProvide English-speaking staffed telephone number available 24 hours, 7 days a week. Submit the deliverable to the COR
00235.2.2.1"4283" Package for DMOsWithin twenty (20) calendar days from Government’s notification dateWhen DMO values is grater than 40 labor hours or 3,500 euros in total costCost Estimate LogExcel Spreadsheet
Supporting Documentation1. Submit 4283

2. Submit a minimum of three (3) vendor quotes for Government’s review and approval. Pre-expended bin supplies and materials shall not be included in the material estimate

3. Update Cost Estimate Log

4. Post all supporting documentation to Government's shared drive 0024 5.2.4.1 Project Cost Estimates (Proposal Packages) and Documentation Submission Within twenty (20) calendar days of the Contractor's receipt of the request Varies Cost Estimate Log Excel Spreadsheet Enter updates to Cost Estimate Log spreadsheet, located on Government shared drive, within three (3) working days of the Contractor's receipt of the request; upload supporting documentation to Government shared drive:

a) estimate spreadsheet format/content for the Government approval (one-time only)

b) three (3) vendor quotes and invoices of purchases as evidence of material costs

c) three (3) vendor quotes or invoices as evidence of specialized equipment rental cost

d) project estimates for labor

e) quotes for specialized subcontract services 0025 5.2.6 5.2.8

5.5.5.5.3Work Centers and Activity TypesWhen posting time and material against GFEBS maintenance orderDailyGFEBSGFEBSThe Contractor shall account in GFEBS for labor hours based on work centers (trades) performing the work/tasks. The Contractor is responsible to coordinate all work between work centers/shops and to account for man-hours and materials being expended until the maintenance order is closed.
00265.3.1.3
5.3.5.2Response Time/Completion for Priority Level 1DailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteRespond and be on-site for all emergency work within two (2) hours of notification/release, and provide first responders, skilled craftsmen, project manager or alternate, which are able and ready to respond to emergency work orders.
00275.3.1.4Downgrade DMO Level 1 in GFEBS to Level 2 or 3DailyDailyDailyGFEBSGFEBSWhen the emergency maintenance order is downgraded to routine or urgent level, post all hours and materials, close the emergency maintenance order (to include supporting documentation), and initiate a new sub-order with a new priority level.
00285.3.2.3Response Time/Completion for Priority Level 2DailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteRespond and be on-site for all urgent work within 24 hours of notification/release and provide skilled craftsmen, project manager or alternate, which are able and ready to respond to urgent work orders
00295.3.2.4Downgrade DMO Level 2 in GFEBS to Level 3DailyDailyDailyGFEBSGFEBSWhen the urgent maintenance order is downgraded to routine level, post all hours and materials, close the urgent maintenance order (to include supporting documentation), and initiate a new sub-order with a new priority level.
00305.3.3.2Response Time/Completion for Priority Level 3 with Completion DateDailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteComplete this type of routine work NLT date identified in GFEBS Maintenance Order. The delivery date is between 1 and 30 calendar days of notification/release
00315.3.4.2Response Time/Completion for All Other Routine WorkDailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteRespond, on-site and complete to all routine work within 30 calendar days of notification/release
00325.3.5.3Refrigerator ReplacementWhen requestedWhen requestedVariesPhone calls

Emails Verbal

GFEBSWork On-SiteReplace faulty refrigerator on-post after normal duty hours, within three (3) hours of resident’s call IAW para 5.5.9 “Work Reception Requirements for Initiating Repair for Government-Owned Domestic Appliances”. Deliver and install a replacement refrigerator and move faulty unit to collection point on base. Initiate a DMO next work day NLT 1000 hours.
00335.3.5.4Power Plan OperationsDuring Phase-InDailyDailyWork On-SiteProvide qualified power plant operator to operate power plants after normal work hours, Monday thru Sunday
00345.5.3.3Self-Help Issue Point OperationsDuring Phase-InDailyDailyMaintain and operate the SHIP open for customer service on a schedule as approved by the Government.
00355.5.3.4Material Safety (MSD) Data SheetsFor all hazardous items issued from the SHIP storeWhen material is issuedVariesDocumentMaintain MSD sheets for all hazardous items issued from the SHIP store including, but not limited to, paint, paint thinner, glue, and sprays, in the English language. Furnish one (1) copy to the customer at the time the item is issued. Maintain translated MSD sheets, and updated inventory of all MSDS materials with quantities on Government’ shared drive, at all times. Have MSDN sheets available on line and email them when requested by the customer
00365.5.3.11SHIP Stores and GFEBSWhen GFEBS enabledWhen material is issuedVariesGFEBSGFEBSInitiate a DMO in GFEBS against SHIP work center, select a functional location identify building, stairwell and apartment number, and perform goods receipt/goods issue transactions; file a signed material receipt by the customer and attach it to supporting invoicing documentation. The customer data shall be legible (print and signed) on the receipt. Enter customer information in GFEBS order general description field (e.g., name, phone number, location, etc.).

