TEPCP
| Total Evaluated Probable Cost/Price | | | | | | | | | | |
| CLIN | Type | | | | | | | | | |
| CLIN | CLIN Description | Phase-In | Base Period Cost | Base Period Fee | Base Period Total | Option Period | | | | | |
| Cost | Option Period | | | | | | | | | | |
| Fee | Option Period | | | | | | | | | | |
| Total | Total Proposed Price | | | | | | | | | | |
| X001 | CPFF | Labor - Base Period (4 years 10 months), Option Period (2 years) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| X002 | CPFF | Overtime - Base Period (4 years 10 months), Option Period (2 years) | | | | | | | | |
| | | Material Handling and/or G&A Rate | | | | | | | | |
| X003 | CR | Other Direct Costs | | | | | | | | |
| X004 | NSP | Service Contract Reporting | | | | | | | | |
| X005 | FFP | Contract Data Requirements List - CDRLs | | | | | | | | |
| X006 | FFP | Phase-In | | | | | | | | |
| | | Sub Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | | FAR 52.217-8 Option to Extend Services (J11) | | | | | | | | |
| | | Scenario 1 (G12) | | | | | | | | |
| | | Scenario 2 (G13) | | | | | | | | |
Grand Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Notes: |
| IAW M.5.4.4.6, the sum of all the CLINs’ evaluated price (Base and Options) plus the evaluated price for the “6-Month Extension of Services” plus the evaluated price of Scenarios 1 and 2* represents the TEPC/P. |
*The Government acknowledges calculating Scenario pricing into the TEPC/P effectively “double counts” this scope of work already incorporated as a portion of the total CLIN 0001 costs, however, the TEPC/P does not impact the ceiling value established under the proposed IDIQ contract and is done for evaluation purposes only.
For CLINs X001, the Total Proposed Price Tab should auto-populate based on the total proposed price under the Base and Option Period Tabs.
The Not to Exceed (NTE) amounts have been provided for CLINs 0003 and 1003; do not adjust these amounts. If a Material Handling or G&A rate will be applied to the CR CLINs, then include the percentage rate in Cell(s) E4 & H4. Include 0% if no indirect rate will be applied. The rate will become part of the contract and will not be adjusted during the life of the Task Order.
| Include your proposed amount for the Phase-In CLIN (0006) in Cell D09 |
| a. CLIN 0003: $18,069,267 |
| b. CLIN 1003: $8,460,213 |
Total Proposed Price
| CLIN | Type | | | | | | | | | |
| CLIN | CLIN Description | Phase-In | Base Period Cost | Base Period Fee | Base Period Total | Option Period | | | | | |
| Cost | Option Period | | | | | | | | | | |
| Fee | Option Period | | | | | | | | | | |
| Total | Total Proposed Price | | | | | | | | | | |
| X001 | CPFF | Labor - Base Period (4 years 10 months) - Option Period (2 years) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| X002 | CPFF | Overtime - Base Period (4 years 10 months) - Option Period (2 years) | | | | | | | | |
| | | Material Handling and/or G&A Rate | | | | | | | | |
| X003 | CR | Other Direct Costs | | | | | | | | |
| X004 | NSP | Service Contract Reporting | | | | | | | | |
| X005 | FFP | Contract Data Requirements List - CDRLs | | | | | | | | |
| X006 | FFP | Phase-In | | | | | | | | |
| | | Sub Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Grand Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Notes: |
| For CLINs X001, the Total Proposed Price Tab should auto-populate based on the total proposed price under the Base and Option Period Tabs. |
The Not to Exceed (NTE) amounts have been provided for CLINs 0003 and 1003; do not adjust these amounts. If a Material Handling or G&A rate will be applied to the CR CLINs, then include the percentage rate in Cell(s) E4 & H4. Include 0% if no indirect rate will be applied. The rate will become part of the contract and will not be adjusted during the life of the Task Order.
| Include your proposed amount for the Phase-In CLIN (0006) in Cell D08 |
| a. CLIN 0003: $18,069,267 |
| b. CLIN 1003: $8,460,213 |
For note purposes...
Base
| Base | | | | | | | | | | | | |
| CLIN | | | | | | | | | | | | |
| 0001 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | | EXAMPLE FIGURES ONLY!! | |
| Regular | Senior Test Manager - CTD | | | | | | | | | | | The amounts included in this Matrix should not be hard input, but should |
| | Senior Test Manager - SPD | | | | | | | | | | | be linked to the Offeror's cost breakdown spreadsheet; See Example Tabs |
| | Senior Test Manager - TSD | | | | | | | | | | | |
| | Test Manager - Field | | | | | | | | | | | |
| | Test Manager - SPD | | | | | | | | | | | |
| | Spectrum Manager | | | | | | | | | | | |
| | Computer Programmer - DMD | | | | | | | | | | | |
| | Project Scientist I | | | | | | | | | | | |
| | Project Scientist II | Exempt | Prime | 1 | 9,880.0 | $34.66 | $35.35 | $342,440.80 | $6,817.20 | $349,258.00 | | This is an example to use when the contract between the Prime and Subcontractor |
| | Project Scientist III | | Sub | | 0.0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | will be T&M or LH; See "e.g. - Subk Costs - T&M or LH" Tab. In addition, since |
| | Chemist I | | | | | | | | | | | many of the employees are classified as professional (FAR 52.222-46) the Subcontractor |
| | Chemist II | | | | | | | | | | | shall submit a separate spreadsheet with the labor rates and fringes proposed and the |
| | Assistant Scientist I | | | | | | | | | | | basis for these rates. |
| | Assistant Scientist II | | | | | | | | | | | |
| | Associate Scientist I | | | | | | | | | | | |
| | Associate Scientist II | | | | | | | | | | | |
| | Senior Scientist - BTD | | | | | | | | | | | |
| | Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | | This is an example to use when the contract between the Prime and Subcontractor |
| | Junior Project Manager - CTD | | | | | | | | | | | will be CPFF; See "e.g. - Subk Costs CPFF" Tab. In addition, the Subcontractor |
| | Junior Project Manager - SPD | | | | | | | | | | | shall submit a separate cost proposal with the same level of information that is |
| | Contractor Support Specialist | | | | | | | | | | | required from the Prime for subcontracts over $5,000,000. For subcontracts under |
| | Clerk - BTD | | | | | | | | | | | $5,000,000, the Subcontractor shall submit a separate spreadsheet with the labor rates |
| | Clerk - CTD | | | | | | | | | | | and fringes proposed and the basis for these rates to evaluate IAW FAR 52.222-46. |
| | Clerk - DMD | | | | | | | | | | | |
| | Clerk - MET | | | | | | | | | | | |
| | Clerk - SPD | | | | | | | | | | | |
| | Clerk - TSD | | | | | | | | | | | |
| | Property Clerk - BTD | | | | | | | | | | | |
| | Property Clerk - CTD | | | | | | | | | | | |
| | Property Clerk - DMD | | | | | | | | | | | |
| | Property Clerk - MET | | | | | | | | | | | |
| | Property Clerk - OPS | | | | | | | | | | | |
| | Property Clerk - Overall | | | | | | | | | | | |
| | Property Clerk - SPD | | | | | | | | | | | |
| | Property Clerk - TSD | | | | | | | | | | | |
| | Supply Technician | | | | | | | | | | | |
| | HVAC Mechanic - Overall | | | | | | | | | | | |
| | Welder - Overall | | | | | | | | | | | |
| | Electrician - TSD | | | | | | | | | | | |
| | Senior Electronic Technician - CTD | | | | | | | | | | | |
| | Senior Electronic Technician - MET | | | | | | | | | | | |
| | Senior Electronic Technician - TSD | | | | | | | | | | | |
| | Electronic Technician - Overall | | | | | | | | | | | |
| | Master Mechanical Technician | | | | | | | | | | | |
| | Senior Mechanical Technician - CTD | | | | | | | | | | | |
| | Senior Mechanical Technician - SPD | | | | | | | | | | | |
| | Senior Mechanical Technician - TSD | | | | | | | | | | | |
| | Mechanical Technician - Overall | | | | | | | | | | | |
| | Mechanical Technician - SPD | | | | | | | | | | | |
| | Range Controllers | | | | | | | | | | | |
| | Drafter - TSD | | | | | | | | | | | |
| | GIS Technician - OPS | | | | | | | | | | | |
| | Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | | |
| | Photographer - TSD | | | | | | | | | | | |
| | Photographer (Scientific and Technical) | | | | | | | | | | | |
| | Audio Visual Specialist - TSD | | | | | | | | | | | |
| | Heavy Duty Equipment Operator - Overall | | | | | | | | | | | |
| | Heavy Duty Equipment Operator - TSD | | | | | | | | | | | |
| | POL/Hazardous Waste Technician - OPS | | | | | | | | | | | |
| | Flight Operations/Aviation Technician - OPS | | | | | | | | | | | |
| | Field Technician - Overall | | | | | | | | | | | |
| | Laboratory Technician I - CTD | | | | | | | | | | | |
| | Laboratory Technician II - CTD | | | | | | | | | | | |
| | Laboratory Technician III - CTD | | | | | | | | | | | |
| | Laboratory Analyst I - CTD | | | | | | | | | | | |
| | Laboratory Analyst II - CTD | | | | | | | | | | | |
| | Air Monitoring Technician | | | | | | | | | | | |
| | Air Monitoring Operator (Safety) | | | | | | | | | | | |
| | Training Coordinator I | | | | | | | | | | | |
| | Training Coordinator II | | | | | | | | | | | |
| | Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | | | |
| | SubTotal - Regular Time | | | 1 | 9,880.0 | | | $342,440.80 | $6,817.20 | $349,258.00 |
| CLIN | | | | | | | | | | |
| 0002 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | |
| Overtime | Senior Test Manager - CTD | | | | | | | | | |
| | Senior Test Manager - SPD | | | | | | | | | |
| | Senior Test Manager - TSD | | | | | | | | | |
| | Test Manager - Field | | | | | | | | | |
| | Test Manager - SPD | | | | | | | | | |
| | Spectrum Manager | | | | | | | | | |
| | Computer Programmer - DMD | | | | | | | | | |
| | Project Scientist I | | | | | | | | | |
| | Project Scientist II | | | | | | | | | |
| | Project Scientist III | | | | | | | | | |
| | Chemist I | | | | | | | | | |
| | Chemist II | | | | | | | | | |
| | Assistant Scientist I | | | | | | | | | |
| | Assistant Scientist II | | | | | | | | | |
| | Associate Scientist I | | | | | | | | | |
| | Associate Scientist II | | | | | | | | | |
| | Senior Scientist - BTD | | | | | | | | | |
| | Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| | Junior Project Manager - CTD | | | | | | | | | |
| | Junior Project Manager - SPD | | | | | | | | | |
| | Contractor Support Specialist | | | | | | | | | |
| | Clerk - BTD | | | | | | | | | |
| | Clerk - CTD | | | | | | | | | |
| | Clerk - DMD | | | | | | | | | |
| | Clerk - MET | | | | | | | | | |
| | Clerk - SPD | | | | | | | | | |
| | Clerk - TSD | | | | | | | | | |
| | Property Clerk - BTD | | | | | | | | | |
| | Property Clerk - CTD | | | | | | | | | |
| | Property Clerk - DMD | | | | | | | | | |
| | Property Clerk - MET | | | | | | | | | |
| | Property Clerk - OPS | | | | | | | | | |
| | Property Clerk - Overall | | | | | | | | | |
| | Property Clerk - SPD | | | | | | | | | |
| | Property Clerk - TSD | | | | | | | | | |
| | Supply Technician | | | | | | | | | |
| | HVAC Mechanic - Overall | | | | | | | | | |
| | Welder - Overall | | | | | | | | | |
| | Electrician - TSD | | | | | | | | | |
| | Senior Electronic Technician - CTD | | | | | | | | | |
| | Senior Electronic Technician - MET | | | | | | | | | |
| | Senior Electronic Technician - TSD | | | | | | | | | |
| | Electronic Technician - Overall | | | | | | | | | |
| | Master Mechanical Technician | | | | | | | | | |
| | Senior Mechanical Technician - CTD | | | | | | | | | |
| | Senior Mechanical Technician - SPD | | | | | | | | | |
| | Senior Mechanical Technician - TSD | | | | | | | | | |
| | Mechanical Technician - Overall | | | | | | | | | |
| | Mechanical Technician - SPD | | | | | | | | | |
| | Range Controllers | | | | | | | | | |
| | Drafter - TSD | | | | | | | | | |
| | GIS Technician - OPS | | | | | | | | | |
| | Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| | Photographer - TSD | | | | | | | | | |
| | Photographer (Scientific and Technical) | | | | | | | | | |
| | Audio Visual Specialist - TSD | | | | | | | | | |
| | Heavy Duty Equipment Operator - Overall | | | | | | | | | |
| | Heavy Duty Equipment Operator - TSD | | | | | | | | | |
| | POL/Hazardous Waste Technician - OPS | | | | | | | | | |
| | Flight Operations/Aviation Technician - OPS | | | | | | | | | |
| | Field Technician - Overall | | | | | | | | | |
| | Laboratory Technician I - CTD | | | | | | | | | |
| | Laboratory Technician II - CTD | | | | | | | | | |
| | Laboratory Technician III - CTD | | | | | | | | | |
| | Laboratory Analyst I - CTD | | | | | | | | | |
| | Laboratory Analyst II - CTD | | | | | | | | | |
| | Air Monitoring Technician | | | | | | | | | |
| | Air Monitoring Operator (Safety) | | | | | | | | | |
| | Training Coordinator I | | | | | | | | | |
| | Training Coordinator II | | | | | | | | | |
| | Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| SubTotal - OverTime | 0 | 0.0 | $0.00 | $0.00 | $0.00 |
| Grand Total | 1 | 9,880.0 | $342,440.80 | $6,817.20 | $349,258.00 |
| Notes: |
| Under Column D, the Offeror is to include the name or initials of the company that is performing that labor category; do not just include the words Prime or Sub. |
It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct
Option
| Option | | | | | | | | | | | | |
| CLIN | | | | | | | | | | | | |
| 1001 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | | EXAMPLE FIGURES ONLY!! | |
| Regular | Senior Test Manager - CTD | | | | | | | | | | | The amounts included in this Matrix should not be hard input, but should |
| | Senior Test Manager - SPD | | | | | | | | | | | be linked to the Offeror's cost breakdown spreadsheet; See Example Tabs |
| | Senior Test Manager - TSD | | | | | | | | | | | |
| | Test Manager - Field | | | | | | | | | | | |
| | Test Manager - SPD | | | | | | | | | | | |
| | Spectrum Manager | | | | | | | | | | | |
| | Computer Programmer - DMD | | | | | | | | | | | |
| | Project Scientist I | | | | | | | | | | | |
| | Project Scientist II | Exempt | Prime | 1 | 9,880.0 | $34.66 | $35.35 | $342,440.80 | $6,817.20 | $349,258.00 | | This is an example to use when the contract between the Prime and Subcontractor |
| | Project Scientist III | | Sub | 0 | 0.0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | will be T&M or LH; See "e.g. - Subk Costs - T&M or LH" Tab. In addition, since |
| | Chemist I | | | | | | | | | | | many of the employees are classified as professional (FAR 52.222-46) the Subcontractor |
| | Chemist II | | | | | | | | | | | shall submit a separate spreadsheet with the labor rates and fringes proposed and the |
| | Assistant Scientist I | | | | | | | | | | | basis for these rates. |
| | Assistant Scientist II | | | | | | | | | | | |
| | Associate Scientist I | | | | | | | | | | | |
| | Associate Scientist II | | | | | | | | | | | |
| | Senior Scientist - BTD | | | | | | | | | | | |
| | Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | | This is an example to use when the contract between the Prime and Subcontractor |
| | Junior Project Manager - CTD | | | | | | | | | | | will be CPFF; See "e.g. - Subk Costs CPFF" Tab. In addition, the Subcontractor |
| | Junior Project Manager - SPD | | | | | | | | | | | shall submit a separate cost proposal with the same level of information that is |
| | Contractor Support Specialist | | | | | | | | | | | required from the Prime for subcontracts over $5,000,000. For subcontracts under |
| | Clerk - BTD | | | | | | | | | | | $5,000,000, the Subcontractor shall submit a separate spreadsheet with the labor rates |
| | Clerk - CTD | | | | | | | | | | | and fringes proposed and the basis for these rates to evaluate IAW FAR 52.222-46. |
| | Clerk - DMD | | | | | | | | | | | |
| | Clerk - MET | | | | | | | | | | | |
| | Clerk - SPD | | | | | | | | | | | |
| | Clerk - TSD | | | | | | | | | | | |
| | Property Clerk - BTD | | | | | | | | | | | |
| | Property Clerk - CTD | | | | | | | | | | | |
| | Property Clerk - DMD | | | | | | | | | | | |
| | Property Clerk - MET | | | | | | | | | | | |
| | Property Clerk - OPS | | | | | | | | | | | |
| | Property Clerk - Overall | | | | | | | | | | | |
| | Property Clerk - SPD | | | | | | | | | | | |
| | Property Clerk - TSD | | | | | | | | | | | |
| | Supply Technician | | | | | | | | | | | |
| | HVAC Mechanic - Overall | | | | | | | | | | | |
| | Welder - Overall | | | | | | | | | | | |
| | Electrician - TSD | | | | | | | | | | | |
| | Senior Electronic Technician - CTD | | | | | | | | | | | |
| | Senior Electronic Technician - MET | | | | | | | | | | | |
| | Senior Electronic Technician - TSD | | | | | | | | | | | |
| | Electronic Technician - Overall | | | | | | | | | | | |
| | Master Mechanical Technician | | | | | | | | | | | |
| | Senior Mechanical Technician - CTD | | | | | | | | | | | |
| | Senior Mechanical Technician - SPD | | | | | | | | | | | |
| | Senior Mechanical Technician - TSD | | | | | | | | | | | |
| | Mechanical Technician - Overall | | | | | | | | | | | |
| | Mechanical Technician - SPD | | | | | | | | | | | |
| | Range Controllers | | | | | | | | | | | |
| | Drafter - TSD | | | | | | | | | | | |
| | GIS Technician - OPS | | | | | | | | | | | |
| | Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | | |
| | Photographer - TSD | | | | | | | | | | | |
| | Photographer (Scientific and Technical) | | | | | | | | | | | |
| | Audio Visual Specialist - TSD | | | | | | | | | | | |
| | Heavy Duty Equipment Operator - Overall | | | | | | | | | | | |
| | Heavy Duty Equipment Operator - TSD | | | | | | | | | | | |
| | POL/Hazardous Waste Technician - OPS | | | | | | | | | | | |
| | Flight Operations/Aviation Technician - OPS | | | | | | | | | | | |
| | Field Technician - Overall | | | | | | | | | | | |
| | Laboratory Technician I - CTD | | | | | | | | | | | |
| | Laboratory Technician II - CTD | | | | | | | | | | | |
| | Laboratory Technician III - CTD | | | | | | | | | | | |
| | Laboratory Analyst I - CTD | | | | | | | | | | | |
| | Laboratory Analyst II - CTD | | | | | | | | | | | |
| | Air Monitoring Technician | | | | | | | | | | | |
| | Air Monitoring Operator (Safety) | | | | | | | | | | | |
| | Training Coordinator I | | | | | | | | | | | |
| | Training Coordinator II | | | | | | | | | | | |
| | Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | | | |
| | SubTotal - Regular Time | | | 1 | 9,880.0 | | | $342,440.80 | $6,817.20 | $349,258.00 |
| CLIN | | | | | | | | | | |
| 1002 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | |
| Overtime | Senior Test Manager - CTD | Exempt | | | | | | | | |
| | Senior Test Manager - SPD | | | | | | | | | |
| | Senior Test Manager - TSD | | | | | | | | | |
| | Test Manager - Field | | | | | | | | | |
| | Test Manager - SPD | | | | | | | | | |
| | Spectrum Manager | | | | | | | | | |
| | Computer Programmer - DMD | | | | | | | | | |
| | Project Scientist I | | | | | | | | | |
| | Project Scientist II | | | | | | | | | |
| | Project Scientist III | | | | | | | | | |
| | Chemist I | | | | | | | | | |
| | Chemist II | | | | | | | | | |
| | Assistant Scientist I | | | | | | | | | |
| | Assistant Scientist II | | | | | | | | | |
| | Associate Scientist I | | | | | | | | | |
| | Associate Scientist II | | | | | | | | | |
| | Senior Scientist - BTD | | | | | | | | | |
| | Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| | Junior Project Manager - CTD | | | | | | | | | |
| | Junior Project Manager - SPD | | | | | | | | | |
| | Contractor Support Specialist | | | | | | | | | |
| | Clerk - BTD | | | | | | | | | |
| | Clerk - CTD | | | | | | | | | |
| | Clerk - DMD | | | | | | | | | |
| | Clerk - MET | | | | | | | | | |
| | Clerk - SPD | | | | | | | | | |
| | Clerk - TSD | | | | | | | | | |
| | Property Clerk - BTD | | | | | | | | | |
| | Property Clerk - CTD | | | | | | | | | |
| | Property Clerk - DMD | | | | | | | | | |
| | Property Clerk - MET | | | | | | | | | |
| | Property Clerk - OPS | | | | | | | | | |
| | Property Clerk - Overall | | | | | | | | | |
| | Property Clerk - SPD | | | | | | | | | |
| | Property Clerk - TSD | | | | | | | | | |
| | Supply Technician | | | | | | | | | |
| | HVAC Mechanic - Overall | | | | | | | | | |
| | Welder - Overall | | | | | | | | | |
| | Electrician - TSD | | | | | | | | | |
| | Senior Electronic Technician - CTD | | | | | | | | | |
| | Senior Electronic Technician - MET | | | | | | | | | |
| | Senior Electronic Technician - TSD | | | | | | | | | |
| | Electronic Technician - Overall | | | | | | | | | |
| | Master Mechanical Technician | | | | | | | | | |
| | Senior Mechanical Technician - CTD | | | | | | | | | |
| | Senior Mechanical Technician - SPD | | | | | | | | | |
| | Senior Mechanical Technician - TSD | | | | | | | | | |
| | Mechanical Technician - Overall | | | | | | | | | |
| | Mechanical Technician - SPD | | | | | | | | | |
| | Range Controllers | | | | | | | | | |
| | Drafter - TSD | | | | | | | | | |
| | GIS Technician - OPS | | | | | | | | | |
| | Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| | Photographer - TSD | | | | | | | | | |
| | Photographer (Scientific and Technical) | | | | | | | | | |
| | Audio Visual Specialist - TSD | | | | | | | | | |
| | Heavy Duty Equipment Operator - Overall | | | | | | | | | |
| | Heavy Duty Equipment Operator - TSD | | | | | | | | | |
| | POL/Hazardous Waste Technician - OPS | | | | | | | | | |
| | Flight Operations/Aviation Technician - OPS | | | | | | | | | |
| | Field Technician - Overall | | | | | | | | | |
| | Laboratory Technician I - CTD | | | | | | | | | |
| | Laboratory Technician II - CTD | | | | | | | | | |
| | Laboratory Technician III - CTD | | | | | | | | | |
| | Laboratory Analyst I - CTD | | | | | | | | | |
| | Laboratory Analyst II - CTD | | | | | | | | | |
| | Air Monitoring Technician | | | | | | | | | |
| | Air Monitoring Operator (Safety) | | | | | | | | | |
| | Training Coordinator I | | | | | | | | | |
| | Training Coordinator II | | | | | | | | | |
| | Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| SubTotal - OverTime | 0 | 0.0 | $0.00 | $0.00 | $0.00 |
| Grand Total | 1 | 9,880.0 | $342,440.80 | $6,817.20 | $349,258.00 |
| Notes: |
| Under Column D, the Offeror is to include the name or initials of the company that is performing that labor category; do not just include the words Prime or Sub. |
It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct e.g. - Prime Costs
| Base Year | Available Work | Days | Hours | | | | | | | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 10080 | | | | | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | Subtotal | PMO Rate | FBLR without Fee | Fee | FBLR with Fee | Total Cost | Total Fee | Total Amount |
| 0001 | | | | | | | 43% | | 4% | | $1.00 | | 2% | | | | |
| 01113 | Information Specialist II | 1.00 | 10,080.00 | 216.00 | 9,864.00 | $17.38 | $7.47 | $24.85 | $0.99 | $25.84 | $1.00 | $26.84 | $0.54 | $27.38 | $264,749.76 | $5,326.56 | $270,076.32 |
| 01612 | Word Processor II | 1.00 | 10,080.00 | 216.00 | 9,864.00 | $18.14 | $7.80 | $25.94 | $1.04 | $26.98 | $1.00 | $27.98 | $0.56 | $28.54 | $275,994.72 | $5,523.84 | $281,518.56 |
| | | 20,160.00 | 432.00 | 19,728.00 | | | | | | | | | | $540,744.48 | $10,850.40 | $551,594.88 |
| Base | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 10080 | | Escalation | 3% | 0% | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | Subtotal | PMO Rate | FBLR without Fee | Fee | FBLR with Fee | Total Cost | Total Fee | Total Amount |
| 0002 | | | | | | | 43% | | 4% | | $0.00 | | 2% | | | | |
| 01113 | Information Specialist II | 1.00 | 10,080.00 | 224.00 | 9,856.00 | $17.38 | $7.47 | $24.85 | $0.99 | $25.84 | $0.00 | $25.84 | $0.52 | $26.36 | $254,679.04 | $5,125.12 | $259,804.16 |
| 01612 | Word Processor II | 1.00 | 10,080.00 | 224.00 | 9,856.00 | $18.14 | $7.80 | $25.94 | $1.04 | $26.98 | $0.00 | $26.98 | $0.54 | $27.52 | $265,914.88 | $5,322.24 | $271,237.12 |
| | | 20,160.00 | 448.00 | 19,712.00 | | | | | | | | | | $520,593.92 | $10,447.36 | $531,041.28 |
| Option | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 4184 | | Escalation | 3% | 0% | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | Subtotal | PMO Rate | FBLR without Fee | Fee | FBLR with Fee | Total Cost | Total Fee | Total Amount |
| 1001 | | | | | | | 43% | | 4% | | $0.00 | | 2% | | | | |
| 01113 | Information Specialist II | 1.00 | 4,184.00 | 224.00 | 3,960.00 | $17.38 | $7.47 | $24.85 | $0.99 | $25.84 | $0.00 | $25.84 | $0.52 | $26.36 | $102,326.40 | $2,059.20 | $104,385.60 |
| 01612 | Word Processor II | 1.00 | 4,184.00 | 224.00 | 3,960.00 | $18.14 | $7.80 | $25.94 | $1.04 | $26.98 | $0.00 | $26.98 | $0.54 | $27.52 | $106,840.80 | $2,138.40 | $108,979.20 |
| | | 8,368.00 | 448.00 | 7,920.00 | | | | | | | | | | $209,167.20 | $4,197.60 | $213,364.80 |
| Option | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 4184 | | Escalation | 3% | 0% | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | Subtotal | PMO Rate | FBLR without Fee | Fee | FBLR with Fee | Total Cost | Total Fee | Total Amount |
| 1002 | | | | | | | 43% | | 4% | | $0.00 | | 2% | | | | |
| 01113 | Information Specialist II | 1.00 | 4,184.00 | 224.00 | 3,960.00 | $17.38 | $7.47 | $24.85 | $0.99 | $25.84 | $0.00 | $25.84 | $0.52 | $26.36 | $102,326.40 | $2,059.20 | $104,385.60 |
| 01612 | Word Processor II | 1.00 | 4,184.00 | 224.00 | 3,960.00 | $18.14 | $7.80 | $25.94 | $1.04 | $26.98 | $0.00 | $26.98 | $0.54 | $27.52 | $106,840.80 | $2,138.40 | $108,979.20 |
| | | 8,368.00 | 448.00 | 7,920.00 | | | | | | | | | | $209,167.20 | $4,197.60 | $213,364.80 |
| Notes: | | | | | | | | | | | | | | | | |
| This is only an example; the Offeror should propose in accordance with their accounting system. This example is only to demonstrate how to link the Offeror's Cost Breakdown spreadsheets to the Phase In, Base and Option Tabs | | | | | | | | | | | | | | | | |
| The Available Work Days and Hours are based on the Period of Performance included in Cells B3, B11, B19 |
| It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct |
| The Offeror shall provide unit prices (FBLRs Without Fee and With Fee) that when multiplied by the quantity (Hours) equal an extended price that does not require rounding beyond a whole penny/cent. See Example above. |
If proposing uncompensated overtime, the adjusted labor hourly rate shall be applied to all proposed hours (regular and overtime), in accordance with FAR 52.237.10 e.g. - Subk Costs CPFF
| Phase In | Available Work | Days | Hours | | | | | | | | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 10080 | | | | | | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR Without Fee | Subcontractor Fee | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Subtotal | Prime Fee | Prime FBLR With Fee | Prime FBLR Without Fee | Total Cost | Total Fee | Total Amount |
| 0001 | | | | | | | 5.00% | | 2.00% | | $1.00 | | 2.00% | | | | | |
| Exempt | Technical Specialist I | 4.00 | 40,320.00 | 800.00 | 39,520.00 | $41.00 | $2.05 | $43.05 | $0.86 | $43.91 | $1.00 | $44.91 | $0.90 | $45.81 | $42.86 | $1,693,827.20 | $116,584.00 | $1,810,411.20 |
4.00 40,320.00 800.00 39,520.00 $1,693,827.20 $116,584.00 $1,810,411.20
| Base | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 10080 | | Escalation | 3% | 0% | | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR Without Fee | Subcontractor Fee | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Subtotal | Prime Fee | Prime FBLR With Fee | Prime FBLR Without Fee | Total Cost | Total Fee | Total Amount |
| 0002 | | | | | | | 5.00% | | 2.00% | | $0.00 | | 2.00% | | | | | |
| Exempt | Technical Specialist I | 4.00 | 40,320.00 | 832.00 | 39,488.00 | $42.23 | $2.11 | $44.34 | $0.89 | $45.23 | $0.00 | $45.23 | $0.90 | $46.13 | $43.12 | $1,702,722.56 | $118,858.88 | $1,821,581.44 |
4.00 40,320.00 832.00 39,488.00 $1,702,722.56 $118,858.88 $1,821,581.44
