Atch1-PWS11-27-12.doc
DOC document 1 MB Posted
- Solicitation number
- W564KV12R0017
About this file
Atch1-PWS11-27-12
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Master PWS
27 November 2012
Installation Maintenance Contract Attachment 1
Section C
Performance Work Statement USAG Stuttgart
Directorate of Public Works
Stuttgart, Germany
Attachment 1 - Section C
Table of Contents
Page Number iiTable of Contents xList of Tables xList of Technical Exhibits
1C.1 General Information
1C.1.1 Introduction
1C.1.1.1 Contract Mission
3C.1.1.2 Responsibility
4C.1.2 Layout of Section C
4C.1.2.1 Section C Contents
5C.1.2.2 Functional Areas
5C.1.2.3 Other Document Information
6C.1.3 Management and Administration
6C.1.3.1 Transition and Phase-in
6C.1.3.2 Phase-out of Contractor Operations
7C.1.3.3 Contractor Management
8C.1.3.4 Contractor Responsiveness
8C.1.3.5 Meetings, Conferences, and Briefings
8C.1.3.6 Hours of Operation
10C.1.4 Personnel
10C.1.4.1 Definition of Contractor Employees
10C.1.4.2 Key Personnel
10C.1.4.3 Personnel Qualifications and Certifications
11C.1.4.4 Employee Roster
HYPERLINK \l "_Toc331573348"
C.1.4.5 Identification of Employees
12C.1.4.7 Employment Requirements
13C.1.5 Conduct of Personnel
13C.1.5.1 Personnel Removal
14C.1.5.2 Personnel Appearance
14C.1.5.3 Personnel Courtesy
14C.1.5.4 Alcohol and Illegal Drug Use
14C.1.5.5 Loitering
15C.1.5.6 Search and Seizure
15C.1.5.7 Smoking
15C.1.5.8 Restricted Areas
15C.1.6 Contractor Interfaces
15C.1.6.1 Government Work Areas
15C.1.6.2 Other Contractors and Government
16C.1.6.3 Customer Service
17C.1.7 Information
17C.1.7.1 Government Provided Workload Data
17C.1.7.2 Data and Information
18C.1.7.3 Documentation and Reports
20C.1.7.4 Administrative Requirements
20C.1.7.5 Regulatory and Reference Documents
21C.1.8 Contingency Requirements
21C.1.8.1 Government Contingencies
21C.1.8.2 Comprehensive Contingency Plan
22C.1.8.3 Strike Contingency
22C.1.9 Performance
22C.1.9.1 Business Practices
23C.1.9.2 Quality Control
26C.1.9.3 Performance, Metric Development Analysis, and Reporting
27C.1.9.4 Inspection by Government Agencies
28C.1.10 Safety
28C.1.10.1 Safety Plan and Program
28C.1.10.2 Protective Measures to Others
28C.1.10.3 Inspections
28C.1.10.4 Occupational Health and Industrial Hygiene
29C.1.10.5 Unsafe Conditions
29C.1.10.6 Safety Training
29C.1.10.7 Fire Prevention
30C.1.10.8 Safety Reporting Requirements
31C.1.10.9 Personnel Escort
31C.1.10.10 Traffic Safety Requirements
31C.1.11 Operational Compliance
31C.1.11.1 Energy and Utilities
32C.1.11.2 Warranty Program Maintenance
33C.1.12 Environmental Compliance
33C.1.12.1 General
33C.1.12.2 ANSI/ISO 14001 Conformance
33C.1.12.3 Environmental Protection Plan
33C.1.12.4 Hazardous Communications
33C.1.12.5 Material Handling
33C.1.12.6 Release of Hazardous Material
34C.1.12.7 Spill Prevention and Clean-up
34C.1.12.8 Inspections
35C.1.12.9 Hazardous Material Identification
35C.1.12.10 Citations and Violation
35C.1.12.11 Hazardous Material Inventory and Disposal
35C.1.12.12 Asbestos Abatement
36C.1.12.13 Recyclable Materials
36C.1.12.14 Environmental Resource Protection
36C.1.13 Security Program
36C.1.13.1 Physical Security
37C.1.13.2 Information Security
37C.1.13.3 Restricted Areas
37C.1.13.4 Key Control
38C.1.13.5 Vehicles
39C.1.13.6 Weapon and Firearm Control
39C.1.13.7.1 Special Directives……. ….
39C.1.13.7.2 Subcontracts….
39C.1.13.7.3 Trusted Agent
39C.1.13.7.4 In processing requirements.
C.1.13.7.5 Computer Network Access Information……………………………………38 40C.1.13.7.6 Initial Application and Login.
40C.1.13.7.7 Application Approval
40C.1.13.7.8 Revalidation Requirements
40C.1.13.7.9 Out-processing Requirements.
40C.1.13.7.10 Employee Absence Due to Expired Documents.
40C.1.13.7.11 Lost or Stolen Badges.