Self-help supply procedures:

a. Perform initial SHIP material inventory during the Phase-In IAW para 5.5.12 “Inventory Management”.

c. Charge all issued SHIP materials against work orders.

d. When the new materials ordered for the SHIP store, provide to the COR, SHIP material invoice with quantities and materials to be entered in GFEBS. Add to GFEBS SHIP warehouse all new SHIP material based on material invoice from vendors. Upload and attach vendors’ invoices to GFEBS warehouse when adding new materials to GFEBS.

0037 5.5.5.5.1 GFEBS Entries - Time Confirmation for Consumed Time When GFEBS enabled Daily NLT next work day GFEBS GFEBS Time Confirmation or at any time Perform time confirmation in GFEBS by entering a number of consumed labor hours for every GFEBS order, and individual task code, whether a task is paid as a fixed price item or hourly rate.

Upload a hard copy of a work order into GFEBS and attach it GFEBS work. Attached work order shall be filled out by the technician, indicating performed hours.

00385.5.5.5.2GFEBS Entries - Task CodeWhen GFEBS enabledDailyDuring Time ConformationGFEBSGFEBS Time Confirmation or at any timeEnter correct task code for work performed.
00395.5.5.5.4GFEBS Entries - Functional Location and GFEBS InventoryDuring phase-in, after 100% inventoryDailyDaily; NLT before the maintenance order is closed and invoicedGFEBSKeep GFEBS equipment records up-to-date and accurate at all times. Ensure all equipment is in GFEBS.

Inform the COR/GFEBS SME when new equipment is found and its not in GFEBS.

Assign valid functional location to GFEBS maintenance order when order is initiated but NLT before the order is closed and invoiced.

00405.5.5.5.5GFEBS Entries for Consumed Material and Parts - For Cost Reimbursed Material (Time&Material)When GFEBS enabledDailyNLT two (2) work days after material is consumed with maintenance order or orderedGFEBSGFEBS goods movement transactionPerform transaction goods receipt/goods issue to individual maintenance order. The Government will credit material for each invoice amount in GFEBS and the Contractor shall debit individual amounts for materials against each GFEBS work order. This process shall be performed after the Contractor issues the monthly invoice for the Governments’ reimbursement and before the Contractor submits the invoice to WAWF for payment. Attach material invoice in GFEBS, to GFEBS maintenance order
00415.5.5.5.5GFEBS Entries for Consumed Material and Parts - Materials and Parts on OrderWhen GFEBS enabledDailyNLT two (2) work days after material is orderedGFEBSGFEBS goods movement transactionWhen materials or parts are placed on order, perform tasks as specified below, NLT two (2) work days after material is ordered:

a. Change maintenance order status to “WM” (Waiting Material).

b. Indicate in remarks field when materials/parts are ordered and estimated delivery date.

c. Inform the resident/POC of the status of ordered materials/parts.

d. Follow up with vendors weekly, enter new material status in remarks section, and inform the resident/POC of the new status of ordered materials/parts.

e. Charge the work order with material NLT two calendar (2) days after material was ordered.

00425.5.5.5.6GFEBS Entries for WarrantiesWhen GFEBS enabledVariesVariesGFEBSGFEBSEnter warranty information for individual equipment.
00435.5.5.5.7GFEBS Entries for PermitsWhen GFEBS enabledVariesVariesGFEBS
Permit LogGFEBS
Excel spreadsheetUpdate Permit Log and enter Permit Log Number into GFEBS.
00445.5.5.5.8Invoice Data and Clos-out OrdersVariesVariesGFEBSGFEBSEnter invoice number in GFEBS, technically complete with applied overhead and settle the order.
0045

5.5.5.5.9 Updates to Maintenance Order Status When GFEBS enabled Daily Daily GFEBS GFEBS Maintenance Order Status Change maintenance order status in GFEBS to “WM” (Waiting Material) and indicate in remarks field:

a. When material/part is ordered

b. What is ordered

c. Estimated delivery date.

Change order status:

a) order on hold

b) QC in progress, etc.

5.5.5.5.10

Meter Readings GFEBS UpdatesWhen GFEBS enabledMonthlyVariesMeters on-site
Meter Readings LogGFEBSEnter meter readings per functional location.
00475.5.5.5.11Quality ControlWhen GFEBS enabledVariesvariesEnter a task code for a quality control indicating the performed quality control. Upload supporting documentation and quality control reports on the Government’s shared drive IAW para 1.6.1.1.
00485.5.5.5.12Sub-Contractor Work DataWhen GFEBS enabledDailyWhen the prime Contractor subcontracts the workGFEBSGFEBSPerform GFEBS entry IAW para 5.5.5. and indicate the work is sub-contracted. The Government will provide task codes.
00495.5.5.6GFEBS Reports Format and UploadVariesVariesVariesGFEBSExcel SpreadsheetUse GFEBS to download reports in excel spreadsheet format for further analysis. Save excel spreadsheet on shared drive - do not save excel as PDF file.
00505.5.6.1.1
5.5.6.1.2Post all documentation on the Government's shared driveVariesDailyDailyGFEBS
Supporting DocumentationGovernment Shared Drive
The Government will create folders and define naming conventions for documents and files posted on Government's shared drive. The Contractor shall follow those rules when and how to post documents on shared drive.Post documents on shared drive IAW published guidance. Use correct folders to post data. Saved and post all files in their original format.
00515.5.6.2Provide all communication in English languageOn Contract award dateDailyDailyGFEBS

Supporting Documentation Emails Verbal GFEBS Government Shared Drive Verbal Perform all communication in English language

a. Email correspondence

b. Maintenance orders’ description of work and material (hard copy) (e.g., all performed repair)

c. Deliverables

d. Bill of Material (BOM) from vendors

e. All GFEBS entries

f. Quality Control Reports

g. Reports of Findings

h. Inspections (e.g., Roof Inspections) I. Logbooks

j. Material Safety Data Sheets (MSDS).

00525.5.6.3
5.5.5.6Preventive Maintenance Documentation and Reporting UploadWhen performing PM workDailyDailyGFEBS
Supporting DocumentationUpload to GFEBS and the Giverment's shared driveUpload PM records for PMOs to the GFEBS and the Government's shared drive:

a. GFEBS Preventive Maintenance Order (upload to GFEBS).

b. Signed and dated Inspection/Maintenance/Repair checklists (upload to GFEBS).

c. Signed and dated UVV/TüV inspections (upload to GFEBS).

d. Signed and dated test and calibrations results (upload to GFEBS).

e. Signed and dated Report of Finding (ROF) (upload to GFEBS).

f. Marked equipment with unique GFEBS number.

g. Electronic versions of logbooks/operational logs.

h. Deficiencies found and repaired within one (1) hour of work.

I. Plan of Action after all deficiencies has been identified.

j. Deficiencies initiated and repaired as GFEBS DMOs.

k. Complete schedule of future inspections with a list of the materials required, IAW para 1.18. “Preventive Maintenance Plan”.

l. Material Safety Data Sheets (MSDS).

00535.5.6.3.1
5.5.6.4PM Inspection ChecklistsWhen performing PM workDailyDailyThis PWS

U.S. Army Regulations Host Nation Regulations OEM Word Document PDF File

ChecklistThe GFEBS PM Plan will generate PMOs. Each PMO will have tasks printed on the maintenance order. Those tasks represent the checklist. In the event the maintenance order tasks (also known as “operations”) are not corresponding to actual work performed by the maintenance worker, send an email to the GFEBS GRC thru the COR and request task list changes. Identify the task list source (e.g., technical manual, regulations, etc.). The task list change shall be submitted NLT ten (10) calendar days from performed work.
00545.5.6.4UVV/TüV InspectionsWhen performing UVV/TüV InspectionsVariesVariesThis PWS

U.S. Army Regulations Host Nation Regulations

OEM GFEBS

Inspection Reports Checklists Government's shared drive Enter all UVV/TüV inspections as the Preventive Maintenance Order (PMO) in GFEBS indicating labor and material data.

Collect signed and dated inspection reports (Prüfbericht) immediately upon completion or NLT one (1) week after completion and upload it to the Government’s shared drive.

Ensure all tasks performed during the inspections are in the check-list format (reference para 5.5.6.3.1 and Deliverable 0053).

5.6.1.3.UVV for Automatic Sliding, Swing and Electrically Operated Rolling Doors
5.6.2.3TüV for Levelers, Cranes, Winches, and Hoists
5.6.3.3UVV for Barriers
5.6.4.3TüV for Elevators and Stairlifts
5.6.5.4UVV for Storage Tanks
5.7.13.2TüV for Air Compressors and Systems
5.7.19.4TüV for Boilers
00555.5.6.5Logbooks or Operations LogsWhen performing PM workVariesUpdate logbooks daily, monthly, quarterly or annually, depending on the equipment and frequency specified in this PWS and/or current regulations and manufacturer manualsMaintain a logbook or operations log for each piece of major equipment on-site to include all DMOs, PMOs, inspections with associated checklists and readings.

Upload logbooks to Government's shared drive.

Record logbook entries in GFEBS.

5.7.9.4Logbooks for Heating Stations
5.7.19.2Logbooks for Heating Hot Water Boilers
5.9.4Logbooks for Electrical Systems
5.9.10.3.2Logbooks for Power Plans - Daily Power Log Readings
5.9.11.2Logbooks for Transformers
5.11.6.1Logbooks for Septic Tanks
5.11.7.1Logbooks for Sewer Pumps
5.11.8.1Logbooks for Sump Pumps
5.11.9.2Logbooks for Traps and Separators
00565.5.6.6.InvoicingWhen invoicingWhen invoicingGFEBSGFEBS

Excel PDF Invoice the Government for reimbursement after completion of a task.

Enter invoice into multi-CLIN Disbursement Log.

Run GFEBS report and update “Invoice Summary” excel spreadsheet.

Scan supporting documentation as individual PDF files for each invoiced GFEBS maintenance order.

00575.5.6.8CMRA entryNLT October 31stAnnuallyGFEBSCMRASend an email to the COR and GFEBS SME with totals entered in eCMRA NLT the COB of the entry day. The eCMRA entries are required to match invoiced hours and GFEBS labor entries.
00585.5.12.1Inventory of EquipmentDuring Phase-InAnnuallyPart 7
On-site equipmentGFEBS
ExcelPerform an initial 100% inventory, during the phase-in period, of mechanical and electrical equipment and associated systems.

Complete 100% of all equipment each Contract Year.

00595.5.12.1Equipment Identification NumberDuring the first Contract YearVariesWhen equipment is replacedGFEBSGFEBS
LabelsAfter first initial equipment inventory is completed (Deliverable 0058), and all equipment is entered in GFEBS (Deliverable 0039), affix Government approved label to equipment on-site. The GFEBS equipment ID number shall be printed.
00605.5.12.3Inventory Management PlanWithin fifteen (15) calendar days of contract awardAnnuallyPart 7
On-site equipmentExcel
Work DocumentInitial submission to the KO, thereafter upload updated Plan annually on Government shared drive
00615.5.14Original Equipment Manufacturer (OEM) ManualsBefore final inspections and Government acceptanceVariesVariesVariesProvide a complete set of record, drawings and operations and maintenance manuals for the equipment called OEM manuals. Record drawings and operations and maintenance manuals shall provide information for troubleshooting, preventive maintenance, and corrective maintenance. Provide OEM manuals upon a Project (PWO or DMO) completion, before final inspections in hard copy and electronic copy. Upload electronic copies to Government’s shared drive. If the Contractor is not able to upload the files due to their size, the Contractor shall place all files to CDs and provide two (2) CD copies.

Identify preventive maintenance frequency and preventive maintenance tasks to be performed IAW OEM manuals. Tasks shall be identified in a checklist format and send to the COR/GFEBS SME in excel, for review and approval. The GFEBS SME will enter all PM tasks to the GFEBS.

0062 5.5.19 Fuel Level Log Request for Fuel Delivery

Receipt of FuelWithin thirty (30) days of contract awardWeeklyWeeklyOn-site
GFEBSMonitor fuel levels and consumption weekly, and maintain fuel inventory in GFEBS warehouse.

Coordinate with the Government to ensure tanks are refueled and shall not allow fuel levels to be depleted to less than 50 percent capacity in any tank. Submit a fuel delivery request to the COR, at least one (1) week prior to reaching the specified limit. Fuel delivery report shall contain the tank location, tank number, fuel type and quantity of fuel required. Receive the fuel, verify the quantities and upload all receipts IAW para 5.5.6 “Work Documentation and Reporting”.

00635.5.20.3.1Outage LogNext work day after the outage or when changes to outage schedule occurVariesVariesOutage LogExcel SpreadsheetUpdate as required “Outage Log" excel spreadsheet. Log is located on the Government's shared drive.
5.5.20.3.2Outage ROFCOB or the next following work dayVariesVariesOutage Log
ROFWord DocumentPrepare Report of Findings (ROF) and upload it with supporting documentation to the shared drive.
00645.5.20.3.3.Water Systems Outages ReportingNotify the COR and all affected customers/activities involved within one (1) hour after an emergency outage requires disconnection of potable waterVariesVariesNotify the COR and all affected customers/activities involved within one (1) hour after an emergency outage requires disconnection of potable water.

If water service is anticipated to be down for more than one (1) hour, the Contractor shall set up and maintain temporary water service for all critical facilities including Child Development Centers (CDC), housing, dining facilities, clinics, or facilities designated by the COR.

00655.5.22As-Builts DrawingsNLT two (2) weeks after final inspection and Government acceptanceVariesVariesMaster Planning SOPSubmit all As-Builts to the Master Planning Division thru the COR.
00665.5.26.1Utility Meter ReadingsRead meters on the last work day of each month or the next working day and update the log, NLT the 10th of each month.MonthlyNLT the 10th of each month - updates to spreadsheetMeters on-site
Meter Readings LogExcel Spreadsheet/GFEBSRead all meters on the last work day of each month or the next working day. Enter all readings to "Meter Readings" excel spreadsheet located on the Government's shared drive, ”, NLT the 10th of each month.
5.5.26.2Solar Meter Readings
00675.7.9.1Combustion Efficiency Records for BoilersAfter phase-in periodMonthlyNLT the 5th calendar day of the month - updates to spreadsheetBoilers on-site
Boilers Efficiency and Consumption LogExcel SpreadsheetUpdate “Boilers Efficiency Log” located on the Government’s shared drive, NLT the 25th of each month:

- Allowable CO2 level and measured O2 level

- Required flue gas temperature and measured flue gas temperature of each boiler

- Total down time for each 30-calendar day period

- Wherever meters are nonexistent or defective, provide portable test equipment or repair/replace the defective or missing metering devices.

5.7.9.2Consumption Records for BoilersAfter phase-in periodProvide monthly consumption records and update "Boilers Efficiency and Consumption Log"
00685.7.9.3Priority 1 (Emergency) NotificationsReport when loss of boilers, loss of cooling, loss of motors, loss of pumps, and loss of power, that reduce the capacity of the system or the steam rate by 15% or boiler pressure by 20% or more for a period extending beyond 30 minutes.VariesVariesOn-SiteTelephone or Email
Excel SpreadsheetReport the condition, probable cause, and estimated time required to restore full pressure and steam rate to SME thru the COR within one (1) hour via phone and follow-up with email.

Update the “Boilers Efficiency and Consumption Log” to reflect the condition.

00695.7.10.2Maintain Refrigerant Recovery and Replacement RecordsWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetOn-Site
ODS InventoryExcel SpreadsheetService equipment and maintain refrigerant recovery and replacement records IAW 40 CFR Part 82 Subparts F and G. Disposal of refrigerants shall be IAW para 1.22 “Environmental Compliance”. Place refrigerant recovery and replacement records to the Government’s shared drive when the maintenance order is completed and closed.

Update "ODS Inventory Log" NLT the 25th of each month.

00705.8.5Report Inoperative and Non-repairable Fire Alarm SystemsWithin one (1) hour of a findingVariesVariesOn-SiteTelephone/Email
ROFReport any inoperative and non-repairable fire alarm system to the USAG Stuttgart Fire Control Center thru the COR, within one (1) hour of a finding. Follow up with the ROF within twenty-four (24) hours after the initial notification.
00715.15.3Change of Occupancy ProgramWith proposal package and within thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileInitial submission to the KO, thereafter upload updated program annually on the Government shared drive
00725.15.4
5.15.7.1.4Facility FoldersDuring phase-in periodVaries
After Pre-Termination Inspection ActionPDF FileMaintain physical facility folders for each housing unit and upload individual documents:

1. Acceptance Statement (upload)

2. Damage to Government Quarters Statement (upload)

3. Quarters AE Form 420-1B “Inventory and Condition Report” (upload)

4. Receipt for Damage to Government Quarters Statement (upload)

5. Key Control/receipt sheet (upload);

6. Quarters Liability Receipt (upload);

7. Quarters Deficiency Sheet (upload);

8. Furnishings Hand Receipt (upload)

00735.15.7.1.3Cost Estimate for any occupant’s caused damage above fair wear and tearWithin two (2) work daysVariesVariesProvide a cost estimate for any occupant’s caused damage above fair wear and tear found during the PTI, to the Government and the resident, after any pro-ration (for life expectancy of item) is applied for damaged item.
00745.15.7.3Inspection of unoccupied unitsDuring phase-in periodEvery two (2) weeksPerform inspection and check there are no leaks in the units, windows are closed, doors are secured, heating and ventilation is on/off depending on the season, and there are no forced entries. Document inspection with a signed and dated checklist and upload documentation to the Government’s shared drive.
00755.15.14GFEBS Entry - vacant/occupied units with vacancy start dateVariesVariesGFEBS
00765.15.15Master KeysFirst day of COMVariesVariesProvide the COR four (4) each master keys on a first day of COM

Tag keys with the quarters address 0077 5.15.20 COM Turnover 1-2 bedroom units = within one (1) work day + one (1) day for cleaning

3-5 bedrooms units = within two (2) work days + one (1) day for cleaning.

Varies Varies Perform all change of occupancy maintenance, repair and cleaning as follows:

1-2 bedroom units = within one (1) work day + one (1) day for cleaning 3-5 bedrooms units = within two (2) work days + one (1) day for cleaning.

0078 5.15.21 Basic COM Tasks and Checklist Varies Varies Use the checklist in para 5.15.21 to perform basic COM tasks and indicate:

1. GFEBS order number

2. Date and time of basic COM

3. Name of maintenance worker(s)

4. Used labor hours and material

5. Date and time when the quality check was performed

6. Name of the QC inspector.

Upload signed checklist IAW para 5.5.6 “Work Documentation and Reporting”.

00791.22.1Environmenatl Protection Plan (EPP)With proposal package and within thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileInitial submission to the KO, thereafter upload updated Plan annually on Government shared drive
Word Document

PDF File Descriptive, narrative document containing text, charts or tables. Can be submitted in PDF format.

Word Document PDF File Descriptive, narrative document containing text, charts or tables. Can be submitted in PDF format.

Sheet2

Deliverable #PWS ParaDeliverableInitial SubmissionTask FrequencyTask Frequency DetailsData SourceMedium/FormatHow to submit deliverables
00011.6.1Quality Control PlanWith proposal package and within thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileInitial submission to the KO, thereafter upload updated Plan annually on Government shared drive
00021.6.8Installation Pass and CAC Inventory LogWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month.
00031.7Key Control and Inventory LogWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetKey Control and Inventory LogExcel SpreadsheetEnter updates to Key Control and Inventory Log spreadsheet, located on Government shared drive, NLT the 25th of each month.
00041.12.1Education and Training LevelWithin thirty (30) calendar days after contract awardMonthlyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month.
00051.18.Phase-In and Phase-Out Plan with milestones and timelineWith proposal package and within fifteen (15) calendar days after contract awardWord Document
PDF FileSubmit deliverable to KO thru COR; Post a copy on Government shared drive
1.18.1.1Phase-In Status Report with milestones and timelineStart of phase-In periodBi-WeeklyWord Document
PDF FileSubmit deliverable to KO thru COR; Post a copy on Government shared drive
1.18.1.2GFEBS accounts and CAC status with milestones and timelineTwo weeks from the start of Phase-In planBi-WeeklyWord Document
PDF FileSubmit deliverable on Government shared drive
Work order transfer from backup system to GFEBSWhen GFEBS enabledOne Time Occurrence during Phase-InInitiate Maintenance Orders - (20) calendar days after becoming GFEBS operational
Enter labor and materials NLT thirty (30) calendar days after becoming GFEBS operationalGFEBSGFEBS
Manual entry of all maintenance orders, labor and materials, etc. from backup system to GFEBS.Submit deliverable via GFEBS
00061.19Management PlanWith proposal package and within thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileSubmit initial deliverable to the KO, thereafter upload updated Plan annually on Government shared drive
00071.20.2
1.20.7Preventive Maintenance (PM) Plan
PM Work Completion Time, Frequency and DeviationsVariesPM Plan - Initial Annually, updates monthly
PM Orders - VariesChanges to Annual PM Plan NLT the 25th of each month - updates to spreadsheetGFEBS PMOPM Plan initial submission to the KO, thru the COR, within 30 days of option year being exercised. changes to annual work plan, monthly, NLT 20th, for the following month. Annual work plan shall list all facilities and equipment with scheduled PM date.

Perform PM work with acceptable deviations as specified below:

a. Annual, Bi-annual, Semi-Annual – 4 weeks after scheduled date

b. Quarterly – 2 weeks after scheduled date

c. Weekly – 1 day after scheduled date

d. Daily - anytime during the day shift each day of the year

e. Seasonal – during the month specified

f. Monthly, Bi-Monthly – 5 days after scheduled date

00081.20.8
For Priority 1 - Initiate a sub-order for deficiencies found during the PM Work.Immediately upon discovery and follow with the emailVariesVariesGFEBSInitiate sub-order for deficiencies found during the PM Work.
1.20.7
5.2.3For Priority 2&3 - Initiate sub-order for deficiencies found during the PM Work.Within three (3) calendar daysVariesGFEBS
00091.20.9Marking on-siteEvery time preventive maintenance is performed.Every time preventive maintenance is performed.Every time preventive maintenance is performed.Affix a Government approved label to individual equipment every time preventive maintenance is performed. The information on the label shall include, but not limited to:

a. GFEBS maintenance order number

b. GFEBS equipment ID number

c. Serial Number

d. Date and time

e. Technician name

00101.21.1Safety PlanWithin thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileInitial submission to the KO, thereafter upload updated Plan annually on Government shared drive
00111.21.4Safety TrainingWithin thirty (30) calendar days after contract award and prior to work assignmentAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00121.22.6.1
1.22.6.2Release of Hazardous Material or Substances Reportingwithin one (1) hourVariesfollow up with ROF within five (5) calendar days after the initial notificationVerbal Notification

Email

ROF

Descriptive, narrative document containing text, charts or tables. Can be submitted in PDF format.Send a notification to Fire Control Center thru COR; post a copy on Government shared drive
Environmental POL Spills ReportingAs requiredfollow up with ROF within five (5) calendar days after the initial notificationVerbal Notification/Email/ROFFire Control Center thru COR; post a copy on Government shared drive
1.22.6.3Incident Logwithin one (1) dayVariesIncident LogExcel SpreadsheetUpdate Incident Log
00131.24.3Contingency PlanWithin thirty (30) calendar days after contract awardAnnuallyWord Document
PDF FileSubmit initial deliverable to the KO, thereafter upload updated Plan annually on Government shared drive
00141.25.1AT Level I TrainingWithin thirty (30) calendar days after contract award and prior to work assignmentAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
1.25.2OPSEC TrainingAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
1.25.3iWATCH TrainingOne Time Occurrence during Phase-InNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00151.25.4Information Assurance TrainingWithin fifteen (15) calendar days after contract award and prior to work assignmentAnnuallyNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00161.25.5Evacuation Coordinator/Fire Prevention TrainingWithin thirty (30) calendar days after contract award and prior to work assignmentUpon AppointmentNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00171.25.6Energy Monitor TrainingWithin thirty (30) calendar days after contract award and prior to work assignmentUpon AppointmentNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00181.25.7Building Coordinator TrainingWithin thirty (30) calendar days after contract award and prior to work assignmentUpon AppointmentNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00191.25.8GFEBS TrainingImmediately upon the AKO account approval and CAC issuance by the Government, NLT 60 days of Contract award dateVariesNLT the 25th of each month - updates to spreadsheetEmployee LogExcel SpreadsheetEnter updates to Employee Log spreadsheet, located on Government shared drive, NLT the 25th of each month; post training certificates to Government shared drive
00203.4.3FlagsWithin thirty (30) calendar days after contract awardMonthlyWhen equipment is replacedGFEBSGFEBS WarehouseMaintain GOCO equipment inventory in GFEBS warehouse.
3.4.4Housing Replacement Refrigerators InventoryWithin thirty (30) calendar days after contract awardMonthlyWhen equipment is replacedGFEBSGFEBS WarehouseMaintain GOCO equipment inventory in GFEBS warehouse.
3.4.6Locks
3.4.7Fire Extinguishers
00213.5Property Management PlanWithin thirty (30) calendar days after contract awardAnnuallyWord Document and Excel SpreadsheetSubmit Initial deliverable to the COR, and upload it to the Government shared drive; thereafter, post updated plan to the drive; the Plan shall meet FAR Clause 52.245-1, Government Property and AR 735-5, Policies and Procedures for Property Accountability;
00224.4.9

5.3.5.1

5.5.2 Mobile Telephone Numbers Within ten (10) calendar days after contract award Varies Email Word Document

PDFProvide English-speaking staffed telephone number available 24 hours, 7 days a week. Submit the deliverable to the COR
00235.2.2.1"4283" Package for DMOsWithin twenty (20) calendar days from Government’s notification dateWhen DMO values is grater than 40 labor hours or 3,500 euros in total costCost Estimate LogExcel Spreadsheet
Supporting Documentation1. Submit 4283

2. Submit a minimum of three (3) vendor quotes for Government’s review and approval. Pre-expended bin supplies and materials shall not be included in the material estimate

3. Update Cost Estimate Log

4. Post all supporting documentation to Government's shared drive 0024 5.2.4.1 Project Cost Estimates (Proposal Packages) and Documentation Submission Within twenty (20) calendar days of the Contractor's receipt of the request Varies Cost Estimate Log Excel Spreadsheet Enter updates to Cost Estimate Log spreadsheet, located on Government shared drive, within three (3) working days of the Contractor's receipt of the request; upload supporting documentation to Government shared drive:

a) estimate spreadsheet format/content for the Government approval (one-time only)

b) three (3) vendor quotes and invoices of purchases as evidence of material costs

c) three (3) vendor quotes or invoices as evidence of specialized equipment rental cost

d) project estimates for labor

e) quotes for specialized subcontract services 0025 5.2.6 5.2.8

5.5.5.5.3Work Centers and Activity TypesWhen posting time and material against GFEBS maintenance orderDailyGFEBSGFEBSThe Contractor shall account in GFEBS for labor hours based on work centers (trades) performing the work/tasks. The Contractor is responsible to coordinate all work between work centers/shops and to account for man-hours and materials being expended until the maintenance order is closed.
00265.3.1.3
5.3.5.2Response Time/Completion for Priority Level 1DailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteRespond and be on-site for all emergency work within two (2) hours of notification/release, and provide first responders, skilled craftsmen, project manager or alternate, which are able and ready to respond to emergency work orders.
00275.3.1.4Downgrade DMO Level 1 in GFEBS to Level 2 or 3DailyDailyDailyGFEBSGFEBSWhen the emergency maintenance order is downgraded to routine or urgent level, post all hours and materials, close the emergency maintenance order (to include supporting documentation), and initiate a new sub-order with a new priority level.
00285.3.2.3Response Time/Completion for Priority Level 2DailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteRespond and be on-site for all urgent work within 24 hours of notification/release and provide skilled craftsmen, project manager or alternate, which are able and ready to respond to urgent work orders
00295.3.2.4Downgrade DMO Level 2 in GFEBS to Level 3DailyDailyDailyGFEBSGFEBSWhen the urgent maintenance order is downgraded to routine level, post all hours and materials, close the urgent maintenance order (to include supporting documentation), and initiate a new sub-order with a new priority level.
00305.3.3.2Response Time/Completion for Priority Level 3 with Completion DateDailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteComplete this type of routine work NLT date identified in GFEBS Maintenance Order. The delivery date is between 1 and 30 calendar days of notification/release
00315.3.4.2Response Time/Completion for All Other Routine WorkDailyDailyDailyPhone calls

Emails Verbal

GFEBSWork On-SiteRespond, on-site and complete to all routine work within 30 calendar days of notification/release
00325.3.5.3Refrigerator ReplacementWhen requestedWhen requestedVariesPhone calls

Emails Verbal

GFEBSWork On-SiteReplace faulty refrigerator on-post after normal duty hours, within three (3) hours of resident’s call IAW para 5.5.9 “Work Reception Requirements for Initiating Repair for Government-Owned Domestic Appliances”. Deliver and install a replacement refrigerator and move faulty unit to collection point on base. Initiate a DMO next work day NLT 1000 hours.
00335.3.5.4Power Plan OperationsDuring Phase-InDailyDailyWork On-SiteProvide qualified power plant operator to operate power plants after normal work hours, Monday thru Sunday

This is the start of the file's text. The full file is on GovTribe.