| Option | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 4184 | | Escalation | 3% | 0% | | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR Without Fee | Subcontractor Fee | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Subtotal | Prime Fee | Prime FBLR With Fee | Prime FBLR Without Fee | Total Cost | Total Fee | Total Amount |
| 1001 | | | | | | | 5.00% | | 2.00% | | $0.00 | | 2.00% | | | | | |
| Exempt | Technical Specialist I | 4.00 | 16,736.00 | 832.00 | 15,904.00 | $43.50 | $2.18 | $45.68 | $0.91 | $46.59 | $0.00 | $46.59 | $0.93 | $47.52 | $44.41 | $706,296.64 | $49,461.44 | $755,758.08 |
4.00 16,736.00 832.00 15,904.00 $706,296.64 $49,461.44 $755,758.08
| Option | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 4184 | | Escalation | 3% | 0% | | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR Without Fee | Subcontractor Fee | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Subtotal | Prime Fee | Prime FBLR With Fee | Prime FBLR Without Fee | Total Cost | Total Fee | Total Amount |
| 1002 | | | | | | | 5.00% | | 2.00% | | $0.00 | | 2.00% | | | | | |
| Exempt | Technical Specialist I | 4.00 | 16,736.00 | 832.00 | 15,904.00 | $44.81 | $2.24 | $47.05 | $0.94 | $47.99 | $0.00 | $47.99 | $0.96 | $48.95 | $45.75 | $727,608.00 | $50,892.80 | $778,500.80 |
| 4.00 | 16,736.00 | 832.00 | 15,904.00 | $727,608.00 | $50,892.80 | $778,500.80 |
| Notes: | | | | | | | |
| This is only an example; the Offeror should propose in accordance with their accounting system. This example is only to demonstrate how to link the Offeror's Cost Breakdown spreadsheets to the Phase In, Base and Option Tabs | | | | | | | |
| The Available Work Days and Hours are based on the Period of Performance included in Cells B3, B11, B19 |
| It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct |
| The Offeror shall provide unit prices (FBLRs Without Fee and With Fee) that when multiplied by the quantity (Hours) equal an extended price that does not require rounding beyond a whole penny/cent. See Example above. |
If proposing uncompensated overtime, the adjusted labor hourly rate shall be applied to all proposed hours (regular and overtime), in accordance with FAR 52.237.10 e.g. Subk Costs -T&M or LH
| Phase In | Available Work | Days | Hours | | | | | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 10080 | | | | | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Prime FBLR Without Fee | Prime Fee | Prime FBLR With Fee | Total Cost | Total Fee | Total Amount |
| 0001 | | | | | | | 2.00% | | $1.00 | | 2.00% | | | | |
| Exempt | Operations Specialist I | 1.00 | 10,080.00 | 200.00 | 9,880.00 | $33.00 | $0.66 | $33.66 | $1.00 | $34.66 | $0.69 | $35.35 | $342,440.80 | $6,817.20 | $349,258.00 |
1.00 10,080.00 200.00 9,880.00 $342,440.80 $6,817.20 $349,258.00
| Base | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 10080 | | Escalation | 3% | 0% | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Prime FBLR Without Fee | Prime Fee | Prime FBLR With Fee | Total Cost | Total Fee | Total Amount |
| 0002 | | | | | | | 2.00% | | $0.00 | | 2.00% | | | | |
| Exempt | Operations Specialist I | 1.00 | 10,080.00 | 208.00 | 9,872.00 | $33.99 | $0.68 | $34.67 | $0.00 | $34.67 | $0.69 | $35.36 | $342,262.24 | $6,811.68 | $349,073.92 |
1.00 10,080.00 208.00 9,872.00 $342,262.24 $6,811.68 $349,073.92
| Option | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 4184 | | Escalation | 3% | 0% | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Prime FBLR Without Fee | Prime Fee | Prime FBLR With Fee | Total Cost | Total Fee | Total Amount |
| 1001 | | | | | | | 2.00% | | $0.00 | | 2.00% | | | | |
| Exempt | Operations Specialist I | 1.00 | 4,184.00 | 208.00 | 3,976.00 | $35.01 | $0.70 | $35.71 | $0.00 | $35.71 | $0.71 | $36.42 | $141,982.96 | $2,822.96 | $144,805.92 |
1.00 4,184.00 208.00 3,976.00 $141,982.96 $2,822.96 $144,805.92
| Option | Available Work | Days | Hours | | | Exempt | Non-Exempt | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 4184 | | Escalation | 3% | 0% | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Subcontractor FBLR With Fee | Prime G&A | Subtotal | PMO Rate | Prime FBLR Without Fee | Prime Fee | Prime FBLR With Fee | Total Cost | Total Fee | Total Amount |
| 1002 | | | | | | | 2.00% | | $0.00 | | 2.00% | | | | |
| Exempt | Operations Specialist I | 1.00 | 4,184.00 | 208.00 | 3,976.00 | $36.06 | $0.72 | $36.78 | $0.00 | $36.78 | $0.74 | $37.52 | $146,237.28 | $2,942.24 | $149,179.52 |
| 1.00 | 4,184.00 | 208.00 | 3,976.00 | $146,237.28 | $2,942.24 | $149,179.52 |
| This is only an example; the Offeror should propose in accordance with their accounting system. This example is only to demonstrate how to link the Offeror's Cost Breakdown spreadsheets to the Phase In, Base and Option Tabs | | | | | | | |
| The Available Work Days and Hours are based on the Period of Performance included in Cells B3, B11, B19 | | | | | | | |
| It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct | | | | | | | |
| The Offeror shall provide unit prices (FBLRs Without Fee and With Fee) that when multiplied by the quantity (Hours) equal an extended price that does not require rounding beyond a whole penny/cent. See Example above. | | | | | | | |
| If proposing uncompensated overtime, the adjusted labor hourly rate shall be applied to all proposed hours (regular and overtime), in accordance with FAR 52.237.10 | | | | | | | |
PMO Rate
| Base | Available Work | Days | Hours | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 1960 | | | | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | FBLR Without Fee | Total PMO Amount |
| 0001 | | | | | | | 10% | | 10% | | |
| Program Manager | 1 | 1,960 | 240 | 1,720 | $150.00 | $15.00 | $165.00 | $16.50 | $181.50 | $312,180.00 |
| Senior Business Manager | | | | | | | | | | |
| Quality Control Manager | | | | | | | | | | |
| Facility Security Officer (FSO) | | | | | | | | | | |
| Project Manager (CTD Only) | | | | | | | | | | |
| Project Manager (SPD Only) | | | | | | | | | | |
| Security Custodian/Assistant Special Security Officer (SPD) | | | | | | | | | | |
| Safety Officer | | | | | | | | | | |
| Contract Finance Manager | | | | | | | | | | |
| HR Specialist | | | | | | | | | | |
| Contract Manager | | | | | | | | | | |
1 1,960 240 1,720 $312,180.00
| Base | Available Work | Days | Hours | | | | | | | | |
| POP | 23 December 2025 - 22 October 2030 | 1260 | 1,960 | | Escalation | 0% | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | FBLR Without Fee | Total PMO Amount |
| 0002 | | | | | | | 10% | | 10% | | |
| Program Manager | 1 | 1,960 | 10 | 1,950 | $10.00 | $1.00 | $11.00 | $1.10 | $12.10 | $23,595.00 |
| Senior Business Manager | | | | | | | | | | |
| Quality Control Manager | | | | | | | | | | |
| Facility Security Officer (FSO) | | | | | | | | | | |
| Project Manager (CTD Only) | | | | | | | | | | |
| Project Manager (SPD Only) | | | | | | | | | | |
