W519TC26RA054_FRKS_FINAL_21AUG2026.pdf
PDF 575 KB Posted
- Attached to
- EAGLE Fort Riley KS W519TC-26-R-A054
- Solicitation number
- W519TC26RA054
About this file
This is a final Request for Proposals (RFP) for maintenance, supply, and transportation services at Fort Riley, Kansas. The solicitation number is W519TC26RA054, issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. The contract covers a comprehensive range of facility maintenance and logistical support services required to sustain operations at the installation. The RFP establishes performance requirements, contractor responsibilities, and evaluation criteria for providing essential services including preventive and corrective maintenance of facilities and infrastructure, supply chain management and material provision, and transportation of personnel, equipment, and materials throughout Fort Riley. The solicitation document was finalized on August 21, 2026.
The RFP establishes specific terms and conditions for contractor performance, including detailed statement of work requirements, quality assurance standards, and compliance obligations with Army regulations and federal contracting requirements. Contractors are required to demonstrate technical capability, financial stability, and past performance in delivering similar services to military installations. The contract vehicle utilizes standard Army procurement procedures and incorporates federal acquisition regulation requirements. Evaluation will assess contractor proposals based on technical merit, cost competitiveness, and organizational capability to execute the full scope of maintenance, supply, and transportation operations while maintaining continuity of service to Fort Riley operations.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSES
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
1 133
W519TC26RA054 21 AUG 2026
W6QK ACC-RI
ACC ROCK ISLAND BLDG 60, 3055 RODMAN AVE
ROCK ISLAND, IL 61299-0000
UNITED STATES
JAMES ZIWAK, EMAIL: JAMES.R.ZIWAK.MIL@ARMY.MIL TELEPHONE: 000-000-0000
W519TC
12:00 PM 23 SEP 2026
JAMES ZIWAK
000 000-0000 JAMES.R.ZIWAK.MIL@ARMY.MIL
1-6 7-20 21-26
29-34 35-37
38-68
69-74
75-84
85-120 121-132
THIS REQUEST FOR PROPOSAL (RFP) WILL BE COMPETED AMONGST ONLY THOSE
OFFERORS THAT HOLD AN ENHANCED ARMY GLOBAL LOGISTICS ENTERPRISE (EAGLE)
BASIC ORDERING AGREEMENT (BOA) BY THE CLOSING DATE OF THIS RFP. THIS
ACQUISITION IS A COMPETITIVE SMALL BUSINESS SET-ASIDE ACQUISITION AND ONLY
BOA HOLDERS WHO CAN CERTIFY PARTICIPATION IN THE SMALL BUSINESS
ADMINISTRATION (SBA) UNDER NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM
(NAICS) CODE 561210 BY THE CLOSING DATE OF THIS RFP WILL BE CONSIDERED FOR
AWARD.
A.1 The U.S. Army Fort Riley, KS (FRKS) has a requirement for logistics support services, including maintenance, supply, and transportation support.
A.2 This is an official RFP and supporting documentation for the FRKS requirement.
A.3 This RFP is a competitive small business set aside acquisition and will be competed among those Offerors that hold an EAGLE Program BOA who can certify small business status under NAICS Code 561210 by the closing date of this RFP. The Government will only evaluate proposals from Offerors that are certified by the SBA as a small business at the time of RFP closing. At the conclusion of evaluations, the Government will advise the SBA Servicing District Office of the apparent successful Offeror. The SBA Servicing District Office will confirm the eligibility of the apparent successful Offeror to receive the contract award.
This RFP will result in a Cost Plus Fixed Fee [Firm Fixed Price Transition In and Program Management (PMO)] task order with 1, 12 month base period, to include a 60 day transition-in period, 4, 1-year options, and 1, 6-month option period in accordance with (IAW) Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 52.217-8 for a total of 5 years and 6 months if all options are exercised. The evaluated option periods, which will be awarded at the Government's sole discretion, will be based on need and performance of contractors.
A.4 The period of performance for each Contract Line-Item Number (CLIN) from Notice to Proceed (NTP) through 1826 Days after NTP is identified below:
CLIN SERVICE PERIOD OF PERFORMANCE:
Base Year (includes 60-day Transition In): CLIN 0001 through 0010, NTP to 365 days after NTP
Option Year 1: CLINs 1001 through 1010, 366 days after NTP to 730 days after NTP
Option Year 2: CLINs 2001 through 2010, 731 days after NTP to 1095 days after NTP
W519TC26RA054
Option Year 3: CLINs 3001 through 3010, 1096 days after NTP to 1461 days after NTP
Option Year 4: CLINs 4001 through 4010, 1462 days after NTP to 1826 days after NTP
Option Period IAW FAR 52.217-8: CLINs 5001 through 5010, 1827 days after NTP to 2008 days after NTP
Transition and Fully Operational Capability (FOC) efforts are part of a single requirement and period of performance. All Transition efforts are still required to be completed within the first 60 days of performance; however, transition to FOC is part of a seamless process. The Contracting Officer may authorize proceeding into FOC as various elements of transition are complete prior to the end of the 60-day Transition period.