40C.1.14 Work Reception and Facilities Management Services
40C.1.14.1 General Requirement
41C.1.14.2 Receive Work Requirements
44C.1.14.3 Process Work Requirements
49C.1.14.4 Maintain Records and Documentation
52C.1.14.5 Manage Facilities and Infrastructure Maintenance
59C.1.14.6 Facilities Work Reporting
62C.2 Acronyms and Definitions
62C.2.1 General
62C.2.2 Acronyms
69C.2.3 Definitions
69C.2.3.1 Contracting Terminology
70C.2.3.2 General Definitions
82C.2.3.3 Technical Equipment Definitions
86C.3 Government-Furnished Property and Services
86C.3.1 General
86C.3.1.1 Contractor Accountability
87C.3.1.2 Inventory Management
88C.3.1.3 Property Marking
88C.3.1.4 Maintenance and Repair
88C.3.1.5 GFP Inspections and Requirements
89C.3.1.6 Property Shortages or Damages
89C.3.1.7 Security
89C.3.1.8 Change of Status for GFP
89C.3.1.9 Reserved
89C.3.2 Facilities
89C.3.2.1 General
89C.3.2.2 Joint Use Facilities
90C.3.2.3 Vacating of Facilities
90C.3.2.4 Government Access
90C.3.2.5 Government Facility Standards
90C.3.2.6 Government-Furnished Facility Loss or Damage
90C.3.2.7 Government-Furnished Facility Alteration
90C.3.3 Utilities
91C.3.4 Government-Furnished Equipment (GFE)
91C.3.5 Automated Information Systems (AIS)
91C.3.6 Material and Supplies
91C.3.6.1 General
92C.3.6.2 Fuels
92C.3.6.3 Equipment Manuals, Supply Catalogs, and Forms
93C.3.7 Services
93C.3.7.1 Emergency Services
93C.3.7.2 Communications
95C.4 Contractor-Furnished Property (CFP) and Services
95C.4.1 General
95C.4.1.1 Provision, Storage, and Removal
95C.4.2 Contractor-Furnished Facilities (CFF)
96C.4.3 Contractor-Furnished Equipment (CFE) and Vehicles
96C.4.3.1 CFE and Vehicle Standards
96C.4.3.2 COCO Maintenance and Repair
96C.4.3.3 Vehicle Condition and Markings
96C.4.3.4 Unserviceable Contractor Equipment
96C.4.3.5 Equipment
97C.4.3.6 Small Tools and Equipment
97C.4.3.7 Safety Equipment
97C.4.3.8 Pest Control PPE
98C.4.4 Materials and Supplies
98C.4.4.1 Stock Levels
98C.4.4.2 Bench Stock Levels
98C.4.4.3 Consumable materials
98C.4.4.4 Quality of Materials
98C.4.5 Contractor-Furnished Services
98C.4.5.1 CFE Calibration Services
99C.4.5.2 Housekeeping
100C.5 Specific Tasks
100C.5.1 Introduction
100C.5.1.1 Recurring Services
100C.5.1.2 On-demand Services
100C.5.1.3 Army Family Housing Work
101C.5.1.4 Non Family Housing Work
101C.5.1.5 Work Documentation
101C.5.1.6 Functional Areas
102C.5.1.7 Workload
104C.5.2 Building Systems Inspection and Maintenance
104C.5.2.1 Fire Protection and Prevention Systems
107C.5.2.2 HVAC Systems
114C.5.2.3 Special Mechanical Systems
117C.5.3 Reserved.
118C.5.4 Utilities Operation & Maintenance
118C.5.4.1 General Information
119C.5.4.2 Reserved.
119C.5.4.3 Exterior Electrical Distribution
124C.5.4.4 Potable Water Systems
128C.5.4.5 Wastewater Systems
130C.5.4.6 Storm Drain Systems
132C.5.4.7 Heating Systems
133C.5.4.8 Heating systems
138C.5.4.9 Fuel Receipt, Storage, and Distribution
139C.5.5 Facilities Repair and Services
139C.5.5.1 General Information
141C.5.5.2 Work Communication
142C.5.5.3 Work Performance
142C.5.5.4 Buildings and Structures and System Repairs
147C.5.5.5 Interior Electrical and Electronic Systems
148C.5.5.6 Mechanical Systems Repair
150C.5.5.7 Utilities
153C.5.5.8 Portable Generator Placement and Operation
154C.5.5.9 Facility and Equipment Deactivation and Reactivation
155C.5.5.10 Reserved
155C.5.5.11 Reserved.
155C.5.5.12 Reserved.
155C.5.5.13 Reserved.
155C.5.5.14 Reserved.
155C.5.5.15 Reserved.
155C.5.5.16 Special Unit-Priced Work
156C.5.6 Army Family Housing Maintenance
157C.5.6.1 Housing Structural Maintenance
158C.5.6.2 Interior Housing Systems Maintenance
160C.5.6.3 Reserved.
160C.5.6.4 Reserved.
161C.5.7 Housing Services
161C.5.7.1 General Information
161C.5.7.2 Inspections
167C.5.7.3 Family Housing Pest Control
169C.5.8 Change of Occupancy Services
169C.5.8.1 General Information
172C.5.8.2 Change of Occupancy Maintenance (COOM)
175C.5.8.3 Lock Services
175C.5.8.4 Cleaning
176C.5.8.5 Reserved.
177C.5.9 Army Family Housing Repair
177C.5.9.1 General Information
179C.5.9.2 Work Performance
180C.5.9.3 Army Family Housing SO Repairs
182C.5.10 Army Family Housing Restoration and Special Services
182C.5.10.1 General Information
183C.5.10.2 Stairwells Roof Inspection and Maintenance
184C.5.10.3 AFH and UPH Wall and Ceiling Restoration
186C.5.10.4 AFH and UPH Floor Restoration
192C.5.11 Alteration & Minor Construction
192C.5.11.1 General Information
192C.5.11.2 Work Performance
193C.5.11.3 Types of Expected Work
194C.5.12 Other Public Works Services
194C.5.12.1 General Information
194C.5.12.2 Pest Control
198C.5.12.3 Self-Help Issue Point (SHIP) Operation
202C.5.12.4 Special Event Support
202C.5.12.5 Reserved
202C.5.12.6 Reserved
202C.5.12.7 Reserved
203C.6 Publications and Forms
203C.6.1 General Information
203C.6.1.1 Contractor Responsibility
203C.6.1.2 Mandatory and Advisory Classification of Publications and Forms
203C.6.1.3 Provisions
204C.6.2 Publications
204C.6.2.1 Department of the Army Publications
205C.6.2.2 Army Technical Manuals and Bulletins
207C.6.2.3 German Standards of the VOB
209C.6.2.4 German Environmental Laws
210C.6.2.5 Other Regulations
210C.6.3 Forms
212C.7 Technical Exhibits
215C.8 Deliverable List
224End of Attachment 1 – Section C
List of Tables
101Table 2 - PWS Functional Areas
43Table 1 - Service Order Response and Completion Time
54Table 3 - Equipment System Reference
132Table 4 Heating Systems
170Table 5 Performance Time for Change of Occupancy Services
List of Technical Exhibits
See the complete list of Technical Exhibits keyed to this Performance Work Section at Section C-7.
A Complete set of the Technical Exhibits is contained in Attachments 2 & 3 to the Contract.
C.1 General Information
C.1.1 Introduction
The Contractor shall provide all management, services, materials, supplies, supervision, personnel, labor, facilities, transportation, and general and specialized equipment, except that specified herein as Government-furnished. The Contractor shall perform Real Property operations, maintenance, repair, and construction services as described herein for the United States Army Garrison (USAG) located in Stuttgart, Germany. The Contractor shall provide the services in accordance with the terms, conditions, and specifications of this Performance Work Statement (PWS). This Contract requires timely and responsive quality services. The Contractor shall provide Installation Maintenance Contract (IMC) services for the Director of Public Works supporting the Commander USAG Stuttgart as defined herein. The Contractor shall perform under the direction of the Contracting Officer (KO). The Contracting Officer will designate specific technical representatives, henceforth designated as the Contracting Officer’s Representative (COR) and Contracting Officer’s Technical Representative(s) (COTR).
C.1.1.1 Contract Mission
C.1.1.1.1 Services shall be performed in the Stuttgart and surrounding areas within Germany to include U.S. Army Installation Areas, Army Family Housing and Unaccompanied Personnel Housing, leased facilities, and designated remote sites. See Technical Exhibit 1.1-001.
C.1.1.1.2 The Contractor shall provide operations, routine maintenance, and minor repair for the installation areas and facilities specified in Technical Exhibit 1.1-002. For the full listing of the facilities to be maintained see Appendix A. Maintenance and repair shall be performed in a manner that ensures:
a. Efficient, continued operation of all facilities and equipment
b. Maximum occupancy of Government quarters with minimal downtime for required repairs to vacant quarters
C.1.1.1.3 The level of maintenance and minor repair required shall be commensurate with the predicted or known age of the facilities and structures listed in Technical Exhibit 1.1-002. Building records listing existing equipment and previously performed maintenance work are available at the Office of the Directorate of Public Works (DPW), located on Kelley Barracks.
C.1.1.1.4 All work required for the proper maintenance and minor repair of all facilities covered by this Contract is intended to be within the scope of work.
C.1.1.1.5 All work shall be in compliance with the terms, conditions, general and special Contract requirements, specifications, drawings, attachments, and exhibits contained herein, or incorporated by reference. Quality standards shall comply with the latest applicable German Standards and Provisions (EU Norm), (DIN, VOB Section C, and VDE), Final Governing Standards (FGS), as well as with U.S. Regulations (210- and 420- series), Technical Manuals (5-600 and 5-800 series), NFPA, OHSA, and Federal Specifications as referenced in the various Functional Areas and Section C-6.
C.1.1.1.5.1 In the event that more than one standard applies, the Contractor shall perform the work in accordance with the first of the following authorities which specifically specifies a standard:
a. The Contract
b. The Specifications
c. Technical Exhibits
d. DoD and Army Regulations
e. DINS
f. German Regulations pertaining to construction, maintenance, repair, & environment.
g. Equipment Manuals
h. Technical Manuals
i. Industry Standards
C.1.1.1.5.2 To the extent that German laws and regulations exceed the requirements of the subparagraphs above, the most stringent shall apply.
C.1.1.1.5.3 The Contractor shall identify conflicts or discrepancies, when noted, and present a recommendation to the Contracting Officer.
C.1.1.1.5.4 The work on Army real property in this contract is generally categorized and accomplished as standing operations orders, service orders and individual job orders as described in general definitions item C.2.3.2 in this contract.
STANDING OPERATIONS ORDER (SOO): A government term for the approval of plant operation, operation maintenance and recurring preventative maintenance services or other services where specific work and manpower requirements are relatively constant and predictable in advance. For work to be considered other than a SOO it must be above and beyond what normal industry practices consider normal plant operation, operation maintenance and recurring preventative maintenance services. The burden of proof lies with the Contractor to prove if work is considered above and beyond SOO work and should be executed as a Service Order or Individual Job Order. However, the Contracting Officer will be the final decision making authority in the event of a dispute. The Contractor will be reimbursed for material costs that occur during the SOO work.
SERVICE ORDER (SO): Minor Maintenance, repair and construction jobs for which work hours and other resources are such that detailed estimating and scheduling are not economically justified. Repairs accomplished by SO that can normally be accomplished within 40 man hours, not to exceed 3,000 EURO in total labor and material cost. SOs that meet the description of the “OMA/AFH Fixed Priced Item list,” shall always use the Fixed Price rate, and shall not use the SO Labor Hour rate. Only SOs which clearly do not meet the description of the Fixed Priced Item list shall be subject to using the Labor Hour rate. There are references throughout this PWS of pre-approved or pre-authorized SOs. Upon Contract award, a list of pre-approved/pre-authorized Service Orders will be provided by the COR. (Examples of pre-authorized SOs could include repair of a door, repair of a light, etc.)
