Army Installation Design Standards
AUG 2012
03 May 2004 ii
THIS PAGE INTENTIONALLY LEFT BLANK
Summary of Changes
03 May 2004 3
Date of Change
Number
Revision Date Detailed Description
Synopsis of Change
NOTE: Click “Details” below to view the detailed description of the change
06/09/2004 2004-06-01 Updated paragraph 3.1.3 03 May 2004 Details
06/09/2004
2004-06-02
Deleted paragraph 3.2.3.1.1 Company Operation Facility (COF), updated the paragraph numbers for paragraph 3.2.3.1, and updated paragraph 3.2.2.1.1
03 May 2004
Details
06/21/2004 2004-06-03 Updated Appendix P 03 May 2004 Details
07/20/2004 2004-07-01 Added hyperlinks to Part 1, IDS, Index 03 May 2004 Details
10/22/2004 2004-10-01 Updated paragraph 4.6 03 May 2004 Details
11/22/2004
2004-11-01 Updated paragraph 3.2.2.7.5 and paragraph 3.2.3.7.3
2004-11-02 Updated paragraph 6.6.6.4 and paragraph
6.6.6.5
2004-11-03 Updated Appendix L to reflect the
PANTONE® trademark.
12/21/2004 2004-12-01 Updated paragraph 3.5.11 03 May 2004 Details
01/14/2005 2005-01-01 Updated paragraph 3.2.2.1.2 03 May 2004 Details
01/14/2005 2005-01-02 Updated paragraph 3.2.2.7.7.1 03 May 2004 Details
01/14/2005 2005-01-03 Updated paragraph 3.2.2.8.1 03 May 2004 Details
01/14/2005 2005-01-04 Updated paragraph 3.2.3.1.10 03 May 2004 Details
01/14/2005 2005-01-05 Updated paragraph 3.2.3.1.11 03 May 2004 Details
01/14/2005 2005-01-06 Updated paragraph 3.18.1 03 May 2004 Details
03/09/2005 2005-03-01 Updated paragraph 3.2.2.7.6 03 May 2004 Details
03/09/2005 2005-03-02 Updated paragraph 3.5.11 03 May 2004 Details
10/24/05
2005-10-01
Updated UFCs and other references within chapters 1 thru 7 and in appendices M and Q.
21 Oct 2005
10/24/05 2005-10-02 Update paragraph 2.3.2.2.4 21 Oct 2005 Details
10/24/05 2005-10-02 Update paragraph 2.3.2.2.5 21 Oct 2005 Details
2005-10-02 Update paragraphs 3.2.2.1.1, 3.2.2.1.1.1, and 3.2.2.1.1.2
2005-10-03 Update paragraphs 3.2.2.7.5, 3.2.2.7.5.1, and 3.2.2.7.5.2
2005-10-04 Update paragraphs 3.2.2.8.1, 3.2.2.8.1.1, and 3.2.2.8.1.2
10/24/05 2005-10-05 Update paragraph 3.2.3.1.1 21 Oct 2005 Details
10/24/05 2005-10-06 Update paragraph 6.3.7.3.2 21 Oct 2005 Details
Summary of Changes
03 May 2004 4
Date of
Number
Revision Date Detailed Description
Synopsis of Change
10/24/05 2005-10-07 Update paragraph 7.2.1.4 21 Oct 2005 Details
2005-10-07 Update paragraphs 7.2.2.1, 7.2.2.1, and 7.2.2.2
10/24/05 2005-10-07 Update paragraphs 7.7, 7.7.1, and 7.7.2 21 Oct 2005 Details
10/24/05 2005-10-07 Delete paragraphs 7.7.2.1 and 7.7.2.2 21 Oct 2005 Details
2005-10-07 Update paragraphs 7.7.3, 7.7.3.1, and 7.7.3.2
2005-10-07 Updated specific references within
Appendix M, paragraph M.5
03 May 2004 5
Table of Contents:
Executive Summary:
Chapter 1, Introduction:
Chapter 2, Site Planning Design Standards: Return To Summary
2.3.2.2.4 Edited the old paragraph as follows: The first sentence read, “…concerned with maintaining of restoring…” and now reads, “…concerned with maintaining or restoring…” The last sentence, which had no primary verb, read as follows, “Reducing water pollution and increasing groundwater recharge, using LID to improve the quality of receiving surface waters and stabilize the flow rates of nearby streams.” It now reads, “Using LID to improve the quality of receiving surface waters and stabilize the flow rates of nearby streams reduces water pollution and increases groundwater recharge.”
(Change number: 2005-10-02) (Change Date: 24 October 2005)
2.3.2.2.5 Changed passive voice to “UFC 3-210-10… provides design guidance.” Also url to this UFC is not found on a government server. Even the USACE link to UFCs links to this CCB site despite holding the other UFCs on their on server.
(Change number: 2005-10-02) (Change Date: 24 October 2005)
Chapter 3, Building Design Standards:
*Changed paragraph 3.1.3 to read:
3.1.3 Sustainability Standards
The Army Sustainability Standards shall be met as an integral part of all building design for new construction, sustainment, repair, and modernization to reduce construction, maintenance, and life cycle costs and conserves energy. The SPiRiT rating of "Silver" is the standard for all FY06 MILCON vertical construction projects currently under design (as of March 18 2003). For all other FY06 and future-year MILCON projects the minimum SPiRiT rating requirement is "Gold". See Assistant Secretary of the Army Memorandum Subject: Sustainable Design and Development Requirements, dated 18 March 2003. See Appendix D for a more complete discussion on Sustainable Design.