A.5 This Best Value source selection process will include an evaluation of the following three (3) factors: (1) Technical, (2) Past Performance, and (3) Cost/Price. A Task Order award under this EAGLE competition will be made to the Offeror determined to be responsible IAW RFO FAR subpart 9.1 whose proposal conforms to the RFP requirements and is determined to be the lowest evaluated (fair and reasonable) priced proposal that is determined Technically Acceptable with Substantial Confidence in Past Performance.
A.6 The Offeror's proposal shall be valid for 180 days from the closing date of the RFP.
A.7 The incumbent contractor is FITT Scientific, LLC under contract W52P1J-18-G-0041, delivery order W52P1J-22-F-0014.
A.8 NOT APPLICABLE
A.9 Government Furnished Facilities and Equipment are identified in the Exhibits/Attachments in Section J of this RFP and identified in the Performance Work Statement (PWS).
A.10 Please note that this RFP contains a Section B, "Supplies or Services and Prices/Costs";
however, Offerors are required to complete and submit the Cost/Price Matrix identified as Attachment 0005.
A.11 The Government intends to conduct a Post Award Conference with the awardee following Task Order award.
A.12 This RFP should not be discussed with any Government employee except the Procuring Contracting Officer (PCO), Michael Thune or Contract Specialist, MAJ James Ziwak, who may be contacted at michael.d.thune2.civ@army.mil and james.r.ziwak.mil@army.mil, respectfully.
A.13 This RFP and any amendments to this RFP shall be issued electronically. Because of this, the Government is under no obligation to maintain an Offerors mailing list. Any EAGLE BOA holders interested in this requirement must periodically access Contract Opportunities located at https://SAM.gov. Failure to provide proposals in accordance with the instructions/format specified in this RFP shall render the Offerors proposal non-compliant. The proposal will not be evaluated and will not be further considered for award.
A.14 The Government is not obligated to provide responses to any questions submitted by Offerors but will consider them and incorporate changes into the RFP as deemed necessary.
A.15 The closing date and time for this RFP is identified on page 1 of this RFP, the Local Time is Central Time. All proposal documents are due at the time set forth in this RFP.
A.16 Proposals shall be submitted electronically to james.r.ziwak.mil@army.mil and michael.d.
thune2.civ@army.mil. Due to file size restrictions, Proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/. Note that only 25 files can be submitted with one upload. Multiple drop-off codes may be requested from the Contract Specialist or Contracting Officer, if necessary. Non-CAC users will have to request a drop-off request from the Contract Specialist or Contracting Officer. Please visit the website for more details and instructions for its use. Cloud Services and third party drop boxes are not acceptable for proposal submission.
Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A054) - Add company name.
It is highly recommended that the Offeror request a Return Receipt or other form of acknowledgement to verify that the proposal submission was received prior to the closing of the
RFP.
A.17 The DD254 Security Form is provided as Attachment 0012. In accordance with L.5.1.8 SECRET Facility Clearance, the Offeror / Subcontractor(s) identified on Attachment 0005, Tab 2 shall have a SECRET Facility Clearance prior to this RFP closing date. In addition, the Offeror / Subcontractor(s) must have a Facilities Clearance in order for personnel within the company to obtain a SECRET Clearance.
A.18 The Government will compare the Offeror's proposal to Section L in order to perform a strict compliance review. Failure to provide proposals in accordance with the instructions/format specified in this RFP shall render the Offerors proposal noncompliant. The proposal will not be evaluated and will not be further considered for award. The Government reserves the right to waive the Strict Compliance Review if it is in the Government's best interest.
A.19 NOT APPLICABLE
A.20 The Army Sustainment Command (ASC) may employ the services of a support contractor to assist in the management and oversight of ASC contracts. The contracted support provided by a support contractor is technical in nature, and in no way supplants the Governments exclusive responsibility for the decision making regarding contract management and oversight. The contract with ASC's support contractor prohibits the unauthorized use or disclosure of any of the information and data associated with ASC contracts in support of management and oversight responsibilities.
In the event ASC determines it will use a support contractor for management and oversight assistance, awardees shall work with the Contracting Officer and support contractor to establish appropriate agreements and proper protections (see RFO FAR 9.505-4(b)) allowing permission for the support contractor to have necessary access to information and data to assist ASC in its management and oversight for any associated contracts.
A.21 Organizational conflict of interest (OCI) means a situation in which
(1) A Government contract requires a contractor to exercise judgment to assist the Government in a matter (such as in drafting specifications or assessing another contractor's proposal or performance) and the contractor or its affiliates have financial or other interests at stake in the matter, so that a reasonable person might have concern that when performing work under the contract, the contractor may be improperly influenced by its own interests rather than the best interests of the Government; or
(2) A contractor could have an unfair competitive advantage in an acquisition as a result of having performed work on a Government contract, under circumstances such as those described in paragraph (1) of this definition that put the contractor in a position to influence the acquisition.
(3) If the Contractor identifies an OCI, the Contractor shall make a prompt and full disclosure in writing to the PCO. OCI that arise during performance of the contract, as well as newly discovered conflicts that existed before contract award, shall be disclosed.
