Attachment 0007 - Configuration Change Management SOW.pdf

PDF 245 KB Posted

Attached to
120mm Tank Training Ammunition - FY22-FY26
Solicitation number
W52P1J-21-R-0035
Issued by

About this file

This statement of work outlines configuration change management requirements for a solicitation seeking 120mm tank training ammunition from fiscal year 2022 through 2026. The contractor may submit engineering change proposals, requests for variance, and value engineering change proposals to request permanent or temporary changes to technical requirements. Proposed changes must include all necessary notices of revision or specification change notices to fully define the change. Submitted changes do not constitute excusable delays and will not relieve the contractor of delivery obligations unless negotiated with the contracting officer.

View the file

Other files

File Type Posted
Attachment 0018 - W52P1J-21-R-0035 Offeror Questions and USG Responses through 11-Aug-2021.pdf PDF
W52P1J21R0035-0004 FINAL.pdf PDF
Attachment 0021 - Appendix 7B - Unitization Procedures for Complete Rounds Packed in Cylindrical Metal Containers on 4-Way....pdf PDF
Attachment 0022 - Basic Procedures - Unitization Procedures for Complete Rounds Packed in Cylindrical Metal or Plastic Containers.pdf PDF
W52P1J21R0035-0003 FINAL.pdf PDF
Attachment 0018 - W52P1J-21-R-0035 Offeror Questions and USG Responses through 05-Aug-2021.pdf PDF
Attachment 0018 - W52P1J-21-R-0035 Offeror Questions and USG Responses through 22-Jul-2021.pdf PDF
W52P1J21R0035-0002 FINAL.pdf PDF
Attachment 0001 - 120mm Tank Training Price Matrix 21July2021.xlsx XLSX spreadsheet
Attachment 0016 - PA171 Drawings 13006756 and 13006757.pdf PDF
W52P1J21R0035-0001 FINAL.pdf PDF
Attachment 0009 - OPSEC Requirements SOW.pdf PDF
Attachment 0005 - Guidance on Documentation of CDRLs.pdf PDF
Attachment 0002 - Contract C Requirements - M1002.pdf PDF
Attachment 0012 - Case Base Inspection Statement of Work (SOW) 29-Nov-2006.pdf PDF
Attachment 0004 - Contract C Requirements - M865A1 Additional.pdf PDF
Attachment 0011 - Hazardous Material Warning.pdf PDF
Exhibit A - Contract Data Requirements List (CDRLs) M1002 and M865A1 24-May-2021.pdf PDF
W52P1J-21-R-0035 FY22-26 120mm Tank Training Ammunition.pdf PDF
Attachment 0003 - Contract C Requirements - M865A1.pdf PDF
Attachment 0014 - Physical Security SOW.pdf PDF
Attachment 0010 - OPSEC Operations Security Plan - Sample.pdf PDF
Attachment 0013 - Small Business Participation Plan.pdf PDF
Attachment 0006 - GFM Accountability Instructions.pdf PDF
Attachment 0008 - Light and Medium Phosphate Coating Requirements SOW.pdf PDF
Attachment 0001 - 120mm Tank Training Price Matrix 12-May-2021.xlsx XLSX spreadsheet
Attachment 0015 - Past Performance Questionnaire.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION

(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

W52P1J-21-R-0035 Attachment 0007 18-May-2021

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

File details come from the government source that posted it. Updated .