Sheet1
| Reference: | Questions: | Response: | ||
| 28 | Please provide the Value Engineering Clause referenced to be in Section I Number I-671. | The Government will add clauses 52.248-1 and 52.248-3 | ||
| 29 | OMA FPI Tab Q008, Floor Restoration. We are asked to give as fixed price estimate on Floor Restoration | |||
| without any additional details or parameters. | Please provide further details about the types of floors the contractor is expected to restore by unit price. Are these floors vinyl, wood, tile, etc? | The Government is still working on a response. | ||
| 30 | OMA FPI Tab Q010, Vinyl Floor Covering. We are asked to give as fixed price estimate on Replacement of Carpeting | |||
| without any additional details or parameters. | Please provide specifications on the type and quality of the vinyl flooring that we are replacing? | The Government is still working on a response. | ||
| 31 | OMA FPI Tab Q011, Replacement of Carpeting. We are asked to give as fixed price estimate on Replacement of Carpeting | |||
| without any additional details or parameters. | Please provide specifications on the type and quality of the Replacement of Carpeting that we are replacing? | See PWS Para at and under C.5.10.4.5 for more details. | ||
| 32 | Reference: PWS, C.1.7.3.2 Management Plan. Per the referenced section of the PWS, the Contractor shall submit a Final Draft Management Plan to the COR for review and approval 30 calendar days prior to Contract start. This plan shall be an update of the plan submitted with the Contractor’s original proposal; however, there are no Management Plans required in Section L. | Are Management Plans required to be submitted with the proposal? | Yes. Section L & M has been amended to clarify. | |
| 33 | German labor Law - Severance. |
German labor law imposes costly severance pay requirements for any employee who is terminated for reasons other than misconduct or poor performance. Due to BGB 613a implications, the responsibility of severance payments will shift to an incoming contractor. An incoming contractor may attempt to realize Cost Savings for the government due to more efficient staffing. This places the incoming contractor at high risk for owing severance payments to those employees who are not hired as a result of the transition, or are terminated due to redundancy over the life of the contract.
| This same severance rule is in effect for customer driven changes in project scope now and in the future, even if the customer allows a 3 month notice period. | Will the customer consider establishing a cost reimbursable CLIN to cover the employee severance payments subject to BGB 613a? | The Government is still working on a response. | ||
| 34 | Section M, 3.d(e), Price/Cost Evaluation Approach. Currency: Offers submitted in response to this solicitation shall be in Euros. | |||
| Price Exibits 9 OMA & AFH FFP IJO's - CLINs X005 & X011 for Subcontract IJO Profit Rate and Subcontract IJO G&A Rate appear to be based on the Est. Qty of US dollars. | Could the Government please clarify that the value should in Euros or US Dollars? | Price exhibit will be corrected with an amendment. | ||
| 35 | Attachment 1 Section C.4.3.5.1 Vehicles and Equipment Requirement; Please note at the end of the paragraph 6 and 8th point. In point 6, Material tasks specified in the PWS such as snow, traction control material, grass, leaves, yard and storm debris. In point 8, Please note the entire statement; All snow removal equipment for streets and walkways that includes but is not limited to plows, blowers, loaders, and spreading equipment. It was announced during the site visit that these requirements will be part of a new contract for grounds maintenance. Did we hear this right or will the above noted requirements still be part of this contract? | No, it's not part of this contract. PWS changed. | ||
| 36 | 613a BGB (Acquired Rights Directive) Employee Payroll Data is incomplete. | Please provide full salary information and benefits for each incumbent employee. | The Government is still working on a response. | |
| 37 | RFP paragraph 52.217-19, Order Limitations (Oct 1995), page 70 of 98. | The maximum order limitation for a single item is 1.6 million. This number seems to be unrealistically high for a single item. Please clarify. | Clause 52.216-19, $16M. The Government used this number because it is possible for the Government to fund SOO (FFP) at the beginning of the base or options by a single task order. | |
| 38 | Please provide the total spend for the last year of contract DAJA02-02-D-0001 and the first year of the current bridge contract. How much of this spend was for IJO/Project work above the Service Order (SO) limit and also not part of the Standard Operating Orders (SOOs)? Since funding allocations are different for OMA and AFH, please provide total spend for OMA and AFH separately. | The Government will not be releasing this information. | ||
| 39 | RFP paragraph 2, Proposal Volumes, Page 86 of 98 | The page limitations for the Phase-in/Phase-out plan as well as the Quality Control plan are significantly too low to provide a comprehensive discussion of what the offeror plans to deliver. Can the page limitation for the Phase-in/Phase-out be raised to at least 25 pages and the limitation to the Quality Control plan be raised to at least 60 pages. This would allow offerors to include at least one sample QC check list for SO, IJO and SOO work as well as checklists for administrative work reception, work control, supply, etc. | The page limit was evaluated and determined to be adequate for evaluation purposes. | |
