5. EXHIBIT A_HVAC Maui.doc

DOC document 47 KB Posted

Attached to
KABD152001 Hawaii Air National Guard - Repair HVAC System, Maui, HI
Solicitation number
W50SLF-20-R-0001
Issued by

About this file

This document contains a performance relevancy questionnaire and related federal contract opportunity for repairing an HVAC system in Maui, Hawaii. The federal contract opportunity is seeking proposals to award a firm fixed-price construction contract valued between $500,000 and $1,000,000 to repair air handling units, ductless split systems, a fan coil unit, and interior air distribution network at Building 501 of the 292nd Combat Communications Squadron in Kahului, Maui. Proposals are due by September 3, 2020, and the contract completion time is 180 calendar days from notice to proceed. This is a total women-owned small business set-aside with a small business size standard of $16.5 million average annual revenue for the previous three years. The pre-proposal conference will be held on August 10, 2020 and the solicitation and plans/specifications are available on SAM.gov.

View the file

Other files

File Type Posted
DDC photo2.jpeg JPEG file
DDC photo3.jpeg JPEG file
DDC photo1.jpeg JPEG file
BLDG 501 CHILLER DRAWINGS.pdf PDF
DDC photo5.jpg JPG image
DDC photo7.jpg JPG image
QA KABD152001 REPAIR HVAC SYSTEM (31-Aug-2020).pdf PDF
DDC photo4.jpeg JPEG file
0021-0012 Maui Chiller Sub 12.pdf PDF
DDC photo6.jpg JPG image
QA KABD152001 REPAIR HVAC SYSTEM 20Aug2020.pdf PDF
1. MFR - Pre-Proposal Conference Site Visit.pdf PDF
6. Q&A KABD152001 Repair HVAC System Maui.pdf PDF
01. Solicitation Amendment W50SLF20R0001 0003.pdf PDF
3. Pre-Proposal Meeting PPT Repair HVAC System Maui.pptx PPTX presentation
5. Maui_HVAC_Pics.xlsx XLSX spreadsheet
EXHIBIT D_Letter of Commitment.docx DOCX document
4. Split_AC_Layout.pdf PDF
01.1. Solicitation W50SLF20R0001 0003 (Conformed Document).pdf PDF
2. Sign-in Sheet.pdf PDF
2. SOW KABD152001 - REPAIR HVAC SYSTEM MAUI.pdf PDF
1.1. Solicitation Amendment 0001.pdf PDF
3. Appendix F - Specifications.pdf PDF
6. EXHIBIT B_HVAC Maui.doc DOC document
4. Appendix H- Reference Drawings.pdf PDF
7. EXHIBIT_C_Reference_Questionnaire_HVAC Maui.docx DOCX document
1.2. Solicitation Amendment 0002.pdf PDF
1.0. Solicitation W50SLF20R0001 0002.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KABD152001 Repair HVAC System, Maui, RFP # W50SLF-20-R-0001

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: Prepare questionnaires in the format provided.

Provide the following information requested in this format for each of the projects/contracts being described. Prepare not more than three (3) of these documents. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted. Projects may be on going, if complete to 70 %, and cannot have been completed any earlier than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding your performance on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as ___________Prime or _________Subcontractor

2. Contract Number

3. Original Contract $ Value _____________ Current/Final Contract $ Value ____________

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date: ______________

2. Current Schedule____________________

3. Estimated/Final Completion Date:________________________________

4. Primary cause for Contract Modifications__________________________________

D. Provide detailed description of the work performed under the contract including, but not limited to your past performance. Note that your description will be evaluated for similarity of the construction methods, particularly ________________ project scope; cost magnitude, and complexity of work performed to those required for the proposed effort. The Government may also consider similarity of the client type (i.e. federal government) and/or the project sustainability requirements. The location at which work was performed to the location(s) at which work will be performed may also be considered.

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors, please list name and principal areas of work they will perform. Indicate if you do not intend on utilizing any of these subcontractors.

3. Address any technical areas about this project you consider uniquely relevant to this project. Include in your discussion if project had sustainability requirements. Indicate if no such requirements.

4. If you intend to use any of the same key personnel on this solicitation’s project, indicate by name and position those personnel proposed to be utilized on the referenced contract. (Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation’s contract. Indicate if you do not intend on utilizing any of these same personnel.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (see section 00120 for information.) (Use as much space as necessary)

E. List a point of Contact for Owner/Government agency Contracting Officer and/or inspector; include a current phone number and facsimile number. Email address is also desired. (This information is required here even though you will be sending Exhibit C letters and questionnaires to these references. (Do NOT include a copy of the Exhibit Cs you sent to your references.)

End of Part 1 - Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of projects discussed in the Exhibit As.

PART 2: Provide the following information one time.

Additional offeror information required, but not project specific. This information need only be provided once in your submission package.

2 A. Applicable to all offerors - Describe your compliance with the requirements of FAR clause 52.219-8 Utilization of Small Business Concerns. Even if you are a Small or Small Disadvantaged Business, this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts. Describe below the methods you have used to comply with this policy on prior federal contracts. Include any evidence, or a point of contact to verify this information, if available.

2B: Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problem(s).

2C: List any projects within the last five (5) years that have been assessed Liquidated damages. If none have been assessed, make a positive statement to that effect.

2D: List any projects within the last five (5) years that have been terminated, for any reason. Provide an explanation. If none, make a positive statement to that effect.

2E. Compliance with Safety Standards. Provide proof of your Experience Modification Rate (EMR).

End of Questionnaire Requirements

File details come from the government source that posted it. Updated .