(Change number: 2004-06-01) (Change Date: 09 June 2004) Return To Summary
*Deleted paragraph 3.2.3.1.1 Company Operation Facility (COF), updated the paragraph numbers for paragraph 3.2.3.1, and changed paragraph 3.2.2.1.1 to read:
3.2.2.1.1 Company Operation Facility (COF) Standards. The AFSC approved Army Standards for Company Operation Facility (COF) are effective starting with FY 06 MCA projects and must be applied to all construction of new COFs on all installations. These
03 May 2004 6
Return To Summary standards shall also be applied to FY05 MCA projects to as great a degree as practical. The AFSC must approve any planned changes from the COF Army Standards. The COF Army Standards incorporate the following characteristics:
• Battalion centric design
• Flexible design
• Enlarged lockers
• Increased interior space
• Covered exterior maintenance areas
• Enlarged arms vaults
• Non-sensitive item secure storage
• Consolidated showers
• Economy of Construction
• Proximity to unit motor pool
Recommended layout for most efficient and flexible configuration will be found in the Company Operation Facility Standard Design, which is currently under development.
(Change number: 2004-06-02) (Change Date: 09 June 2004)
3.2.2.1.1 Company Operations Facilities (COFs) Standards.
3.2.2.1.1.1 The AFSC approved Army Standards for Company Operations Facilities (COFs) on 20 May 2004. These standards are effective starting with FY 06 MCA projects and must be applied to all construction of new COFs on all installations. These standards shall also be applied to FY05 MCA projects to as great a degree as practical. The AFSC must approve any planned changes from the COFs Army Standards. The COFs Army Standards incorporate the following characteristics:
• Enlarged lockers
• Increased interior space
• Covered exterior maintenance areas
• Enlarged arms vaults
• Non-sensitive item secure storage
• Consolidated showers
3.2.2.1.1.2 The AFSS approved the Standard Design for Company Operations Facilities on 6 July 2004; Memorandum for Record, subject: Standard Design for Company Operations Facilities, dated 6 July 2004 (See Standard Design for Company Operations Facilities.)
(Change number: 2005-10-02) (Change Date: 24 October 2005) Return To Summary
03 May 2004 vii
3.2.2.1.2 General Instruction Building (GIB) and Army Continuing Education System (ACES) Standards. The AFSC has approved standards for classroom facilities, which provide for flexibility in instructional use while accommodating all instructional needs as well as providing for administrative, special function use, and support space. These standards include Standard Design Criteria defining spatial and functional requirements. All facilities shall be ADA compliant. See The Army Standard for General Instruction Building (GIB) and Army Continuing Education System (ACES) Facilities and Memorandum for Record, Subject: The Army Standard for General Instruction Building (GIB) and Army Continuing Education System (ACES) Facilities, dated 01 December 2004.
(Change number: 2005-01-01) (Change Date: 14 January 2005)
3.2.2.7.5 Child Development Centers (CDC). Child Development Centers are intended to serve two juvenile groups: ages 6 weeks to 5 years; and 6 to 10 years.
3.2.2.7.5.1 CDC facilities for ages 6 weeks to 5 years shall conform to Appendix G, Child Development Center of the TECHINFO, TI 800-01, Design Criteria (see also ProjNet).
3.2.2.7.5.2 CDC facilities for ages 6 years to 10 years shall conform to Army Standards for Child Development Center Construction (for school-age children) October 2004 per Memorandum for Record, Subject: Army Standards for Child Development Centers, dated 19 October 2004. These mandatory Army Standards are being incorporated into a Standard Design that will provide floor plans and design criteria.
(Change number: 2004-11-01) (Change Date: 22 November 2004)
3.2.2.7.5 Child Development Centers (CDC). Child Development Centers are intended to serve two juvenile groups: ages 6 weeks to 5 years; and 6 to 10 years.
3.2.2.7.5.1 CDC facilities for ages 6 weeks to 5 years shall conform to Appendix G, Child Development Center of TI 800-01, Design Criteria. There are seven (7) design packages which include child capacities of 60, 99, 122, 145, 198, 244, and 303 children. (See ProjNet design packages.)
3.2.2.7.5.2 CDC facilities for ages 6 years to 10 years shall conform to Army Standards for Child Development Center Construction (for school-age children) October 2004 per Memorandum for Record, Subject: Army Standards for Child Development Centers, dated 19 October 2004. The AFSC approved Standard Designs for four (4) CDC facility designs which include the following child capacities: 60-65 child capacity (Wing Addition), 105-135 child capacity, 150-180 child capacity, and 195-225 child capacity.
(Change number: 2005-10-03) (Change Date: 24 October 2005)
3.2.2.7.6 Family Housing
3.2.2.7.6.1 Residential Communities Initiative (RCI)
http://www.hnd.usace.army.mil/techinfo/ti/800-01/App_g.pdf http://www.hnd.usace.army.mil/techinfo/ti/800-01/App_g.pdf http://www.hnd.usace.army.mil/techinfo/ti/800-01/App_g.pdf
03 May 2004 8
3.2.2.7.6.1.1 The intent of the Residential Communities Initiative (RCI) is to improve the housing for military families by providing quality housing, built in attractive neighborhoods.