A.22 Notice of OCI: ASC's support contractor, and any affiliates, subsidiaries, or subcontractors and any affiliates, subsidiaries, or subcontractors have OCIs, and are precluded from offering a proposal as either a prime or a subcontractor, or from participating as a member of any team competing for this contract and/or any other resultant contracts stemming from this RFP. The Government reserves the right to reject any offer it considers to represent an OCI. Offerors are directed to RFO FAR 9.5 for further information on OCIs for detailed OCI contract restrictions /requirements.
A.23 This is a Requirements Contract IAW RFO FAR 52.216-21 for the services specified in the PWS and workload data, and effective for the period of performance identified in Paragraph A.4.
A.24 The Estimated Total Contract Value (ETCV) is TBD (at award). The ETCV amount is NOT a ceiling price, but rather an ESTIMATE of the total 5 and a half years of performance under this contract.
A.25 NOT APPLICABLE
A.26 If an Amendment is deemed necessary for this RFP, the Amendment notice will be posted to Contract Opportunities as stated in Section A, Paragraph A.13. Please be advised that when an Amendment is posted to Contract Opportunities it will be listed on the bottom of the RFP notice.
A.27 All clauses and provisions identified within the EAGLE BOA are incorporated by addendum to this RFP.
A.28 Effective 17 July 2026, the Army Contract Writing System (ACWS) has officially superseded the Procurement Automated Data and Document System (PADDS) as the authorized system of record for the generation of Requests for Proposals (RFPs), subsequent contract awards, and all associated administrative contract actions. Consequently, this system migration requires the issuance of updated solicitation and award identification numbers. To ensure administrative consistency, all references to RFP No. W519TC-26-R-0011 throughout this solicitation- including all previously incorporated exhibits, attachments, and enclosures- are herby updated and replaced in their entirety with RFP No. W519TC-26-R-A054.
*** END OF NARRATIVE ***
B.1 OFFERORS SHALL SUBMIT PRICES USING ATTACHMENT 0005- COST/PRICE MATRIX
BILLING INSTRUCTIONS FOR CLIN 0001-0010:
The Contractor is authorized to bill IAW FAR 52.216-7(a)(1).
*** END OF NARRATIVE ***
C.1 EAGLE BUSINESS RULES STEP THREE TASK ORDER REQUEST
a. An Offeror must be a qualified BOA holder by the closing date of the RFP. The Government is under no obligation to place an order against an EAGLE BOA.
b. A Task Order becomes a binding contract at the time of the Government's acceptance of a Task Order proposal and award of a Task Order per RFO FAR 16.703-3(b)(4).
c. This Task Order is being competed among EAGLE BOA holders who hold a BOA at the time of the closing date of the RFP. No extensions to the RFP will occur for purposes of allowing interested Offerors additional time to become an EAGLE BOA holder. The Government will confirm that an Offeror is a qualified BOA holder by checking the effective date of an Offeror's BOA. Due to the complexity and the wide range of capabilities required by this Task Order, Joint Ventures (JVs) may be utilized; however, a JV offeror must be an approved BOA holder from Step Two in order to propose as a Prime on this Task Order solicitation, and the JV must comply with the applicable requirements of Title 13 of the Code of Federal Regulations (CFR) (see Parts 121.103(h), 124.513, 128.402, 126.616, and 127.506).
d. In Step Two (i.e. BOA process), BOA holders were required to demonstrate the capability to perform all three functional areas; that technical capability may have been achieved with or without subcontractors. For this Task Order (Step Three), Offerors are not required to propose those same subcontractors that were used to establish technical capability in Step Two; however, the Offeror must propose itself and any subcontractors that are necessary for it to be able to meet the evaluation criteria and successfully perform the requirements of this Task Order.
e. The contractor shall adhere to the prices proposed and agreed to in the resultant task order issued against its BOA. The contractor is not authorized to begin work on an order issued against the BOA until prices have been established. In the event that the Contracting Officer requires work to begin prior to establishment of pricing, failure to reach agreement on price may be disputed under the Disputes clause.
f. The following sections submitted by the Offeror with its BOA proposal will be carried forward and incorporated by reference into this Step Three EAGLE Task Order contract:
BOA RFP Property Management Plan- Not Applicable
BOA RFP Resource / Task Order Management- Not Applicable
BOA RFP L.5.2.1.1(c) Flexible Staffing Approach
BOA RFP L.5.4.2.7 Transition-in Approach
BOA RFP L.5.2.1.1(b)(2)(iii) Identification of an onsite independent quality control
g. Failure to comply with any term of the Task Order, to include meeting small business subcontracting goals, may result in negative past performance that could negatively impact the BOA holder's ability to be successful in future Task Order competitions.
h. The Contractor may be required to enter into an Associate Contractor Agreement (ACA) with another contractor as part of the task order performance.
i. Responsibility determinations will be made at Step Three. An otherwise successful Offeror may not be eligible for award if it cannot be determined responsible for any of the reasons in RFO FAR 9.104, including capacity.
