This document is an Addendum to the bidding documents for the Add/Alter (ADAL) Fire Crash Rescue Station, Building 510 project at Volk Field, Wisconsin. The addendum includes several drawing updates, such as corrected column notations, added notes regarding lead-based paint, asbestos, and mold remediation, and updates to floor tile specifications. It also includes a list of specification sections that can be deleted in their entirety.
The federal contract opportunity associated with this project is a solicitation from the Department of the Army National Guard to award a single firm fixed-price construction contract for the ADD/ALTER (ADAL) FIRE CRASH RESCUE STATION BLDG 510 project. The project involves constructing a new 3,430 SF facility addition and renovating approximately 15,970 SF of the existing facility. The work includes upgrades to the lighting, HVAC, glazing, EFIS, fire detection/suppression, security systems, and other facility components. The contract duration is 365 calendar days. The solicitation is open to full and open competition, with a NAICS code of 236220 and a small business size standard of $45,000,000. The magnitude of construction is between $5,000,000 and $10,000,000.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Volk Field Add-Reno Fire Station Addendum 01 cover Page 1 of 1
Project name:
Add/Alter (ADAL) Fire Crash Rescue
Station, Bldg. 510 Client: Volk Field CRTC, WI ANG
Project location: Volk Field CRTC, Camp Douglas, WI Client representative: Maj Nick Crovetti
Project number: 3141400-191065.01 Date: June 14, 2024
TO ALL BIDDERS: You are requested to make all changes and/or additions contained in this Addendum to the Bidding Documents. Failure to acknowledge this Addendum in Proposal shall result in rejection of bid.
I. DRAWINGS (All drawing updates are attached as full sheets.)
A. Drawing S-152:
1. Corrected existing column notations between grids A-X and 1.2-12.
B. Drawing AD101.:
1. Added Keyed Notes and callouts 4.017 thru 4.022 for lead-based paint, asbestos containing materials, and mold remediation.
C. Drawing A-101:
1. Update General Note 17.
D. Drawing A-102:
1. Update General Note 17.
E. Drawing A-701:
1. Add Room callout for Room 143 Women’s Vestibule.
F. Drawing A-710:
1. Updated floor tile in Room Finish Schedule for 114, 115, 117, 118, 121, 143.
II. SPECIFICATIONS
A. The following specification sections can be deleted in their entirety:
1. 07 27 19.01 – Self-Adhering Air Barriers
2. 07 27 36 – Spray Foam Air Barriers
3. 07 42 13 – Metal Wall Panels
4. 07 72 33.13 – Roof Hatch Rail System
B. Specification 07 27 26 – Fluid-Applied Membrane Air Barriers
1. Delete paragraph 1.8 Air Barrier Testing.
END OF ADDENDUM
Addendum No. 1
1 2 4 7 9 11
E E
D
C
C
B B
A A
AA
3.6 9.4
2060100
C1
D1
X X
Y Y
Z Z
121.2
9'-7" 6'-0 1/2" 15'-7 1/2" 15'-7 1/2" 6'-0 1/2" 9'-7" 6'-3 1/2"
3' -1
/2
'-8
2' -1
1"
( 1
'-7
( 1
'-7
( 1
'-8
( 1
'-8
( 1
'-8
( 1
'-8
( 1
'-8
( 1
'-8
( 121'-5 1/2" ) ( 121'-5 1/2" ) ( 121'-5 1/2" ) ( 121'-5 1/2" ) ( 121'-5 1/2" ) ( 121'-5 1/2" )
( 121'-8" )
( 121'-8" ) ( 121'-8" ) ( 121'-8" ) ( 121'-8" )
( 121'-8" )
( 1
'-8
( 1
'-8
'-8
/2
62'-6"
'-3
'-5
/2
EX
. W
X2
EX
. W
X2
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. 2
4K
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
8X
EX
. W
X2
EX
. W
X2
EX. W10X30EX. W10X30EX. W10X30EX. W10X30EX. W10X30EX. W10X30
EX
. 3
6V G
EX
. 3
6V G
EX
. 3
6V G
EX
. 3
6V G
EX. 18LH02 EX. 18LH02
EX. 18LH02 EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX
. W
X6
EX
. W
X6
EX. W14X22 EX. W14X22
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. 18LH02
EX. W10X54
EX. W8X15 EX. W8X28 EX. W8X15 EX. W10X54
EX. W16X67 EX. W8X31 EX. W16X67
EX. W10X54 EX. W8X28 EX. W8X28EX. W8X28 EX. W10X54
EX. W8X28 EX. W8X28 EX. W8X28 EX. W8X28 EX. W8X28 EX. W8X28 EX. W8X28
EX. W10X33 EX. W10X33 EX. W10X33 EX. W10X33 EX. W10X33 EX. W10X33
EX. W8X18 EX. W8X18 EX. W8X18 EX. W8X18 EX. W8X18 EX. W8X18
EX. W8X28
11.1 1311.811.2
C.1
D.3
E.5
9.5
2.5
2.5
1.5
1.5
10.5
10.5
11.5
11.5
A.2 A.2
5' -8
/2
'-6
/2
'-1
1/
2" 5'
-7
B.8 B.8
MAU-2
1000#
IH-3
200#
3.601
MAU-1
1000#
IH-2
250#
3.601
3.6033.603
W14X30
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W14X30
W10X12
W14X30
W10X12
W
X3
( 1
'-8
W
X3
( 1
'-8
W
X4
( 1
'-4
W
X4
( 1
'-4
W14X30 W
X4
( 1
'-2
/4
W
X4
( 1
'-2
/4
W
X3
( 1
'-8
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W10X12
W14X30
W14X30
W10X12
W
X3
( 1
'-8
RENOVATION
YAQF172012
ADDITION
YAQF049026
R
EN
O
VA
TI
O
N
YA
Q F1
AD
D
IT
IO
N
YA
Q
F0
ADDITION
YAQF049026
RENOVATION
YAQF172012
RENOVATION
YAQF172012
ADDITION
YAQF049026
S-541
S-541
1'-7" 7'-9 3/4"10'-2 3/4" 1'-7"
3.604
3.604
W
X4
W
X4
W
X3
W
X3
W
X4
W
X3
W
X4
W
X3
3.605
3.605
S-541
S-541
S-541
S-541
S-541
S-541
S-541
S-541
3.606 TYP 3.606TYP
S-542
S-542
H
SS
X6
X1 /4
( 1
'-1 0"
H
SS
X6 X1
/4 ( 1
'-1
0"
H
SS
X6
X1 /4
( 1
'-1 0"
H
SS
X6 X1
/4 ( 1
'-1
0"
S-542
S-542
2.11.8
1 1 1 1 1
111111
1.
2.
3.
4.
5.
6.
7.
SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON CIVIL SITE PLAN
= ELEVATION 100'-0" ON STRUCTURAL DRAWINGS.
FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE
ATTENTION OF THE CONTRACTING OFFICER FOR FINAL DECISION.
REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,
AND SYMBOLOGY.
REFER TO SHEET S-010 FOR ROOF LOADING PLAN AND SPECIAL JOIST
LOADING REQUIREMENTS.
REFER TO SHEET S-541 FOR TYPICAL DETAILS NOT REFERENCED ON
THIS SHEET.
REFER TO SHEET S-601 FOR STRUCTURAL SCHEDULES
S = SHORING (SEE KEYED NOTE 3.612)
8. DESTRATIFICATION FANS, INFRARED HEATERS AND OTHER
MECHANICAL EQUIPMENT SHOWN IN APPROXIMATE LOCATIONS.
COORDINATE WITH MECHANICAL DRAWINGS. PROVIDE ALL
ASSOCIATED MOUNTING STEEL REQUIRED FOR SUSPENSION FROM
STRUCTURE ABOVE PER MANUFACTURER. EQUIPMENT AND
WEIGHTS NOT LABELED AND PRESUMED UNDER 150 LBS.
ROOF FRAMING
PLAN GENERAL NOTES:
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
710 Avis Drive, Suite 100, Ann Arbor, MI 48108 phone: 810-956-9300
6/
/2
1:
:2
PM
C :\R ev it
Lo ca l\1
5.
-S
-R
_m ar k.
el lis m ea dh un t.c om
.rv t
VO
LK
F
IE
LD
C
R
TC
C am p D ou gl as , W
I 5
AD
D
T O
F
IR
E/ C
R
AS
H R
ES
C
U E
ST
AT
IO
N
A N
D R
EP
AI
R F
IR
E/
C R
AS
H
R
ES
C U
E
ST
AT
IO
N , B
S-152
HIGH ROOF
FRAMING PLAN
R3141400-191065.01
DND
BPB
May 4, 2022
JJF
AN
G
P ro je ct
N o.
: Y
AQ
F0
AN
D
Y
AQ
F1
1/8" = 1'-0"1 HIGH ROOF FRAMING PLAN
KEYED NOTES
3.601 MECHANICAL EQUIPMENT SUPPORTED FROM STRUCTURE ABOVE.
PROVIDE CHANNEL FRAME SIMILAR TO DETAIL 6/S-541. PROVIDE
ALL ASSOCIATED STEEL AS REQUIRED BY MANUFACTURER. AT
JOISTS, IF LOAD IS NOT LOCATED AT PANEL POINT, PROVIDE ANGLE
STRUTS PER DETAIL 8/S-541. NOT ALL MECHANICAL SHOWN ON
STRUCTURAL PLANS, CONTRACTOR MUST COORDINATE QUANTITY
OF SUPPORTED UTILITIES THROUGHOUT THE BUILDING.
3.603 ROOF DIAPHRAGM SHALL CONFORM TO THE FOLLOWING:
- DECK - 1 1/2", 20 GAUGE, WIDE RIB ROOF DECK.
- SUPPORT FASTENING - PAFS AT 36/4 PATTERN.
- PERIMETER FASTENING - PAFS AT 12"O.C.
- SIDELAP FASTENING - (3) #10 SCREWS PER SPAN.
3.604 ROOF PENETRATION FOR MECHANICAL, PLUMBING AND/OR
ARCHITECTURAL. PROVIDE FRAMED OPENING PER DETAIL 6/S-541.
NOT ALL PENETRATIONS NECESSARILY SHOWN. CONTRACTOR TO
COORDINATE WORK QUALITY AND EXACT LOCATIONS THROUGHOUT
DRAWINGS.
3.605 FOR TYPICAL BEAM TO GIRDER CONNECTION, SEE DETAIL 1/S-541,
UNLESS NOTED OTHERWISE.
3.606 FOR TYPICAL MOMENT CONNECTION (UNLESS NOTED OTHERWISE),
REFER TO DETAIL 15/S-541.
05/04/22 B3 FINAL
1 06/14/24 ADDENDUM NO. 1
R E
F
D W
2 4 7 9 11
3 5 6 8 10
E
D
C
B
A
AA
3.6 9.4
2060100
C1
D1
X
Y
Z
121.2
4.009 4.009
4.001
4.002
4.002
4.001
4.001
4.007
4.007
4.0074.007
4.0074.007
4.006
4.005
4.005
4.0084.0084.008
4.0114.011
4.0114.011
4.0114.011
4.004
4.0044.004
4.0034.003
IC
E
F R
Z
4.0104.010
4.0104.010
4.0104.0104.010
4.0014.001
AD1012
AD101 2
OPP.
4.004
4.0044.004
4.0124.012
4.013 4.013
4.004
12'-0" FV
/8
F
V
4.014
.0
34'-11" FV
4.014
9.5
4.0154.015
4.0154.015
4.0154.015
4.0154.015
2.11.8
12'-10 1/4" FV
4.016
11'-7 1/2" FV
FV
3'-4"
4.020
4.0191
4.017
4.018
4.022
DEMOLITION PLAN GENERAL NOTES:
1. THE GENERAL CONTRACTOR SHALL VERIFY BUILDING AND SITE CONDITIONS
AND REPORT DISCREPANCIES TO THE CONTRACTING OFFICER'S
REPRESENTATIVE BEFORE PROCEEDING WITH SCHEDULED DEMOLITION
WORK.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ARCHITECTURAL,
STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL, TECHNOLOGY, AND
PLUMBING WORK AND SUBCONTRACTORS FOR DEMOLITION AND REPAIR
WORK.
3. IT IS THE INTENT OF THESE DRAWINGS TO INDICATE THE REMOVAL OF ITEMS
WHICH INTERFERE WITH THE FINAL CONSTRUCTION AS SHOWN ON THE
FLOOR PLANS, ELEVATIONS, DETAILS, AND SCHEDULES. FLOOR FINISHES,
BASE, ABANDONED FURNITURE, WINDOW TREATMENTS, SHELVING, SIGNAGE,
AND ROOFING MATERIALS SHALL BE DEMOLISHED IN THEIR ENTIRETY.
4. REMOVE ITEMS OF DEMOLITION WORK FROM THE PROJECT DAILY AND
DISPOSE OF PROPERLY.
5. EXISTING CONCRETE AND STEEL STRUCTURE TO REMAIN, TYP. PROTECT
COLUMNS, PILASTERS, BEAMS, AND SLABS.
6. WHERE EXISTING MECHANICAL, ELECTRICAL,TECHNOLOGY, AND PLUMBING
ITEMS AND/OR SYSTEMS CONFLICTS WITH NEW WORK, DEMOLITION OR
REROUTING OF EXISTING INFRASTRUCTURE SHALL BE REQUIRED. REFER TO
MECHANICAL, ELECTRICAL, PLUMBING AND TECHNOLOGY PLANS FOR ITEMS
TO BE REUSED. UNLESS NOTED OTHERWISE, ITEMS TO BE DEMOLISHED
SHALL BE REMOVED IN THEIR ENTIRETY, BACK TO THE ORIGINAL SOURCE.
SURROUNDING MATERIALS WHICH ARE DISTURBED OR DEMOLISHED THAT
ARE SCHEDULED TO REMAIN SHALL BE PATCHED WITH LIKE SURROUNDING
MATERIALS, TYPICAL.
7. DEMOLISH CONCRETE FLOOR SLABS AS REQUIRED TO INSTALL NEW
EQUIPMENT, UNDERGROUND CONDUIT, PLUMBING SYSTEMS, AND FLOOR
DRAINS, REF: STRUCTURAL, EQUIPMENT, ELECTRICAL, PLUMBING
DEMOLITION, AND PLUMBING DRAWINGS.
8. PROTECT EXISTING SURFACES TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
9. REPAIR OR REPLACE EXISTING CONSTRUCTION (WINDOWS, WALLS, DOORS,
CEILINGS, FLOORS, ETC.) TO REMAIN WHICH ARE DAMAGED DURING
CONSTRUCTION. REPLACEMENT MATERIAL SHALL MATCH IN KIND.
B A.2B.8
F
V
D E
M O
L
IS
H E
D W
A L
L W
A L L
T O
M
A
IN
4.012 4.013
4'-7" VIF
4.0214.0214.0214.021 4.0214.0214.0214.021
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
710 Avis Drive, Suite 100, Ann Arbor, MI 48108 phone: 810-956-9300
/1
/2
:5
:3
P
M C
R e v it L o c a l\
.0
-A
-R m a rk
.b ra it h w a it e
.r v t
V O
L K
F
IE
L D
C R
T C
C a m p
D o u g la s W
I
A D
D T
O F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N A
N D
R E
P A
IR
F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N B
AD101
FIRST FLOOR
DEMOLITION PLAN
R3141400-191065.01
MAB
MTS
May 4, 2022
RDU
A N
G P ro je c t
N o
Y
A Q
F
A
N D
Y A
Q F
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN
KEYED NOTES
4.001 DEMOLISH EXISTING WINDOW SYSTEM.
4.002 DEMOLISH EXISTING WINDOW SYSTEM AND PREPARE OPENING
FOR REPLACEMENT.
4.003 EXISTING PLUMBING FIXTURE TO BE DEMOLISHED. SEE PLUMBING.
4.004 EXTENTS OF SLAB DEMOLITION. SEE STRUCTURAL.
4.005 MECHANICAL EQUIPMENT TO BE DEMOLISHED. SEE MECHANICAL.
4.006 ELECTRICAL EQUIPMENT TO BE DEMOLISHED. SEE ELECTRICAL.
4.007 DEMOLISH EXISTING WALL. SEE STRUCTURAL AND CIVIL.
4.008 EXISTING EQUIPMENT PAD TO BE DEMOLISHED.
4.009 EXISTING COLUMN TO REMAIN. SEE STRUCTURAL.
4.010 SALVAGE EXISTING APPLIANCE FOR OWNER'S USE.
4.011 SALVAGE EXISTING LOCKERS FOR OWNER'S USE.
4.012 DEMOLISH EXISTING WALL (EIFS, METAL FRAMING, METAL LINER
PANEL) TO BELOW THE CONNECTIONS AT THE GIRDER TRUSS
APPROXIMATE ELEVATION = 116'-3". SEE DEMOLITION ELEVATION
ON THIS SHEET. SEE STRUCTURAL DRAWINGS FOR DEMOLITION
OF EXISTING ABOVE GRADE CONCRETE WALL.
4.013 DEMOLISH EXISTING OVERHEAD DOOR, HARDWARE, HEADER AND
JAMB FRAMING, TYPICAL.
4.014 DEMOLISH PORTION OF EXTERIOR WALL TO FULL HEIGHT,
4.015 DEMOLISH ONE SIDE OF WALLBOARD AND ANY EXISTING
INSULATION. FRAMING AND OUTSIDE WALLBOARD TO REMAIN.
4.016 DEMOLISH EIFS AND INSULATED METAL PANEL FULL HEIGHT.
METAL FRAMING TO REMAIN.
4.017 LEAD HAS BEEN IDENTIFIED IN APPROXIMATELY 100 SF OF
CERAMIC WALL TILE IN THE EXISTING RESTROOM. SEE
SPECIFICATION SECTION 00 31 26 EXISTING HAZARDOUS
MATERIAL INVESTIGATION FOR MORE INFORMATION. REMEDIATE
AS INDICATED IN SPECIFICATION SECTION 02 83 00 LEAD
REMEDIATION.
4.018 ASBESTOS CONTAINING MATERIAL HAS BEEN IDENTIFIED UNDER
THE SINK IN THE EXISTING KITCHEN. SEE SPECIFICATION SECTION
00 31 26 EXISTING HAZARDOUS MATERIAL INVESTIGATION FOR
MORE INFORMATION. REMEDIATE AS INDICATED IN
SPECIFICATION SECTION 02 82 00 ASBESTOS REMEDIATION.
4.019 ASBESTOS CONTAINING MATERIAL HAS BEEN IDENTIFIED IN THE
CANVAS WRAP OVER FIBERGLASS ON THE DUCT IN THE EXISTING
MECHANICAL ROOM. SEE SPECIFICATION SECTION 00 31 26
EXISTING HAZARDOUS MATERIAL INVESTIGATION FOR MORE
INFORMATION. REMEDIATE AS INDICATED IN SPECIFICATION
SECTION 02 82 00 ASBESTOS REMEDIATION.
4.020 ASBESTOS CONTAINING MATERIAL HAS BEEN IDENTIFIED IN THE
GRAY CAULK AROUND THE EAST DOOR FRAME OF PPE STORAGE
ROOM 140 (OLD ROOM 120). SEE SPECIFICATION SECTION 00 31 26
EXISTING HAZARDOUS MATERIAL INVESTIGATION FOR MORE
INFORMATION. REMEDIATE AS INDICATED IN SPECIFICATION
SECTION 02 82 00 ASBESTOS REMEDIATION
4.021 LEAD-BASED PAINT HAS BEEN IDENTIFIED IN THE PAINT ON THE
EXTERIOR OVERHEAD DOOR JAMB FRAMES. SEE SPECIFICATION
SECTION 00 31 26 EXISTING HAZARDOUS MATERIAL
INVESTIGATION FOR MORE INFORMATION. REMEDIATE AS
INDICATED IN SPECIFICATION SECTION 02 83 00 LEAD
REMEDATION.
4.022 MOLD HAS BEEN IDENTIFIED WITHIN THE SHADED AREA INDICATED
ON THE DRAWING. REMEDIATE IN ACCORDANCE WITH STATE OF
WISCONSIN DEPARTMENT OF HEALTH SERVICES AND THE U.S.
ENVIRONMENTAL PROTECTION AGENCY REGULATIONS AND BEST
PRACTICES
1/8" = 1'-0"2
APPARATUS BAY DEMOLITION ELEVATION
05/04/22 B3 FINAL
1 06/12/24 ADDENDUM NO. 1
F
W
DW
W
D D
F R
Z
FLOOR PLAN GENERAL NOTES:
1. SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON SITE PLAN = 100'-0" ON
ARCHITECTURAL DRAWINGS.
2. FIELD VERIFY DIMENSIONS, BRING DISCREPANCIES TO THE ATTENTION OF THE
ARCHITECT/ENGINEER FOR FINAL DECISION.
3. INTERIOR DIMENSIONS ARE FROM FINISH FACE OF WALLS (I.E. GYPSUM
WALLBOARD OR CMU), UNLESS NOTED OTHERWISE.
4. FINISH FLOOR ELEVATIONS ARE TO THE TOP OF CONCRETE, UNLESS NOTED
OTHERWISE.
5. REFERENCE SHEET G-011 AND G-021 FOR CODE, FIRE RATING, AND
SEPARATION REQUIREMENTS.
6. GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING CONSTRUCTION
(WALLS, DOORS, CEILINGS, FLOORS, ETC.) AS REQUIRED FROM DEMOLITION
OR CONSTRUCTION TO ALLOW FOR THE PREP WORK AND NEW OR
COMPLETION OF EXISTING FINISHES. REPAIRS OR REPLACEMENTS MUST BE
DURABLE, SEAMLESS, AND MATCH THE EXISTING MATERIAL.
7. GENERAL CONTRACTOR SHALL PATCH FLOOR AND WALL PENETRATIONS
CAUSED BY DEMOLITION OF MECHANICAL, ELECTRICAL, TECHNOLOGY, AND
PLUMBING, INCLUDING BUT NOT LIMITED TO PIPING AND CONDUIT RUNS, IN A
MANNER THAT IS CONSISTENT WITH THE EXISTING FLOOR AND WALL
CONSTRUCTION AND FINISH. PENETRATIONS SHALL MEET REQUIRED FIRE
RATINGS.
8. COORDINATE THE INSTALLATION OF OWNER-SUPPLIED EQUIPMENT.
REFERENCE PLANS, SPECS, AND INTERIOR ELEVATIONS FOR SPECIFIC
EQUIPMENT AND ITS INSTALLATION REQUIREMENTS.
9. GENERAL CONTRACTOR SHALL PROVIDE BLOCKING, STIFFENERS, BRACINGS,
BACKING PLATES, SUPPORTING BRACKETS, AND NECESSARY SELECTIVE
DEMOLITION REQUIRED FOR THE PROPER INSTALLATION OF CASEWORK,
TOILET ROOM ACCESSORIES, TOILET PARTITIONS AND MISCELLANEOUS
EQUIPMENT.
10. EXISTING AND INFILL CONCRETE SUB-FLOOR SHALL BE MADE LEVEL, PLUMB
AND IN SOUND CONDITION AS REQUIRED FOR THE INSTALLATION OF FINAL
FLOOR FINISHES, TYPICAL. PROVIDE ARDEX OR EQUAL LEVELING CONCRETE
TO PROVIDE A SMOOTH WALKABLE AREA.
11. RECESSED CABINETS, PANELS, BOXES, ETC. LOCATED IN FIRE-RATED
PARTITIONS SHALL BE INSTALLED IN A MANNER WHICH MAINTAINS THE FIRE
RATED CONSTRUCTION.
12. SEE ENLARGED PLANS FOR NOTES, DIMENSIONS, AND WALL TYPES WITHIN
THE DETAIL CALLOUT BOUNDARIES.
13. REFERERNCE SHEET A-002 FOR INTERIOR PARTITION TYPES. INTERIOR
PARTITION TAGS NOTED ENCOMPASS THE ENTIRE LENGTH OF WALL SHOWN
TO CORNERS OF ROOM, OVER AND AROUND DOORWAYS SHOWN.
14. REFERENCE SHEET A-700'S FOR FINISHES PLAN.
15. REFERENCE SHEET A-800'S FOR SIGNAGE LAYOUTS AND COORDINATION
REQUIREMENTS.
16. REFERENCE SHEET A-900'S FOR FURNITURE AND EQUIPMENT LAYOUTS AND
COORDINATION REQUIREMENTS.
17. CONSTRUCTION STAGING AND LAYDOWN AREAS CAN BE PLACE ON THE
EXISTING ROADWAY TO BE DEMOLISHED TO THE SOUTH OF THE FIRE
STATION. THE FINAL ACCEPTABLE LOCATION AND ANY ADDITIONAL
LOCATIONS WHICH MAY BE NEEDED CAN BE COORDINATED WITH THE
CONTRACTING OFFICER AND CONTRACTING OFFICER’S REPRESENTATIVE.
18. WHERE COLUMNS ARE SHOWN WITHIN WALLS, WALLS TO BE CENTERED ON
COLUMN, U.N.0
A-301
A-301
A-301
A-302
2 4 7 9 113
E
D
C
B
A
AA
3.6 9.420
C1
D1
X
Y
Z
1.2
1.2
LOBBY
ADA
RESTROOM
TRAINING
CONTROL RM
CIRCULATION
ASST CHIEF
CHIEF
ASST CHIEF
ASST CHIEF
CLERICAL
OFFICE
MENS
SHOWERS
MENS
LOCKERS
KITCHEN
MENS SINK
MENS
VESTIBULE
DAY ROOM
STORAGE
CIRCULATION
DORM
COMM RM
MECHANICAL
ELECTRICAL
DORM
LAUNDRY/
JANITOR
DORM
DORM
WOMENS
LOCKER
WOMENS
RESTROOM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
APPARATUS
BAY - SOUTH
APPARATUS
BAY - NORTH
PPE
STORAGE
A-2013
A-201
A-201 4
A-201
A-402
A-401
A-401
A-401
A-402
A-301
MENS TOILET
A-40212
103A
A
A
A
A
A
A
A
A
A
S
129A
128A
127A
126A
112A
W1
W2
W3
W6W7
W8
W5
W4
A
B
W11
A-302
A-302
139F
G
H
C
D
139E
A-311
A-311
A-311
A-402 13
SA3SA3
SA3SA3
SA3SA3
SA3
FC3
SA3
SB3SB3
SB3
1H
SB3
1H
SB3
1H
SB3
SB3
1H
SB3
1H
SA3SA3
SA3
1H
SB3
SB3
1H
SB3
SB3
SA3
SA3
SB3
SB3
1H
CIRCULATION
RENOVATION
YAQF172012
ADDITION
YAQF049026
R E
N O
V A
T
IO
N Y
A Q
F
A D
D
IT
IO
N
Y A
Q F
RENOVATION
YAQF172012
ADDITION
YAQF049026
ADDITION
YAQF049026
RENOVATION
YAQF172012
UTILITY YARD
WOMENS
VESTIBULE
W9 W10
A-402 14
A
A
A
A
A
A
A
SB3
SB3SB3SB3SB3
SB3
SB3
1H SB3
1H A-402 15
A
A-402
D.3
2.51.5 10.5 11.5
A.2
B.8
11.1 11.2
E.5
11.8
4.105
4.104
4.1054.105 4.105
4.104
4.104 4.104
4.104
4.105
4.106
4.108 4.107
4.107
/8
/8
/8
/8
/2
/2
/4
/4
/4
/4
54'-4" 46'-6 1/4" 1'-2 5/8" 16'-4 3/4"
1'-3 1/8"
8'-0" 13'-3 3/4" 1'-2 5/8"
41'-4 7/8"
4'-11 1/2" 8'-6 5/8" 8'-8 1/2" 8'-10 3/8" 8'-9"
/2
13'-10 1/2" 8'-7 1/2" 8'-2 7/8" 16'-7 3/8" 3'-2" 19'-1" 3'-3" 10'-6" 10'-6" 6'-0" 13'-0 3/4"
3'-6 1/8" 8'-8 3/4"
C L E
A R
/8
/4 " C
L E
A R
/2
4.110
4"
4.110
CLEAR
4'-8"
/8
C.1 10'-6" 10'-6" 11'-1 3/8"
5 3/8"
15'-5 3/8"
2'-11 1/4"
2'-5"
7'-10" 7'-0"
A-501
ALIGN
8'-8 5/8"
/8
/8
B
A
4.111
4.111
4.111
4.111
4.114
4.1144.114
4.114
4.1144.114
4.102
A-503
A-503
A-402
9.5
SG3
SG3
SG3SG3
SG3
SG3SG3
SA3
4.101
A
2.11.8
A-603
4.104
4.102
A-502
A-502
OPP.
A-503
A-503
4.117
4.118
4.107
4.108
TYP
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
710 Avis Drive, Suite 100, Ann Arbor, MI 48108 phone: 810-956-9300
/1
/2
:5
:3
P
M C
R e v it L o c a l\
.0
-A
-R m a rk
.b ra it h w a it e
.r v t
V O
L K
F
IE
L D
C R
T C
C a m p
D o u g la s W
I
A D
D T
O F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N A
N D
R E
P A
IR
F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N B
A-101
FIRST FLOOR PLAN
R3141400-191065.01
MAB
MTS
May 4, 2022
RDU
A N
G P ro je c t
N o
Y
A Q
F
A
N D
Y A
Q F
1/8" = 1'-0"1
FIRST FLOOR PLAN
KEYED NOTES
4.101 ALIGN FINISH FACE OF PARTITION WITH FINISH FACE OF EXISTING PARTITION.
4.102 INFILL OPENING. MATCH EXISTING PARTITION CONSTRUCTION AND FINISH.
4.104 CONCRETE STOOP, SEE STRUCTURAL.
4.105 EQUIPMENT PAD, SEE STRUCTURAL DRAWINGS.
4.106 CONCRETE SLAB, SEE STRUCTURAL DRAWINGS.
4.107 MECHANICAL EQUIPMENT, SEE MECHANICAL DRAWINGS.
4.108 ELECTRICAL EQUIPMENT, SEE ELECTRICAL DRAWINGS.
4.110 3'-6" X 7'-0" OPENING.
4.111 CONCRETE FILLED PIPE BOLLARD, TYPICAL. SEE STRUCTURAL DRAWINGS.
4.114 ALIGN FINISH FACE OF NEW EXTERIOR WALL WITH EXISTING WALL FACE. 2"
EXTERIOR INSULATING AND FINISHING SYSTEM (EIFS) OVER EXTERIOR AIR
BARRIER ON 5/8" EXTERIOR SHEATHING ON 6" METAL STUDS WITH BATT
INSULATION WITH 5/8" INTERIOR GYPSUM WALL BOARD.
4.117 COUNTERTOP AND CABINETRY IN TRAINING ROOM 103 ARE BID OPTION 2 IN
THE ADDITION PROJECT YAQF049026.
4.118 BID OPTION 6: SCREEN WALL.
05/04/22 B3 FINAL
FLOOR PLAN GENERAL NOTES:
1. SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON SITE PLAN = 100'-0" ON
ARCHITECTURAL DRAWINGS.
2. FIELD VERIFY DIMENSIONS, BRING DISCREPANCIES TO THE ATTENTION OF THE
ARCHITECT/ENGINEER FOR FINAL DECISION.
3. INTERIOR DIMENSIONS ARE FROM FINISH FACE OF WALLS (I.E. GYPSUM
WALLBOARD OR CMU), UNLESS NOTED OTHERWISE.
4. FINISH FLOOR ELEVATIONS ARE TO THE TOP OF CONCRETE, UNLESS NOTED
OTHERWISE.
5. REFERENCE SHEET G-011 AND G-021 FOR CODE, FIRE RATING, AND
SEPARATION REQUIREMENTS.
6. GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING CONSTRUCTION
(WALLS, DOORS, CEILINGS, FLOORS, ETC.) AS REQUIRED FROM DEMOLITION
OR CONSTRUCTION TO ALLOW FOR THE PREP WORK AND NEW OR
COMPLETION OF EXISTING FINISHES. REPAIRS OR REPLACEMENTS MUST BE
DURABLE, SEAMLESS, AND MATCH THE EXISTING MATERIAL.
7. GENERAL CONTRACTOR SHALL PATCH FLOOR AND WALL PENETRATIONS
CAUSED BY DEMOLITION OF MECHANICAL, ELECTRICAL, TECHNOLOGY, AND
PLUMBING, INCLUDING BUT NOT LIMITED TO PIPING AND CONDUIT RUNS, IN A
MANNER THAT IS CONSISTENT WITH THE EXISTING FLOOR AND WALL
CONSTRUCTION AND FINISH. PENETRATIONS SHALL MEET REQUIRED FIRE
RATINGS.
8. COORDINATE THE INSTALLATION OF OWNER-SUPPLIED EQUIPMENT.
REFERENCE PLANS, SPECS, AND INTERIOR ELEVATIONS FOR SPECIFIC
EQUIPMENT AND ITS INSTALLATION REQUIREMENTS.
9. GENERAL CONTRACTOR SHALL PROVIDE BLOCKING, STIFFENERS, BRACINGS,
BACKING PLATES, SUPPORTING BRACKETS, AND NECESSARY SELECTIVE
DEMOLITION REQUIRED FOR THE PROPER INSTALLATION OF CASEWORK,
TOILET ROOM ACCESSORIES, TOILET PARTITIONS AND MISCELLANEOUS
EQUIPMENT.
10. EXISTING AND INFILL CONCRETE SUB-FLOOR SHALL BE MADE LEVEL, PLUMB
AND IN SOUND CONDITION AS REQUIRED FOR THE INSTALLATION OF FINAL
FLOOR FINISHES, TYPICAL. PROVIDE ARDEX OR EQUAL LEVELING CONCRETE
TO PROVIDE A SMOOTH WALKABLE AREA.
11. RECESSED CABINETS, PANELS, BOXES, ETC. LOCATED IN FIRE-RATED
PARTITIONS SHALL BE INSTALLED IN A MANNER WHICH MAINTAINS THE FIRE
RATED CONSTRUCTION.
12. SEE ENLARGED PLANS FOR NOTES, DIMENSIONS, AND WALL TYPES WITHIN
THE DETAIL CALLOUT BOUNDARIES.
13. REFERERNCE SHEET A-002 FOR INTERIOR PARTITION TYPES. INTERIOR
PARTITION TAGS NOTED ENCOMPASS THE ENTIRE LENGTH OF WALL SHOWN
TO CORNERS OF ROOM, OVER AND AROUND DOORWAYS SHOWN.
14. REFERENCE SHEET A-700'S FOR FINISHES PLAN.
15. REFERENCE SHEET A-800'S FOR SIGNAGE LAYOUTS AND COORDINATION
REQUIREMENTS.
16. REFERENCE SHEET A-900'S FOR FURNITURE AND EQUIPMENT LAYOUTS AND
COORDINATION REQUIREMENTS.
17. CONSTRUCTION STAGING AND LAYDOWN AREAS CAN BE PLACE ON THE
EXISTING ROADWAY TO BE DEMOLISHED TO THE SOUTH OF THE FIRE
STATION. THE FINAL ACCEPTABLE LOCATION AND ANY ADDITIONAL
LOCATIONS WHICH MAY BE NEEDED CAN BE COORDINATED WITH THE
CONTRACTING OFFICER AND CONTRACTING OFFICER’S REPRESENTATIVE.
18. WHERE COLUMNS ARE SHOWN WITHIN WALLS, WALLS TO BE CENTERED ON
COLUMN, U.N.0
A-301
2 4 7 9 11
3 5 6 8 10
C
B
A
AA
3.6 9.4
2060100
X
Y
Z
121.2
A-2013
A-201 4
A-201
A-301
A-302
A-302
A-311
J
APPARATUS
BAY - SOUTH
EQUIPMENT
PLATFORM
APPARATUS
BAY - NORTH
OPEN TO BELOW
OPEN TO BELOW
W12
RENOVATION
YAQF172012
ADDITION
YAQF049026
RENOVATION
YAQF172012
ADDITION
YAQF049026
ADDITION
YAQF049026
RENOVATION
YAQF172012
2.51.5 10.5 11.5
A.2
B.8
11.1 13
C.1
AD1012
7'-0"
A-502
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
710 Avis Drive, Suite 100, Ann Arbor, MI 48108 phone: 810-956-9300
/1
/2
:5
:1
P
M C
R e v it L o c a l\
.0
-A
-R m a rk
.b ra it h w a it e
.r v t
V O
L K
F
IE
L D
C R
T C
C a m p
D o u g la s W
I
A D
D T
O F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N A
N D
R E
P A
IR
F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N B
A-102
EQUIPMENT
PLATFORM FLOOR
PLAN
R3141400-191065.01
MAB
MTS
May 4, 2022
RDU
A N
G P ro je c t
N o
Y
A Q
F
A
N D
Y A
Q F
1/8" = 1'-0"1
EQUIPMENT PLATFORM FLOOR PLAN
05/04/22 B3 FINAL
F
W
DW
W
D D
F R
Z
ROOM FINISH GENERAL NOTES:
1. REFER TO FINISH SCHEDULE, SHEET A-710 FOR MATERIAL SELECTION AND COLOR.
2. REFER TO ROOM FINISH SCHEDULE, SHEET A-710 FOR ALL ROOM FINISHES NOT NOTED
ON PLAN.
3. ALL FLOORING TRANSITIONS SHALL BE CENTERED UNDER DOOR IN CLOSED POSITION
U.N.O. REFER TO SHEET A-710 FOR TYPICAL TRANSITION DETAILS.
4. ALL INTERIOR HM DOOR FRAME FINISHES TO BE PAINTED PT-4. UNO IN DOOR SCHEDULE.
5. ALL METAL LINEAR DIFFUSERS SHALL BE PAINTED TO MATCH SURROUNDING WALL
SURFACE, U.N.O.
6. ALL SHOP PRIMED ACCESS PANELS SHALL BE PAINTED TO MATCH ADJACENT SURFACE.
7. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE SEALED, U.N.O.
8. ALL WALLS TO BE PAINTED PT-1, U.N.O.
LOBBY
CONTROL RM
TRAINING
ASST CHIEF
CHIEF
ASST CHIEF
ASST CHIEF
CLERICAL
OFFICE
KITCHEN
DAY ROOM
DORM
COMM RM
MECHANICAL
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
DORM
ELECTRICAL
ADA
RESTROOM
CIRCULATION
STORAGE
MENS
VESTIBULE
WOMENS
RESTROOM
WOMENS
LOCKER
MENS TOILET
MENS SINK
MENS
SHOWERS
MENS
LOCKERS
CIRCULATION
APPARATUS
BAY - SOUTH
APPARATUS
BAY - NORTH
PPE
STORAGE
LAUNDRY/
JANITOR
CIRCULATION
PLC
CPT-2
CPT-2 CPT-2
CPT-2
CPT-2CPT-2CPT-2
CPT-1
PLCCPT-1
CPT-1
CT-2
CT-2
SLC
CPT-1
CPT-1
CT-2
CT-2
CPT-3CPT-3CPT-3CPT-3CPT-3
CPT-3
CPT-3
CPT-3
CPT-3
CPT-3CPT-3CPT-3
CPT-1
SLC
SLC
CPT-3
SLC
CT-2
RENOVATION
YAQF172012
ADDITION
YAQF049026
R E
N O
V A
T
IO
N Y
A Q
F
A D
D
IT
IO
N
Y A
Q F
RENOVATION
YAQF172012
ADDITION
YAQF049026
ADDITION
YAQF049026
RENOVATION
YAQF172012
A-710
A-710
A-710
A-710
CPT-1
PLC CPT-1
PLC
WOMENS
VESTIBULE1
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
710 Avis Drive, Suite 100, Ann Arbor, MI 48108 phone: 810-956-9300
/1
/2
:2
:0
A
M C
R e v it L o c a l\
.0
-A
-R m a rk
.b ra it h w a it e
.r v t
V O
L K
F
IE
L D
C R
T C
C a m p
D o u g la s W
I
A D
D T
O F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N A
N D
R E
P A
IR
F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N
B
A-701
FIRST FLOOR FINISH
PLAN
R3141400-191065.01
MAB
MTS
May 4, 2022
RDU
A N
G P ro je c t
N o
Y
A Q
F
A
N D
Y A
Q F
1/8" = 1'-0"1
FIRST FLOOR FINISH PLAN
05/04/22 B3 FINAL
ACP = ACOUSTICAL CEILING PANEL
ACPN = ACOUSTICAL CEILING PANEL - NONPOROUS
B = BRICK
BJ = BAR JOIST
CONC = CONCRETE
CGW = CHANNEL GLASS WALL
CMU = CONCRETE MASONRY UNIT
CP = CEMENT BASED PAINT
CPL = CHECKERED PLATE (STAINLESS STEEL)
CPT = CARPET
CT = CERAMIC TILE
CTB = CERAMIC TILE BASE (COVE)
DT = DOUBLE TEE
EM = ENTRY MAT
ETR = EXISTING TO REMAIN
EXPSD = EXPOSED
EF = EPOXY FLOORING
EP = EPOXY PAINT
FB = FLOOR BRICK
FG = FIBERGLASS COATING
FRPLY = FIRE RETARDANT PLYWOOD
GR = GROUT
GWB = GYPSUM WALL BOARD
GWBA = GYPSUM WALL BOARD - ABUSE RESISTANT
GW = GLASS WALL
MB = MARKER BOARD
MD = METAL DECK
MP = METAL PANEL
PLAM = PLASTIC LAMINATE
MS = METAL STUD
PCP = PRECAST CONCRETE PLANK
PCT = PRECAST CONCRETE PLANK W/2" TOPPING
PLC = POLISHED CONCRETE
PMTL = PERFORATED METAL
PS = PROJECTOR SCREEN
PT = LATEX PAINT
QT = QUARRY TILE
RB = RUBBER BASE
RF = RESINOUR FLOORING
RFT = RUBBER FLOOR TILE
S = SEALER
SLC = SEALED CONCRETE
SSM = SOLID SURFACE MATERIAL
T = TERAZZO
TB = TACKBOARD
VB = VINYL BASE
VCT = VINYL TILE
VWC = VINYL WALLCOVERING
WD = WOOD BASE
ROOM FINISH ABBREVIATIONS:
CT-3 SHOWER TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
FLOOR TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
SHOWER TILE, REFER TO
ARCHITECTURAL FINISH
PLANSCONCRETE SLAB
CONCRETE SLAB
SQUARE
INLET
DRAIN
SQUARE
INLET
DRAIN
1/4" 12" 1/4"
12" 1/4"
12" 1/4"
12"
POURED CONCRETEPOURED CONCRETE - SLOPE
TO DRAIN
POURED CONCRETE - SLOPE
TO DRAIN
POURED CONCRETE - SLOPE
TO DRAIN
WATERPROOF MEMBRANE AND
VAPOR RETARDER EXTEND TO
SHOWER DRAIN CLAMPING RING
AS SPECIFIED
WATERPROOF MEMBRANE AND
VAPOR RETARDER EXTEND TO
SHOWER DRAIN CLAMPING RING
AS SPECIFIED WATERPROOF MEMBRANE
AND VAPOR RETARDER AS
SPECIFIED
WALL TILE, REFER TO SHEET A-401
6 1/2"
SLOPE BACK TO
LOCKER ROOM
FLOOR TILE
ELEVATION
SCHLUTER DILEX-AHK COVE TRIM
PAINTED WALL, REFER TO
ARCHITECTURAL FINISH PLANS
PARTITION, AS SCHEDULED
SCHLUTER RONDEC
WALL TILE, REFER TO
ARCHITECTURAL FINISH PLANS
A N
D S
C H
E D
U L E
F O
R H
E
IG
H T
R E
F E
R T
O F
IN
IS
H E
S P
L A
N
WALL TILE, REFER TO
ARCHITECTURAL FINISH
PLANS
COVE TILE BASE
PARTITION, AS SCHEDULED
ADHESIVE
CERAMIC FLOOR TILE,
REFER TO
ARCHITECTURAL FINISH
PLANS
ALUMINUM TRANSITION STRIP
WALL FINISH
PARTITION TYPES
PARTITION WIDTH
AS NOTED ON
PARTITION ,AS SCHEDULED
ALUMINUM CORNER (TYP. AT
ALL OUTSIDE CORNERS)
CORNER GUARD AS
SPECIFIED, WITH TOP AND
BOTTOM CAPS, INSTALL PER
MANUFACTURER'S
REQUIREMENTS
PROVIDE MINIMUM
CLEARANCE FROM INSTALLED
WALL BASE
C
L E
A R
M
IN
IM
U M
WALL BASE, REFER TO
FINISH PLANS AND ROOM
FINISH SCHEDULE
METAL TRANSITION (0" - 3/8")
FASTENED TO CONCRETE SLAB
SEALED OR POLISHED
CONCRETE FLOOR
CONCRETE SLAB
CARPET, REFER TO
ARCHITECTURAL FINISH PLANS
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
710 Avis Drive, Suite 100, Ann Arbor, MI 48108 phone: 810-956-9300
/1
/2
:2
:3
A
M C
R e v it L o c a l\
.0
-A
-R m a rk
.b ra it h w a it e
.r v t
V O
L K
F
IE
L D
C R
T C
C a m p
D o u g la s W
I
A D
D T
O F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N A
N D
R E
P A
IR
F
IR
E
/C R
A S
H R
E S
C U
E S
T A
T
IO
N
B
A-710
FINISH SCHEDULES
AND DETAILS
R3141400-191065.01
MAB
MTS
May 4, 2022
RDU
A N
G P ro je c t
N o
Y
A Q
F
A
N D
Y A
Q F
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME FLOOR BASE
WALLS CEILING
REMARKSNORTH EAST SOUTH WEST MTL HEIGHT
101 LOBBY PLC RB-1 PT-1 PT-1 PT-1 PT-1 GYP 10'-0"
102 ADA RESTROOM CT-2 CT-1 CT-1 CT-1 CT-1 CT-1 ACP-2 CT WAINSCOT TO 5', PT-1 ABOVE
103 TRAINING CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
104 CIRCULATION CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
105 CONTROL RM CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
106 ASST CHIEF CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
107 ASST CHIEF CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
108 CLERICAL OFFICE CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
109 ASST CHIEF CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
110 CHIEF CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
111 KITCHEN PLC RB-1 PT-1 PT-1 PT-1 PT-1 EXPSD -
112 DAY ROOM CPT-2 RB-1 PT-1 PT-1 PT-1 PT-1 EXPSD -
113 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
114 MENS VESTIBULE CT-2 CT-1 PT-1 PT-1 PT-1 PT-1 ACP-2 8'-0"
115 MENS LOCKERS CT-2 CT-1 - SEE ELEV SEE ELEV CT-1 ACP-2 8'-0"
116 MENS SHOWERS CT-3 CT-1 CT-1 CT-1 - CT-1 GYP 7'-6"
117 MENS SINK CT-2 CT-1 CT-1 CT-1 CT-1 CT-1 ACP-2 8'-0" CT WAINSCOT TO 5', PT-1 ABOVE
118 MENS TOILET CT-2 CT-1 CT-1 CT-1 CT-1 CT-1 ACP-2 8'-0" CT WAINSCOT TO 5', PT-1 ABOVE
119 CIRCULATION CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
120 WOMENS RESTROOM CT-2 CT-1 CT-1 CT-1 CT-1 CT-1 ACP-2 8'-0" CT WAINSCOT TO 5', PT-1 ABOVE
121 WOMENS LOCKER CT-2/CT-3 CT-1 - CT-1 SEE ELEV CT-1 ACP-2 8'-0" CT-3 TILE IN SHOWER STALL
122 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
123 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
124 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
125 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
126 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ETR -
127 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ETR -
128 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ETR -
129 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ETR -
130 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1
131 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
132 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
133 LAUNDRY/ JANITOR SLC RB-1 PT-1 PT-1 PT-1 PT-1 ACP-2 8'-0"
134 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1 8'-0"
135 DORM CPT-3 RB-1 PT-2 PT-2 PT-2 PT-2 ACP-1/GYP 8'-0"
136 COMM RM SLC RB-1 FRPLY FRPLY FRPLY FRPLY EXPSD - FRPLY WAINSCOT 2'AFF TO10'AFF
137 MECHANICAL SLC RB-1 - - - - EXPSD -
138 ELECTRICAL SLC RB-1 FRPLY FRPLY FRPLY FRPLY- EXPSD - FRPLY WAINSCOT 1'AFF TO 9' AFF
139 APPARATUS BAY - SOUTH - - - - - - EXPSD -
140 PPE STORAGE - - - - - - EXPSD -
141 APPARATUS BAY - NORTH - - - - - - ETR -
142 CIRCULATION CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1 8'-0"
143 WOMENS VESTIBULE CT-2 CT-1 PT-1 PT-1 PT-1 PT-1 ACP-2 8'-0"
ARCHITECTURAL FINISHES SCHEDULE
FINISH
NUMBER FINISH DESCRIPTION
PRODUCT DESCRIPTION
REMARKSMANUFACTURER MODEL NUMBER STYLE COLOR SIZE
ACP-1 ACOUSTIC CEILING PANEL ARMSTRONG CALLA 15/16 SQ TEG WHITE 24"X24" DRY AREAS
ACP-2 ACOUSTIC CEILING PANEL ARMSTRONG CALLA HEALTH 15/16 SQ TEG WHITE 24"X24" WET AREAS
BRK-1 BRICK MASONRY ENDICOTT MODULAR FACE BRICK SMOOTH RED BLEND 2-1/4"X3-5/8"X7-5/8" ENTRY WALL
BRK-2 BRICK MASONRY ENDICOTT MODULAR FACE BRICK SMOOTH GOLDEN BUFF 2-1/4"X3-5/8"X7-5/8" BENCH AND SILL
CPT-1 CARPET TILE INTERFACE VISUAL CODE HARD DRIVE/STATIC
LINES
105943 STEEL HD/105939
STEEL STATIC
25CMX1M INSTALLED ASHLAR, 50/50 RANDOM MIX, DAY ROOM
CPT-2 CARPET TILE INTERFACE VISUAL CODE STATIC LINES 105939 STEEL STATIC 25CMX1M INSTALLED ASHLAR, OFFICES
CPT-3 CARPET TILE INTERFACE VISUAL CODE STATIC LINES 105939 STEEL STATIC 25CMX1M INSTALLED ASHLAR, DORMS
CT-1 CERAMIC TILE MIRAGE HUB DESIGN CORE UG17 NAT FOAM 6"X24" WALLS, TILE X DESIGN
CT-2 CERAMIC TILE MIRAGE HUB DESIGN CORE UG25 NAT COMPACT 12"X24" FLOORS
CT-3 CERAMIC TILE MIRAGE HUB DESIGN CORE UG88 NAT COMPACT 12"X12" MOSAIC SHOWERS
PLAM-1 PLASTIC LAMINATE - TYPE 1 FORMICA 961-58 FOG
PLC POLISHED CONCRETE
PT-1 INTERIOR PAINT SHERWIN WILLIAMS SW 7014 SATIN EIDER WHITE GENERAL
PT-2 INTERIOR PAINT SHERWIN WILLIAMS SW 7059 SATIN UNUSUAL GRAY DORMS
PT-3 EXTERIOR PAINT EXTERIOR EIFS
PT-4 INTERIOR PAINT SHERWIN WILLIAMS SE 7069 IRON ORE HM DOORS AND FRAMES
RB-1 RUBBER WALL BASE ROPPE 193 STANDARD TOE 193 BLACK BROWN 4" GENERAL
SLC SEALED CONCRETE
SSF-1 SOLID SURFACE CAESAR STONE 4030 PEBBLE 2CM RESTROOMS
SSF-2 SOLID SURFACE CAESAR STONE 4004 RAW CONCRETE 2CM CONTROL ROOM, KITCHEN
3" = 1'-0"1
SHOWER TILE BASE
3" = 1'-0"2
TILE WAINSCOT
6" = 1'-0"3
TILE WALL BASE
3" = 1'-0"4
WALL TILE OUTSIDE CORNER
1/2" = 1'-0"6
CORNER GUARD ELEVATION
6" = 1'-0"5
TRANSITION - CPT/CONCRETE
05/04/22 B3 FINAL
1 06/12/24 ADDENDUM NO. 1
| S-152 - HIGH ROOF FRAMING PLAN |
| AD101 - FIRST FLOOR DEMOLITION PLAN |
| AD101 - FIRST FLOOR DEMOLITION PLAN |
| A-101 - FIRST FLOOR PLAN |
| A-101 - FIRST FLOOR PLAN |
| A-102 - EQUIPMENT PLATFORM FLOOR PLAN |
| A-102 - EQUIPMENT PLATFORM FLOOR PLAN |
| A-701 - FIRST FLOOR FINISH PLAN |
| A-701 - FIRST FLOOR FINISH PLAN |
| A-710 - FINISH SCHEDULES AND DETAILS |
| A-710 - FINISH SCHEDULES AND DETAILS |
File details come from the government source that posted it. Updated .