INDIVIDUAL JOB ORDER (IJO): Directive for those maintenance, repair and construction jobs for which detailed estimating of work hours and other resources are necessary. Maintenance, repair, construction or alterations that exceed service order criteria. It may also be referred to as a facilities engineer work order or work request. Repairs requiring greater that 40 man hours but not to exceed 75,000 EURO in total labor and material cost. Preference shall be given to accomplishing IJOs as Firm Fixed Priced requirements, whether worked internally by the IMC Contractor, or subcontracted out. IJOs shall only be executed as Labor Hour requirements when the work needing to be performed meets the criteria of Priority 1, Emergency Work (TE 5.1-002), or the work is truly unable to be defined within a reasonable degree of clarity and certainty.
Fixed Priced Item (FPI): In addition to work ordered as a Service Order or Individual Job Order, work may also be ordered by the COR as a FPI. This work will be ordered in specific unit quantities and includes work such as raingutter cleaning, painting, replacement of carpeting, etc. Materials are to be included by the Contractor, and are not reimbursed by the Government. Materials are to be of like or better quality than currently existing materials, as determined by the COR.
C.1.1.2 Responsibility
The Contractor shall assume total responsibility for all requirements stated herein on the commencement date of the performance period. The Contractor shall perform as specified in this Contract and under the direction of the Contracting Officer (KO). See also Paragraph 1.1 Introduction.
C.1.1.2.1 Work Responsibility. The Contractor shall perform all work and assume responsibility for planning, programming, administering, managing, and executing all functions necessary to provide the services specified in this PWS. The Contractor shall conduct work in accordance with this PWS and all applicable United States (U.S.), German, and local laws, regulations, standards, provisions, and directives to include applicable publications in Section C-6. The Contractor shall ensure that all work meets the level of service, performance standards, or tolerances specified in the PWS or in applicable referenced documents. Some services under this Contract may be performed at designated facilities, or portions of installations, by in-house Government personnel or by other contractors.
C.1.1.2.2 Administrative Responsibility. The Contractor shall perform all related administrative actions required to provide services or perform work such as material requisitioning, quality control (QC), financial control, meetings, and correspondence. The Contractor shall also maintain accurate and complete records, files, and libraries of documents to include all U.S., German, and local regulations, standards, provisions, codes, laws, technical manuals, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed. The Contractor shall compile historical data, prepare required reports, and submit information as specified by the Deliverable List presented in this PWS. A comprehensive list of required Deliverables and submittals is provided in Section C.8. (All material handling fees under this contract are to be included under the firm fixed price CLIN titled, “OMA Standing Operations Orders and AFH Standing Operations Orders”.)
C.1.1.2.3 Contractor Work Locations. The Contractor shall perform services under this Contract at different installations within the greater Stuttgart vicinity. Installation areas and facilities are specified Technical Exhibit 1.1-001 and 1.1-002 of this PWS. Specific locations supported under this PWS within the general location are subject to change. Facilities and specific tasks may be added or deleted at the discretion of the Government. This will apply in situations such as (but not limited to) adding buildings or accommodating for installation closures. Negotiation will be conducted by the Contracting Officer with the contractor when locations are added or deleted.
C.1.1.2.4 Work by the Government. For work outside the FFP effort of the contract, the Government reserves the right to utilize Government forces or other contractors to accomplish the same type or similar work as solicited for in this PWS. In such cases, the Contractor shall coordinate with the other entity performing work as needed to meet requirements.
C.1.1.3 USAG Stuttgart Characteristics
C.1.1.3.1 General. The USAG located in Stuttgart, Germany has the mission to provide command, control, communications and Base Operations to assigned and attached units. The two largest customers of the USAG are Headquarters United States European Command (EUCOM) and United States African Command (AFRICOM). The USAG is composed of administrative and service organizations to provide support for all military organizations, service members, families, and DoD Civilians.
C.1.1.3.2 Location of the USAG. The USAG Military Community is located in Stuttgart in the State of Baden Wuerttemberg, Germany. The USAG consists primarily of five installations and other facilities in the Stuttgart area: Kelley Barracks, Patch Barracks, Panzer Kaserne, Robinson Barracks, and Echterdingen Airfield, Kornwestheim Golf Course and the Weilimdorf Supply Facility to include associated housing areas and other support installations.
C.1.1.3.3 Climate and Terrain. The general geographical region covered by the USAG Stuttgart has a cool, continental climate with abundant rainfall and a long overcast season. The general area has an average summer temperature of 14( C, an average fall temperature of 9( C, an average winter temperature of 7(C, and an average spring temperature of 13( C. The annual precipitation is 700 mm.
C.1.1.3.4 Population and Demographics. In total, the USAG Stuttgart is home to a community of over 21,000 service members, Department of the Defense (DoD) civilians, and family members.
C.1.2 Layout of Section C
C.1.2.1 Section C Contents
Section C of this PWS is structured as follows:
· C-1: General Information
· C-2: Acronyms and Definitions
· C-3: Government-Furnished Property (GFP) and Services
· C-4: Contractor-Furnished Property and Services
· C-5: Specific Tasks
· C-6: Publications and Forms
· C-7: Technical Exhibits
· C-8: Deliverable List
Paragraphs in Section C-1 all begin with the number “1," paragraphs in Section C-2 all begin with the number “2," and the pattern continues for the other sections.
C.1.2.2 Functional Areas
Functional Areas are found in Section C-5, Specific Tasks. The Functional Areas are organized into the following broad work categories:
5.1 Introduction
5.2 Building Systems Inspection and Maintenance
5.3 Reserved 5.4 Utilities Operations and Maintenance
5.5 Facilities Repair and Special Operations
5.6 Army Family Housing Maintenance
5.7 Housing Services
5.8 Change of Occupancy Services
5.9 Army Family Housing Repair
5.10 AFH Restoration and Special Services
5.11 Alteration and Minor Construction
5.12 Other Public Works Services
5.13 For example: The technical description of the functional area “Building Systems Inspection and Maintenance” is found in Functional Area C-5.2.
C.1.2.3 Other Document Information
C.1.2.3.1 Technical Exhibits. Technical Exhibits are used to provide supplementary information and can be in forms of text, tables, graphs, or maps. Technical Exhibits may be referenced from any part of the PWS. Technical Exhibits for Section C have a 5-digit number that links them to a designated PWS Section; e.g., Technical Exhibit 5.8-002 is the second Technical Exhibit referenced from Sub-Functional Area 5.8. All Technical Exhibits are contained in Section C.7.
C.1.2.3.2 Pagination. Pagination for all parts of Section C begins with the letter “C.” Examples are C.1-12 at the Section C level or C.5.2-006 at the Functional Area Level. Technical Exhibits will have a page number such as TE-5.8-002-3, which would designate the third page of Technical Exhibit 5.8-002 referenced from Functional Area 5.8.
C.1.2.3.3 Deliverable List. The Contractor shall compile historical data, prepare required reports, and submit information as specified by Deliverables in this Contract. Deliverables may be referenced from any part of the Contract. Deliverables for Section C have a 3-digit number which links them to a designated Contract Section, e.g., Deliverable 503R001, is the first Deliverable referenced in Section C-5.3. A listing of all Deliverables is located in Section C.8 of this Contract.
C.1.2.3.4 Other Document Information. As a general rule the word Contractor or Contract stated within this PWS with a capital “C” refers to the IMC Contractor of this Contract versus a contractor or contract (lower case “c”) not covered under this specific Contract.
C.1.3 Management and Administration
C.1.3.1 Transition and Phase-in
C.1.3.1.1 Transition Plan. The Contractor shall develop comprehensive procedures for phasing in work performance to the level prescribed and within the time allowed under the terms of this PWS. The Contractor shall submit a completed Transition Plan NLT 15 calendar days after Contract award. The Contractor shall implement changes identified by the COR into the plan and shall re-submit the plan for final approval. (Deliverable 103R001)
C.1.3.1.2 Phase-in Period. The period between Contract award and Contract start date will constitute the phase-in period. During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of the PWS. The Contractor shall take all actions necessary for a smooth transition of the Contracted operations. This period will be approximately 60 calendar days from Contract award. The Government will make all facilities and equipment accessible to the Contractor for a maximum of 30 calendar days prior to the Contract start date for site familiarization and planning. During the 30 calendar days prior to the Contract start date, the Contractor's management personnel will be permitted to observe predecessor contract operations, as approved by the COR. During the phase-in period, the Contractor shall at a minimum:
· Establish the Contractor’s Project Management Office.
· Obtain all required certifications, licenses, permits, and clearances necessary to perform required tasks to include installation passes.
· Participate in joint inventories and accept responsibility for Government-furnished Property (GFP). This requirement will occur towards the end of the phase-in period.
· Develop and submit any required deliverables.
· Attend post-award meetings as required.
· Participate in a one-day “partnering session” between the Contractor management and staff and the DPW management and staff.
· Accomplish any necessary training to support the functions listed in Section C-5.
C.1.3.2 Phase-out of Contractor Operations
C.1.3.2.1 Phase-Out Plan. The Contractor shall develop a phase-out plan within 30 days after start of contract performance, and submit to the COR for approval, to effect a smooth and orderly transfer of performance responsibility to a successor. The Phase-out Plan shall contain details that include, but are not limited to, timelines for events, key personnel involved, and interface with the Government and follow-on contractor. (Deliverable 103R002)
C.1.3.2.1.1 The plan shall fully describe how the Contractor will approach the following issues: employee notification; retention of key personnel; turnover of work-in-progress, inventories, and transfer of Government property; removal of Contractor property; data and information transfer; and all other actions required to ensure continuity of operations.
C.1.3.2.1.2 Contractor’s Phase-Out Plan shall also include a joint inventory by the incumbent, the Government and the successor contractor. Reconciliation of all property accounts and requisitions, turn-in of excess property, and clean up of Contractor work areas is required with Contractor responsible for liabilities accrued beyond fair wear and tear. The Contractor shall correct or replace, as determined by the COR any damage to Government owned property IAW FAR 52.245-1(h).
C.1.3.2.1.3 Provision for training of the successor’s personnel on Government-furnished Automated Information Systems (AIS) used in performance of this PWS, specialized equipment, utilities systems, and ongoing work (work-in-progress) that the successor would be required to complete shall be planned in detail.
C.1.3.2.2 Phase-Out Plan Update.
C.1.3.2.2.1 The Contractor shall update the Contractor’s Phase-out Plan within 30 days after award of an Option Year. The updated Phase-out Plan shall address all areas of the Contract and each specific Functional Area. It shall be submitted to the KO for concurrence.
C.1.3.2.2.2 The Contractor shall verify the library specified in Paragraph C.1.7.5.1.4 is up to date. The Contractor shall maintain an index of documents within the library and provide to the COR upon request.
C.1.3.2.2.3 The Contractor shall prepare a labor inventory within 30 days after award of an option year. The inventory shall include the number of the full-time employees, their tariff grade, seniority with the firm, age, title, and the labor rates in effect at the date of submission. (Deliverable 103R005).
C.1.3.2.2.4 Phase-out. During the 30 calendar day period immediately prior to the expiration or termination of the Contract, the Contractor shall permit the successor contractor (and the successor contractor's employees) to observe and become familiar with any and all operations specified in this PWS.
C.1.3.2.2.5 At the expiration or termination of the Contract, the Contractor's backlog shall not exceed 280 Service Orders and/or Individual Job Orders (IJOs) in-progress (none over 15 days old from time of receipt). The Contractor shall not defer any needed repairs or maintenance for the purpose of transferring responsibility to the successor contractor.
C.1.3.2.2.6 The Contractor shall fully cooperate with the successor contractor and the Government so as not to interfere with their work or duties.
C.1.3.3 Contractor Management
The Contractor shall perform continual management of the functional areas contained in this PWS and shall provide a Project Manager physically present on-site during normal duty hours. The Project Manager shall conduct overall management coordination and shall be the central point of contact (POC) with the Government for performance of all work under the PWS. At the Post Award conference, the Contractor shall submit to the COR, in writing, the name, title, office, home and mobile telephone number of the Project Manager (Deliverable 103R003). A Contractor employee shall be designated to act for the Project Manager when work is being performed outside of duty hours, or during the Project Manager’s absence. Both the Project Manager and the Contractor employee filling in for the Project Manager, shall have full authority to act for the contractor on all Contract matters relating to daily operation of this Contract.
C.1.3.4 Contractor Responsiveness
The Project Manager or designated alternate shall be available for telephone communication or site attendance, with the COR, as required by the COR, 24 hours a day, 7 days a week. A personal answering service is permitted at other than normal Contract workdays and work hours for receipt of COR emergency response work requirements, provided that the Project Manager or designee responds to all calls within a time not to exceed two hours after notification of the call by the answering machine and/or service. The Project Manager and any individuals designated to act in that capacity shall have full authority to contractually bind the Contractor for prompt action on matters pertaining to execution of the PWS.
C.1.3.5 Meetings, Conferences, and Briefings
The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. These meetings include, but are not limited to, the Performance Evaluation meetings in Paragraph C.1.9.2.2 . The Contractor shall participate in meetings with customers, U.S., German and local agencies and their representatives, and contractors as required by the Government. These meetings include both on-site and off-site meetings, and the frequency may be daily, weekly, monthly, or as otherwise required and specified in Section C.5 by functional area.
C.1.3.5.1 Attendees. The Project Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
C.1.3.5.2 Command Interest Briefing. The Contractor shall present during command briefings matters within the scope of this PWS which impact the USAG Stuttgart’s mission, Government funds, or satisfactory performance of this PWS as requested by the COR.
C.1.3.5.3 Significant Activity Briefing. The Contractor shall present a significant activity written report and an oral briefing highlighting the week’s activities and accomplishments as requested by the COR.
C.1.3.6 Hours of Operation
C.1.3.6.1 Regular Duty Hours. The Contractor shall provide customer services for a minimum of eight hours each workday, at times that best suit the needs of the customers served, as approved by the COR. The Project Manager or representative shall be available on-site during regular USAG duty hours that are 0730 to 1630 Monday through Friday. Contractor work schedules shall vary to accommodate specific evening and weekend facility requirements such as operation of the self-help stores. Variances in operating hours must be approved by the COR.
C.1.3.6.2 Call-Out and After-hours Work. The Contractor shall provide fully qualified personnel on a 24-hour basis to perform services, maintain operational status and reliability of critical equipment and power plants, and satisfy emergency requirements as specified in Section C-5, or as directed by the COR. The Contractor shall provide a list of key personnel, by name and functional area, with emergency contact information to the COR no later than 15 calendar days prior to Contract start date and shall ensure the lists are updated thereafter ( Deliverable 103R004).
C.1.3.6.3 Emergency Service Order Work. The Contractor shall perform emergency Service Order work when requested during after-hours periods and on German holidays.
C.1.3.6.4 Temporary Installation Closures. When an unforeseen closure or curtailment of activities occurs on a regularly scheduled day of work due to weather or other circumstances to include, but not be limited to, military security actions, the Government will have the following options:
· Reschedule the work to be performed the following workday;
· Reschedule the work on any day acceptable to the Government;
· Defer the work as deemed appropriate by the Government;
· Have the Contractor continue the work as scheduled.
C.1.3.6.5 Critical Services during base closures. Closings shall in no way relieve the Contractor of responsibility to perform critical services and maintenance of the critical systems identified in Section C.5 and listed in Technical Exhibit 5.2-002 and TE 5.2-004. The only exception being a force protection upgrade to (D) Delta. The Contractor shall be responsible for keeping these critical services and systems operational 24 hours a day, every day, or shall initiate immediate corrective action. The Contractor shall obtain COR approval before implementing changes to existing critical services and systems.
C.1.3.6.6 Holidays.
C.1.3.6.6.1 U.S. Holidays. U.S. holidays shall be considered normal workdays for the Contractor and the Contractor can expect most U.S. Government Offices to be closed on U.S. holidays. In the cases where U.S. and German holidays coincide, the Contractor shall treat the day as a German holiday. The absence of personnel on U.S. holidays may provide the Contractor with an opportunity for access to facilities and areas for uninterrupted performance of work. The Contractor shall take full advantage of such opportunities by planning maintenance or other actions that are better accomplished when personnel are not using facilities during those times. The Contractor shall not perform work in Government housing quarters on U.S. holidays except to resolve an emergency condition or with the expressed permission of the occupant in advance. Refer to TE 1.3-001 for the ten legal U.S. holidays per year. When such holidays fall on a Saturday, the preceding Friday will be considered a holiday. When such holidays fall on a Sunday, the succeeding Monday will be considered a holiday.
C.1.3.6.6.2 German Holidays. On German holidays, the Contractor shall maintain operations of the critical services and systems identified in Section C.5. Except as otherwise specified, the Contractor shall not schedule routine work on German holidays. When a scheduled service is required and the schedule for that work falls on a German holiday, the Contractor shall accomplish the work on the workday preceding or following the holiday. On German holidays, all Contractor offices may be closed, except for minimum essential personnel, or as otherwise specified in this PWS. Refer to TE 1.3-001 for the German holidays.
C.1.3.6.7 Training Holidays. USAREUR has historically granted military personnel Training Holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training Holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
C.1.4 Personnel
The Contractor shall provide qualified management, supervisory, technical, administrative, and clerical personnel to accomplish all work and services required by this PWS. All work and services shall be accomplished within the specified time frames. Past staffing levels may not indicate future requirements. The Contractor is expected to implement efficiencies where feasible without degrading customer service or satisfaction.
C.1.4.1 Definition of Contractor Employees
For the purpose of this PWS, the term "Contractor employee(s)" applies to all Contractor employees and subcontractor employees performing work on this PWS. The Contractor shall be responsible for all actions of subcontractor personnel in the performance of this Contract.
C.1.4.2 Key Personnel
C.1.4.2.1 The Contractor shall provide key personnel for the management and performance of this Contract. Key personnel include, but are not limited to, the following: Project Manager, and an Alternate Project Manager who isl pre-designated to perform Project Manager duties in the absence (e.g., illness, vacation, and travel) of the Project Manager, and those individuals responsible for managing and supervising the work in each functional area of the PWS. See Technical Exhibit 1.4-001.
C.1.4.2.2 Any changes to the working status of key personnel shall be submitted to the COR for approval prior to the change. The Contractor shall provide personnel with specific licenses, certifications, and clearances as required in this Contract. (Deliverable 104R001)
C.1.4.3 Personnel Qualifications and Certifications
Contractor employees shall be trained, qualified, certified, or licensed for the positions to which they are assigned as required in this PWS prior to starting work. The Government will not provide initial skills training to Contractor employees. Refer to TE 1.4-001 for the Project Manager and other personnel qualifications.
C.1.4.3.1 The Contractor shall ensure employees possess the specific licenses, certifications, and clearances as defined in this PWS. The Contractor shall ensure that only qualified personnel with required certification and permits execute specialized services requiring those certifications and permits, e.g., VDS and VDE for Fire Alarm systems. (Incumbent employees possess the specific licenses, certifications, and clearances as defined in the PWS.)
C.1.4.3.2 The Contractor shall maintain records of training qualifications and obtain all certifications, permits, and licenses required for performance of work and for compliance with all applicable U.S., German, and local laws. All applicable professional and occupational, standards as recognized by the industry and/or required by law, shall apply. Evidence of such documents shall be available for review by the COR not later than 15 days prior to Contract start date and throughout the term of the Contract. The Contractor shall maintain the work force in such a manner as to ensure that the employees remain fully qualified to perform the work assigned.
C.1.4.4 Employee Roster
At Contract start, the Contractor shall provide the COR with a roster that lists, by functional area, all employees (to include subcontractor employees), their job titles, qualifications and certifications, passport number and country of issue, the organizational sub-element they are a part of, and their primary work location. The Contractor shall update the roster not less than on a quarterly basis, or when requested by the government. (Deliverable 104R002).
C.1.4.4.1 Buergerlische Gesetzbuch (BGB) 613a Workforce Report In the event BGB 613a (German Civil Code) applies to this requirement, or any part thereof, the Contractor shall cooperate with the Government and the follow-on contractor in order to arrange and effectively conduct the transfer of the existing direct hire local national positions. This cooperation shall facilitate the follow-on contractor’s assumption of the impacted members of the affected workforce. It shall also help to ensure successful contract phase-in and the prevention of a downgrade in services during the new contract’s phase-in period.
Regardless of the applicability of BGB 613a, upon the request of the Government, the Contractor shall provide a list of local national direct hire positions and copies of any applicable tariff and/or shop agreements. The list of local national direct hire positions shall include the following information for each affected employee: (Deliverable 104R003).
1. Job Title
2. Salary
3. Length of Service
4. Date of Hire
5. Years to Retirement
6. Date of Contract Expiration
7. Handicapped Status and Severity
8. Accumulated Vacation C.1.4.5 Identification of Employees C.1.4.5.1 Employee ID Card. The Contractor shall provide each employee a company (Contractor’s Company) photo identification (ID) card on Contract start date or on the employment start date. The ID card format shall be approved by COR and include, at a minimum, color photograph, the badge number, date issued and expiration date, employee's name, Contractor's name, and functional area of assignment. The company's (or Contractor’s name) and employee's name shall be of a contrasting color and shall be legible. The ID cards for key personnel shall also indicate their job titles.
C.1.4.5.2 Display of ID Card. Contractor personnel shall wear the ID card at all times when performing work under this PWS. Unless otherwise specified in the PWS, each Contractor employee shall wear the ID card where easily visible and approved by the COR except when safety reasons prohibit.
C.1.4.5.3 Presentation of ID Card. Upon request by any Government employee or by any contract-provided security personnel, individuals shall present company ID cards. This includes access to all installations within the USAG.
C.1.4.5.4 Accountability of ID Cards. The Contractor shall be accountable for all employees’ ID Cards and shall ensure the proper use of these cards. Upon expiration or termination of this PWS or of an employee, the Contractor shall collect and dispose of all Contractor-furnished ID cards. If any are not collected, the Contractor shall notify the COR on the day employment is terminated.