j. RESERVED
Joint Ventures (JV). Entities proposing as a JV are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation?" subparagraph (h) (Affiliation based on joint ventures) prior to submitting a proposal. 13 CFR 121.103 provides several examples that may assist a prospective offeror in assessing whether affiliation could be applied to its JV. Note: In accordance with 13 CFR 121.103, a JV of two (2) or more business concerns may submit an offer as a small business without regard to affiliation so long as each concern is small under the size standard for NAICS 561210. In order for this affiliation exception to apply, however, the following conditions must be met: there must be a written JV agreement, the JV must do business under its own name and be identified in the System for Award Management (SAM), and the JV does not submit additional proposals after a two-year period starting from the date of award of the first contract award (note: a joint venture may be awarded one or more contracts within that two-year window, and may still receive awards after the two-year period has expired as long as the initial proposal was submitted prior to the end of the two-year period).
Subcontracting and Ostensible Subcontractors. Offerors proposing subcontracting arrangements at this Task Order level (Step Three) are encouraged to specifically review 13 CFR 121.103, "How Does SBA Determine Affiliation? (subparagraph (h)(3)) prior to submitting a proposal. A finding by the SBA of affiliation between an offeror and its subcontractor(s) may result in a determination that the Offeror is other than a small business and therefore ineligible for the SBSA Task Order award (if applicable). For SBSA solicitations, Offerors proposing subcontracting arrangements at the Task Order level (Step Three) may be required to explain which of its subcontractors are similarly situated subcontractors pursuant to the definition provided in 13 CFR 125.1 for purposes of determining whether the arrangement includes the use of any ostensible subcontractors and unduly reliant joint venture partners.
l. NOT APPLICABLE
C.2 CONTRACTOR PERFORMANCE MANAGEMENT REVIEW
a. Performance Management Review (PMR) - All tasks under this contract will be subject to periodic (not less than quarterly) PMRs. The Contractor will receive briefings on the PMR slide deck and be allowed the opportunity to submit a response. Corrective Action Request (CARs) / Nonconformance Reports (NCRs) will be reviewed during the PMR, if the Government deems them material. The Contractor's portion of the PMR presentation will consist of participating in conversations regarding work accomplished, evaluation of work against applicable program metrics (to include schedule), cost savings, lessons learned, forecasted staffing requirements based on anticipated workload, self-evaluations/inspection results, corrective actions, funding levels/contractor performance report (financial), and contractor-employee utilization rates.
Prior to the PMR the contractor will complete the following information on the slide deck (Exhibit H) and submit to the AFSB.
-Slides 5-9 (as applicable): The contractor will complete the "Contractor Self-Assessment" portion of the slide and also rate themselves using the ratings of "Green-Meeting Expectations" or "Amber Performance Concern" or "Red-Not Meeting Expectations."
-Slide 10: Contractor will fill out accidents/incidents/areas of concerns along with any comments for challenges, best practices and way ahead. Contractor will also report "close calls" to document lessons learned.
b. Contractor Performance Assessment: Currently, the Government uses an escalating system of deficiency reporting. Local deficiency reporting consists of: verbal notification and CARs. Verbal notification is primarily used for nonrepeating, minor nonconformance/discrepancies of tasks that can be reperformed at no additional cost to the government and with minimal impact to the effort.
A CAR will be issued when previous verbal notifications failed to result in corrective actions or when more/major nonconformance or significant deficiencies exist/occur. CARs are indicators of performance and will be used to substantiate the Government's Contractor Performance Assessment Reporting System (CPARS) input. Performance deficiencies may include any government-identified noncompliance with contract requirements; an activity or action did not take place, or did not take place to the standards of timeliness or quality required. Note, that while the contractor will be given the opportunity for re-performance when possible, significant deficiencies will nevertheless be documented. Use of this escalating deficiency reporting procedure does not, in any way, limit the Government's ability to take corrective action up to and including termination.
c. Contractor's Fixed Fee will be assessed for validated negative PMRs, unresolved CARs or as determined by the PCO IAW RFO FAR 52.246-5 using the following schedule:
Critical Nonconformance Contractor's fee will be assessed not less than 10% of the monthly fixed fee in which the critical nonconformance occurred. PCO determination will address the exact fee decrement based on severity, impact to the effort, contractor willingness to resolve and any other factors as deemed relevant by the PCO.
Unresolved CARs Contractor's fee will be assessed not less than 5% of the daily fixed fee starting with first day of delinquency in resolution. Fee reduction percentages are assigned as follows;
however, the PCO has the discretion to apply whatever percentage it deems reasonable based on severity, impact to the effort, contractor willingness to resolve and any other factors as deemed relevant by the PCO.
Percentage of Fee:
Critical: 10% and above (monthly)
Major: 710% (daily)
Minor: 57% (daily)
The Contractor will be given the opportunity to comment and respond to issued CARs during the PMR prior to the Government executing a fee decrement.
Definitions:
Critical nonconformance - a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission. Repeated or unresolved major nonconformance will result in re-designation as critical nonconformance.
Major nonconformance - a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Repeated or unresolved minor nonconformance will result in re-designation as major nonconformance.
Minor nonconformance - a nonconformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services.
Unresolved CAR - a CAR remaining unresolved, or unacknowledged, past the PCO established suspense date. May be re-designated as minor, major or critical based on the PCO independent determination.
Daily Fee - The yearly fixed fee amount divided by 12 months divided by 30 days.
C.3 PURCHASING AND INVOICING PROCEDURES
a. The Government and Contractor shall utilize the procedures outlined in the Purchasing and Invoicing Guide (Attachment 0009). This guide details the process that the United States Government (USG) will use to conduct and oversee contractor purchasing and invoicing on this task order. Each step in the process will be described in detail along with the responsibilities of each individual position. It is the intent of the Government that the process will be sufficient for detailed cost accounting and approval without negatively impacting the contractor's ability to provide Maintenance, Supply, and Transportation services at FRKS. If the process is found to negatively impact operations, it will be reevaluated by the USG and updated appropriately to achieve the desired effect.
b. Final invoice for the Transition In CLIN shall be submitted no later than seven days after the end of CLIN 0001's period of performance.
C.4 GOVERNMENT PROPERTY
a. In the event that Government property accountable to this contract is lost, damaged, destroyed or stolen, the Contractor shall promptly perform an investigation and provide a report to the Contracting Officer or the Contracting Officers representative IAW RFO FAR 52.245-1(f)(1)(vi) and RFO DFARS 252.245-7005 Management and Reporting of Government Property. The Contracting Officer shall review the Contractor's report and, if the Contracting Officer deems necessary, may perform an additional independent investigation in accordance with RFO FAR 52.245-1(g). In accordance with RFO FAR 52.245-1(g)(3) should it be determined by the Government that the Contractor's (or subcontractor's) property management practices are inadequate or not acceptable for the effective management and control of Government property under this contract, or present an undue risk to the Government, the Contractor shall prepare a corrective action plan and take all necessary corrective actions as specified by the schedule within the corrective action plan. The Contracting Officer may, in writing, revoke the Government's assumption of risk for loss, theft, damage or destruction, due to a determination under RFO FAR 52.245-1(g) that the Contractor's property management practices are inadequate, and/or present an undue risk to the Government, and the Contractor failed to take timely corrective action. If the Contracting Officer revokes the Government's assumption of liability and holds the Contractor liable, the Contractor may not charge the Government for the loss, theft, damage or destruction of Government property or any costs associated thereof except as provided in accordance with RFO
FAR 52.245-1(h)(1)(iii). The Contracting Officer may delegate the investigation to an appropriate Government representative of the Contracting Officer's choosing.
C.5 COST/PRICE CONTRACT EXECUTION
a. FEE RATE(s):
This is a Cost Plus Fixed Fee contract and thus, by definition, the fee is fixed at the DOLLAR amount proposed in the Cost/Price proposal. If, at any time during the life of this requirements task order (RFO FAR 52.216-21), a change order is necessary for modification of the requirements, the subsequent fee amount will be subject to a CAP based on the following fee RATES proposed in KTR NAME proposal dated XXX, in accordance with M.5.3.3 of the solicitation:
#% for all work self- performed, #% for subcontract work
Fee Rates: Contractor name proposal dated XXX included a fee rate(s) of XX% which is hereby capped as proposed for the life of this task order in accordance with M.5.3.3 of the Solicitation.
C.6 AbilityOne Program and/or 8(a) Contracts
a. Notwithstanding the inclusion of RFO FAR 52.216-21 in this task order, any maintenance, supply, and transportation tasks currently being performed by an AbilityOne contractor or an 8(a) contractor at FRKS, or subsequently determined appropriate for performance by an AbilityOne contractor or an 8(a) contractor, are not included within the scope of this EAGLE requirements Task Order.
C.7 POST AWARD CONFERENCE:
The Contractor agrees to attend any postaward conference convened by the contracting activity or contract administration office IAW FAR subpart 42.5.
*** END OF NARRATIVE ***
G.1 BILLING INSTRUCTIONS FOR CLIN 0001-0010:
The Contractor is authorized to bill IAW RFO FAR 52.216-7(a)(1).
G.2 Fixed Fee Withholds:
In accordance with RFO FAR Clause 52.216-8 Fixed Fee,
(a) The Government shall pay the Contractor for performing this contract the fixed fee specified in the Schedule.
(b) Payment of the fixed fee shall be made as specified in the Schedule; provided that the Contracting Officer withholds a reserve not to exceed 15 percent of the total fixed fee or $100,000, whichever is less, to protect the Government's interest. The Contracting Officer shall release 75 percent of all fee withholds under this contract after receipt of an adequate certified final indirect cost rate proposal covering the year of physical completion of this contract, provided the Contractor has satisfied all other contract terms and conditions, including the submission of the final patent and royalty reports, and is not delinquent in submitting final vouchers on prior years' settlements. The Contracting Officer may release up to 90 percent of the fee withholds under this contract based on the Contractor's past performance related to the submission and settlement of final indirect cost rate proposals.
The Government will withhold five (5) percent or $100,000.00, whichever is less, of the total fixed fee applicable to the current period of performance. However, based on information known, the Contracting Officer has the authority to raise the withhold to fifteen (15) percent or $100,000.00, whichever is less, of the total fixed fee applicable to the current period of performance if the Contracting Officer determines it is in the Government's best interest to do so. The contractor is authorized to invoice fixed fee applicable to the current period of performance up to an amount not to exceed per month 1/12th of the Max Fee able to be invoiced for the Base Year and Option Years. In total the contractor is not authorized to invoice fixed fee above the difference of total fixed fee for the current period of performance less the Government withhold. See Attachment 0005 for the specific fee amounts applicable to the current period of performance. Upon approval of a completion invoice or voucher submitted by the Contractor IAW RFO FAR 52.216-7(d)(5), and upon the Contractors compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
G.3 The direct labor rates contained in this contract (to include those included by way of incorporation of the contractor's proposal) are considered binding to the following extent. The contractor shall inform the Contracting Officer of any change in rates prior to submitting an invoice containing rates other than those agreed to previously. If the Contracting Officer determines the submitted rate(s) to be unreasonable the contractor shall not execute any action(s) to increase the previously agreed to rate(s) and shall not submit invoice(s) containing rates other than those agreed to previously.
*** END OF NARRATIVE ***
H.1 CONTRACTOR PERFORMANCE INFORMATION
H.2 The successful offeror/bidder under this solicitation is advised that after contract award its performance under this contract will be subject to an assessment(s) in accordance with RFO FAR subpart 42.11 and AFARS 5142.11. Department of Defense (DoD) Contractor Performance Assessment Report (CPARS) will be used to maintain the performance report(s) generated on this contract. The rating system to be used in this assessment shall be as follows:
H.3 Exceptional Performance meets contractual requirements and exceeds many to the Governments benefit. The contractual performance of the element or sub element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
H.4 Very Good Performance meets contractual requirements and exceeds some to the Governments benefit. The contractual performance of the element or sub element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
H.5 Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
H.6 Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractors proposed actions appear only marginally effective or were not fully implemented.
H.7 Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub element contains serious problem(s) for which the contractors corrective actions appear or were ineffective.
H.8 The evaluation procedures to be used in this assessment, which include coordination with the contractor, are detailed in AFARS 5142.1103.
H.9 REQUIRED INSURANCE
Pursuant to RFO FAR 52.228-5(a), "Insurance Work on a Government Installation," or RFO FAR 52.228-7, "Insurance Liability to Third Persons," the Contractor shall procure and maintain the following insurance during the entire period of performance under this contract:
H.10 TYPE - AMOUNT
Workers Compensation: As required by Law.
Employers Liability: Minimum liability limit $100,000.
General Liability: Minimum bodily injury limit $500,000 per occurrence.
Automobile Liability: Minimum liability of $200,000 per person, $500,000 per occurrence for bodily injury, and $20,000 per occurrence for property damage.
Aircraft Public and Passenger: Liability Coverage required when contract performance involves use of aircraft: Minimum liability of $200,000 per person, $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Passenger liability shall be at least $200,000 multiplied by the number of seats or number of passengers, whichever is greater.
Vessel Collision Liability: Coverage required when contract performance involves use of vessels:
Minimum liability of $5,000,000 or the market value of the property being shipped by vessel, whichever is greater.
H.11 Invoicing Practices and Procedures
H.12 Under the performance of this contract, the Government requires the Prime contractor invoice all costs incurred by the Prime Contractor and all subcontractors at any tier no later than 45 days after the costs are incurred. Incurred costs include direct labor, provisional indirect costs, fee, and expenditures authorized under Other Direct Costs (ODCs). Contractors shall remain in full compliance with RFO FAR Clause 52.216-7 including paragraph (b)(1)(i) which states that reimbursable costs must represent actual payments made for items or services purchased directly for contract performance.
H.13 In accordance with Contract Data Requirements List (CDRL) CD-02, incurred costs that have been incurred but not yet paid shall be accurately reflected in monthly CD-02 submissions.
The Government relies on reported CD-02 cost information, including Estimate at Completion projections, to support funding decisions and determine whether additional funding is required or excess funding may be deobligated.
H.14 To ensure efficient management of current-year appropriations, the Government intends to deobligate excess funding approximately 60 calendar days after the applicable period of performance end date. Note, there could be occasions, especially towards the end of the fiscal year, that the Government will deobligate projected excess current-year funding prior to the performance end date. Contractors are expected to invoice all allowable incurred costs within the timeframe identified above and should not anticipate requests for additional current-year funding following deobligation actions for direct labor or ODCs. Requests for additional funding associated with indirect rate adjustments may still be considered following completion of a Government incurred cost audit.
H.15 Prime Contractors are responsible for ensuring all invoices and payment requirements are flowed down to subcontractors at every tier. Failure to comply with invoicing or payment requirements may result in revised payment terms and conditions.
*** END OF NARRATIVE ***
L.1 GENERAL INSTRUCTIONS:
L.1.1 These instructions are a guide for preparing a proposal. These instructions describe the type and extent of information required and emphasizes the significant areas to be addressed in the proposal. Review the Performance Work Statement (PWS) contained in this Request for Proposal (RFP) for further insight into the areas that must be addressed within the proposal. Include detailed information sufficient to enable the Government evaluators to conduct a meaningful review and make a determination relative to the Offeror's understanding of the requirements in each of the evaluated areas. It is the Government's intent to award a single combination Cost-Plus Fixed Fee / Firm Fixed Price (Transition-In CLIN and PMO CLINs only) Requirements contract with some non-fee-bearing cost elements (e.g., Other Direct Costs) which are ancillary to the services provided.
L.1.2 In accordance with (IAW) RFO FAR 52.215-1(f)(4), Instructions to Offerors - Competitive Acquisition (Nov 2021), the Government intends to award a contract without negotiations with offerors. Offerors are cautioned to examine this RFP in its entirety and to ensure that proposals contain all necessary information, provide all required documentation, and are complete in all respects. The Government is not obligated to make another request for the required information nor does the Government assume the duty to search for data to cure problems it finds in proposals. The Government reserves the right to conduct negotiations in the evaluation process and to permit Offerors to revise proposals, if deemed necessary. During the evaluation process, the Government may request clarifications as needed. Clarifications do not constitute competitive negotiations and an Offeror is not allowed to change its proposal in response to a request for clarification. In accordance with RFO FAR 15.204-1, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Any Offeror eliminated from further consideration will be notified in writing.
L.1.3 Offerors shall submit proposals that will remain valid for not less than 180 days from the required submission date.
L.1.4 Proposals, modifications, revisions, or withdrawals of proposals received after the date established in this RFP for receipt of proposals will be handled IAW RFO FAR Clause 52.215-1.
L.1.5 An Offeror is defined as the prime BOA Holder submitting a proposal under this RFP.
L.1.6 For the purposes of this Task Order RFP, a Joint Venture (JV) is defined as a team of two or more firms that have entered into a legally binding JV agreement. A firm proposing as a JV will be referred to as the Offeror.
L.1.7 Updates related to this Task Order RFP, to include the RFP, amendments, notices, and other information, will be posted to Contract Opportunities as stated in Section A, Paragraph A.13.
Offerors are advised to continuously monitor Contract Opportunities website for new information.
Offerors are deemed to have knowledge of all information that is posted to Contract Opportunities.
L.1.8 Notice to Offerors: Use of Artificial Intelligence (AI) tools in Proposal Evaluations
L.1.8.1 Use of AI tools in Support of Evaluations: The Government may employ AI as a tool to assist in the analysis and review of Offeror proposals. AI tools may be used to support tasks such as summarizing proposal content, identifying compliance with request for task order proposal /solicitation requirements, and highlighting areas of potential strength, weakness, or risk.
L.1.8.2 Maintaining Inherently Governmental Functions: Notwithstanding the use of AI tools to support the evaluation process, all final evaluation judgements, including the assignment or assessment of adjectival ratings, best value determinations, and source selection decisions, will be made exclusively by duly appointed Government personnel. The Government retains sole responsibility for all inherently governmental functions and will not delegate decision making authority to any AI tool.
L.1.8.3 Offeror Confidentiality and Data Protection: The AI tools utilized by the Government will be employed in a manner consistent with applicable regulations that govern the protection of proprietary and source selection information. The AI tool will be an output-only system. Any generated report data is not saved. No proposal data will be transmitted to or processed by external, non-Government systems without appropriate safeguards and authorizations in place.
L.2 PROPOSAL PREPARATION:
L.2.1 The proposal must be prepared in a clear and legible manner. In addition, the Offeror shall write the proposal in English and the proposal must be specific and complete as described in these instructions. Offerors shall not specifically prepare samples or descriptive literature for submission with the proposal. Adherence to the prescribed format is required. FAILURE TO PROVIDE
PROPOSALS IN COMPLIANCE WITH THE INSTRUCTIONS SPECIFIED AS "STRICT
" IN SECTION L OF THIS RFP AND IN COMPLIANCE WITH COMPLIANCE REQUIREMENTS
ALL INSTRUCTIONS IN SECTION M.3 OF THIS RFP SHALL RENDER THE OFFEROR'S
PROPOSAL NON-COMPLIANT. THE PROPOSAL WILL NOT BE EVALUATED AND WILL NOT
BE FURTHER CONSIDERED FOR AWARD.
L.2.2 All information pertaining to a particular volume shall be confined to that volume. For example, no Cost/Price information shall be included in any volume other than the Cost/Price Proposal volume. The Government is not required to and will not search other volumes for a missing file or missing information.
L.2.3 The proposal must not contain any classified material.
L.2.4 Offeror must be registered in the System for Award Management (SAM) and have a Marketing Partner Identification Number (MPIN) and Commercial and Government Entity (CAGE) Code.
L.2.5 Digital Microsoft (MS) Word files and MS Excel files must be compatible with Microsoft Office 2013.
L.2.5.1 Please Note: The Offeror shall not lock or password protect any file (e.g. *.doc/.docx, *.pps/.
pptx, *.xls/.xlsx, *.txt, *.msg).
L.2.6 Adobe PDF (Portable Document Format) Files. Scanned PDF documents must be legible and must be viewable in Adobe Acrobat.
L.2.6.1 Text Searchable Adobe PDFs: File formats that are identified as "Text Searchable Adobe PDF" must be formatted to contain searchable text. All elements of the file must be able to be searched for text. The Government will not accept scanned or image-only PDF files in lieu of this requirement and will not invoke the text recognition feature within Adobe Acrobat.
L.2.7 Compressed files (e.g. *.zip) and Executable files (e.g. *bat, *.exe,*.jar, *.vb, *.wsf) will NOT be accepted. Refer to Attachment 0010 - Blocked File Extensions for a complete list of non-acceptable file types.
L.2.8 For the purposes of proposal preparation and evaluation only, the Offeror shall use 3 January 2027 as the Notice to Proceed (NTP) date. Proposal information shall reflect that NTP date.
L.3 PROPOSAL SUBMITTAL INSTRUCTIONS:
L.3.1 Proposals shall be submitted electronically to james.r.ziwak.mil@army.mil and Michael.d.
thune2.civ@army.mil. Due to file size restrictions, proposals may be submitted through Department of Defense (DOD) Secure Access File Exchange (SAFE), https://safe.apps.mil/ . Note that only 25 files can be submitted with one upload. Multiple drop-off codes may be requested, if necessary. Non-CAC users will have to request a drop-off request from the Contract Specialist or Contracting Officer. Please visit the website for more details and instructions for its use. Cloud Services and third party drop boxes are not acceptable for proposal submission.
Emailed proposals shall state the following in the subject line: Proposal for solicitation number (W519TC-26-R-A054) - Add company name.
It is highly recommended that the Offeror request a Return Receipt or other form of acknowledgement to verify that the proposal submission was received prior to the closing of the
RFP.
L.3.2 The proposal submittal method used for this solicitation is the electronic response via document upload method.
L.3.3 Offerors should enter a description for every file uploaded. For files over 10 megabytes (MB) the "Large Upload (JAVA)" button must be utilized. The combined file size limit for upload using "Large Upload (JAVA)" is 100MB. If needed, the Offeror can break single files over 100MB into smaller files or use the upload utility multiple times if files exceed the 100MB size limit.
L.3.4 Digital file names must use the required naming convention for each specific proposal document identified below. Filenames must be 40 characters or less and must not contain single quotes, spaces and pound or percent signs. If an Offeror's file name is too long (more than 40 characters), it is permitted to abbreviate the Name of the Company field within the file name.
L.3.5 Proposal revisions are possible and permitted until the solicitation response deadline.
Note: The Offeror must be logged in to the system to be able to submit / revise electronic responses.
L.3.6 Do not assume submission will be instantaneous. File size and number of files to be uploaded will be factors to consider. Offeror/ Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Offeror's submission and all Subcontractor(s) submissions) must be received by the due date and time for the proposal to be considered.
L.3.7 To avoid rejection of an offer, the Offeror must make every effort to ensure its electronic submission is virus-free. Proposals, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to RFO FAR 15.108(c).
L.3.8 Submission Instructions for Subcontractor Cost proposal can be found in L.5.4.2.10.
L.4 PROPOSAL STRUCTURE:
L.4.1 The Offeror must submit a proposal IAW the guidelines below.
L.4.1.1 For all documents, each page shall include the complete Offeror's name, volume number, file name, date, and solicitation number in a header and/or footer.
L.4.1.2 Each Offeror shall submit ONLY one proposal and that proposal shall address all of the requirements of the RFP. To be considered for this requirement, the Offeror must submit a complete response to this RFP using the instructions provided in Section L. STRICT
COMPLIANCE REQUIREMENT: IF THE OFFEROR'S PROPOSAL FAILS TO MEET THE TERMS
AND CONDITIONS OF THE RFP OR TAKES EXCEPTION TO ANY OF THE TERMS AND
CONDITIONS OF THE RFP, WILL RENDER THE OFFEROR'S PROPOSAL UNACCEPTABLE
.AND WILL NOT BE FURTHER CONSIDERED FOR AWARD
L.4.1.2 (a) Each Offeror shall submit the most current versions of Attachment 0002 - Staffing and Labor Mix, Attachment 0003 - Performance Questionnaire, and Attachment 0005 - Cost Price Matrix required for this RFP. The Government will verify that the Offerors submission contains the most current RFP Attachments 0002, 0003 and 0005 that were posted to Contract Opportunities as stated in Section A, Paragraph A.13.
L.4.1.2 (b) STRICT COMPLIANCE REQUIREMENT: FAILURE TO PROVIDE THE MOST
CURRENT VERSIONS OF THE RFP ATTACHMENTS 0002, 0003, OR 0005 SHALL RENDER
THE OFFEROR'S PROPOSAL NON-COMPLIANT AND WILL NOT BE FURTHER CONSIDERED
.FOR AWARD
L.4.1.3 A proposal is presumed to represent the Offerors best efforts to respond to the RFP.
This is the start of the file's text. The full file is on GovTribe.