| 40 | RFP Paragraph C.1.13.2, Information Security, Page C-27 | Is there any requirement for any contractor personnel to handle classified information or have a security clearance? | The Government is still working on a response. | |
| 41 | RFP SOW Paragraph C.1.14.2.2.1, Facility SO Requests, Page C-42 | What data accounting system is current in use, i.e. IFS, GF EBS, or another system? What system will be used for the new contract? If a new system is put in place, what Government training will be provided to contractor employees? | The Government is still working on a response. | |
| 42 | Please provide a historical cost for material for OMA and AFH for years 2010, 2011 and 2012. | The Government is still working on a response. | ||
| 43 | Section B - CLIN Number 0003, OMA Standing Operation Orders and CLIN 0007, AFH Standing Operations Orders | From the information in IFS or other accounting system, please provide a listing by craft skill of the number of hours billed and charged to the Government for Standard Operations Orders work in FY2012, FY2011 and FY2012. Please delete or separately identify the hours previously billed for roads and grounds tasks. | See TE 5.5-001. FY09, FY10 and FY11 are provided in this TE. FY12 not available yet. | |
| 44 | Section B- CLIN Number 0008, AFH Fixed Price Items (FPis) | From the data in IFS (or other data system used to prepare billing for work accomplished), please provide the historical workload for the last three (3) fiscal years (FY 2010, FY 2011, and FY 2012). | The Government is still working on a response. | |
| 45 | TE 1.4-003 Certificates, licenses and permits | Does the incumbent workforce have all the necessary certificates, licenses and permits. If the answer is no, please provide a listing of all certificates, licenses and permits not presently on hand. | The incumbent Contractor is in compliance with their contract. | |
| 46 | Attachment 2, Technical Exhibit TE2, Section C3, Government Furnished Properties and Facilities | The first note on page 15, Attachment 2, comments that in 2012 CFF Build ing 2342 and 2213 will be turned back to the Government. Has this oc curred? If yes, has the incumbent contractor been provided with space in Building 2333. Please provide information on what facilities are in Building 2333. | This has not occurred yet. | |
| 47 | RFP Attachment 2, Technical Exhibit, TE 5.2-001 Fire Sprinkler Systems (Pages 71-81) | The table TE5.2-001 contains little information on the Minimax Fire Sprin kler Systems. If this information is available, please provide. Since most of the information is not in the table (TE5.2-001), does this mean that Minimax or another subcontractor is providing the PM and any SO work that is necessary? | All available information is provided in TE 5.2-001. No, this does not mean that the PM and any SO work that is necessary is performed by a sub-contractor. | |
| 48 | RFP Attachment 2, Technical Exhibit, TE 5.8-002 | The text refers to IFS, VQM Hour and Service Order Distributions for Contract Years 98 - 00 (December 1997 - November 2000). The ta ble refers to Contract Year 2007. Which is correct? | Contract Year 2007 is correct. | |
| 49 | The data in TE 5.8-002 does not match the data in AT4, FY 2008 (December 2007 through November 2008). Please explain the dis crepancy. Which data is correct? | The data in TE 5.8-002 is correct. | ||
| 50 | Service Orders by definition should not exceed 40 hours per SO. Why is work exceeding 40 hours considered a Service Order. | The Government is still working on a response. | ||
| 51 | The text states "Additional VQMs greater than or equal to 25 hours are completed on a Service Order and are not reflected below" _ Since the Range Column includes SOs greater than 25 hours, the text does not make sense. Please explain. | Statement has been deleted from TEs. | ||
| 52 | RFP Attachment 2, Technical Exhibit, TE 5.8-005 | Since there is a separate Domestic Appliance Contract, we assume that the tasks listed for "Contractor" refer to the Domestic Appliance and I or Dray age Contractor not the IMC Stuttgart Contractor. Is this correct? Does the IMC Stuttgart contractor have any tasks for Domestic Appliances? | No. Tasks in TE 5.8-005 are for this Contract | |
| 53 | PWS Attachment 2, Technical Exhibit, TE 1.4-002 (Page 8) and TE 1.4-001 (Page 5 and 6) | The chart in TE 1.4-2000 references an engineer. There is no reference in TE 1.4-001 to an engineer. Please provide information on the qualification and responsibilities for the "engineer''. What job title or position does this person hold. | "Engineer" in TE1.4-0002 refers to "Other Expert Personnel" in TE1.4-0001. | |
| 54 | RFP Attachment 1, Section C, Paragraph C 1.1.1.5.4 (Page C-2) | Please provide the historical information for all Standing Operation Orders (SOOs) by craft skill and hours expended for FY2010, FY2011, and FY2012. Please delete or separately identify hours for roads and grounds | See TE 5.5-001. FY09, FY10 and FY11 are provided in this TE. FY12 not available yet. | |
