Maintenance-PV-_Kelley_Barracks.pdf

PDF 85 KB Posted

Attached to
Installation Maintenance Services for USAG-Stuttgart
Solicitation number
W564KV-18-R-0003
Issued by

About this file

Maintenance PV Generator Kelley Barracks

View the file

Other files

File Type Posted
CONFORMED_W564KV-18-R-0003-0006.pdf PDF
W564KV-18-R-0003-0006.pdf PDF
W564KV-18-R-0003_Amendment_5_Q&A.pdf PDF
W564KV-18-R-0003-0005.pdf PDF
03-13-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
Amendment_W564KV-18-R-0003-0004.pdf PDF
W564KV-18-R-0003_Amendment_4_Q&A_12_March_18.pdf PDF
03-12-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
02-22-2018_Deliverables.xlsx XLSX spreadsheet
02-26-2018_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
W564KV-18-R-0003_Amendment_3_Q&A.pdf PDF
AER_604-1_Local_National_Screening_Program_in_Germany.pdf PDF
GFEBS_Entry_Requirements_Chart.pdf PDF
Kelley_Barracks_Water-Rights_Permit_Map.pdf PDF
Appendix_R_-_Lighting_Exterior.pdf PDF
GFEBS_Maintenance_Order_Entry_Chart.pdf PDF
W564KV-18-R-0003-0003.pdf PDF
Appendix_R_-_Exit_Signs.pdf PDF
AE_Reg_190-16_Installation_Access_Control_(April_2017).pdf PDF
Appendix_R_-_Lighting_Occupancy_Sensors.pdf PDF
DRAFT_Army_Installation_Design_Standards_AUG_2012.pdf PDF
W564KV-18-R-0003_Performance_Work_Statement_27Feb18.pdf PDF
W564KV-18-R-0003-0002.pdf PDF
W564KV-18-R-0003-0001.pdf PDF
W564KV-18-R-0003_Performance_Work_Statement.pdf PDF
W564KV-18-R-0003_Price_Sheet_-_Contractor.xlsx XLSX spreadsheet
W564KV-18-R-0003_Government_Furnished_Property_Listing.pdf PDF
W564KV-18-R-0003_Past_Performance_Questionnaire.docx DOCX document
W564KV-18-R-0003.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Facilities and Equipment Maintenance Activitiy Manu-facturer Quantity yearly if required

1 PV Modules Cleaning the glass with clear water - without cleaning accessories. The water will be supplied.

Sharp NDR 245 A 5

159 X

2 Mounting System parallel to the roof

Inspection of mounting parts Engcotec X

3 DC String Control of the cable and ist mounting

11 X

4 Surge protection DC Control of the function display Dehn 11 X

5 Potential equalization Control of mounting 3 X

6 Inverter Fronius Symo 20.0-3-M

Function control due to VDE 0100 part 600/712

Fronius 2 X

7 Measuring of the open circuit voltage and short-circuit stream per module string

Control and Measurement due to VDE 0100 part 600/712

11 X

8 Measuring of the insulation resistance per string line

Control and Measurement due to VDE 0100 part 600/712

11 X

9 Breakers customer

Control of bubble tube and test 6 X

Execution

Maintenance PV-Generator Kelley Barracks, Bldg 3315

File details come from the government source that posted it.