W50S9H-24-B-0001-0001 - ADD ALTER FIRE CRASH STATION BLDG 510 - 06182024.pdf

PDF 216 KB Posted

Attached to
ADD/ ALTER (ADAL) FIRE CRASH RESCUE STATION BLDG 510
Solicitation number
W50S9H-24-B-0001
Issued by

About this file

This document is an amendment to a solicitation for the construction of an addition and renovation to the Fire Crash Rescue Station Building 510 at Volk Field Combat Readiness Training Center in Wisconsin. The amendment extends the solicitation closing date and the question and answer period, and adds new attachments, including drawings and additional single-source justifications.

The solicitation seeks offers for a firm-fixed-price contract to construct a 3,430 SF addition to the existing 15,970 SF fire station facility and renovate the existing building. The work includes upgrades to the mechanical, electrical, plumbing, fire detection/suppression, and security systems, as well as architectural finishes. The contract duration is 365 calendar days. This is a full and open competition procurement with a NAICS code of 236220. The government has identified certain brand name products that must be used, including Advantor security systems and Monaco fire alarm panels. Offers are due by July 11, 2024 and will be publicly opened.

View the file

Other files

File Type Posted
ABSTRACT OF OFFERS - W50S9H-24-B-0001 - ADD ALTER FIRE CRASH STATION BLDG 510 - 7.30.2024.pdf PDF
QA LOG - ADD ALTER FIRE STATION - 7.11.2024.pdf PDF
BLDG 510 FIRE MOLD PHOTOS.pdf PDF
QA LOG - ADD ALTER FIRE STATION - 07092024.pdf PDF
W50S9H-24-B-0001-0002 - ADD ALTER FIRE CRASH STATION BLDG 510 - 07092024.pdf PDF
ADDENDUM 02 - VOLK FIELD ADD-RENO FIRE STATION.pdf PDF
ADDENDUM 01 - DRAWINGS - ADD ALTER FIRE STATION.pdf PDF
JA FAR Part 6 - BEST lock cores and keys.pdf PDF
QA LOG - ADD ALTER FIRE STATION - 06172024.pdf PDF
QA LOG - ADD ALTER FIRE STATION - 06112024.pdf PDF
W50S9H-24-B-0001 - PRE-BID SIGN IN SHEET - 06062024.pdf PDF
W50S9H-24-B-0001 - ADAL FIRE CRASH - PRE BID SLIDES - 06 JUNE 2024.pdf PDF
W50S9H-24-B-0001 - Pre Bid Minutes - 06 JUNE 2024.pdf PDF
W50S9H-24-B-0001 - QA LOG - ADD ALTER FIRE STATION - 06062024.pdf PDF
SF 1442 - W50S9H-24-B-0001 - ADD ALTER FIRE CRASH STATION BLDG 510.pdf PDF
VOLK FIELD ENTRY ACCESS LIST (EAL) DOCUMENT.xlsx XLSX spreadsheet
PLANS AND SPECS 220504_Vol 3 of 4 Specifications_Volk Field Add-Repair Fire Station_B3.pdf PDF
JA FAR PART 6 - ADVANTOR SECURITY SYSTEMS_Redacted.pdf PDF
PLANS AND SPECS 220504_Vol 4 of 4 Specifications_Volk Field Add-Repair Fire Station_B3.pdf PDF
PLANS AND SPECS 220504_Vol 1 of 4 Specifications_Volk Field Add-Repair Fire Station_B3.pdf PDF
DRAWINGS FULL SET Project YAQF049026.pdf PDF
PLANS AND SPECS 220504_Vol 2 of 4 Specifications_Volk Field Add-Repair Fire Station_B3.pdf PDF
JA FAR Part 6 - MONACO FIRE SYSTEM_Redacted.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YAQF 049026

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this Amendment is to: 1) Extend the Solicitation closing date from 20 June 2024 to 11 July 2024. 2). Extend the Question & Answ er period from 14 June 2024 to 1 July 2024. 3). Add ATTACHMENT – ADDENDUM 01 – DRAWINGS – Project #YAQF049026, Dated 06/14/2024. Add ATTACHMENT 10 – YAQF049026 FIRE CRASH RESCUE REMODEL – Single Source Doc – Best Lock Cores and Keys

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9H24B0001

X 9B. DATED (SEE ITEM 11)

13-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jun-2024

CODE

USPFO WI CRTC MISSION SPT CONTRACTING

100 INDEPENDENCE DR

CAMP DOUGLAS WI 54618-5001

W50S9H 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9H24B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 20-Jun-2024 01:00 PM to 11-Jul-2024 01:00 PM.

The following have been modified:

INSTRUCTIONS

SECTION 00 01 10 Table of Contents

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00 10 00 - BID SCHEDULE, NOTES

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS

SECTION 00 70 00 - CONTRACT CLAUSES

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

SECTION 01 00 00 - GENERAL REQUIREMENTS

ATTACHMENT 1 - PLANS AND SPECIFICATIONS Vol 1 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 2 - PLANS AND SPECIFICATIONS Vol 2 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 3 - PLANS AND SPECIFICATIONS Vol 3 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 4 - PLANS AND SPECIFICATIONS Vol 4 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 5 - DRAWINGS FULL SET Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 6 – YAQF049026 FIRE CRASH RESCUE REMODEL - Single Source Doc - Monaco Fire Alarm ATTACHMENT 7 – YAQF049026 FIRE CRASH RESCUE REMODEL - Single Source Doc - Advantor Fire Alarm

ATTACHMENT 8 – VOLK FIELD ENTRY ACCESS LIST (EAL) DOCUMENT

ATTACHMENT 9 – ADDENDUM 01 – DRAWINGS – Project #YAQF049026, Dated 06/14/2024 ATTACHMENT 10 – YAQF049026 FIRE CRASH RESCUE REMODEL – Single Source Doc – Best Lock Cores and Keys

SECTION 00 10 00 NOTES

NOTES

1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov.

2. Facsimile transmission of bid is not authorized. Electronic submission of bids will/will NOT be accepted.

3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.

4. A complete bid package must contain the following:

(a) Offer, Standard Form (SF) 1442 front and back signed

(b) Section 00 10 00 Bid Schedule - all items must be priced

(c) A Bid Bond and Power of Attorney is required along with the bid on the due date. In accordance with DoD Deviation 2020-O0016, electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

(d) Section 00 45 00, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.

(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.

(f) All amendments to the solicitation must be acknowledged.

(g) Mark the front of the envelope with the following: “BID No. W50S9H-24-B-0001”, and the Name and

Address of Bidder. See Block 13A of SF 1442 for required number of copies.

5. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications- Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories:

(A) Small business;

(B) Service-disabled veteran-owned small business;

(C) Women-owned small business (WOSB) under the WOSB Program;

(D) Economically disadvantaged women-owned small business under the WOSB Program; or

(E) Historically underutilized business zone small business.

End of Section 00 10 00

SECTION 00 21 00 - INSTRUCTIONS

INSTRUCTIONS, CONDITIONS, AND

SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. Description of the Project: The intent of this construction project is to remodel the existing Bldg. 510 Fire House facility. The function of Bldg. 510 Fire/Crash Rescue Station is to provide emergency crash/rescue operations on the airfield. The facility is located on the flight-line for quick response to aircraft emergencies.

Space is provided for truck bays, radio dispatch area; maintenance and apparatus, which includes fire protection vehicle storage, maintenance, repair, and supply support; administration and training; and the general residential and living areas. This project contains two portions performed together: renovation to Bldg. 510 and additions to Bldg. 510 (The current facility is 15,970 SF with proposed additions of 3,430 SF.). The facility hasn’t been modified in 20 years. The mechanical, electrical, comm services are outdated and do not meet ANG requirements. Fire detection/ suppression system is not present and will be added to the facility. All work will be in accordance with design requirements, specifications, and drawings provided within the master specifications.

2. Instructions to Bidders:

2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S9H-24-B-0001 entitled FIRE CRASH RESCUE STATION REMODEL, Project Number YAQF 049026, at Volk Field Combat Readiness Training Center, Camp Douglas, WI.

2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

2.3. This solicitation is Unrestricted. In accordance with FAR Clause 52.219-4 Notice of Price Evaluation

Preference for HUBZone Small Business concerns the HUBZone preference of 10% is applicable.

3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:

3.1. A pre-bid conference will be conducted on 6 JUNE 2024 at 0900 CDT for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held 100 Independence Dr. Camp Douglas WI 54618-5001 Bldg 331 Base Civil Engineering. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.

3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to SMSgt Seth I. Swieter and SMSgt Katherine Fox at the following addresses: seth.swieter@us.af.mil and katherine.fox@us.af.mil

Firm Name and Telephone Number Visitor’s Name and Social Security No.

Drivers License Citizenship

3.3. This information must be provided in advance, 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

3.4. Visitors must who are properly registered will be added to the base Entry Authorization List (EAL) will be able to access the installation with a valid drivers license. Be prepared to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law an/ or you have consted to such.

3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

4.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Subject Line: Reference No. SOLICITATION W50S9H-24-B-0001 Email: seth.swieter@us.af.mil; katherine.fox@us.af.mil

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry: _______________

From: ______________________________ Company Name: _____________________________

Address:_____________________________________________________________________

Phone Number: _____________________________

Email address: __________________________________________________________________

Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

4.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.

4.3. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN

THIS PROCESS.

4.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov.

4.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.

4.6. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system.

4.6.1. Amendments, if/when issued will be posted to https://www.SAM.gov for electronic downloading.

This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation.

Websites are occasionally inaccessible due to various reasons.

5. BID REPOSITORY AND BID OPENING:

5.1. A bid repository is provided for hand carried bids and is located at 100 Independence Dr. Camp Douglas, WI 54618, Bldg 418. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtaining access to the base in the Site Visit instruction.

Follow the same instructions for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.

5.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442 at Bldg 331 Base

Civil Engineering, 100 Independence Dr. Camp Douglas WI 54618-5001. All interested offerors and their major subcontractors are encouraged to attend the bid opening.

Bids WILL NOT be accepted electronically or by Facsimile.

6. WAGE DETERMINATION:

Construction Wage Rates are applicable to this project are General Decision Number: WI20240011 dated MAY 9, 2024 as shown in Section 00 73 00.

7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:

This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

8. CLAUSES:

Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

9. DISPOSITION OF UNSUCCESSFUL BIDS:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.

10. OFFERORS QUALIFICATIONS:

To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

11. SUBCONTRACTING PLAN:

A Subcontractig Plan will be required of the apparent lowe bidder, if they are a large business. The small business subcontracting plan will be requested by the Contracting Officer after the public bid opening. If required, offerors shall prepare and submit their subcontracting plan in accordance with FAR Clause 52.219-9 Alt II and DFARS Clause 52.219-7003. The National Guard Bureau Subcontracting Goals for use in development of your plan are as follows: Small Business, 28%; Small Disadvantaged Business 5%; Woman-owned Small Business 0.6%; Service- Disabled Veteran Owned Business 5% and Hub Zone firms 3%

11.1. Submit the Small Business Subcontracting Plan in a format to accommodate evaluation in accordance with AFARS 5119.704. In accordance with FAR 19.7, “The Small Business Subcontracting Program”, and FAR clause 52.219-9, “Small Business Subcontracting Plan”, subcontracting plans shall be evaluated for acceptability by the contracting team using the criteria set forth in AFARS Appendix DD- Subcontracting Plan Evaluation Guide that can be found at http://www.acquisition.gov. Subcontracting goals shall be consistent with NGB Goals unless non-consistency is well justified. Goals must be challenging but achievable. To be acceptable, plans must adequately address the required statutory elements.

12. List of Brand Name Requirements posted on SAM.gov.

12.1. Monaco Fire Systems

12.2. Advantor Security Systems

12.3. Best Lock Cores and Keys

END OF SECTION 00 21 00

SECTION 00 72 00 - GENERAL CONDITIONS

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

ATTACHMENT 1 - PLANS AND SPECIFICATIONS Vol 1 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 2 - PLANS AND SPECIFICATIONS Vol 2 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 3 - PLANS AND SPECIFICATIONS Vol 3 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 4 - PLANS AND SPECIFICATIONS Vol 4 Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 5 - DRAWINGS FULL SET Project #YAQF049026, Dated 05/04/2022 ATTACHMENT 9 – ADDENDUM 01 – DRAWINGS – YAQF049026, Dated 06/14/2024

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .