QA KABD152001 REPAIR HVAC SYSTEM (31-Aug-2020).pdf
PDF 119 KB Posted
- Solicitation number
- W50SLF-20-R-0001
- Issued by
-
Department of the Army National Guard
About this file
This document provides questions and answers related to solicitation number W50SLF-20-R-0001 for repair of the HVAC system at Hawaii Air National Guard, 292nd Combat Communications Squadron in Kahului, Maui, Hawaii. The scope of work includes replacing existing air handling units, ductless split systems, a fan coil unit and interior air distribution network. Construction is required to be completed within 180 calendar days of notice to proceed and includes demolition, new mechanical and electrical equipment installation, startup and testing. The total magnitude of the project is estimated between $500,000 and $1,000,000. The solicitation closing date is September 3, 2020 and the pre-proposal conference was held on August 10, 2020. The North American Industry Classification System code for this work is 238220 and it is set aside as a total women owned small business opportunity.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Related To:
KABD152001 REPAIR HVAC SYSTEM, MAUI
Solicitation W50SLF-20-R-0001 Dated 11-Aug-2020
Q1: We were able to look at a few of the Air Handling Units that are to be replaced. Please confirm if replacement will also include the isolation valves. Furthermore, please confirm that the chilled water piping, to include valves and appurtenances will be insulated.
A1: Per Statement of Work page 4, Principle Elements of Work – Mechanical, item 1 states to demolish all existing mechanical equipment, ductwork, piping, valves, appurtenances, and controls. Similarly, item 2 states to provide the demolished items and replace with new, resulting in a complete functioning system in compliance with all applicable codes. In regards to the AHUs, this would include the isolation values for both the return and supply lines.
Concerning the chilled water piping, to have a complete functioning system, all chilled water piping and appurtenances would include insulating as necessary to prevent condensation. This would include any re-insulating necessary due to the demolish phase and the tie-in phase.
Q2: It was noticed that the exterior pipe/duct for the split AC units were different. The exterior pipe/duct for the 12K BTU unit for the Server room had its black insulation exposed, the 36K BTU unit for room 123 was encapsulated in a metal pipe, and the 2 each 36K BTU units for the Keawe Cove room were encapsulated in a PVC type of jacket/channel. Please advise on the jacket/channel type of new split units.
A2: The exterior pipe/duct for all new split AC units will following the existing type, or similar, used for the Keawe Cove room existing split AC units. Refer to the pictures taking during the site visit.
Q3: Page 6 of the Statement of Work provides requirements for DESIGN SUBMISSION.
Please confirm if this is a requirement for this project.
A3: As addressed during the Pre-Proposal Conference, the Design Submission section will be required should the new installation equipment, location, associated piping/routing, and current code requirements differs from what is existing. This will include situations where the existing location may need to be structurally reinforced to receive the new installation (i.e., soffit structure in the Keawe Cove room, boring new holes for piping/routing, etc). If the new equipment, location, and associated piping/routing are in-kind with the existing and there are no conflicts with current code requirements, the Design Submission section is not required.
Q4: It was mentioned that Pre-Construction Meeting requirements will be discussed after project award. Just so we are aware of these requirements, please advise on these.
A4: After project award/NTP and prior to the start of onsite construction, a Pre-Construction Meeting will be held with the Contractor, Contracting, Civil Engineer Squadron, and other key stakeholders from the Government. The purpose of the Pre-Construction Meeting will be for the Contractor to present how they intend to complete the project in accordance with the contract documents. At least 2 weeks prior to the Pre-Con, the Contractor is to submit to the Gov’t the following items as these will be agenda items of discussion: 1) Quality Control Plan to include Submittal Register and Testing/Commissioning Register, 2) Environmental Protection Plan, 3) Safety Plan, 4) Gantt-type Baseline Construction Schedule with sufficient detail to track progress to include Administrative items, Submittals, Onsite Work Activities, and Closeout Activities, and 5) Schedule of Values for Progress Payment with sufficient detail to track completed items for invoice purposes. Approval or further revisions to these submittals will be made at the conclusion of this Pre-Con. For scheduling requirements in the Technical proposal, assume Pre-Construction Meeting to be held no later than 4 weeks after NTP (Notice To Proceed).
Dated 20-Aug-2020
Q5: Can you advise if contracting will accept CPARS for the project experience in lieu of the Project Past Performance Questionnaire? We suspect that CPARS is acceptable as it is more formal than the PPQ and is government furnished.
A5: Yes - CPARS is acceptable.
Reference solicitation, sub-section 2.5.3.11. Past Performance References – REQUIRED – A “Final” Performance Evaluation (Construction) (also referred to as CCASS Evaluation) issued for a project may be included in lieu of sending out reference package for the project.
According to Acquisition Central, the CPARS, Architect-Engineer Contract Administration Support System (ACASS) and Contractor Appraisal Support System (CCASS) are being merged into a single application under the CPARS name in order to standardize the contractor performance evaluation process across the entire Federal Government.
Q6: Please confirm all work is assumed to be non-hazardous.
A6: Other than the work/materials associated with the existing A/C refrigerant and AHUs per industry standards, all other work are non-hazardous. The paint in the building has been tested earlier this year for asbestos with results negative.
Q7: Please confirm where each of the exhibits is to be included
Exh A - Vol 2, Part 2 - Past/Present Info Exh B – Vol 1, Part 1 –Experience and Capability?
Exh C – Vol 2, Part 2 - Past/Present Info Exh D – Vol 1, Part 1 – Experience and Capability?
A7: Exhibit A, Part 1 Information (Provide no more than three (3)) - Vol 2, Part 2 – Offeror’s Past/Present Performance Information
Exhibit A, Part 2 Information (Provide one time) - Vol 2, Part 2 – Offeror’s Past/Present Performance Information
Exhibit B (required if key person is sub-contractor) – Vol 2, Part 2 – Offeror’s Past/Present
Exhibit C – Reference solicitation sub-section 2.5.3.11. Offerors shall prepare and submit to prior client(s) and inform clients the completed Performance Questionnaire should be returned to the Contracting Officer via email at: manuel.llanes.mil@mail.mil and copy to cezar.y.deveas.mil@mail.mil to arrive not later than the closing date for receipt of proposals. Offeror must not review the Past Performance Questionnaire prior to submission. They are to be submitted by the client/evaluator directly to the Contracting Officer. Offeror's should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner.
Exhibit D (required if key person is sub-contractor) – Vol 2, Part 2 – Offeror’s Past/Present
Q8: For JV or teaming arrangements, are max 3 PPE/PPQ (Exh A/Exh C) allowed for each company (total 6 for the team)? Or are max 3 PPE/PPQ (Exh A/Exh C) allowed for the team?
Is it a requirement that each company must submit at least 1?
A8: Max 3 PPE/PPQ (Exh A/Exh C) allowed for the team. There is no such requirement that each company must submit at least 1.
Q9: The Form DD2626 is a standardized final performance evaluation form used by some contracting agencies. Can Form DD2626 be included (similar to the CCASS evaluation) in lieu of the Exhibit C reference package?
From past requests, some agencies will refuse to complete any evaluation and will simply defer to only CCASS evals. However, CCASS evals are generally only required to be completed for projects over $750,000. So if there is a project of smaller scale, there will not be a CCASS on file to reference and the agency will decline to provide an evaluation.
From past requests, DD2626 have been accepted similar to the CCASS since it is a standardized government evaluation form.
A9: DD Form 2626 can be submitted in lieu of CCASS Evaluation (CPARS) or Exhibit C Reference Questionnaire Forms.
Dated 28-Aug-2020
Q10: Requesting your assistance with Exhibit C and 2.5.3.11 Past Performance References. The three projects that we would like to submit for Exhibit A for Past/Present Performance demonstrates our past performances on contracts similar in scope, complexity, and cost magnitude, however these projects do not have CPARS or personnel available to evaluate our performance for Section C.
We do have projects that are somewhat similar in scope but not so much in complexity and in the range of the cost magnitude for this project. These projects do have CPARS.
We do have the relevant past performance experience, and in this case because Exhibit C is a requirement, would it be best to submit projects that may not meet scope, complexity and size but with CPARS to fulfill 2.5.3.11?
A10: Contractors should submit Past Performance as required in the Solicitation. Offerors will be rated in accordance with the guidelines as established in the solicitation. See sec 3.3.4 of solicitation.
Q11: Do you know the Air Handling Unit’s: Make, model, Serial #, and fan motor information?
A11: Office 1 Carrier S#: 831815224
M#: 39BA060859
Motor S#: LR-33543
M#: M672 Voltage: 208-230 FR: D56 RPM: 1725 HP: ¾
3 Phase
Office 2 Carrier S#: 831815228
M#: 39BA040859
Motor S#: 258146M
CAT#: C412V1
Voltage: 208 I 230 FR: J56 RPM: 1725 HP: ½ 1 Phase
ICAP Room Carrier S#: 1783 T 09599
M#: 39ED12 HVF1SCS3 FCS1
Motor S#:
M#: 00318EP3E182T
Voltage: 208-230 FR: 182T RPM: 1765 HP: (KW) 3.0 (2.2) 3 Phase
Kitchen Unit Carrier S#: 831815226
M#: 39BA050859
Motor S#: N/A
Conference Room Carrier S#: 831815225
M#: 39BA060859
Motor S#: LR-33543 M#: M672
Voltage: 208-230 FR: D56 RPM: 1725 HP: ¾ 3 Phase
Hallway Carrier S#: 831815227
M#: 39BA060859
Motor S#: LR-33543 M#: M672 Voltage: 208-230 FR: D56 RPM: 1725 HP: ¾ 3 Phase
Upstairs Barracks Trane S#: T05E22972
M#: BCHC054B1A0A4G02D000000B016
Motor Part #: X70370346030
M#: CQB 56C17D1396D P
Voltage: 208-230 FR: 56 RPM: 1725 HP: ½ 1 Phase
Coms Motor Part # X70370342020
M#: CQB 56T17D5927B P
Voltage: 208 I 230 FR: 56-70 RPM: 1725 HP: 1-½ 3 Phase
Q12: Can you please confirm that the extent of duct work replacement is the immediate transition at the AC units and not the duct work in its entirety?
A12: Our goal is to only replace what’s necessary. Reutilize existing ductwork, transitions and piping if possible.
Q13: Does the building have existing DDC system? If yes, can you please provide POC and info on your service provider?
A13: Attached are the as-builts and a test and balance report. See attached photos of the controller. Contact Carrier Hawaii. Phone: 808-677-6339 or 808-792-1778. They should have a copy of these full set of plans.
Q14: Are DDC control drawing available? We need to assure that we propose controls that can integrate with the existing system.
A14: Attached are the as-builts and a test and balance report. See attached photos of the controller. Contact Carrier Hawaii. Phone: 808-677-6339 or 808-792-1778. They should have a copy of these full set of plans.
Q15: We understand that the Quality Control Manager (QCM) and Site Superintendent have to be on site at all times, but are the Site Safety & Health Officer (SSHO) and Project Manager (PM) also required to be on site at all times as well?
A15: Typically-
A Site Superintendent/Project Manager is on site at all times.
A Site Safety & Health Officer (SSHO) should evaluate the work site each day to assure safety concerns.
A Quality Control Manager (QCM) should evaluate the work each day to assure quality concerns.