C.1.4.5.5 Installation Passes. The Contractor shall obtain installation passes as defined in Paragraph C.1.13. Contractor employees shall have installation passes in their possession at all times when on property controlled by the U.S. Government in accordance with AR 190-16. Passes will be obtained in accordance with AR 604-1 and the USAG Stuttgart Supplement thereto.
C.1.4.5.6 Formal Training During Contract Period.
C.1.4.5.6.1 The Contractor shall provide employees trained with the skills, knowledge, certifications, and licenses to perform the services in this Contract.
C.1.4.5.6.2 If the Contractor desires to use Government Schools, requests for school quotas to attend Government Courses of Instruction shall be prepared and submitted to the COR. The Government reserves the right to accept or reject such requests.
C.1.4.5.7 Specific Personnel Requirements.
C.1.4.5.7.1 Certifications, Licenses, and Permits. The Contractor shall ensure that all specialized services requiring certification, license, or permits are executed by qualified personnel (for example: Technische Regeln fuer Gefahrstoffe (TRGS) 519 for asbestos workers, USAREUR computer user certification, and hazardous waste transporter license for drivers transporting hazardous waste).
C.1.4.5.7.2 Mandatory On-site Personnel. The Contractor shall provide supervisory, trade, and administrative personnel each workday including required trade and respective supervisory personnel for work performed on holidays.
C.1.4.7 Employment Requirements
C.1.4.7.1 Supervisory Personnel. The Contractor shall provide supervisory personnel who are capable of reading, writing, speaking, and understanding the English language. Supervisors shall be readily available and able to communicate with all subordinate personnel regarding work requirements.
C.1.4.7.2 Language Requirement. The Contractor shall provide personnel with the language proficiency and ability to operate in a workplace where the official language is English but a majority of the workers speak German as their native language. English proficiency requirements shall be in accordance with TE 1.4-002.
C.1.4.7.3 Physical Fitness. The Contractor shall ensure that all personnel meet the physical requirements to perform the function(s) and task(s) they are assigned. This may include performing work in conditions of extreme heat and cold, high humidity, and blowing sand and dust, as well as lifting heavy objects and working in areas with excessive noise.
C.1.4.7.4 Deleted C.1.4.7.5 Employment of Military or Government Personnel.
C.1.4.7.5.1 Employment of off-duty military personnel or Government civilian personnel is generally permissible provided such employment does not conflict with the policies set forth in DoD Joint Ethics Regulation 5500.7-R and local garrison limitations. Such employment shall not involve holding of a concurrent U.S. civilian position nor result in receipt of U.S. Government compensation for work performed for the Contractor. The facts of each case should be examined to ensure that no sham or subterfuge is present that would, in effect, allow a soldier or civilian to receive dual compensation for work done. The Contractor is cautioned that off-duty active military personnel working under this PWS may be subject to field duty, sudden deployments, and permanent change of station (PCS).
C.1.4.7.5.2 The Contractor shall notify the COR, in writing, NLT 15 days prior to the employment of any U.S. Army active civilian or military personnel by the Contractor to work on this PWS. The notification shall include the name of the individual, civilian grade or military rank, U.S. Army organization, assignment, and a clear statement explaining the person’s work assignment with the Contractor. The Contractor shall not employ any person whose employment will violate the requirements of DoD 5500.7-R.
C.1.4.7.6 U.S. Citizens. The Contractor shall ensure that U.S. citizens who are employed hold a German work permit and residence permit, as required from appropriate German authorities prior to performing work under this PWS.
C.1.4.7.7 SOFA Requirement. No logistic support will be provided to Contractor employees and Technical Expert status, IAW NATO SOFA and its supplementary agreement, is not authorized under this Contract.
C.1.5 Conduct of Personnel
The Contractor shall be responsible for the performance and conduct of Contractor and subcontractor personnel. Personnel employed by the Contractor in the performance of this PWS or any representative of the Contractor entering the installation shall abide by the security regulations, German laws, and policy letters or directives listed in the PWS, and shall be subject to inspections by the Government as deemed necessary. The Contractor shall not employ for performance under this PWS any person whose employment would result in a conflict with the Government's standards of conduct. The Contractor shall maintain a liability insurance to include, but not limited to, lost or damaged government property as a result of employee accident, negligence, or fraud.
C.1.5.1 Personnel Removal
Government rules, regulations, laws, directives, and requirements that are issued during the Contract term relating to law and order, installation administration, and security shall be applicable to all employees or representatives who enter USAG Stuttgart installations. Violation of such rules, regulations, laws, directives, or requirements shall be grounds for removal (permanently or temporarily as the Government determines) from the work site. Removal of employees does not relieve the Contractor from the responsibility for the work defined in this PWS.
C.1.5.1.1 Removal by Base Commander. The Base Commander may, at his discretion, bar an individual from entry under the authority of 18 United States Code (USC) 1382 (1972), and Paragraph B-15, Appendix B of AR 380-49 for conduct determined contrary to good order, discipline, or installation security.
C.1.5.1.2 Removal by COR. The COR may require the Contractor to remove any employee performing requirements under this PWS for reason of misconduct or security risk posed. Contractor employees shall be subject to dismissal from the premises upon determination by the COR that such action is in the interest of the Government.
C.1.5.1.3 Removal by Military Police (MP), German Law Enforcement Agencies, or Contract Security Guards. Contractor employees may be denied entry to, or be physically removed from, installations by MP, German law enforcement agencies, or contract security guards if it is determined that such entry, or presence on, may be contrary to good order, discipline, security of the property, or violation USAG…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .