This document provides unitization procedures for complete rounds of 120mm tank training ammunition packed in cylindrical metal containers on 4-way pallets. It specifies packaging and palletization requirements for various cartridge types including the M831, M831A1, M865, M1002, and others. Containers are to be packed one per PA116 or PA171 container, unitized at 30 containers per 40" x 44" special wooden pallet constructed per MIL-DTL-15011 specifications. General notes cover applicable drawings, container details, identification marking requirements, lot number marking, pallet and dunnage specifications, preservative and heat treatment of wood, filler assemblies, and bundling and tiedown strap specifications and locations.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ARMY DEFENSE AMMUNITION CENTER
REV.
ENGINEER
OR
TECHNICIAN
BASIC
ENGINEERING
DIVISON
TEST ENGINEER
EXPLOSIVE
SAFETY
DIRECTORATE
CLASS DIVISION DRAWING FILE
U.S. ARMY MATERIEL COMMAND DRAWING
DO NOT SCALE
PROJECT FSA 63/7B-66
NOTICE: THIS APPENDIX CANNOT STAND ALONE BUT MUST BE USED IN CONJUNCTION WITH THE BASIC UNITIZATION
PROCEDURES DRAWING 19-48-4079-20PM1002.
19 48
DISTRIBUTION STATEMENT A:
APPROVED FOR PUBLIC RELEASE
DISTRIBUTION IS UNLIMITED.
LAURA A. FIEFFER
20PM10024079/7B
CAUTION: VERIFY PRIOR TO USE AT HTTPS://MHP.REDSTONE.ARMY.MIL THAT THIS IS
THE MOST CURRENT VERSION OF THIS DOCUMENT. THIS IS PAGE 1 OF 6.
NOVEMBER 1987
TEST
REPORT
APPROVED BY ORDER OF COMMANDING
GENERAL, U.S. ARMY MATERIEL COMMAND
APPROVED, U.S. ARMY RESEARCH, DEVELOPMENT
AND ENGINEERING COMMAND
RDAR-EIL-TP
AMSJM-LIT
APPROVED, U.S. ARMY JOINT MUNITIONS COMMAND
MADELINE BANKS
APPENDIX 7B
UNITIZATION PROCEDURES FOR
COMPLETE ROUNDS PACKED IN
CYLINDRICAL METAL CONTAINERS
ON 4-WAY ENTRY PALLETS*
CARTRIDGE, 120MM, TP-T, M831 OR M831A1, OR
TPCSDS-T, M865, OR TMP-T, M1002, PACKED 1 PER
PA116 OR PA171 SERIES CONTAINER, UNITIZED 30
CONTAINERS PER 40” X 44” SPECIAL WOODEN
PALLET*; APPROX CONTAINER SIZE 44-1/2" L X 7-
3/4” W X 7-3/4" H
* SEE GENERAL NOTE "K" ON PAGE 3.
MAY 2015REVISION NO. 8
SEE THE REVISION LISTING ON PAGE 2
50-87
REHMSTEDT.
MARK.J.12305
48400
Digitally signed by
REHMSTEDT.MARK.J.1230548400
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=REHMSTEDT.MARK.J.1230548400 Date: 2015.03.19 10:49:23 -05'00'
RUS.ALLEN.J
.1230354282
Digitally signed by
RUS.ALLEN.J.1230354282
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=RUS.ALLEN.J.1230354282 Date: 2015.03.25 08:38:53 -05'00'
FIEFFER.LAURA
.A.1230375727
Digitally signed by
FIEFFER.LAURA.A.1230375727
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FIEFFER.LAURA.A.1230375727 Date: 2014.07.28 10:39:27 -05'00'
SHIMP.UPTON
.R.1231257183
Digitally signed by
SHIMP.UPTON.R.1231257183
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=SHIMP.UPTON.R.1231257183 Date: 2015.03.25 10:04:48 -05'00'
FELICIANO.AD
IN.1259200373
Digitally signed by
FELICIANO.ADIN.1259200373
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=FELICIANO.ADIN.1259200373 Date: 2014.08.04 10:47:02 -05'00'
TRIVITT.TERRY
.F.1230872011
Digitally signed by
TRIVITT.TERRY.F.1230872011
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=TRIVITT.TERRY.F.1230872011 Date: 2014.08.07 10:47:19 -05'00'
W52P1J-21-R-0035 Attachment 0021
PROJECT FSA 63/7B-66 DRAWING 19-48-4079/7B
PALLET UNIT DATA
ITEMS INCLUDED
*HAZARD
CLASS
AND
DIVISION
*COMPATI-
BILITY GROUP
APPROX
WEIGHT
(LBS)
NSN DODIC
1315- 01-250-8636 C784 1.2.1 C 2,420 01-369-6612 C784 1.2.1 C 2,420 01-242-4796 C785 1.2.1 C 2,054 01-288-5545 C785 1.2.1 C 2,054 01-550-4811 01-599-5332 01-607-2105
C785 C785 C785
1.3 1.2.1 1.3
C C C
2,174 2,054 2,174
01-509-3555 CA31 1.3 C 2,288
*HAZARD CLASSIFICATION DATA CONTAINED IN THE ABOVE CHART IS FOR GUIDANCE AND INFORMATIONAL PUR-
POSES ONLY. VERIFICATION OF THE SPECIFIED DATA SHOULD BE MADE BY CONSULTING THE MOST RECENT
JOINT HAZARD CLASSIFICATION SYSTEM LISTING OR OTHER APPROVED LISTING(S).
REVISIONS
REVISION NO. 1, DATED MARCH 1989, CONSISTS OF:
1. CHANGING THE QD CLASSES IN THE “PALLET UNIT DATA” CHART.
2. ADDING GENERAL NOTE “N” (BUFFER PIECE THICKNESS).
3. ADDING ITEM BY NATIONAL STOCK NUMBER TO THE “PALLET UNIT DATA” CHART.
REVISION NO. 2, DATED MAY 1994, CONSISTS OF CHANGES PER ECP M3K3014 INCLUDING:
ADDING ITEM BY NATIONAL STOCK NUMBER TO THE “PALLET UNIT DATA” CHART.
REVISION NO. 3, DATED APRIL 1996, CONSISTS OF CHANGES PER ECP M3T4321 AND ECP M4T3006 IN-
CLUDING:
1. ADDING AN ALTERNATE STRINGER LOCATION TO BETTER SUPPORT THE TIEDOWN STRAPS.
2. ADDING THE APPLICATION TABLE.
3. ADDING GENERAL NOTE “R” (BUNDLING STRAP).
REVISION NO. 4, DATED OCTOBER 1998, CONSISTS OF CHANGES PER ECP R7T9211 INCLUDING:
1. ADDING GENERAL NOTE “J” (LOT NUMBER MARKING).
2. ADDING LOT NUMBER MARKING DETAIL TO ISOMETRIC VIEW.
3. REMOVING GENERAL NOTE RELATING TO STRAP CUTTER AND RELETTERING THE REMAINING
NOTES (NOT IN ECP).
REVISION NO. 5, DATED MARCH 2003, CONSISTS OF CHANGES PER ECP R2T5303 INCLUDING:
1. UPDATING GENERAL NOTE “H” TO REFLECT NEW ACV DRAWING.
2. UPDATING GENERAL NOTE “K” TO MAKE THE ALTERNATE STRINGER LOCATION THE MANDATORY
LOCATION.
3. ADDING GENERAL NOTE “O” ALLOWING THE USE OF TRUSS NAIL PLATES OR ADDITIONAL NAILS INTO
THE POSTS.
REVISION NO. 6, DATED JULY 2006, CONSISTS OF CHANGES PER ECP R05T5076 INCLUDING:
1. ADDING ALL REFERENCES FOR PA171 CONTAINER.
2. CHANGING THE HARDWOOD BUFFER TO ALLOW ONLY HARDWOOD USE, ELIMINATING PLYWOOD.
3. ADDING GENERAL NOTE “S” (ROOFING NAILS) AND UPDATING PALLET UNIT DETAIL.
4. ELIMINATING ONE PIECE OF THE PLYWOOD PALLET DUNNAGE.
5. SHIFTING THE HEAT TREATMENT MARKING FROM THE RIGHT FORK OPENING TO THE LEFT.
6. ADDING ITEM BY NATIONAL STOCK NUMBER TO THE “PALLET UNIT DATA” CHART.
7. ADDING THE PERTINENT DRAWINGS TO GENERAL NOTE “C”.
REVISION NO. 7, DATED AUGUST 2010, CONSISTS OF CHANGES PER ECP R07T3003 (#1) AND R08K3004
(#2) INCLUDING:
1. ADDING ITEM BY NATIONAL STOCK NUMBER TO THE “PALLET UNIT DATA” CHART.
2. UPDATING GENERAL NOTE “J” TO ADD M1002.
3. UPDATING GENERAL NOTE “N” TO COMBINE PRESERVATIVE TREATMENT (REVISION 6 GENERAL
NOTE “N”) WITH NEW HEAT TREATMENT REQUIREMENTS (REVISION 6 GENERAL NOTE “P”).
REVISION NO. 8, DATED MAY 2015, CONSISTS OF CHANGES PER ECP R13T3006 (#1-3) AND R11T3007 (#1)
INCLUDING:
1. ADDING ITEMS BY NATIONAL STOCK NUMBER TO THE “PALLET UNIT DATA” CHART.
2. UPDATING GENERAL NOTE “H” (ACV00561 MARKING) TO REFLECT “IN ACCORDANCE WITH”.
3. UPDATING GENERAL NOTES “K” (SPECIAL PALLET) AND “O” (TRUSS PLATE) TO REFLECT MIL-DTL-
15011.
PROJECT FSA 63/7B-66DRAWING 19-48-4079/7B
GENERAL NOTES
A. THIS APPENDIX CANNOT STAND ALONE BUT MUST BE USED IN CONJUNC-
TION WITH THE BASIC UNITIZATION PROCEDURES DRAWING 19-48-4079-
20PM1002. TO PRODUCE AN APPROVED UNIT LOAD, ALL PERTINENT PRO-
CEDURES, SPECIFICATIONS AND CRITERIA SET FORTH WITHIN THE BASIC
DRAWING WILL APPLY TO THE PROCEDURES DELINEATED IN THIS APPENDIX.
ANY EXCEPTIONS TO THE BASIC PROCEDURES ARE SPECIFIED IN THIS AP-
PENDIX.
B. DIMENSIONS, CUBE AND WEIGHT OF A PALLET UNIT WILL VARY SLIGHTLY
DEPENDING UPON THE ACTUAL DIMENSIONS OF THE BOXES AND THE
WEIGHT OF THE SPECIFIC ITEM BEING UNITIZED.
C. THE FOLLOWING AMC DRAWINGS ARE APPLICABLE FOR OUTLOADING AND
STORAGE OF THE ITEMS COVERED BY THIS APPENDIX.
CARLOADING - - - - 19-48-4212/8B-5PM1003
TRUCKLOADING - - - 19-48-4213/8B-11PM1003
STORAGE - - - - - 19-48-4145/8B-1-2-3-4-14-22PM1003
END OPENING ISO
CONTAINER - - - - 19-48-4215/8B-15PM1013
MILVAN - - - - - - 19-48-4214/8B-15PM1006
SIDE OPENING ISO
CONTAINER - - - - 19-48-4265/8B-15PM1014
CROP - - - - - - - 19-48-4906/25-CA17Q7
D. IF ITEMS COVERED HEREIN ARE UNITIZED PRIOR TO ISSUANCE OF THIS
REVISION TO THIS APPENDIX, THE CONTAINERS NEED NOT BE REUNITIZED
SOLELY TO CONFORM TO THIS REVISION.
E. FOR DETAILS OF THE PA116 OR PA171 CONTAINER SEE ARDEC DRAWING
9386831 OR 12990755, RESPECTIVELY.
F. THE UNITIZATION PROCEDURES DEPICTED HEREIN MAY ALSO BE USED
FOR UNITIZING 120MM CARTRIDGES WHEN IDENTIFIED BY DIFFERENT NA-
TIONAL STOCK NUMBERS (NSN) THAN WHAT IS SHOWN ON PAGE 2, PRO-
VIDED THE CONTAINER PACK DOES NOT VARY FROM WHAT IS DELINEATED
HEREIN. THE EXPLOSIVE CLASSIFICATION OF OTHER ITEMS MAY BE DIF-
FERENT THAN WHAT IS SHOWN.
G. BUNDLING STRAPS AND STABILIZING STRAPS MUST BE TENSIONED AND
SEALED PRIOR TO THE APPLICATION OF THE TIEDOWN STRAPS. INSTALL AS
CLOSE TO THE OUTER CONTAINER RINGS AS POSSIBLE, TO AVOID DAMAGE
TO THE CONTAINER. CAUTION: STRAPS MUST NOT BE ALLOWED TO OVER-
LAP. DO NOT PLACE ANY STRAP OVER THE IM BLOWOUT PANELS OF THE
PA171 SERIES CONTAINERS.
H. FULL IDENTIFICATION MARKINGS IN ACCORDANCE WITH DAC DRAWING
ACV00561, TO INCLUDE NSN AND DODIC, QUANTITY AND NOMENCLATURE,
LOT NUMBER AND GROSS WEIGHT OF THE LOAD, SHALL BE MARKED ON
TAGS LOCATED ON OPPOSITE UPPER CORNERS OF THE LOAD. BAR CODE
LABELS ARE REQUIRED IN ACCORDANCE WITH DAC DRAWING ACV00561.
J. THE AMMUNITION LOT NUMBER MARKING SHALL BE PLACE IN THE AREA
INDICATED IN THE ISOMETRIC VIEW ON PAGE 4, FOR THE M865, M831A1
AND M1002 CARTRIDGES ONLY; IN 1/2" HIGH UNDERLINED LETTERS.
K. THE SPECIAL PALLET WILL BE CONSTRUCTED AND ASSEMBLED IN AC-
CORDANCE WITH A MILITARY SPECIFICATION MIL-DTL-15011, STYLE 1, TYPE
I, CLASS 1 PALLET WITH THE FOLLOWING EXCEPTIONS. THE TOP AND
BOTTOM DECK BOARDS WILL BE 44” LONG INSTEAD OF 48”. IN ORDER TO
PROVIDE ADDITIONAL SUPPORT FOR THE STEEL BANDS, THE TWO OUT-
SIDE 1” X 8” STRINGER BOARDS ON THE MODIFIED PALLET SHALL BE POSI-
TIONED AS SHOWN IN THE DETAIL ON PAGE 5, AND THE CENTER STRINGER
BOARD ON THE MODIFIED PALLET SHALL BE REPLACED WITH A 1” X 6” AS
SHOWN IN THE DETAIL ON PAGE 5. THE MODIFIED STYLE 1 PALLET ALSO
NEED NOT HAVE CHAMFERS OR STRAP SLOTS AS SPECIFIED WITHIN MILI-
TARY SPECIFICATION MIL-DTL-15011 WHEN USED FOR THE UNITIZATION OF
ITEMS COVERED BY THIS APPENDIX. ALL OTHER REQUIREMENTS SPECI-
FIED WITHIN MIL-DTL-15011 FOR A STYLE 1, TYPE I, CLASS 1 PALLET WILL
APPLY TO THE PALLET SPECIFIED WITHIN THIS DRAWING.
L. ALTHOUGH THE CONTAINERS DEPICTED IN THE UNIT LOAD ON PAGE 4 ARE
CONSTRUCTED WITH INTERLOCKING DEVICES, THE INTERLOCKS WILL NOT
FUNCTION PROPERLY UNLESS THE CONTAINERS ARE POSITIONED SO THAT
THE “PINS” OF THE INTERLOCKS ARE FACING UPWARD. THIS ORIENTATION
WILL AID IN THE PREVENTION OF CONTAINER MOVEMENT, BOTH LATERALLY
AND LONGITUDINALLY, DURING SHIPMENT OF THE UNIT LOAD.
(CONTINUED AT RIGHT)
(GENERAL NOTES CONTINUED)
M. THE HARDWOOD BUFFER PIECES DEPICTED IN THE UNIT LOAD ON PAGE 4
WILL BE NOMINAL 1” X 6” LUMBER IAW ASTM D6199, CLASS 2, GROUP IV.
THE THICKNESS OF THE HARDWOOD BUFFER PIECES MUST BE ADJUSTED,
AS REQUIRED, TO COMPLY WITH THE DIMENSIONAL VARIANCE OF THE
PA116 OR PA171 CONTAINERS, SO AS TO COMPLETELY FILL OUT THE PAL-
LET. THE LENGTH DIMENSION OF THE PALLET UNIT AT THE HARDWOOD
BUFFER PIECES MUST BE WITHIN THE TOLERANCE OF PLUS 1/4”, MINUS 0”
OF THE LENGTH DIMESION AT THE TOP OF THE PALLET UNIT.
N. ALL WOODEN DUNNAGE SHALL BE PRESERVATIVE TREATED IN ACCORD-
ANCE WITH GENERAL NOTE “X” IN THE BASIC PROCEDURES, AND HEAT
TREATED IN ACCORDANCE WITH GENERAL NOTE “BB” IN THE BASIC PRO-
CEDURES. SEE PAGE 5 FOR THE ALTERNATIVE PALLET MARKING LOCA-
TIONS TO BE USED IF NAIL PLATES COVER THE PALLET POST ENDS AND
CANNOT BE MARKED AS REQUIRED IN THE BASIC PROCEDURES.
O. TWO METHODS MAY BE USED TO IMPROVE PALLET PERFORMANCE DUR-
ING MULTIPLE HANDLINGS IN THE REUSE PROGRAM, IF SO DESIRED. FIRST
METHOD: COMMERCIALLY AVAILABLE TRUSS-NAIL PLATES MAY BE ADDED
TO THE SIX OUTSIDE POSTS OF THE PALLET. SECOND METHOD: FOUR 3-
1/4” NAILS MAY BE USED IN EACH POST IN A BOX SHAPED PATTERN IN LIEU
OF THE THREE 3-1/4” NAILS IN A STAGGERED PATTERN CURRENTLY SPECI-
FIED IN MIL-DTL-15011.
P. FOR DETAILS OF THE METAL LIFTING FRAME, SEE DAC DRAWING
AC200000807 AND MILITARY SPECIFICATION MIL-A-70788.
Q. WHEN TWO OR MORE LAYERS ARE OMITTED, THE BUNDLING STRAP RE-
QUIREMENTS WILL CHANGE. A FOUR LAYER UNIT WILL HAVE TWO BUN-
DLING STRAPS OMITTED. THE REMAINING BUNDLING STRAPS WILL SUR-
ROUND THE SECOND THROUGH THE FOURTH LAYERS. A UNIT WITH THREE
OR LESS LAYERS DOES NOT REQUIRE BUNDLING STRAPS. THERE WILL BE
NO CHANGE ON THE STABILIZING STRAP REQUIREMENT.
R. ROOFING NAILS IAW ASTM F1667 NL RF SS-02Z OR NL RF SQ-02Z MAY BE
USED AS AN ALTERNATIVE TO STAPLES FOR SECURING THE STEEL
STRAPS TO THE BUFFER PIECES. NAILS MUST BE APPLIED NEXT TO THE
STRAPPING SUCH THAT THE NAIL HEADS OVERLAP THE STRAPPING. AP-
PLY 12 NAILS (FOUR PER STRAP) TO EACH BUFFER PIECE IN PAIRS ON EI-
THER SIDE OF THE STRAP WITH THE SECOND NAIL APPLIED APPROXI-
MATELY 180 DEGREES FROM THE FIRST NAIL.
PALLET UNIT
SEE GENERAL NOTE "B" PAGE 3.
PARTIAL VIEW A
HARDWOOD BUFFER AND STRAPS HAVE
BEEN OMITTED FOR CLARITY.
PA116 OR
PA171 SERIES
CONTAINER
SPECIAL 40"
X 44" PALLET
SEAL FOR 1-1/4" STRAPPING
(3 REQD, 1 PER STRAP).
CRIMP EACH SEAL WITH
TWO PAIR OF NOTCHES.
TIEDOWN STRAP, 1-1/4" X .035"
OR .031" OR .029" X 15'-6" LONG
STEEL STRAPPING (3 REQD).
HARDWOOD BUFFER (2
REQD). SEE THE DETAIL
ON PAGE 5 AND GENERAL
NOTE "M" ON PAGE 3.
STAPLE, 1-17/32 WIDE BY 3/4"
LEG LENGTH (12 REQD, 4 PER
TIEDOWN STRAP). ALTERNA-
TIVE: ROOFING NAILS (24 REQD,
8 PER TIEDOWN STRAP). SEE
GENERAL NOTE "R" ON PAGE 3.
PLYWOOD PALLET DUNNAGE
(1 REQD). SEE THE "PALLET
STRINGER MODIFICATION
AND DUNNAGE LOCATION"
DETAIL ON PAGE 5.
METAL LIFTING FRAME.
SEE GENERAL NOTE
"P" ON PAGE 3.
PLYWOOD PALLET
DUNNAGE
STABILIZING STRAP, 3/4" X
.035" OR .031" OR .029" X 9'-9"
LONG STEEL STRAPPING
(1 REQD). SEE GENERAL
NOTE "G" ON PAGE 3.
VIEW A
PALLET UNIT DATA
30 CONTAINERS OF 120MM CARTRIDGES @ 75.4 LBS - - - - - 2,262 LBS
DUNNAGE - - - - - - - - - - - - - - - - - - - - - - - - 81 LBS
PALLET - - - - - - - - - - - - - - - - - - - - - - - - 77 LBS
TOTAL WEIGHT - - - - - - - - - - - 2,420 LBS (APPROX)
CUBE - - - - - - - - - - - - - - - 53.8 CU FT (APPROX)
BILL OF MATERIAL
LUMBER LINEAR FEET BOARD FEET
1” X 6” 7.25 3.63
NAILS NO. REQD POUNDS
6d (2”) 6 0.04
SPECIAL PALLET, 40” X 44” – - 1 REQD - - 77 LBS
STEEL STRAPPING, 3/4” - 54.08’ REQD - 4.83 LBS
STEEL STRAPPING, 1-1/4”- 46.50’ REQD - 6.64 LBS
SEAL FOR 3/4” STRAPPING - - - 5 REQD - - - - NIL
SEAL FOR 1-1/4” STRAPPING - - 3 REQD - - - - NIL
STAPLE, 1-17/32” X 3/4” - - -12 REQD - - - - NIL
METAL LIFTING FRAME - - - - - 1 REQD - - 57 LBS
PLYWOOD, 3/8” - – - 4.98 SQ FT REQD - 5.13 LBS
40 1/8" 44"
52 5/8"
44" 40"
LOT
BUNDLING STRAP, 3/4" X
.035" OR .031" OR .029" X
11'-1" LONG STEEL STRAP-
PING (4 REQD). SEE GENERAL
NOTE "G" ON PAGE 3.
SEAL FOR 3/4" STRAPPING
(5 REQD, 1 PER STRAP).
CRIMP EACH SEAL WITH
TWO PAIR OF NOTCHES.
PA116 OR PA171
SERIES CONTAINER
SPECIAL 40" X 44" PALLET. SEE
GENERAL NOTE "K" ON PAGE 3
AND THE "PALLET STRINGER
MODIFICATION AND PALLET
DUNNAGE LOCATION" DETAIL
ON PAGE 5.
44 1/2"
PROJECT FSA 63/7B-66DRAWING 19-48-4079/7B
FILLER A
THIS FILLER IS TO BE USED WHEN ONE CONTAINER
IS TO BE OMITTED FROM A PALLET UNIT, OR IN
COMBINATION WITH OTHER FILLER ASSEMBLIES.
*SEE SPECIAL NOTE 2 ON PAGE 6.
END BEARING PIECE, 2" X 8"
(RIPPED TO 5-3/4") X 7 (2 REQD).
NAIL TO THE TIE PIECES W/3-10d
NAILS AT EACH END.
MARK ON TOP OF EACH OUTSIDE BOTTOM
DECKBOARD. NOTE: THE PRESERVATIVE MARKING
MAY BE APPLIED ADJACENT TO THE HEAT TREATMENT
MARKING WHEN A TRUSS-NAIL PLATE WILL COVER
THIS MARKING. SEE GENERAL NOTE "N" ON PAGE 3.
DECK DUNNAGE, PLYWOOD, 3/8"
X 18-1/2" X 38-3/4" (1 REQD). NAIL
THRU DECK BOARDS W/6-6d NAILS
AND CLINCH.
FILLER B
THIS FILLER IS TO BE USED WHEN TWO CONTAINERS
ARE TO BE OMITTED FROM A PALLET UNIT, OR IN
COMBINATION WITH OTHER FILLER ASSEMBLIES.
TIE PIECE, 2" X 8"
(RIPPED TO 5-3/4")
X 41-1/2" (2 REQD).
BUFFER PIECE, HARDWOOD,
1" X 6"X 43-1/2" (2 REQD). SEE
GENERAL NOTE "M" ON PAGE 3.
STRUT, 1" X 4" X 7"
(6 REQD). NAIL TO
THE TIE PIECES W/2-6d
NAILS AT EACH END.
3/4"
3/4"
19 7/8" 40"
40" 44"
40 3/8"
3/4"
2" +1/4"
3"
16 1/2"
44 1/2"
5 1/4"
8 1/2"
7 1/4" *
3"
16 1/2"
44 1/2"
5 1/4"
16 3/8"
7 1/4"
1/4"
PALLET STRINGER MODIFICATION AND
PALLET DUNNAGE LOCATION
SEE GENERAL NOTE "K" ON PAGE 3.
HARDWOOD BUFFER
(2 REQD)
FILL PIECE, 1" X 4" X 7-1/4"
(6 REQD). NAIL TO THE TIE
PIECE W/2-6d NAILS AND TO THE STRUTS W/2-6d NAILS
AT EACH END.
BELL END
OF FILLER
ASSEMBLY.
BELL END
OF FILLER
ASSEMBLY.
END BEARING PIECE, 2" X 8"
(RIPPED TO 5-3/4") X 14-7/8"
(2 REQD). NAIL TO THE TIE PIECES
W/3-10d NAILS AT EACH JOINT.
TIE PIECE, 2" X 8"
(RIPPED TO 5-3/4")
X 41-1/2" (3 REQD).
STRUT, 1" X 4" X 14-7/8" (6
REQD). NAIL TO THE TIE PIECES
W/2-6d NAILS AT EACH END.
FILL PIECE, 1" X 4" X 7-1/4"
(6 REQD). NAIL TO THE TIE
PIECE W/2-6d NAILS AND TO THE STRUTS W/2-6d NAILS
AT EACH END.
CL
FILLER C
THIS FILLER IS TO BE USED WHEN THREE CONTAINERS
ARE TO BE OMITTED FROM A PALLET UNIT, OR IN
COMBINATION WITH OTHER FILLER ASSEMBLIES.
FILLER B (1 REQD). SEE
THE DETAIL ON PAGE 5.
PA116 OR PA171
SERIES CONTAINER
24 1/8"
7 1/4"
16 1/2"
3"
44 1/2"
6 1/4"
6 1/4"
BELL END
OF FILLER
ASSEMBLY.
END BEARING PIECE, 2" X 8"
(RIPPED TO 5-3/4") X 22-5/8"
(2 REQD). NAIL TO THE TIE
PIECES W/3-10d NAILS AT
EACH JOINT.
TIE PIECE, 2" X 8"
(RIPPED TO 5-3/4")
X 41-1/2" (4 REQD).
STRUT, 1" X 4" X 22-5/8" (6
REQD). NAIL TO THE TIE PIECES
W/2-6d NAILS AT EACH JOINT.
FILL PIECE, 1" X 4" X 7-1/4"
(6 REQD). NAIL TO THE TIE
PIECE W/2-6d NAILS AND TO THE STRUTS W/2-6d NAILS
AT EACH END.
5 1/4"
DETAIL A
THIS DETAIL DEPICTS PROCEDURES TO BE USED
WHEN A STANDARD PALLET UNIT MINUS ONE
CONTAINER IS TO BE UNITIZED. THE FILLER ASSEMBLY
DEPICTED MUST BE INSTALLED IN THE MIDDLE OF THE
TOP LAYER OF THE PALLET UNIT.
DETAIL B
THIS DETAIL DEPICTS PROCEDURES TO BE USED WHEN A
STANDARD PALLET UNIT MINUS TWO CONTAINERS IS TO BE
UNITIZED. THE FILLER ASSEMBLY DEPICTED MUST BE
INSTALLED IN THE MIDDLE OF THE TOP LAYER OF THE
PALLET UNIT.
DETAIL C
THIS DETAIL DEPICTS PROCEDURES TO BE USED WHEN A
STANDARD PALLET UNIT MINUS FOUR CONTAINERS IS TO BE
UNITIZED. THE FILLER ASSEMBLIES DEPICTED MUST BE
INSTALLED IN THE MIDDLE OF THE TOP LAYERS OF THE PALLET
UNIT.
FILLER A (1 REQD). SEE
THE DETAIL ON PAGE 5.
PA116 OR PA171
SERIES CONTAINER
PA116 OR PA171
SERIES CONTAINER
FILLER C (1 REQD). SEE
THE DETAIL AT RIGHT.
FILLER A (1 REQD).
SEE THE DETAIL
ON PAGE 5.
SPECIAL NOTES:
1. WHEN FIVE CONTAINERS ARE TO BE OMITTED FROM A PALLET UNIT, A COM-
PLETE LAYER OF CONTAINERS WILL BE OMITTED. WHEN FOUR CONTAINERS
ARE TO BE OMITTED FROM A PALLET UNIT, A COMBINATION OF FILLER ASSEM-
BLIES DEPICTED ON PAGE 5 AND BELOW MUST BE USED. WHEN THREE OR LESS
CONTAINERS ARE TO BE OMITTED FROM A PALLET UNIT, A COMBINATION OR
ONE OF THE FILLER ASSEMBLIES DEPICTED ON PAGE 5 AND BELOW MUST BE
USED. ALL FILLER ASSEMBLIES MUST BE INSTALLED IN THE MIDDLE OF THE TOP
LAYER OR LAYERS OF A PALLET UNIT.
2. WHEN A “FILLER A” ASSEMBLY IS USED IN COMBINATION WITH A “FILLER B” OR
“FILLER C” ASSEMBLY THE “FILLER A” ASSEMBLY MUST BE POSITIONED IN THE
SECOND LAYER OF CONTAINERS FROM THE TOP OF THE PALLET UNIT AND
MUST HAVE ITS OVERALL HEIGHT REDUCED FROM 7-1/4” TO 7” AND ALSO 2” X 6”
MATERIAL WILL BE SUBSTITUTED FOR THE 2” X 8” (RIPPED TO 5-3/4”) PIECES
USED.
3. WHEN TWO “FILLER A” ASSEMBLIES ARE USED IN PLACE OF TWO OMITTED CON-
TAINERS, THE FILLER ASSEMBLIES WILL BE SEPARATED BY AT LEAST ONE CON-
TAINER TO INSURE PROPER FILLER ASSEMBLY RETENTION AND TO PRECLUDE
ASSEMBLY INTERFERENCES.
4. WHEN TWO OR MORE LAYERS ARE OMITTED, THE BUNDLING STRAP REQUIRE-
MENTS WILL CHANGE. SEE GENERAL NOTE “Q” ON PAGE 3.