3.2.2.7.6.1.2 To ensure a uniform level of quality throughout the Residential Communities Initiative (RCI), Headquarters, Department of the Army has developed the “Standards for Housing at RCI Projects - Update # 2”. These standards apply to the construction, renovation, and condition of privatized housing. Compliance with these standards is mandatory unless the Department of the Army (DA) Residential Communities Initiative (RCI) office approves a waiver in writing. These standards apply to RCI projects with Community Development and Management Plan (CDMP) collaboration contracts awarded after January 1, 2005 and are not retroactive to previous projects.
3.2.2.7.6.1.3 All RCI projects planned or under design will meet the "Gold" SPiRiT rating (see Assistant Secretary of the Army Memorandum Subject: Sustainable Design and Development Requirements, dated 18 March 2003).
3.2.2.7.6.1.4 Installation Design Guides (IDG) and RCI Projects. RCI projects will apply installation practices and policies to RCI projects. Paragraph 3(b) of the “Standards for Housing at RCI Projects - Update # 2” reads; “Many installations have published guidelines and construction standards (e.g. Installation Design Guide) that may exceed or differ substantially from local codes and standards. It is DA RCI’s intention that installation practices and polices apply to RCI projects unless waived by appropriate installation authorities. If an installation guideline or standard appears unreasonable for an RCI project and a consensus solution cannot be reached at the installation level, DA RCI may be consulted in resolving the conflicting standards.”
(Change number: 2005-03-01) (Change Date: 09 March 2005)
3.2.2.7.7.1 The AFSC has approved The Army Standard for Army Lodging. These standards promote economies in serving the Army traveler, but not at the expense of quality or service.
The standards define the facilities and the level of service the Army traveler should expect when they travel to an Army installation. The facility standard and level of service will be consistent from installation to installation. See The Army Standard for Army Lodging and Memorandum for Record, Subject: Army Standards for Army Lodging, dated 14 December 2004.
(Change number: 2005-01-02) (Change Date: 14 January 2005) http://rci.army.mil/programinfo/29_6_jan_05_rci_constr_renovation_stds.pdf http://rci.army.mil/programinfo/29_6_jan_05_rci_constr_renovation_stds.pdf http://rci.army.mil/programinfo/29_6_jan_05_rci_constr_renovation_stds.pdf http://rci.army.mil/programinfo/29_6_jan_05_rci_constr_renovation_stds.pdf
03 May 2004 9 truction of
3.2.2.8.1 Access Control Points (ACPs) (see also Chapter 4, paragraph 4.7 and Chapter 7, paragraph 7.7). The AFSC has approved The Army Standard for Access Control Points (ACPs).
The standard provides detailed criteria for the development of entrance facilities and appurtenances within, and related to, the ACP corridor, which will be understood to include the secured area between the entrance gate and the final set of vehicle barriers. Criteria shall be concerned with all aspects of Force Protection in regard to vehicular and pedestrian access to installations, safety, optimum working conditions for personnel, and the defeat of any threat to installation security. See The Army Standard for Access Control Points (ACPs) and Memorandum for Record, Subject: The Army Standard for Access Control Points, dated 14 December 2004.
(Change number: 2005-01-03) (Change Date: 14 January 2005)
3.2.2.8.1 Access Control Points (ACPs) (Also, see paragraphs 4.8 and 7.7.)
3.2.2.8.1.1 The AFSC has approved The Army Standard for Access Control Points (ACPs). The standard provides detailed criteria for the development of entrance facilities and appurtenances within, and related to, the ACP corridor, which will be understood to include the secured area between the entrance gate and the final set of vehicle barriers. Criteria shall be concerned with all aspects of Force Protection in regard to vehicular and pedestrian access to installations, safety, optimum working conditions for personnel, and the defeat of any threat to installation security. (See UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points, The Army Standard for Access Control Points (ACPs), and Memorandum for Record, subject: The Army Standard for Access Control Points, dated 14 December 2004.)
3.2.2.8.1.2 The AFSS approved the ACP Design on 14 December 2004 (See Standard Definitive Design for Access Control Points.)
(Change number: 2005-10-04) (Change Date: 24 October 2005)
3.2.3.1.1 Range Standards. The Army Sustainable Range Program (SRP), proponent is HQDA Office Deputy Chief of Staff Operations, ODCSOPS/G3 (DAMO-TRS), phone number
(703) 692-6410. The SRP develops and manages standard designs for Army Ranges in accordance with AR 210-21 and Training Circular 25-8 Army Training Ranges. The Range Standards are available on the following web pages.
• Design Manual for Remoted Target Systems (RETS) Ranges, CEHCN 1110-1-23
Manual.
• Revised Range Design/Construction Interface Standards.
• Unexploded Ordinance Considerations in the Planning, Design, and Cons
Ranges, Supplement to CEHNC 1110-1-23 Manual.
(Change number: 2005-10-05) (Change Date: 24 October 2005)
3.2.3.1.10 Information Systems Facility
(Change number: 2005-01-04) (Change Date: 14 January 2005) http://www.wbdg.org/ccb/DOD/UFC/ufc_4_022_01.pdf http://www.wbdg.org/ccb/DOD/UFC/ufc_4_022_01.pdf http://www.wbdg.org/ccb/DOD/UFC/ufc_4_022_01.pdf http://www.hnd.usace.army.mil/rtlp/DesignManuals.aspx http://www.hnd.usace.army.mil/rtlp/DesignManuals.aspx http://www.hnd.usace.army.mil/rtlp/UXO/UXO%20Procedures.pdf
03 May 2004 1 systems will be
3.2.3.1.11 Airfields, Railroad, and Pavements
(Change number: 2005-01-05) (Change Date: 14 January 2005)
3.5.11 Locks and Locking Devices. Programmable electronic key card access installed in all Army facilities, per MFR dated Dec 14 2004, Subject: The Army Standards for Electronic Key Card Access for all Facilities.
(Change number: 2004-12-01) (Change Date: 21 December 2004)
3.5.11 Locks and Locking Devices. The implementation guidance for programmable electronic key card access systems policy memorandum issued 14 December 2004 is in the next two paragraphs. The basic memorandum requires the use of electronic, programmable electronic key card access systems for all new construction and major building renovations. See Memorandum for Record, Subject: The Army Standards for Electronic Key Card Access for all Facilities.
3.5.11.1 Beginning in FY07, electronic key card access systems must be included in projects for facility types listed in paragraph 3.5.11.2. Electronic key card access systems will be treated as real property and are subject to normal work classification regulations. Access systems will be funded using MILCON or operation and maintenance construction or repair appropriations.
Once technical implementation guidance is developed and published, all proposed FY06 and Congressional add projects that are less than 35% designed will be evaluated on a case-by-case basis to determine if electronic key card access systems should be incorporated.
3.5.11.2 Technical implementing guidance will be developed by HQDA and fielded by December 2005. The intent of the current policy memorandum is to utilize hotel room type card access systems on interior and exterior doors where keys are provided to successive tenants over the life of the building. The priority for implementation is Unaccompanied Enlisted Personnel Housing, Transient Lodging, Officers Quarters, Operational Readiness Training Complexes, Battalion/Brigade Headquarters, Company Operations Facilities, Tactical Equipment Maintenance Facilities, and Administrative Buildings.
3.5.11.3 Each Army installation will develop a master plan for the Electronic Key Card Access system. The master plan should specify that all buildings will use equipment from a single manufacturer so that there is consistency, compatibility, and sustainability across installed Electronic Key Card Access equipment. Each installation will be responsible for obtaining the appropriate sole source justification for their installation in coordination with the IMA region.
3.5.11.4 In keeping with the Transient Lodging Standards, spaces for access by Directorate of Public Works personnel may retain key systems until a project for full conversion of all DPW access can be executed. If a new building is being built on an installation that already has electronic key card access equipment on existing buildings, the requirement for a single-type or compatible equipment for the whole installation serving both existing and new facilities should be implemented.
(Change number: 2005-03-02) (Change Date: 09 March 2005) xi
3.18.1 The cited Army Standards shall be met. (The following Standards were added to the list.)
• Army Standards for General Instruction Building (GIB) and Army Continuing Education System (ACES) Standards
• General Instruction Building (GIB) and Army Continuing Education System (ACES)
Standard Design Criteria
• The Army Standard for Army Lodging
• The Army Standard for Access Control Points (ACPs)
• The Army Standards for Electronic Key Card Access for all Facilities
(Change number: 2005-01-06) (Change Date: 14 January 2005)
Chapter 4, Circulation Design Standards:
4.6 PAVEMENT MARKING STANDARDS
4.6.1 Pavement markings shall be as described in Part 3 of the Manual of Uniform Traffic Control Devices (MUTCD), also see Chapter 6, Site Elements, paragraph 6.4.4.3.4 for traffic related signage.
4.6.2 Concrete curbs and gutters shall not be painted. Markings shall be restricted to the pavement surface and marking paint shall not be applied to concrete curb, gutter, or any portion thereof including curb cuts for vehicle or wheelchair access.
4.6.3 Markings intended to prohibit parking shall be applied to the pavement surface parallel to the curb and gutter in a continuous band for the entirety of the restricted length of pavement.
4.6.4 Where appropriate a boxed area shall be created with diagonal lines to establish a no parking zone in street conditions such as curb side parking, etc.
(Change number: 2004-10-01) (Change Date: 22 October 2004)
Chapter 5, Landscape Design Standards:
Chapter 6, Site Elements Design Standards:
6.3.7.3.2
Fences for outdoor swimming pools will comply with the requirements of this section and other applicable Army safety references. Swimming pools are any structure intended for swimming, recreational bathing or wading that contains water over 24 inches (610mm) deep. This includes in-ground, above-ground and on-ground pools; hot tubs; spas and fixed-in-place wading pools.
Swimming pools will be completely enclosed by a fence at least 4 feet (1290 mm) in height or a screen enclosure. Openings in the fence will not permit the passage of a 4-inch-diameter (102 http://mutcd.fhwa.dot.gov/ http://mutcd.fhwa.dot.gov/ http://mutcd.fhwa.dot.gov/
03 May 2004 xii rm can be
mm) sphere. The fence or screen enclosure will be equipped with self-closing and self-latching gates.
(Change number: 2005-10-06) (Change Date: 24 October 2005)
6.6.6.4 Water Storage Tanks. A water storage tank that has visual strength in its fo used as a focal point or identifying landmark that can provide a sense of orientation within the installation.
6.6.6.4.1 Water Storage Tank Painting. With the following exception, water storage tanks will be finished with a solid tan or sky blue color (see Appendix L). Water storage tanks on airfields or in the proximity of an airfield and situated in a location that could cause an adverse effect to an aviator flying a pattern or on approach will be painted in a checkerboard pattern using aviation orange and white coloring as directed by Federal Aviation Administration Advisory Circular AC 70/7460-1K, Obstruction Marking and Lighting. (see paragraph 121 for paint standards). Graphics and artwork on the water storage tank shall be limited to the installation name and the Installation Unit Crests as approved in the Installation Design Guide.
6.6.6.4.2 Water Storage Tank Lighting. Lighting of water storage tanks will be as prescribed in Advisory Circular AC 70/7460-1K, Obstruction Marking and Lighting.
6.6.6.5 Fire hydrants will be nutmeg brown in color with a reflective finish (see Appendix L for color). They will be visible and free of screening (Fig. 1-6.31). This is the color adopted as the Army Standard on all installations. Following guidance from the National Fire Protection Association (NFPA) 291, Recommended Practice for Fire Flow Testing and Marking of Hydrants, a painted accent band on the bonnet shall indicate tested water pressure (Class AA = Light Blue;
Fig. 1-6.31 - Fire Hydrants shall be Nutmeg Brown.
Bands around the Bonnets Shall Indicate Tested Water Pressure
Class A = Green; Class B = Orange; Class C =Red) as scheduled in the NFPA 291.
(Change number: 2004-11-02) (Change Date: 22 November 2004)
Chapter 7, Force Protection Design Standards:
7.2.1.4 When the minimum standoff distances cannot be achieved because land is unavailable, the standards allow for building hardening to mitigate blast effects. Costs and requirements for building hardening will be addressed in the DoD Security Engineering Manual. See paragraph
7.2.2 below for information regarding the DoD Security Engineering Manual.
(Change number: 2005-10-07) (Change Date: 24 October 2005)
7.2.2 Implementing Design Standards.
http://www.faa.gov/ats/ata/ai/AC70_7460_1K.pdf http://www.faa.gov/ats/ata/ai/AC70_7460_1K.pdf http://www.faa.gov/ats/ata/ai/AC70_7460_1K.pdf http://www.faa.gov/ats/ata/ai/AC70_7460_1K.pdf http://www.faa.gov/ats/ata/ai/AC70_7460_1K.pdf http://www.nfpa.org/catalog/product.asp?catalog_name=NFPA%2BCatalog&pid=29102&query=291&link_type=search&src=nfpa http://www.nfpa.org/catalog/product.asp?catalog_name=NFPA%2BCatalog&pid=29102&query=291&link_type=search&src=nfpa http://www.nfpa.org/catalog/product.asp?catalog_name=NFPA%2BCatalog&pid=29102&query=291&link_type=search&src=nfpa http://www.nfpa.org/catalog/product.asp?catalog_name=NFPA%2BCatalog&pid=29102&query=291&link_type=search&src=nfpa http://www.nfpa.org/catalog/product.asp?catalog_name=NFPA%2BCatalog&pid=29102&query=291&link_type=search&src=nfpa
03 May 2004 13 orps of Engineers’ ficial use only
7.2.2.1 Additional guidance on applying the DoD Minimum Antiterrorism Standards for Buildings can be found in UFC 4-010-02, Design (FOUO): DoD Minimum Standoff Distances for Buildings. This document includes tables 1 and 2, which identify the minimum standoff distances and separation for new and existing buildings and expeditionary and temporary structures. The last column of each table, titled “Applicable Explosive Weight”, includes specific explosive weights in kilograms (pounds) of TNT, which makes these tables for of
(FOUO).
7.2.2.2 Access to UFC 4-020-02 can be gained through the U. S. Army C
Protective Design Center (PDC) web-based library. A user name and password are required. Site entry is restricted to U.S. Government agencies and their U.S. contractors. However, many of the publications listed on the site are approved for public release and can be found on the web at Publications of Headquarters, Corps of Engineers web page or on the web ProjNet Unified Facilities Criteria site.
(Change number: 2005-10-07) (Change Date: 24 October 2005)
7.7 GATES AND ENTRANCES (ACCESS CONTROL POINTS [ACP]) STANDARDS
7.7.1 Installation entry points are key components in the force protection security program.
The most effective entrances accommodate the functions of observation, detection, inspection, access control, and disablement of hostile personnel and vehicles, while containing the vehicles and pedestrians until access is granted. These areas are some of the most important installation features in the creation of a sense of arrival for both installation personnel and visitors. It is important that these areas present a positive public image (see paragraph 4.8). (Fig. 1-7.6)
7.7.2 The Headquarters, Department of the Army force protection standards for ACPs is found in UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points and The Army Standard for Access Control Points (ACPs) (see paragraphs 3.2.2.8.1.1 and 3.2.2.8.1.2).
Delete 7.7.2.1 and 7.7.2.2
7.7.2.1 Canopies for ACPs. ACPs will have a canopy, which will cover the full width of incoming lanes at the Guard Booth. The canopy shall have a minimum clearance of 14.5 feet and shall have a minimum length of 50 feet. Supporting structure of roof will consist of columns sized and located to create peripheral vision for the guards with minimal obstructions. Lighting will provide a minimum of 10 ft-candles with a Color Rendition Index of 65. Measures will be taken to protect the canopy from the threat of an over-height vehicle.
7.7.2.2 The Interim Army Standard for Canopies at Army Installation Access Points, Feb. 2004
7.7.3 Physical Security Equipment Standards
http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_02.pdf http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_02.pdf http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_02.pdf https://pdc.usace.army.mil/library http://www.projnet.org/report/doc_ufc.html http://www.projnet.org/report/doc_ufc.html http://www.projnet.org/report/doc_ufc.html
03 May 2004 14 equipment, ons include
7.7.3.1 The Product Manager, Force Protection Systems (PM-FPS) under DoD Directive
3324.3 is assigned the mission of developing, fielding, and supporting physical security equipment throughout its life cycle for the Army, Joint Services, and other Government agencies.
7.7.3.2 The DoD Directive 3324.3 assigns specific areas of responsibility which include:
interior FPS, C2 systems, security lighting, force protection systems, tactical security barrier and systems, and interior and exterior robotics. Management functi
Return To Summary responsibility for research, development, acquisition, fielding, and logistics support of FPS except for those functions specifically assigned to other Services or to the Defense Threat Reduction Agency (DTRA). The PM-FPS homepage and the DA approved equipment Blank Purchase Agreements (BPAs) are listed below.
• Product Manager – Force Protection Systems (PM-FPS) Homepage
• DA Approved FPS Equipment Blanket Purchase Agreements (BPAs)
Index:
Added hyperlinks to all paragraph numbers in the Index, the changes are too extensive to list here. Click on the change number below to see the Index.
(Change number: 2004-07-01) (Change Date: 20 July 2004)
Appendix L:
Updated Appendix L to reflect the PANTONE® trademark.
(Change number: 2004-11-03) (Change Date 22 November 2004)
Appendix M:
M.5 REFERENCES
• Advisory Council on Historic Preservation
• United States Army Environmental Center Historic Buildings
• United States Army Environmental Center Native Indian Affairs
• United States Army Environmental Center Archeology
(Change number: 2005-10-08) (Change Date: 24 October 2005)
Appendix P:
http://www.pm-fps.army.mil/about.htm http://www.pm-fps.army.mil/contracts.htm http://www.pm-fps.army.mil/contracts.htm http://www.achp.gov/ http://aec.army.mil/usaec/cultural/cultural02.html http://aec.army.mil/usaec/cultural/cultural02.html http://aec.army.mil/usaec/cultural/cultural03.html
03 May 2004 xv
Updated the contact list in Appendix P, the changes are too extensive to list here. Click on the change number below to see Appendix P.
(Change number: 2004-06-03) (Change Date: 21 June 2004)
Comment Form:
03 May 2004 xv
ARMY INSTALLATION DESIGN STANDARDS
The following Table of Contents is interactive. Click on the hyperlink to directly access the Section or Sub-section. To return to the Table of Contents use the back button on your browser.
Suggested Improvements: Submit comments and suggested improvements on the comment form provided to Facilities Policy Division, Assistant Chief of Staff Installation Management (Comment Form).
Summary of Changes................................................................................................................... iii
Table of Contents .........................................................................................................................xv
Executive Summary ................................................................................................................ ES-1
PART 1 ARMY INSTALLATION DESIGN STANDARDS (IDS)
Chapter 1 Introduction ............................................................................................................. 1-1
1.1 Purpose................................................................................................................. 1-1
1.2 Authority .............................................................................................................. 1-1
1.3 Applicability ........................................................................................................ 1-1
1.4 Responsibilities .................................................................................................... 1-2
1.5 Army Facilities Standardization Committee (AFSC) .......................................... 1-4
1.6 IDS Waivers or Changes...................................................................................... 1-5
1.7 Organization......................................................................................................... 1-6
1.8 Installation Status Report (ISR) ........................................................................... 1-7
1.9 Category Codes (CATCD)................................................................................... 1-7
Chapter 2 Site Planning Design Standards ............................................................................. 2-1
2.1 Introduction.......................................................................................................... 2-1
03 May 2004 xvi
2.2 Site Planning Standards ....................................................................................... 2-2
2.3 Site Planning Design Standards ........................................................................... 2-4
2.4 Army Standards ................................................................................................... 2-7
2.5 References............................................................................................................ 2-8
Chapter 3 Building Design Standards ..................................................................................... 3-1
3.1 Introduction.......................................................................................................... 3-1
3.2 Facility Types Standardization ............................................................................ 3-2
3.3 Physical Security Requirements .......................................................................... 3-9
3.4 Building Design Standards .................................................................................. 3-9
3.5 Structural Character Standards .......................................................................... 3-10
3.6 Building Entrances............................................................................................. 3-12
3.7 Service Areas ..................................................................................................... 3-13
3.8 Building Accessibility........................................................................................ 3-13
3.9 Seismic Policy.................................................................................................... 3-13
3.10 Historic Architecture.......................................................................................... 3-16
3.11 Renovations and Additions ................................................................................ 3-16
3.12 Plazas and Courtyards........................................................................................ 3-17
3.13 Building Maintenance ........................................................................................ 3-17
3.14 Interior Design Standards .................................................................................. 3-17
3.15 Mechanical Systems .......................................................................................... 3-24
3.16 Electrical and Communications Systems and their Distribution ....................... 3-24
3.17 Sale and Outlease of Army Assets..................................................................... 3-25
3.18 Army Standards ................................................................................................. 3-26
3.19 References.......................................................................................................... 3-27
Chapter 4 Circulation Design Standards................................................................................. 4-1
4.1 Introduction.......................................................................................................... 4-1
4.2 Circulation Standards........................................................................................... 4-2
4.3 Roadway Hierarchy Standards............................................................................. 4-2
4.4 Roadway Setback Standards ................................................................................ 4-6
4.5 Roadway System Design Standards..................................................................... 4-6
4.6 Pavement Marking Standards .............................................................................. 4-8
4.7 Intersections Standards ........................................................................................ 4-8
4.8 Entrance Gate (Access Control Point [ACP]) Standards ................................... 4-10
4.9 Parking Standards .............................................................................................. 4-10
4.10 Service Areas ..................................................................................................... 4-15
4.11 Drop-Off Areas .................................................................................................. 4-15
4.12 Walkways and Pedestrian Circulation ............................................................... 4-15
4.13 Bikeway Standards ............................................................................................ 4-18
4.14 Army Standards ................................................................................................. 4-22
4.15 References.......................................................................................................... 4-23
Chapter 5 Landscape Design Standards.................................................................................. 5-1
03 May 2004 xvii
5.1 Introduction.......................................................................................................... 5-1
5.2 Landscape Objectives .......................................................................................... 5-1
5.3 Standards of Landscape Development................................................................. 5-2
5.4 Sustainable Landscape Development .................................................................. 5-3
5.5 Landscape Design Standards ............................................................................... 5-3
5.6 Plant Material Selection Standards ...................................................................... 5-7
5.7 Plant Material Installation Standards ................................................................... 5-8
5.8 Maintenance of Plant Material............................................................................. 5-9
5.9 Tree Protection and Preservation ....................................................................... 5-10
5.10 Force Protection Considerations ........................................................................ 5-11
5.11 Army Standards ................................................................................................. 5-11
5.12 References.......................................................................................................... 5-12
Chapter 6 Site Elements Design Standards ............................................................................. 6-1
6.1 Introduction.......................................................................................................... 6-1
6.2 Site Element Standards ........................................................................................ 6-1
6.3 Site Furnishings Standards................................................................................... 6-2
6.4 Exterior Sign Standards ....................................................................................... 6-9
6.5 Exterior Lighting Standards ............................................................................... 6-17
6.6 Utility Standards ................................................................................................ 6-20
6.7 Army Standards ................................................................................................. 6-23
6.8 References.......................................................................................................... 6-23
Chapter 7 Force Protection Design Standards........................................................................ 7-1
7.1 Introduction.......................................................................................................... 7-1
7.2 Building Siting and Design Standards ................................................................. 7-2
7.3 Fencing Standards ................................................................................................ 7-4
7.4 Landscape Force Protection Standards ................................................................ 7-4
7.5 Exterior Lighting Force Protection Standards ..................................................... 7-5
7.6 Berm Standards .................................................................................................... 7-6
7.7 Gates and Entrances (Access Control Points [ACP]) Standards ......................... 7-6
7.8 Army Standards ................................................................................................... 7-7
7.9 References............................................................................................................ 7-8
PART 2 MODEL ARMY INSTALLATION DESIGN GUIDE (IDG)
Chapter 8 Model Army Installation Design Guide .................................................................. 8-i
Summary of Changes ...................................................................................................... 8-iii Table of Contents ............................................................................................................ 8-xi Users Guide.................................................................................................................. 8-xvii Executive Summary ................................................................................................... 8-ES-1 Section 1 Introduction................................................................................................... 8-1-1
Section 2 The Installation Design Guide Process and Implementation........................ 8-2-1
03 May 2004 18
Section 3 Design Guide Analysis Criteria .................................................................... 8-3-1 Section 4 Installation Profile......................................................................................... 8-4-1 Section 5 Visual Themes and Zones ............................................................................. 8-5-1 Section 6 Improvement Projects ................................................................................... 8-6-1 Section 7 Site Planning Design Standards .................................................................... 8-7-1 Section 8 Buildings Design Standards .......................................................................... 8-8-1 Section 9 Circulation Design Standards ....................................................................... 8-9-1 Section 10 Landscape Design Standards .................................................................... 8-10-1 Section 11 Site Elements Design Standards ............................................................... 8-11-1 Section 12 Force Protection Design Standards........................................................... 8-12-1
Appendix A Design Team IDG Checklist ............................................................................... A-1
Appendix B Project Requirements IDG Checklist .................................................................B-1
Appendix C Interior Design Review Checklist ...................................................................... C-1
Appendix D Sustainable Design............................................................................................... D-1
Appendix E SPiRiT Checklist...................................................................................................E-1
Appendix F Landscape Maintenance Schedule ......................................................................F-1
Appendix G Prioritized Improvements Project List ............................................................. G-1
Appendix H Self-Help Project Checklist ................................................................................ H-1
Appendix I Interior Finishes Standards ...................................................................................I-1
Appendix J Interior Furnishings Standards ........................................................................... J-1
Appendix K Exterior Materials Charts .................................................................................. K-1
Appendix L Exterior Color Charts ..........................................................................................L-1
Appendix M Historic Preservation Guidelines ..................................................................... M-1
Appendix N Housekeeping Rules (Example).......................................................................... N-1
Appendix O Plant Palette ......................................................................................................... O-1
Appendix P Army Facilities Standardization Program Centers of Standardization ..........P-1
Appendix Q Standards and References .................................................................................. Q-1
(Part 1) IDS Index ........................................................................................ (Part 1) IDS Index-1
(Part 2) Model IDG Index ...............................................................(Part 2) Model IDG Index-1
Comment Form ....................................................................................................................... CF-1
03 May 2004 19
03 May 2004 20
Page ES-1 03 May 2004
ES.1 PURPOSE
The purpose of the Army Installation Design Standards (IDS) is to provide directives for the mandatory common facility and infrastructure standards for all Army installations. These standards set a common basis to facilitate the continuous improvement of the functional and visual aspects of all Army installations (Fig. 1-ES.1). It is also the purpose of these standards to promote sustainable designs and developments and to promote an integrated design process for all projects.
ES.2 AUTHORITY
Authority for this document is derived from the Message from Vice Chief of Staff Army (VCSA), dated 241209Z Apr 03, Subject: Army Installation Design Standards, which directs implementation of the Army Installation Design Standards effective 28 April 2003.
ES.3 APPLICABILITY
ES.3.1 This document is applicable to all installations and activities under jurisdiction and supervision of the Department of the Army in the United States, its territories and possessions, the Commonwealth of Puerto Rico, and in foreign countries. This document applies to the National Guard and Army Reserves, and includes planning and development of base camps in theaters of operation.
ES.3.2 Organizational Responsibilities; Army Facilities Standardization Committee (AFSC) process for development of facilities standards, waiver, and change procedures are defined in Chapter 1, Introduction.
Fig. 1-ES.1 - The Army Installation Design Standards Facilitate Continuous Functional and Visual Improvements.
Page ES-2 03 May 2004
ES.4 BACKGROUND
ES.4.1 The Installation Design Standards (IDS) provide the Army Standards for all facilities. The Installation Design Guide Model follows the concept established in the Joint Service Unified Facilities Criteria Installation Design manual (UFC 2-600-01).
ES.4.2 Research was conducted to incorporate into Army standards the best practices from other organizations such as the Air Force, Navy, Army and Air Force Exchange Services (AAFES), General Services Administration (GSA), National Park Service, Federal Highway Administration, and various city and county governments, and associations.
ES.5 SCOPE
ES.5.1 The IDS consists of two parts.
ES.5.2 Part 1, Army Installation Design Standards. Part 1 of the IDS consists of six chapters, which provide comprehensive Army standards in the following areas:
• Site Planning Design Standards (Chapter 2)
• Building Design Standards (Chapter 3)
• Circulation Design Standards (Chapter 4)
• Landscape Design Standards (Chapter 5)
• Site Elements Design Standards (Chapter 6)
• Force Protection Design Standards (Chapter 7)
ES.5.2.1 Site Planning Design Standards
ES.5.2.1.1 Site planning is the process of arranging an external physical environment in complete detail to include the structures, circulation patterns, and other elements that form the built environment. The site planning and design process is used to develop a project that fulfills facility requirements and creates the optimal relationship with the natural site (Fig. 1-ES.2).
ES.5.2.1.2 The goal of site planning for Army installations is functional attractive, sustainable development. Sustainability requires the built environment to be designed and constructed to preserve and enhance the natural environment. Manmade facilities are designed as a part of the environment to minimize negative environmental impacts. General site planning techniques resulting in sustainable development are cost efficient because they conserve energy and reduce construction and maintenance costs.
Fig. 1-ES.2 – Site Planning Facilitates Sustainable Design and Development
Page ES-3 03 May 2004
ES.5.2.2 Building Design Standards
ES.5.2.2.1 Building design standards encompass the character of buildings as well as the arrangement of buildings to one another and to their environment. The use of architectural style, materials, and colors are given consideration in the development of an installation. Also, the preservation of historically and culturally significant structures is recognized for its importance in adding to an installation’s character and providing a sense of heritage (Fig.
1-ES.3).
ES.5.2.2.2 The Building Design Standards include standard for key facility types and for all facilities, sustainability, accessibility, use of materials, placement of entrances, incorporation of additions and renovations. The standards applying to all facilities are also established for physical security requirements, structural character, seismic design, exterior materials and colors, plazas and courtyards, service areas, interior design, the appropriateness and quality of building maintenance, mechanical systems, and electrical and communications systems.
ES.5.2.3 Circulation Design Standards
ES.5.2.3.1 Circulation design standards are relevant to the design and location of roadways, walkways, trail ways, bikeways, installation entrances, and parking lots. The primary roadway system and parking lots utilize considerable amounts of land and are a visually dominant element of any installation.
ES.5.2.3.2 The circulation system provides a primary vantage point from which all installations are viewed. Safe and efficient vehicular movement results in better orientation and contributes to the development of a positive environment for installation personnel and visitors (Fig.