| 55 | RFP Attachment 1, Section C, Paragraph C 1.3..2.2.3, (Page C-6) | German law specifically precludes providing personal information on em ployees, i.e., age and labor I tariff rates or wages. Please clarify the re quired CDRL263R005 requirement so that the contractor can avoid viola tion of German law. | There is no CDRL 263R005. Deliverable # 103R005 only requires the following information. "Include the number of the full-time employees, their tariff grade, seniority with the firm, age, title, and the labor rates in effect at the date of submission." This information is not specifically related to a person by name, therefore it is "Statistics" not "Personal". | |
| 56 | RFP Attachment 1, Section C, Subparagraph C 1.8.1 and C 1.8.2 (Page C-21) | Is it correct to assume that the work that may be required under C 1.8.1 and C 1.8.2 is not part of the Firm Fixed Price (FFP) of the contract and will be separately negotiated? | Yes | |
| 57 | RFP Attachment 2, Section C, Paragraph C 1.9.3 Performance Metric Development Analysis, and Reporting (Page C-26) | Are the requirements for paragraph C 1.9.3 in the current incumbent's contract? | Yes. | |
| 58 | RFP Attachment 2, Section C, Paragraph C 1.14.1, General Requirement (Page C-40). See also Paragraph C 1.14.2.2 [Page C-42]) | Is the GFEBS automation system currently in use on the incumbent con tract? When was the GFEBS automation system activated in Stuttgart? Is IFS still maintained? Can information still be retrieved from IFS? | Yes. November 2011. No. No. | |
| 59 | RFP Attachment 1, Section C, Paragraph C 1.14.2.1.6, Logged After Hours Emergency Service Order Follow up (Page C-42) | The receipt of information "prior to 1000 hours" seems very late. Is it possi ble that the Fire Control Center transmits a copy of the Emergency Service Order immediately after it is created to the contractor's work reception desk so that response can be checked as soon as the work reception center is operational each work day? | No. | |
| 60 | RFP Attachment 1, Section C, Paragraph C 1.14.2.2.8 (Page C-43) | There are separate contracts for delivery, repair, and removal of domestic appliances as well as for commercial equipment. Does the Installation Management Contract contractor have any responsibility for domestic ap pliances and I or commercial kitchen equipment. If the answer is yes, please provide specific work responsibilities. | Yes. It's clearly stated in PWS Paragraph C.1.14.2.2.8. | |
| 61 | RFP Attachment 1, Section C, Paragraph C 1.14.3.5, SO Work Cost Esti mates (Page C-47) and Definitions for Service Order (SO), DA Form 4287 (Page C-80) | We assume that the cost estimate to be prepared for SOs is nothing more than a rough desktop estimate to determine if the work will take more than 40 hours or the estimated cost for labor and material is over € 3,000. Is this correct? | PWS paragraphs C.1.14.3.5., C.1.14.3.5.1. and C.1.14.3.5.2 describe the cost estimates in detail. These estimates are more than a "rough desktop" estimate. | |
| 62 | RFP Attachment 1, Section C, Paragraph C 1.14.3.7, Material Estimates (Page C- 48) | The paragraph states "Material prices shall be as specified in Section 8". What does this sentence mean? There are no material prices specified in Section 8. There are several CLINs for Material. | IAW Administrative Notes, "Offerors need not propose prices for OMA and AFH Material CLINs, which will be reimbursed at cost." I assume you are referring to Section B, CLINs. | |
| 63 | RFP Attachment 1, Section C, Paragraph C 1.14.5.8.1, TOV Inspections (Page C- 58) | The actual price of TOV inspections is generally considered part of material costs. Please confirm whether this is correct. If not, please provide histori cal data of TOV inspections with costs for FY 2010, FY 2011, and FY 2012. | TüV inspections are included in the SOOs. PWS changed. | |
| 64 | RFP Attachment 1, Section C, Paragraph C 1.14.6.4.1, Accounting System (Page C-59) | The offer is divided into FFP CLINs as well as T&M CLINs. Since under the FAR other than for a formal investigation, i.e. DCA's fraud audit, there is no requirement in the FAR for a contractor to provide detailed cost information for FFP CLINs, we assume that there is no accounting necessary to be re ported for FFP CLINs. Please confirm if this is correct. | Correct - no cost information required for current FFP CLIN requirements. | |
| 65 | RFP Attachment 1, Section C, Paragraph C 1.14.6.7.3, (Page C- 61) | Please provide a definition of a minor report as well as a large report, i.e., what is the upper limit on hours for a minor as well as a large report. | A minor report is one that requires minimal effort to produce. Upper limits on hours needed to produce these reports will vary depending on any particular contractor. Our estimate for a minor report is between 2 to 4 hours to produce. Large reports are estimated to require between 6 to 10 hours to produce. | |
| 66 | RFP Attachment 1, Section C, Paragraph C 2.3.1, Contracting Terminology, Specialized Subcontractor (Page C- 70) | Please provide a listing of specialized subcontractor work performed in FY 2010, FY 2011, and FY 2012. | No added value to provide. Each contractor has different needs for sub-contracting. | |
| 67 | RFP Attachment 1, Section C, Paragraph C 4.4.3, Consumable Materials (Page C- 98) | The CLINs X005 (OMA Materials) and X010 (AFH Materials) require that "All supplies and materials necessary...". Paragraph C 4.4.3 conflicts with this requirement. Please confirm that "all" supplies and materials are accounted for under the respective material CLINs | The Government does not see a conflict. "The Contractor shall furnish all consumable material within the fixed-priced work elements as specified within the PWS." CLIN #005 is FFP IJOs. CLIN #010 is LH IJOs. | |
| 68 | RFP Attachment 1, Section C, Paragraph C 5.2.1.3, (Page C- 104) | Please provide by craft skill the historical hours of PM for OMA and separately for AFH facilities for FY 2010, FY 2011, and FY 2012. | See TE 5.5-001. FY09, FY10 and FY11 are provided in this TE. FY12 not available yet. | |
| 69 | RFP Attachment 1, Section C, Paragraph C 5.2.1.4, Fire Detection and Alarm System Inspections and Maintenance, (Page C- 105) | Does the incumbent contractor have sufficient VDE qualified personnel to fulfill the requirements of C.5.2.1.4? | Yes | |
| 70 | RFP Attachment 1, Section C, Paragraph C 5.2.1.5, Fire Suppression Sys |
tems (Page C- 106)
| Are"·the work requirements of paragraph C 5.2.1.5 performed by qualified in-house incumbent employees or by subcontractor? | The Government is still working on a response. | ||
| 71 | RFP Attachment 1, Section C, Paragraph C 5.2.2.2.3 Conservation of Energy (Page 108) | Please provide the date that the last heat loss analysis was made for each building that falls under the requirements of paragraph C 5.2.2.2.3. Please provide a sample of the required heat loss calculation. | Heat Loss calculation sample is attached. |
| 72 | RFP Attachment 1, Section C, Paragraph C 5.4.3.3.1 Power House Opera |
tion (Page C- 121)
| Please define which Power Houses are affected by the four hour inspection requirement. Does the 4 hour inspection refer to duty hours or a 24 hour day? | TE5.4-002 lists the Power Plants. There are 3 of them, 1 at Bldg 2363, 1 at Bldg 2316 and 1 at Bldg 2374. PWS paragraph C.5.4.3.3.1. clearly states "The Contractor shall schedule and operate the power houses listed in TE 5.4-002 on a 24-hour seven days per week basis. Operators shall conduct operational inspections at least every four hours in each location." | ||
| 73 | RFP Attachment 1, Section C, Paragraph C 5.5.1 (Page C-139) | Please detail the COR approval procedures for pre-authorization approval of SOs (C.5.5.1.1.5). What SOs must be sent to COR for approval before work can start. | List of common Service Orders that are pre-approved will be provided after contract award. More details about the approval process can be found in PWS paragraphs C.5.5.1 through C.5.5.1.7.3. |
| 74 | RFP Attachment 1, Section C, Paragraph C 5.5.4.10 (Page C- 146) | Is it correct that the cleaning of roofs, drains, gutters, and downspouts will be performed as a SO or IJO depending on the scope of the work effort? | Correct. |
| 75 | RFP Attachment 1, Section C, Paragraph C 5.5.5, Interior Electrical and Electronic Systems (Page C- 147) and Paragraph C 5.5.7, Utilities (Page C- 150) | Is it correct that the paragraph titles should read "Electrical and Electronic Systems Repair" and "Utilities Repair"? | No. the titles of these paragraphs are correct as they are. |
| 76 | RFP Attachment 1, Section C, Paragraph C 5.6.2.3.3, Laundry Room Dryer Ventilation System Cleaning (Page C- 160) | Is the work described in the paragraph performed by the Domestic Appliance Contract contractor? | No. It is performed by the IMC Contractor. |
| 77 | RFP Attachment 1, Section C, Paragraph C 5.7.2.3.1, Inspection Scheduling (Page C-162) | ||
| For FY 2011 and FY 2012 please provide the number of inspections that were performed on each workday for the entire FY. | The Government is still working on a response. | ||
| 78 | RFP Attachment 1, Section C, Paragraph C 5.8.4.1.1 (Page G- 175) | Is it correct to state that the work in paragraph C 5.8.4.1.1 is performed by the Domestic Appliance Contract contractor? | No. It is performed by the IMC Contractor. |
| 79 | RFP Attachment 1, Section C, Paragraph C 5.11.3.4.2 (Page C- 192) | TE 5.1-001 displays historical hours not "examples of work order''. | PWS Paragraph C 5.11.3.4.2. States "Examples of work that may be ordered is displayed in TE 5.1-001 that reflects a historical perspective of possible work" The workload listed in TE 5.1-001 shows historical hours performed in various "shops", which leads to the type of possible work.. |
| 80 | TE 5.1-001 (Page 23) and TE 5.1-004 (Page 37) | Are the hours on page 23 included in the costs on page 37? What was the $ to € conversion rate for the contract in FY2011? | See #83. |
| 81 | TE 5.1-004 IJO Workload | Please identify which IJOs were performed in-house and which IJOs were performed by subcontract. | TE 5.1-004, IJO workload data for FY11 and FY10 are all subcontracted. For FY09, most are subcontracted with some excepections shown in the "Inhouse Est. Mat. €" and the "Est. Inhouse Hrs." columns. |
| 82 | For in-house performed IJOs does the$ amount only include material or is the cost of labor also included? | There are no inhouse performed IJO shown in US Dollars ($). The in house performed IJOs are shown in FY09 as €, and the amounts in the material column are for materials only. | |
| 83 | What was the $ to € conversion rate for each FY for the TE5.1-004 IJO workload tables? | FY08 - .8259; FY09 - .7905; FY10 - .7737; FY11 - .7212; FY12 - .7491; FY13 - .7241 | |
| 84 | Attachment 1, Paragraph C1.14.5.2.B, Initial RCM Evaluation of Equipment | RCM often requires an upfront investment for major overhaul which may be above the IJO limitation of €75,000. How will such work be accomplished under the proposed contract? | IJOs can also be competed outside of the IMC contract on separate contract actions. |
| 85 | Attachment 1, Paragraph C1.14.5.3, Preventive Maintenance Program | Is there a currently Government approved maintenance plan? | The Government is still working on a response. |
| 86 | If yes, please provide a copy of the currently approved maintenance plan. | The Government is still working on a response. | |
| 87 | Attachment 1, Paragraph C1.14.6.7.1, Reporting System | The paragraph discusses numerous reports to be provided. For all firm fixed price items the monthly cost is 1/12 the annual cost. (Approved fund ing). Please clarify and explain what cost data is desired for Standing Op eration Order type work. For Time and Material type costs, the monthly as well as cumulative costs are shown in the Form 1034 summary cost data with each invoice. Please clarify what is required by paragraph C1.14.6.7.1.1, C1.14.6.7.1.2, and C1.14.6.7.1.3. | The Government believes that there are enough details provided within the PWS for the contractor to prepare these reports. |
| 88 | Reference RFP Section L, paragraph 2.b, Content Requirements on page 86 of 98. The RFP states “Each volume of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion (not counted against the page limits). The Summary Section shall contain a brief abstract of the file.” | Will the Government clarify what is contained in the Narrative discussion and verify it is not counted against the page limits? | "Narrative Discussion" is any additional pertinent information provided to the Government, for better understanding of the proposals. |
| 89 | Reference Section L paragraph 2.b.(i).a. Element 3 on page 87 of 98. The RFP states “An organizational chart which includes lines of authority flowing both vertically and horizontally. | Will the government please define “horizontally?” | The Government is still working on a response. |
| 90 | Reference: Section M.C.1.d. Element 1 on page 95 of 98. The RFP states “The offeror’s approach to conducting comprehensive quality assurance methods and practices. The Government will evaluate the extent to which the offeror’s quality assurance methods are in accordance with the PWS (IAW PWS C.9.2) and to ensure the provision of quality services without heavy reliance on Government inspection. The Government will also evaluate to ensure the offeror provides procedures to monitor performance, identify discrepancies, and take corrective action to prevent reoccurrences.” | Would the Government clarify if this reference should be C.1.9.2? | Yes, this reference should be C.1.9.2. This reference has been corrected in the RFP. |
| 91 | Reference PWS paragraph C.1.2.2 Functional Areas on page C – 5. The Government references 5.13 Optional Public Works Services however there is no corresponding section to describe these services. | Could the Government provide the description and associated workload information for 5.13 Optional Public Works Services or clarify what is required in this section? | The reference to 5.13 "Opitional Public Works Services" at PWS para C.1.2.2 is now deleted from PWS. PWS changed. |
| 92 | Reference PWS paragraph C.1.12.4 on page C-33. The PWS states “The Contractor shall implement and operate a Hazardous Communications Plan for Contractor employees in compliance with U.S. and German laws.” | Will the Government provided the timeline for submitting the Hazardous Communications Plan? | The plan shall be implemented and operated by the Contractor, not submitted. |
| 93 | Reference PWS paragraph C.1.13.2.1 on page C-37. The PWS states “The Contractor shall develop an Information Security Plan in accordance with AR 380-5 (Army Information Security Program Regulation) and DoD Regulation 5200.1-R (Defense Information Security Program Regulation) for the control of classified information, including personnel security requirements related to handling and accessing classified information. The Contractor shall deliver an Information Security Plan to the Contracting Officer for review at least no later than 15 days following Contract start date (Deliverable 113R002).” | Will the Government clarify what level(s) of classified material the contractor is required to maintain? Will the Government provide a DD254? | The Contractor will not maintain any classified material. This paragraph and the corresponding Deliverable have been deleted. PWS changed. |
| 94 | Reference PWS paragraph C.5.4.6.2 on page C-131. Workload data is given for roof drains and oil/water/grease separators, but not for gutters, culverts, channels, ditches, or storm sewers. | Will the Government provide quantified information for gutters, culverts, channels, ditches, or storm sewers? | The Government is still working on a response. |
| 95 | Reference PWS paragraph C.5.4.4.4.2 on page C-127. The last sentence states, “The Contractor’s PM Plan (plus updates) addressed in Paragraph C.1.14.5.3 shall include leak detection (Deliverable 504R008). However in C.8, Deliverable List, Deliverable 504R008 is reserved. | Will the Government clarify the requirement for Deliverable 504R008? | Reference to 504R008 in this paragraph should be deleted. PWS changed. |
| 96 | Reference PWS C.8 Deliverable List, Deliverable 503R001, R&G Maintenance Plan page C – 221. | Please clarify the requirements for this Plan and whether or not it is still a deliverable with the removal of Roads and Grounds from the PWS. | 503R001 is no longer needed. PWS changed. |
| 97 | Reference RFP Technical Exhibit 3.001 C.3 Government Furnished Properties and Facilities Page 15. The Government states “In 2012 GFF, the facilities 2342 and 2213 will be turned back to the Government for demolition. New contract facilities will be made available in 2333, approx. 1090 square meters. | Is the reference to 2333 a building number, and if so, where is it located? If not, please provide clarification. | 2333 is a building number located on Patch Barracks. TE changed. |
| 98 | Reference RFP Price Exhibit 3, OMA Fixed Priced Items. CLIN X002-Q013-Clean Downspouts, the UI is listed as “lfm”, whereas in Price Exhibit 6, AFH Fixed Priced Items CLIN X008-Q012-Clean Downspouts, the UI is listed as “Each”. | Would the Government please confirm that both UI are listed correctly? Also please define “lfm”. | Price Exhibit 6 should be lfm not each; lfm = Laufender Meter/Linear Meter |
| 99 | Can the Government confirm there is no existing Social Plan or any other shop/company agreements providing for severance payments or for compensations on the occasion of a business transfer or in conjunction with a business transfer? Apart from this, could you confirm that there are no collective agreements, shop/company agreements, individual agreements or any other sources (e.g. agreements with the Government, US Armed Forces and so on) applicable to providing for severance payments? | The Government is still working on a response. | |
| 100 | If there are shop agreements, please provide specific details and copies of those agreements. | The Government is still working on a response. | |
| 101 | Are there any company habits (e.g. extra days off, etc.)? Please provide specific details. | The Government is still working on a response. | |
| 102 | How long are the breaks per day and are they paid or unpaid? | The Government is still working on a response. | |
| 103 | Can the Government provide details of pension scheme(s) that employees are members of and what level of contributions employers are currently making into those schemes? | The Government is still working on a response. | |
| 104 | What, if any, is the “additional daily pay allowance” for on-call work? | The Government is still working on a response. | |
| 105 | Is the daily reimbursement for on-call work the same for Saturday, Sunday and Monday through Friday? How many employees on the average are on-call each day? Is the on-call employee provided with a vehicle that he/she can use to drive from home to the work-site? | The Government is still working on a response. | |
| 106 | Can the Government provide copies of the incumbent’s Tariff Agreement(s)? Request the information include salaries/pay-scales, bonuses, vacation arrangements, retirement, benefits, insurance, etc. The data contained in Amendment 2, Attachment 5 Workforce Listing, does not include this data. | The Government is still working on a response. | |
| 107 | Subfactor D: Quality Control (IAW paragraph C.1.9.2 of the PWS) –[L.2.b(i)(d) and M.C.1.d] | For a new joint venture, will the ISO certification of the managing partner meet the Sections L and M, Quality Control, Element 2 requirement to provide a copy of the ISO 9001-2008 certification with the proposal? | For Joint Ventures, acceptability will be based on the demonstration from One (1) or more businesses. |
| 108 | C.1.14.1Work reception and facilities management general requirements | It is clear that it is not the intent of the government to provide for the all of the contractors IT requirements. We assume that we will be allowed to install Contractor Owned computers connected to the Government’s Network to interface with IFS/GFEBS, and eMH (or other government systems). Is this assumption correct? Follow-up: If this assumption is correct what are the minimum system requirements for equipment and software to be connected to the Government’s network. | The Government is still working on a response. |
| 109 | Para C.1.14.6 through C.1.14.6.8 Facilities work reporting | Is GFEBS Capable of providing the reports required by the reference paragraph? | No. |
| 110 | C.3 Government Furnished property and services | Do the computers systems provided by the government as GFE include access to Microsoft access programs such as Word, Excel, Access and Power Point? | No. |
| 111 | Government Furnished GFEBS/AIS. The Materials inventory and cost assignment of this contract has at least 4 separate cost sources that will have to be tracked and reported separately from each other. 1. Government Owned- To be used by the contractor and assigned to WO costs |
2. Contractor Purchased - To be used by the contractor and assigned to WO costs then invoiced as Materials costs.
3. Contractor Owned-To be used for FPI and Incidentals/Consumables
4. Government Owned – Self Help
| Does the government provided software allow the managing of materials inventory, issue, invoicing and reporting from multiple cost sources? | No. | |||
| 112 | C.4.4.2 Bench Stock levels | Are contractor purchased materials for bench stock and spares invoiced as they are purchased and placed into inventory or when they are installed in Government Real Property? | IAW Material CLIN description "The Contractor will invoice for materials as they are consumed, except for Self Help Issue Point (SHIP) Operation inventory. SHIP inventory can be invoiced before being consumed, but after it has been received and is in physical possession of the Contractor." | |
| 113 | C.1.3.2.1.3 Phase-out training | Does training of the successor’s employees include training them on GFEBS, eMH or IFS? | The Government is still working on a response. | |
| 114 | C.1.9.3.1.1 Metric Attributes | Item c. Customer orientation looks out of place here, did the government intend to use a different word than orientation? | No. | |
| 115 | C.1.12.11.2 Hazardous Waste | Are Disposal Costs paid by SO or in the FFP CLIN’s? | FFP | |
| 116 | C.1.14.2.2.8 Domestic appliances | This referenced paragraph states that we receive calls about leased housing appliances, is the contractor required to perform any maintenance activities in leased housing? | All facilities that require maintenance and repair are listed in Appendix A. | |
| 117 | C.1.14.3.11.2 Service order and individual job order workload | Do the reference paragraph thresholds refer to the limits that exist now in the current contract? | No. | |
| 118 | C1.14.3.7.4 quotes for specialized subcontractor services | Are TuV Inspectors considered Specialized Sub Contractors? | Yes. | |
| 119 | C.1.14.6.4.3.2 Connectivity to Government furnished interface | Is Web hosting on the USAG Stuttgart MAN provided by the government? Follow-up: If it is not, please provide the contact information for the provider. | Yes. | |
| 120 | C.4.3.5.1 Equipment | Please confirm that there are not any requirements for Snow and Ice Control/Removal in this solicitation. | Confirmed. The last bullet has been deleted. PWS Changed. | |
| 121 | C.5.8 Change of Occupancy Services and TE 5.7-002 quarters pre/final termination inspection checklist. The inspection Check List has a column for COOM Req’t (required?) and SO Req’t it isn’t clear how the inspector determines the work will be a SO or if a COOM? | Please provide additional explanation explaining how the Housing Inspector determines if work will be ordered as a SO or if a complete COOM will be ordered? | The Government believes that the PWS paragraphs in section C.5.8 describe COOM and any related SO work. | |
| 122 | C.5.8 Change of Occupancy Services | When the Housing Inspector identifies items that the tenant should have called in for on Demand work during the Pre-Inspection is that identified work then called in as an on demand SO? | Yes. | |
| 123 | C.5.8.2.3.1 Reserved | C.5.8.2.3.1 is a sub set of C.5.8.2.3 that paragraph is titled reserved, please clarify | PWS paragraph C.5.8.2.3 should be titled "Quarters COOM Wall Repair" PWS Changed | |
| 124 | C.5.10.2.3 rain gutter cleaning | Should this paragraph read “the contractor shall annually” vs. manually? | No. The paragraph is correct as written. | |
| 125 | C.5.10.3 AFH and UPH Wall and Ceiling restoration. Restoration implies that the walls and ceilings will be returned to a like new condition. | Does the Government intend to order less than complete “unit” of painting under this item? If yes does the government intend to order in quantities less than a complete room? If yes does the government intend to order in quantities less than a complete wall? | The Government is still working on a response. | |
| 126 | C.5.10.4 Restoration implies that the floors will be returned to a like new condition. | Does the Government intend to order less than complete “unit” of flooring under this item? If yes does the government intend to order in quantities less than a complete room? If yes does the government intend to order in quantities less than a complete floor? | The Government is still working on a response. | |
| 127 | C.5.10.4.5 | What is the fire rating and technical specifications of the carpeting currently being used at USAG Stuttgart? | The Government is still working on a response. | |
| 128 | C.5.2.2.15 Grounding Systems | We are unable to determine the quantity of grounding systems. No Technical exhibit is provided listing the grounding systems. Can the Government provide a quantity of grounding systems and identify where they are located? | All buildings are grounded. | |
| 129 | C.5.3.8 Grounding and lighting protection systems | We are unable to determine the quantity of grounding and lighting protection systems. No Technical exhibit is provided listing the grounding and lighting protection systems. Can the Government provide a quantity of grounding and lighting protection systems and identify where they are located? | All buildings have lightning protection. | |
| 130 | Attachment 2, Technical Exhibits TE 5.1-001, Pages 23 to 27 | The SO and IJO information for Y12 (10 Oct 2011 to 30 Sep 2012) is not provided. Consequently, only the incumbent has the historical workload for OMA and AFH for 2012, i.e. for the past fiscal year on the new bridge contract. Please provide the FY 2012 information in the same format, i.e., by shop or craft skill as for FY2011. | No. FY2012 data is not yet complete and therefore not provided. | |
| 131 | Attachment 2, Technical Exhibits TE 3.1, Page 22 | The table provides information on SO receives. Please provide the same information for IJOs processed and approved for funding for the same periods. | IJOs are not received by the Contractor as part of Work Reception. | |
| 132 | Price Exhibit 4, OMA Labor Rates and Price Exhibit 7, AFH Labor Rate | We are aware that the Estimated Hours are only a guess on the amount of work that may be required. Please discuss what mechanism will be used for an equitable adjustment if the actual amount of work exceeds the estimates by more than 10 per cent. Often contractors have considerable additional costs involved in hiring additional personnel to perform a significantly (more than 10 per cent) greater amount of work. | Through the Contract Modification process. | |
| 133 | RFP Schedule B, CLIN 0006 OMA Material and CLIN 0012 AFH Material. | Please provide the Government's estimated value of activity within these CLINs so that bidders can determine the level of procurement activity that it will need to support. | Estimated amounts are as follows: OMA is $1.7M, 1.4M, 1.5M, 1.5M 1.5M per year; AFH is $575,000, 450,000, 458,000, 466,000, 474,000 per year. These are estimates and not guaranteed amounts for the follow on contract. | |
| 134 | PWS C.5.4.3.3.1, Operation. The requirements for operation of the emergency back-up Power Plants states: “Operators shall conduct operational inspections at least every four hours in each location.” | Please clarify if operational inspections occurs only while the generators are actually running (i.e., generating electricity) or if the inspections occur when the generators are in operational ready status. | The Government is still working on a response. | |
| 135 | PWS C.5.4.3.2, Preventive Maintenance | Is the contractor permitted to perform Preventive Maintenance of the Exterior Electrical Distribution System, including the Power Plants, after normal working hours? | Yes. | |
| 136 | PWS 5.8.4, Cleaning | Please indicate the CLIN, or FPI where the (COOM) Cleaning effort should be priced. | It's clearly shown as an FPI item. | |
| 137 | Price Exhibit 3. OMA Fixed Price Items (X002 Q010 Vinyl Floor Covering and X002 Q011 Replacement of Carpet) and 6. AFH Fixed Price Items (X008 Q009 Vinyl Floor Covering, X008 Q010 Replace Carpet Floor, and X008 Q013 Replace Curtains in GFOQ Houses) | As these price exhibits include materials please provide recommended Brand Name/Samples of the material to be used to ensure the proper quality of materials are used in price calculations to meet the USG's expectations. | The Government is still working on a response. | |
| 138 | Site visit - Facility Site Plans | Will the Government provide the Government facilities site plans for all appropriate sites? | The Government is still working on a response. | |
| 139 | Site visit - Panzer Hotel Warranty? | When does the warranty expire for the Panzer hotel? | The Government is still working on a response. | |
| 140 | Amend 2 - ATT 5 Workforce Listing - Apparent uneven application of accumulated vacation assigned to various labor categories. | Can the Government explain why many of the personnel with only a brief length of service can have many days of accumulated vacation? Some examples include: Some examples include: | ||
| 1) The KLIMAFACHMANN (HVAC Technician) hired 10/1/2012 has 8 days of accumulated vacation. 2) Schreiner (carpenter) G5 hired 10/29/12 has 5 days of accumulated vacation. 3) Kälteanlagenbauer (Refrigeration Tech) hired 10/1/2012 has 6 days of accumulated vacation. | The Government is still working on a response. | |||
| 141 | Atch 2 - TE 1.4-001 Personal Qualifications | Can the Government please clarify the requirement for a certified Master Tradesman (Meister) for Roads & Grounds. | Not required. TE Changed. | |
| 142 | General Question - The pending applicability of BGB 613a, and the requirement for the incoming contractor to honor pre-existing Works Council agreements. | Will the Government provide the current Works Council Agreement and any terms or benefits that affect productive and non-productive hours, employee wages and benefits, and any other cost impacting factors? | The Government is still working on a response. | |
| 143 | Price Exhibit 8. CLIN X003 &X009. Q002 | Can the Government please provide specifications of quality and size of acoustic tiles to be replaced. | The Government is still working on a response. | |
| 144 | Price Exhibit 8. CLIN X003 &X009. Q003 | Can the Government please provide specifications for circuit breaker/fuse. | The Government is still working on a response. | |
| 145 | Price Exhibit 8. CLIN X003 &X009. Q009 | Can the Government please specify the requirement of replacing a faucet. During the site visit different models with a range of cost implication have been noticed. | The Government is still working on a response. | |
| 146 | Price Exhibit 8. CLIN X003 &X009. Q013 | Can the Government please provide more detailed specifications for Tubular Lock. | The Government is still working on a response. | |
| 147 | Price Exhibit 8. CLIN X003 &X009. Q016 | Can the Government please provide more detailed specifications for Shower Head. | The Government is still working on a response. | |
| 148 | General Question - Accrued Vacation earned by incumbent employees. | Will the Government reimburse the incoming contractor for any accrued vacation earned by incumbent employees, subject to BGB613a. | The Government is still working on a response. | |
| 149 | General Question - Phase-In | Does the Government intend to address the loss in productive workdays due to the five national holidays that fall during the end of the Phase-In Period in the RFP? | The Government is still working on a response. | |
| 150 | PWS - C.3.2.1 - Facilities - The Government will furnish or make available to the Contractor existing facilities in "as is" condition specified in TE 3-001and listed in appendix A; areas within facilities; and equipment (including installed equipment), tools, furniture, materials, and supplies therein. | Is the Contractor to price all required furniture and work stations, or will the Government provide a list of available office furniture in the areas provided? The Government states it will furnish or make available to the contractor existing facilities to include existing furniture. TE 3-001 does not list any office furniture available for the Contractor's use. | True, TE 3.001 does not list any office furniture available for the Contractor's use, because there is no office furniture available for the Contractor's use. |