| Security Custodian/Assistant Special Security Officer (SPD) | | | | | | | | | | |
| Safety Officer | | | | | | | | | | |
| Contract Finance Manager | | | | | | | | | | |
| HR Specialist | | | | | | | | | | |
| Contract Manager | | | | | | | | | | |
1 1,960 10 1,950.00 $23,595.00
| Option | Available Work | Days | Hours | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 1960 | | Escalation | 0% | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | FBLR Without Fee | Total PMO Amount |
| 1001 | | | | | | | 10% | | 10% | | |
| Program Manager | 1 | 1,960 | 10 | 1,950 | $10.00 | $1.00 | $11.00 | $1.10 | $12.10 | $23,595.00 |
| Senior Business Manager | | | | | | | | | | |
| Quality Control Manager | | | | | | | | | | |
| Facility Security Officer (FSO) | | | | | | | | | | |
| Project Manager (CTD Only) | | | | | | | | | | |
| Project Manager (SPD Only) | | | | | | | | | | |
| Security Custodian/Assistant Special Security Officer (SPD) | | | | | | | | | | |
| Safety Officer | | | | | | | | | | |
| Contract Finance Manager | | | | | | | | | | |
| HR Specialist | | | | | | | | | | |
| Contract Manager | | | | | | | | | | |
1 1,960 10 1,950.00 $23,595.00
| Option | Available Work | Days | Hours | | | | | | | | |
| POP | 23 October 2030 - 22 October 2032 | 523 | 1960 | | Escalation | 0% | | | | | |
| CLIN | Labor Category | FTEs | Total Hours | Non-Productive Hours | Productive Hours | Labor Rate | Fringe Rate | Subtotal | G&A | FBLR Without Fee | Total PMO Amount |
| 1002 | | | | | | | 10% | | 10% | | |
| Program Manager | 1 | 1,960 | 10 | 1,950 | $10.00 | $1.00 | $11.00 | $1.10 | $12.10 | $23,595.00 |
| Senior Business Manager | | | | | | | | | | |
| Quality Control Manager | | | | | | | | | | |
| Facility Security Officer (FSO) | | | | | | | | | | |
| Project Manager (CTD Only) | | | | | | | | | | |
| Project Manager (SPD Only) | | | | | | | | | | |
| Security Custodian/Assistant Special Security Officer (SPD) | | | | | | | | | | |
| Safety Officer | | | | | | | | | | |
| Contract Finance Manager | | | | | | | | | | |
| HR Specialist | | | | | | | | | | |
| Contract Manager | | | | | | | | | | |
1 1,960 10 1,950.00 $23,595.00
| PMO Rate | Base CLIN 0001 | Base CLIN 0001 | Option CLIN 1001 | Option CLIN 1002 |
| Total PMO Amount | $312,180.00 | $23,595.00 | $23,595.00 | $23,595.00 |
| Base - Direct Labor Hours | 9,880.00 | | | |
| PMO Amount / Labor Hour | $1.00 | | | |
| Notes: |
| The Available Work Days and Hours are based on the Period of Performance included in Cells B2, B34, B66 |
| It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct |
Scenario 1
| Scenario 1 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | EXAMPLE FIGURES ONLY!! |
| Regular | Senior Test Manager - CTD | | | | | | | | | | The amounts included in this Matrix should not be hard input, but should |
| Senior Test Manager - SPD | | | | | | | | | | be linked to the Offeror's cost breakdown spreadsheet; |
| Senior Test Manager - TSD | | | | | | | | | | |
| Test Manager - Field | | | | | | | | | | |
| Test Manager - SPD | | | | | | | | | | |
| Spectrum Manager | | | | | | | | | | |
| Computer Programmer - DMD | | | | | | | | | | |
| Project Scientist I | | | | | | | | | | |
| Project Scientist II | Exempt | Prime | 1 | 9,880.0 | $34.66 | $35.35 | $342,440.80 | $6,817.20 | $349,258.00 | This is an example to use when the contract between the Prime and Subcontractor |
| Project Scientist III | | Sub | | 0.0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | will be T&M or LH; See "e.g. - Subk Costs - T&M or LH" Tab. In addition, since |
| Chemist I | | | | | | | | | | many of the employees are classified as professional (FAR 52.222-46) the Subcontractor |
| Chemist II | | | | | | | | | | shall submit a separate spreadsheet with the labor rates and fringes proposed and the |
| Assistant Scientist I | | | | | | | | | | basis for these rates. |
| Assistant Scientist II | | | | | | | | | | |
| Associate Scientist I | | | | | | | | | | |
| Associate Scientist II | | | | | | | | | | |
| Senior Scientist - BTD | | | | | | | | | | |
| Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | This is an example to use when the contract between the Prime and Subcontractor |
| Junior Project Manager - CTD | | | | | | | | | | will be CPFF; See "e.g. - Subk Costs CPFF" Tab. In addition, the Subcontractor |
| Junior Project Manager - SPD | | | | | | | | | | shall submit a separate cost proposal with the same level of information that is |
| Contractor Support Specialist | | | | | | | | | | required from the Prime for subcontracts over $5,000,000. For subcontracts under |
| Clerk - BTD | | | | | | | | | | $5,000,000, the Subcontractor shall submit a separate spreadsheet with the labor rates |
| Clerk - CTD | | | | | | | | | | and fringes proposed and the basis for these rates to evaluate IAW FAR 52.222-46. |
| Clerk - DMD | | | | | | | | | | |
| Clerk - MET | | | | | | | | | | NOTES: |
| Clerk - SPD | | | | | | | | | | |
| Clerk - TSD | | | | | | | | | | Offerors shall delete/add labor categories as deemed appropriate to support requirements |
| Property Clerk - BTD | | | | | | | | | | of Scenario 1. See L.3.3.4.1.5 |
| Property Clerk - CTD | | | | | | | | | | |
| Property Clerk - DMD | | | | | | | | | | PMO Personnel and hours supporting the Scenario shall be proposed/identified, as |
| Property Clerk - MET | | | | | | | | | | applicable, however, the PMO rates are excluded from the Scenario 1 TEPC/P calculation. |
| Property Clerk - OPS | | | | | | | | | | See L.3.3.4.5.1 and M.5.4.4.5. |
| Property Clerk - Overall | | | | | | | | | | |
| Property Clerk - SPD | | | | | | | | | | |
| Property Clerk - TSD | | | | | | | | | | |
| Supply Technician | | | | | | | | | | |
| HVAC Mechanic - Overall | | | | | | | | | | |
| Welder - Overall | | | | | | | | | | |
| Electrician - TSD | | | | | | | | | | |
| Senior Electronic Technician - CTD | | | | | | | | | | |
| Senior Electronic Technician - MET | | | | | | | | | | |
| Senior Electronic Technician - TSD | | | | | | | | | | |
| Electronic Technician - Overall | | | | | | | | | | |
| Master Mechanical Technician | | | | | | | | | | |
| Senior Mechanical Technician - CTD | | | | | | | | | | |
| Senior Mechanical Technician - SPD | | | | | | | | | | |
| Senior Mechanical Technician - TSD | | | | | | | | | | |
| Mechanical Technician - Overall | | | | | | | | | | |
| Mechanical Technician - SPD | | | | | | | | | | |
| Range Controllers | | | | | | | | | | |
| Drafter - TSD | | | | | | | | | | |
| GIS Technician - OPS | | | | | | | | | | |
| Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | |
| Photographer - TSD | | | | | | | | | | |
| Photographer (Scientific and Technical) | | | | | | | | | | |
| Audio Visual Specialist - TSD | | | | | | | | | | |
| Heavy Duty Equipment Operator - Overall | | | | | | | | | | |
| Heavy Duty Equipment Operator - TSD | | | | | | | | | | |
| POL/Hazardous Waste Technician - OPS | | | | | | | | | | |
| Flight Operations/Aviation Technician - OPS | | | | | | | | | | |
| Field Technician - Overall | | | | | | | | | | |
| Laboratory Technician I - CTD | | | | | | | | | | |
| Laboratory Technician II - CTD | | | | | | | | | | |
| Laboratory Technician III - CTD | | | | | | | | | | |
| Laboratory Analyst I - CTD | | | | | | | | | | |
| Laboratory Analyst II - CTD | | | | | | | | | | |
| Air Monitoring Technician | | | | | | | | | | |
| Air Monitoring Operator (Safety) | | | | | | | | | | |
| Training Coordinator I | | | | | | | | | | |
| Training Coordinator II | | | | | | | | | | |
| Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | | |
| SubTotal - Regular Time | | | 1 | 9,880.0 | | | $342,440.80 | $6,817.20 | $349,258.00 |
| Scenario 1 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF |
| Overtime | Senior Test Manager - CTD | | | | | | | | | |
| Senior Test Manager - SPD | | | | | | | | | |
| Senior Test Manager - TSD | | | | | | | | | |
| Test Manager - Field | | | | | | | | | |
| Test Manager - SPD | | | | | | | | | |
| Spectrum Manager | | | | | | | | | |
| Computer Programmer - DMD | | | | | | | | | |
| Project Scientist I | | | | | | | | | |
| Project Scientist II | | | | | | | | | |
| Project Scientist III | | | | | | | | | |
| Chemist I | | | | | | | | | |
| Chemist II | | | | | | | | | |
| Assistant Scientist I | | | | | | | | | |
| Assistant Scientist II | | | | | | | | | |
| Associate Scientist I | | | | | | | | | |
| Associate Scientist II | | | | | | | | | |
| Senior Scientist - BTD | | | | | | | | | |
| Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| Junior Project Manager - CTD | | | | | | | | | |
| Junior Project Manager - SPD | | | | | | | | | |
| Contractor Support Specialist | | | | | | | | | |
| Clerk - BTD | | | | | | | | | |
| Clerk - CTD | | | | | | | | | |
| Clerk - DMD | | | | | | | | | |
| Clerk - MET | | | | | | | | | |
| Clerk - SPD | | | | | | | | | |
| Clerk - TSD | | | | | | | | | |
| Property Clerk - BTD | | | | | | | | | |
| Property Clerk - CTD | | | | | | | | | |
| Property Clerk - DMD | | | | | | | | | |
| Property Clerk - MET | | | | | | | | | |
| Property Clerk - OPS | | | | | | | | | |
| Property Clerk - Overall | | | | | | | | | |
| Property Clerk - SPD | | | | | | | | | |
| Property Clerk - TSD | | | | | | | | | |
| Supply Technician | | | | | | | | | |
| HVAC Mechanic - Overall | | | | | | | | | |
| Welder - Overall | | | | | | | | | |
| Electrician - TSD | | | | | | | | | |
| Senior Electronic Technician - CTD | | | | | | | | | |
| Senior Electronic Technician - MET | | | | | | | | | |
| Senior Electronic Technician - TSD | | | | | | | | | |
| Electronic Technician - Overall | | | | | | | | | |
| Master Mechanical Technician | | | | | | | | | |
| Senior Mechanical Technician - CTD | | | | | | | | | |
| Senior Mechanical Technician - SPD | | | | | | | | | |
| Senior Mechanical Technician - TSD | | | | | | | | | |
| Mechanical Technician - Overall | | | | | | | | | |
| Mechanical Technician - SPD | | | | | | | | | |
| Range Controllers | | | | | | | | | |
| Drafter - TSD | | | | | | | | | |
| GIS Technician - OPS | | | | | | | | | |
| Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| Photographer - TSD | | | | | | | | | |
| Photographer (Scientific and Technical) | | | | | | | | | |
| Audio Visual Specialist - TSD | | | | | | | | | |
| Heavy Duty Equipment Operator - Overall | | | | | | | | | |
| Heavy Duty Equipment Operator - TSD | | | | | | | | | |
| POL/Hazardous Waste Technician - OPS | | | | | | | | | |
| Flight Operations/Aviation Technician - OPS | | | | | | | | | |
| Field Technician - Overall | | | | | | | | | |
| Laboratory Technician I - CTD | | | | | | | | | |
| Laboratory Technician II - CTD | | | | | | | | | |
| Laboratory Technician III - CTD | | | | | | | | | |
| Laboratory Analyst I - CTD | | | | | | | | | |
| Laboratory Analyst II - CTD | | | | | | | | | |
| Air Monitoring Technician | | | | | | | | | |
| Air Monitoring Operator (Safety) | | | | | | | | | |
| Training Coordinator I | | | | | | | | | |
| Training Coordinator II | | | | | | | | | |
| Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| SubTotal - OverTime | 0 | 0.0 | $0.00 | $0.00 | $0.00 |
| Grand Total | 1 | 9,880.0 | $342,440.80 | $6,817.20 | $349,258.00 |
| Notes: |
| Under Column D, the Offeror is to include the name or initials of the company that is performing that labor category; do not just include the words Prime or Sub. |
It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct
Scenario 2
| Scenario 2 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | EXAMPLE FIGURES ONLY!! |
| Regular | Senior Test Manager - CTD | | | | | | | | | | The amounts included in this Matrix should not be hard input, but should |
| Senior Test Manager - SPD | | | | | | | | | | be linked to the Offeror's cost breakdown spreadsheet; |
| Senior Test Manager - TSD | | | | | | | | | | |
| Test Manager - Field | | | | | | | | | | |
| Test Manager - SPD | | | | | | | | | | |
| Spectrum Manager | | | | | | | | | | |
| Computer Programmer - DMD | | | | | | | | | | |
| Project Scientist I | | | | | | | | | | |
| Project Scientist II | Exempt | Prime | 1 | 9,880.0 | $34.66 | $35.35 | $342,440.80 | $6,817.20 | $349,258.00 | This is an example to use when the contract between the Prime and Subcontractor |
| Project Scientist III | | Sub | | 0.0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | will be T&M or LH; See "e.g. - Subk Costs - T&M or LH" Tab. In addition, since |
| Chemist I | | | | | | | | | | many of the employees are classified as professional (FAR 52.222-46) the Subcontractor |
| Chemist II | | | | | | | | | | shall submit a separate spreadsheet with the labor rates and fringes proposed and the |
| Assistant Scientist I | | | | | | | | | | basis for these rates. |
| Assistant Scientist II | | | | | | | | | | |
| Associate Scientist I | | | | | | | | | | |
| Associate Scientist II | | | | | | | | | | |
| Senior Scientist - BTD | | | | | | | | | | |
| Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | This is an example to use when the contract between the Prime and Subcontractor |
| Junior Project Manager - CTD | | | | | | | | | | will be CPFF; See "e.g. - Subk Costs CPFF" Tab. In addition, the Subcontractor |
| Junior Project Manager - SPD | | | | | | | | | | shall submit a separate cost proposal with the same level of information that is |
| Contractor Support Specialist | | | | | | | | | | required from the Prime for subcontracts over $5,000,000. For subcontracts under |
| Clerk - BTD | | | | | | | | | | $5,000,000, the Subcontractor shall submit a separate spreadsheet with the labor rates |
| Clerk - CTD | | | | | | | | | | and fringes proposed and the basis for these rates to evaluate IAW FAR 52.222-46. |
| Clerk - DMD | | | | | | | | | | |
| Clerk - MET | | | | | | | | | | NOTES: |
| Clerk - SPD | | | | | | | | | | |
| Clerk - TSD | | | | | | | | | | Offerors shall delete/add labor categories as deemed appropriate to support requirements |
| Property Clerk - BTD | | | | | | | | | | of Scenario 2. See L.3.3.4.1.5 |
| Property Clerk - CTD | | | | | | | | | | |
| Property Clerk - DMD | | | | | | | | | | PMO Personnel and hours supporting the Scenario shall be proposed/identified, as |
| Property Clerk - MET | | | | | | | | | | applicable, however, the PMO rates are excluded from the Scenario 2 TEPC/P calculation. |
| Property Clerk - OPS | | | | | | | | | | See L.3.3.4.5.1 and M.5.4.4.5. |
| Property Clerk - Overall | | | | | | | | | | |
| Property Clerk - SPD | | | | | | | | | | |
| Property Clerk - TSD | | | | | | | | | | |
| Supply Technician | | | | | | | | | | |
| HVAC Mechanic - Overall | | | | | | | | | | |
| Welder - Overall | | | | | | | | | | |
| Electrician - TSD | | | | | | | | | | |
| Senior Electronic Technician - CTD | | | | | | | | | | |
| Senior Electronic Technician - MET | | | | | | | | | | |
| Senior Electronic Technician - TSD | | | | | | | | | | |
| Electronic Technician - Overall | | | | | | | | | | |
| Master Mechanical Technician | | | | | | | | | | |
| Senior Mechanical Technician - CTD | | | | | | | | | | |
| Senior Mechanical Technician - SPD | | | | | | | | | | |
| Senior Mechanical Technician - TSD | | | | | | | | | | |
| Mechanical Technician - Overall | | | | | | | | | | |
| Mechanical Technician - SPD | | | | | | | | | | |
| Range Controllers | | | | | | | | | | |
| Drafter - TSD | | | | | | | | | | |
| GIS Technician - OPS | | | | | | | | | | |
| Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | | |
| Photographer - TSD | | | | | | | | | | |
| Photographer (Scientific and Technical) | | | | | | | | | | |
| Audio Visual Specialist - TSD | | | | | | | | | | |
| Heavy Duty Equipment Operator - Overall | | | | | | | | | | |
| Heavy Duty Equipment Operator - TSD | | | | | | | | | | |
| POL/Hazardous Waste Technician - OPS | | | | | | | | | | |
| Flight Operations/Aviation Technician - OPS | | | | | | | | | | |
| Field Technician - Overall | | | | | | | | | | |
| Laboratory Technician I - CTD | | | | | | | | | | |
| Laboratory Technician II - CTD | | | | | | | | | | |
| Laboratory Technician III - CTD | | | | | | | | | | |
| Laboratory Analyst I - CTD | | | | | | | | | | |
| Laboratory Analyst II - CTD | | | | | | | | | | |
| Air Monitoring Technician | | | | | | | | | | |
| Air Monitoring Operator (Safety) | | | | | | | | | | |
| Training Coordinator I | | | | | | | | | | |
| Training Coordinator II | | | | | | | | | | |
| Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | | |
| | SubTotal - Regular Time | | | 1 | 9,880.0 | | | $342,440.80 | $6,817.20 | $349,258.00 |
| CLIN | | | | | | | | | | |
| 0002 | Description | WD | Prime / Sub | FTEs | Months - Productive Hours | FBLR Without Fee | FBLR With Fee | Total Cost | Fixed Fee Amount | Total Amount CPFF | |
| Overtime | Senior Test Manager - CTD | | | | | | | | | |
| | Senior Test Manager - SPD | | | | | | | | | |
| | Senior Test Manager - TSD | | | | | | | | | |
| | Test Manager - Field | | | | | | | | | |
| | Test Manager - SPD | | | | | | | | | |
| | Spectrum Manager | | | | | | | | | |
| | Computer Programmer - DMD | | | | | | | | | |
| | Project Scientist I | | | | | | | | | |
| | Project Scientist II | | | | | | | | | |
| | Project Scientist III | | | | | | | | | |
| | Chemist I | | | | | | | | | |
| | Chemist II | | | | | | | | | |
| | Assistant Scientist I | | | | | | | | | |
| | Assistant Scientist II | | | | | | | | | |
| | Associate Scientist I | | | | | | | | | |
| | Associate Scientist II | | | | | | | | | |
| | Senior Scientist - BTD | | | | | | | | | |
| | Senior Scientist - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| | Junior Project Manager - CTD | | | | | | | | | |
| | Junior Project Manager - SPD | | | | | | | | | |
| | Contractor Support Specialist | | | | | | | | | |
| | Clerk - BTD | | | | | | | | | |
| | Clerk - CTD | | | | | | | | | |
| | Clerk - DMD | | | | | | | | | |
| | Clerk - MET | | | | | | | | | |
| | Clerk - SPD | | | | | | | | | |
| | Clerk - TSD | | | | | | | | | |
| | Property Clerk - BTD | | | | | | | | | |
| | Property Clerk - CTD | | | | | | | | | |
| | Property Clerk - DMD | | | | | | | | | |
| | Property Clerk - MET | | | | | | | | | |
| | Property Clerk - OPS | | | | | | | | | |
| | Property Clerk - Overall | | | | | | | | | |
| | Property Clerk - SPD | | | | | | | | | |
| | Property Clerk - TSD | | | | | | | | | |
| | Supply Technician | | | | | | | | | |
| | HVAC Mechanic - Overall | | | | | | | | | |
| | Welder - Overall | | | | | | | | | |
| | Electrician - TSD | | | | | | | | | |
| | Senior Electronic Technician - CTD | | | | | | | | | |
| | Senior Electronic Technician - MET | | | | | | | | | |
| | Senior Electronic Technician - TSD | | | | | | | | | |
| | Electronic Technician - Overall | | | | | | | | | |
| | Master Mechanical Technician | | | | | | | | | |
| | Senior Mechanical Technician - CTD | | | | | | | | | |
| | Senior Mechanical Technician - SPD | | | | | | | | | |
| | Senior Mechanical Technician - TSD | | | | | | | | | |
| | Mechanical Technician - Overall | | | | | | | | | |
| | Mechanical Technician - SPD | | | | | | | | | |
| | Range Controllers | | | | | | | | | |
| | Drafter - TSD | | | | | | | | | |
| | GIS Technician - OPS | | | | | | | | | |
| | Explosive Handler - SPD - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| | Photographer - TSD | | | | | | | | | |
| | Photographer (Scientific and Technical) | | | | | | | | | |
| | Audio Visual Specialist - TSD | | | | | | | | | |
| | Heavy Duty Equipment Operator - Overall | | | | | | | | | |
| | Heavy Duty Equipment Operator - TSD | | | | | | | | | |
| | POL/Hazardous Waste Technician - OPS | | | | | | | | | |
| | Flight Operations/Aviation Technician - OPS | | | | | | | | | |
| | Field Technician - Overall | | | | | | | | | |
| | Laboratory Technician I - CTD | | | | | | | | | |
| | Laboratory Technician II - CTD | | | | | | | | | |
| | Laboratory Technician III - CTD | | | | | | | | | |
| | Laboratory Analyst I - CTD | | | | | | | | | |
| | Laboratory Analyst II - CTD | | | | | | | | | |
| | Air Monitoring Technician | | | | | | | | | |
| | Air Monitoring Operator (Safety) | | | | | | | | | |
| | Training Coordinator I | | | | | | | | | |
| | Training Coordinator II | | | | | | | | | |
| | Training Coordinator I - INTERMITTENT - 240 Hrs each | | | | | | | | | |
| SubTotal - OverTime | 0 | 0.0 | $0.00 | $0.00 | $0.00 |
| Grand Total | 1 | 9,880.0 | $342,440.80 | $6,817.20 | $349,258.00 |
| Notes: |
| Under Column D, the Offeror is to include the name or initials of the company that is performing that labor category; do not just include the words Prime or Sub. |
It is the Offeror's responsibility to ensure that any formulas included in this spreadsheet are correct