This document is the specifications for the construction project to repair and add to the Fire/Crash Rescue Station Building 510 at Volk Field in Wisconsin. The project includes constructing a new 3,430 SF addition, renovating approximately 15,970 SF of the existing facility, and upgrading various building systems and components. The key tasks include demolition, site work, new mechanical/electrical/plumbing systems, architectural finishes, and security system upgrades. The solicitation is being issued as an Invitation for Bids for a single firm fixed-price construction contract with a duration of 365 calendar days. The magnitude of construction is between $5-10 million. Brand name products required include an Advantor security system and Monaco Vulcan fire alarm panels. The solicitation includes FAR clause 52.219-14(e)(3) limiting subcontracting to 85% of the contract value, excluding materials.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Volk Field – CRTC
Wisconsin Air National Guard
Camp Douglas, Wisconsin
Repair Fire/Crash Rescue
Station B510
PN: YAQF172012
Add to Fire Crash Rescue
Station
PN: YAQF049026
Type B3 Final Submittal
Specifications Volume 2 of 4
May 4, 2022
This page intentionally left blank.
YAQF172012-REPAIR FIRE/CRASH RESCUE STATION B510
YAQF049026-ADD TO FIRE CRASH RESCUE STATION
TYPE B-3
04 MAY 2022
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION
00 31 26A HAZARDOUS MATERIALS INSPECTION REPORT
00 31 32 GEOTECHNICAL DATA
00 31 32A GEOTECHNICAL REPORT
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00A SUBMITTAL REGISTER
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 73 00 EXECUTION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 SELECTIVE DEMOLITION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
VOLUME 2
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
TYPE B-3
PROJECT TABLE OF CONTENTS Page 2
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 19 WATER-DRAINAGE EXTERIOR INSULATION AND FINISH SYSTEM
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 13 METAL WALL PANELS
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 72 33.13 ROOF HATCH RAIL SYSTEM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 36 13 SECTIONAL OVERHEAD DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
TYPE B-3
PROJECT TABLE OF CONTENTS Page 3
VOLUME 3
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 09 93A APPENDIX - SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 52 00 HEATING BOILERS
23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND
INTEGRATION
VOLUME 4
DIVISION 26 - ELECTRICAL
26 05 02 ELECTRICAL DEMOLITION AND ALTERATION
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH
AUXILIARIES
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 41 00 AUDIO-VISUAL SYSTEMS
27 51 16 PUBLIC ADDRESS SYSTEMS
TYPE B-3
PROJECT TABLE OF CONTENTS Page 4
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
28 48 25 FIRE STATION ALERTING SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
YAQF172012-REPAIR FIRE/CRASH RESCUE STATION B510 TYPE B-3
YAQF049026-ADD TO FIRE CRASH RESCUE STATION 04 MAY 2022
SECTION 04 20 00
UNIT MASONRY
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI SP-66 (2004) ACI Detailing Manual
ASTM INTERNATIONAL (ASTM)
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip
ASTM A185/A185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
ASTM A615/A615M (2020) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A641/A641M (2019) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A951/A951M (2011) Standard Specification for Steel Wire for Masonry Joint Reinforcement
ASTM A996/A996M (2016) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement
ASTM A1008/A1008M (2020) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
SECTION 04 20 00 Page 1
ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM C67/C67M (2020) Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
ASTM C90 (2016) Standard Specification for Loadbearing Concrete Masonry Units
ASTM C129 (2017) Standard Specification for Nonloadbearing Concrete Masonry Units
ASTM C207 (2018) Standard Specification for Hydrated Lime for Masonry Purposes
ASTM C270 (2019) Standard Specification for Mortar for Unit Masonry
ASTM C476 (2020) Standard Specification for Grout for Masonry
ASTM C641 (2017) Standard Test Method for Iron Staining Materials in Lightweight Concrete Aggregates
ASTM C652 (2019b) Standard Specification for Hollow Brick (Hollow Masonry Units Made from Clay or Shale)
ASTM C1019 (2019) Standard Test Method for Sampling and Testing Grout
ASTM C1384 (2012a) Standard Specification for Admixtures for Masonry Mortars
ASTM D2000 (2018) Standard Classification System for Rubber Products in Automotive Applications
ASTM D2287 (2019) Nonrigid Vinyl Chloride Polymer and Copolymer Molding and Extrusion Compounds
ASTM E514/E514M (2020) Standard Test Method for Water Penetration and Leakage Through Masonry
THE MASONRY SOCIETY (TMS)
TMS MSJC (2016) Masonry Standard Joint Committee's (MSJC) Book - Building Code Requirements and Specification for Masonry Structures, Containing TMS 402/ACI 530/ASCE 5, TMS 602/ACI 530.1/ASCE 6, and Companion Commentaries
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only.
SECTION 04 20 00 Page 2
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Cut CMU Drawings; G
Reinforcement Detail Drawings; G
SD-03 Product Data
Hot Weather Procedures; G
Cold Weather Procedures; G
Clay Brick; G
Cement; G
Cementitious Materials; G
Insulation; G
SD-04 Samples
Clay Brick; G
Concrete Masonry Units (CMU); G
Admixtures for Masonry Mortar; G
Anchors, Ties, and Bar Positioners; G
Joint Reinforcement; G
Clay Masonry Expansion-Joint Materials; G
SD-05 Design Data
Masonry Compressive Strength; G
SD-06 Test Reports
Efflorescence Test
Single-Wythe Masonry Wall Water Penetration Test
SD-07 Certificates
Clay Brick
Concrete Masonry Units (CMU)
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver, store, handle, and protect material to avoid chipping, breakage, and contact with soil or contaminating material. Store and prepare materials in already disturbed areas to minimize project site disturbance and size of project site.
SECTION 04 20 00 Page 3
1.3.1 Masonry Units
Cover and protect masonry units from precipitation. Conform to handling and storage requirements of TMS MSJC.
a. Pack glazed brick, glazed structural clay tile, and prefaced concrete masonry units in the manufacturer's standard paper cartons, trays, or shrink wrapped pallets with a divider between each unit. Do not stack pallets. Do not remove units from cartons until cartons are placed on scaffolds or in the location where units are to be laid.
b. Mark prefabricated lintels on top sides to show either the lintel schedule number or the number and size of top and bottom bars.
1.3.2 Reinforcement, Anchors, and Ties
Store steel reinforcing bars, coated anchors, ties, and joint reinforcement above the ground. Maintain steel reinforcing bars and uncoated ties free of loose mill scale and loose rust.
1.3.3 Cementitious Materials, Sand and Aggregates
Deliver cementitious and other packaged materials in unopened containers, plainly marked and labeled with manufacturers' names and brands. Store cementitious material in dry, weathertight enclosures or completely cover.
Handle cementitious materials in a manner that will prevent the inclusion of foreign materials and damage by water or dampness. Store sand and aggregates in a manner to prevent contamination and segregation.
1.4 PROJECT/SITE CONDITIONS
Conform to TMS MSJC for hot and cold weather masonry erection.
1.4.1 Hot Weather Procedures
When ambient air temperature exceeds 100 degrees F, or exceeds 90 degrees F and the wind velocity is greater than 8 mph, comply with TMS MSJC Article
1.8 D for: preparation prior to conducting masonry work; construction while masonry work is in progress; and protection for newly completed masonry.
1.4.2 Cold Weather Procedures
When ambient temperature is below 40 degrees F, comply with TMS MSJC Article 1.8 C for: preparation prior to conducting masonry work;
construction while masonry work is in progress; and protection for newly completed masonry.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Design - Specified Compressive Strength of Masonry
The specified compressive strength of masonry, f'm, is 2000 psi.
SECTION 04 20 00 Page 4
2.1.2 Performance - Verify Masonry Compressive Strength
Verify specified compressive strength of masonry using the "Unit Strength Method" of TMS MSJC. Submit calculations and certifications of unit and mortar strength.
Verify specified compressive strength of masonry using the "Prism Test Method" of TMS MSJC when the "Unit Strength Method" cannot be used. Submit test results.
2.2 MANUFACTURED UNITS
2.2.1 General Requirements
Do not change the source of materials, which will affect the appearance of the finished work, after the work has started except with Contracting Officer's approval. Submit test reports from an approved independent laboratory. Certify test reports on a previously tested material as the same materials as that proposed for use in this project. Submit certificates of compliance stating that the materials meet the specified requirements.
2.2.2 Clay Brick
2.2.2.1 General
2.2.2.1.1 Sample Submittal
Submit brick samples as specified, showing the color range and texture of clay or shale brick. Limit units used on the project to those that conform to the approved sample. Submit sample of colored mortar with applicable masonry unit and color samples of three stretcher units and one unit for each type of special shape.
2.2.2.1.2 Efflorescence Test
Test clay brick that will be exposed to weathering for efflorescence in accordance with ASTM C67/C67M. Schedule tests far enough in advance of starting masonry work to permit retesting if necessary. Units meeting the definition of "effloresced" are subject to rejection.
2.2.2.2 Hollow Clay Brick
Provide hollow claye brick that conforms to ASTM C652, Grade SW, Type HBS.
a. Provide brick size of 3-5/8 inches inches thick, 2-1/4 inches inches high, and 7-5/8 inches inches long.
b. Where vertical reinforcement is shown in hollow brick, provide hollow brick designed to provide precise vertical alignment of the cells, with minimum cell dimension of 2-1/2 inches.
2.2.3 Concrete Units
2.2.3.1 Aggregates
Test lightweight aggregates, and blends of lightweight and heavier aggregates in proportions used in producing the units, for stain-producing iron compounds in accordance with ASTM C641,visual classification method.
SECTION 04 20 00 Page 5
Do not incorporate aggregates for which the iron stain deposited on the filter paper exceeds the "light stain" classification.
2.2.3.2 Concrete Masonry Units (CMU)
2.2.3.2.1 Cement
Use only cement that has a low alkali content and is of one brand.
2.2.3.2.2 Size
Provide units with specified dimension of 8 inches wide, 8 inches high, and 16 inches long.
2.2.3.2.3 Unit Types
a. Hollow Load-Bearing Units: ASTM C90, or normal weight. Provide load-bearing units for exterior walls, load-bearing walls, and shear walls.
b. Hollow Non-Load-Bearing Units: ASTM C129, lor normal weight.
Load-bearing units may be provided in lieu of non-load-bearing units.
c. Solid Load-Bearing Units: ASTM C90, normal weight units. Provide solid units as indicated.
2.2.3.2.4 Jamb Units
Provide jamb units of the shapes and sizes to conform with wall units.
Solid units may be incorporated in the masonry work where necessary to fill out at corners, gable slopes, and elsewhere as approved.
Provide sash jamb units with a 3/4 by 3/4 inch groove near the center at end of each unit.
2.3 MATERIALS
2.3.1 Mortar Materials
2.3.1.1 Cementitious Materials
Provide cementitious materials that conform to those permitted by ASTM C270.
2.3.1.2 Hydrated Lime and Alternates
Provide lime that conforms to one of the materials permitted by ASTM C207 for use in combination with portland cement, hydraulic cement, and blended hydraulic cement. Do not use lime in combination with masonry cement or mortar cement.
2.3.1.3 Admixtures for Masonry Mortar
In cold weather, use a non-chloride based accelerating admixture that conforms to ASTM C1384, unless Type III portland cement is used in the mortar.
2.3.1.4 Aggregate and Water
Provide aggregate (sand) and water that conform to materials permitted by
SECTION 04 20 00 Page 6
ASTM C270.
2.3.2 Grout and Ready-Mix Grout Materials
2.3.2.1 Cementitious Materials for Grout
Provide cementitious materials that conform to those permitted by ASTM C476.
2.3.2.2 Aggregate and Water
Provide fine and coarse aggregates and water that conform to materials permitted by ASTM C476.
2.4 MORTAR AND GROUT MIXES
2.4.1 Mortar Mix
a. Provide mortar Type S unless specified otherwise herein.
b. Provide mortar that conforms to ASTM C270. Use Type S mortar. For field-batched mortar, measure component materials by volume. Use measuring boxes for materials that do not come in packages, such as sand, for consistent batching. Mix cementitious materials and aggregates between 3 and 5 minutes in a mechanical batch mixer with a sufficient amount of water to produce a workable consistency. Do not hand mix mortar unless approved by the Contracting Officer. Maintain workability of mortar by remixing or retempering. Discard mortar that has begun to stiffen or is not used within 2-1/2 hours after initial mixing.
c. For preblended mortar, follow manufacturer's mixing instructions.
2.4.2 Grout and Ready Mix Grout Mix
Use grout that conforms to ASTM C476. Use conventional grout with a slump between 8 and 11 inches. Use self-consolidating grout with slump flow of 24 to 30 inches and a visual stability index (VSI) not greater than 1.
Provide minimum grout strength of 2500 psi in 28 days, as tested in accordance with ASTM C1019. Do not change proportions and do not use materials with different physical or chemical characteristics in grout for the work unless additional evidence is furnished that grout meets the specified requirements. Use ready-mixed grout that conforms to ASTM C476.
2.5 ACCESSORIES
2.5.1 Grout Barriers
Grout barriers for vertical cores that consist of fine mesh wire, fiberglass, or expanded metal.
2.5.2 Anchors, Ties, and Bar Positioners
2.5.2.1 General
a. Fabricate anchors and ties without drips or crimps. Size anchors and ties to provide a minimum of 5/8 inch mortar cover from each face of masonry.
b. Fabricate steel wire anchors and ties shall from wire conforming to
SECTION 04 20 00 Page 7
ASTM A1064/A1064M and hot-dip galvanize in accordance with
ASTM A153/A153M.
c. Fabricate joint reinforcement in conformance with ASTM A951/A951M. Hot dip galvanize joint reinforcement in exterior walls and in interior walls exposed to moist environment in conformance with ASTM A153/A153M.
Galvanize joint reinforcement in other interior walls in conformance with ASTM A641/A641M; coordinate with paragraph JOINT REINFORCEMENT below.
d. Fabricate sheet metal anchors and ties in conformance with ASTM A1008/A1008M. Hot dip galvanize sheet metal anchors and ties in exterior walls and in interior walls exposed to moist environment in compliance with ASTM A153/A153M Class B. Galvanize sheet metal anchors and ties in other interior walls in compliance with ASTM A653/A653M, Coating Designation G60.
e. Submit two anchors, ties and bar positioners of each type used, as samples.
2.5.2.2 Wire Mesh Anchors
Provide wire mesh anchors of 1/4 inch mesh galvanized hardware cloth, conforming to ASTM A185/A185M, with length not less than 12 inches, at intersections of interior non-bearing masonry walls.
2.5.2.3 Wall Ties for Multi-Wythe Masonry Construction
Provide rectangular-shaped wall ties, fabricated of hot-dipped galvanized W1.7 diameter steel wire. Provide rectangular wall ties no less than 4 inches wide.
Provide adjustable type wall ties, if approved for use, that consist of two essentially U-shaped elements fabricated of minimum W2.8 diameter steel wire or pintle type ties that are inserted to eyes of horizontal joint reinforcement, hot-dip galvanized. Provide adjustable ties with double pintle legs and allows a maximum offset of 1-1/4 inch between each element of the tie and maximum distance between connecting parts no more than 1/16 inch. Form the pintle and eye elements shall be formed so that both can be in the same plane. Wall ties may also be of a continuous type conforming to paragraph JOINT REINFORCEMENT.
2.5.2.4 Dovetail Anchors
Provide dovetail anchors of 3/16 inch diameter steel wire, triangular shaped, and attached to a 12 gauge or heavier steel dovetail section. Use these anchors to connect the exterior masonry wythe as it passes over the face of concrete columns, beams, or walls. Fill cells immediately above and below these anchors unless solid units are used. Furnish dovetail slots, which are specified to be installed by others, in accordance with Section 03 30 00 CAST-IN-PLACE CONCRETE.
2.5.2.5 Adjustable Anchors
2.5.2.5.1 Anchorage of Veneer to Light Gauge Steel or Concrete Backing
Use one of the following types of adjustable anchors to connect veneer to light gauge steel or concrete backing:
SECTION 04 20 00 Page 8
a. sheet metal at least 7/8 inch wide, 0.06 inch thick, and with corrugations having a wavelength of 0.3 to 0.5 inch and an amplitude of
0.06 to 0.10 inch or bent, notched or punched to provide equivalent performance;
b. wire anchors of minimum size W1.7 with ends bent to form a minimum 2 inches extension and without drips;
c. or wire pintle anchors used in conjunction with joint reinforcement.
Do not exceed 1/16 inch clearance between connecting parts of the tie.
Assemble adjustable anchors to prevent disengagement. Provide pintle anchors with one or more pintle legs of wire size W2.8 and an offset not exceeding 1-1/4 inch.
2.5.2.6 Veneer Anchor Screws
Provide screws for attachment of veneer anchors to cold-formed steel framing members of size No. 12 . Provide length of screws such that the screws penetrate the holding member by not less than 5/8 inch.
2.5.2.7 Bar Positioners
Factory-fabricate bar positioners, used to prevent displacement of reinforcing bars during the course of construction, from 9 gauge steel wire or equivalent, and hot-dip galvanized. Bar positioners must be suitable for intended use and be corrosion resistant steel. Bar positioners not fully contained within the wythe must be hot-dip galvanized.
2.5.3 Joint Reinforcement
Factory fabricate joint reinforcement in conformance with ASTM A951/A951M, welded construction. Provide ladder type joint reinforcement, having one longitudinal wire in the mortar bed of each face shell for hollow units and one wire for solid units and with all wires a minimum of 9 gauge. Size joint reinforcement to provide a minimum of 5/8 inch cover from each face.
Space crosswires not more than 16 inches. Provide joint reinforcement for straight runs in flat sections not less than 10 feet long. Provide joint reinforcement with factory formed corners and intersections. If approved for use, joint reinforcement may be furnished with adjustable wall tie features. Submit one piece of each type used, including corner and wall intersection pieces, showing at least two cross wires.
2.5.4 Reinforcing Steel Bars
Reinforcing steel bars and rods shall conform to ASTM A615/A615M or ASTM A996/A996M, Grade 60.
2.5.5 Concrete Masonry Control Joint Keys
Provide control joint keys of a factory fabricated solid section of natural or synthetic rubber (or combination thereof) conforming to ASTM D2000 M2AA-805 with a minimum durometer hardness of 80 or polyvinyl chloride conforming to ASTM D2287 Type PVC 654-4 with a minimum durometer hardness of 85. Form the control joint key with a solid shear section not less than 5/8 inch thick and 3/8 inch thick flanges, with a tolerance of plus or minus 1/16 inch, to fit neatly, but without forcing, in masonry unit jamb sash grooves.
SECTION 04 20 00 Page 9
2.5.6 Clay Masonry Expansion-Joint Materials
Provide backer rod and sealant, adequate to accommodate joint compression and extension equal to 50 percent of the width of the joint. Provide the backer rod of compressible rod stock of closed cell polyethylene foam, polyurethane foam, butyl rubber foam, or other flexible, nonabsorptive material as recommended by the sealant manufacturer. Provide sealant in conformance with Section 07 92 00 JOINT SEALANTS.
Submit one piece of each type of material used.
2.5.7 Through Wall Flashing and Weeps
2.5.7.1 General
Provide stainless steel sheet, self-adhesive rubberized sheet, or reinforced membrane sheet flashing except that flashing indicated to terminate in reglets shall be metal or coated-metal flashingandexcept that the material shall be one which is not adversely affected by dampproofing material.
2.5.7.2 Stainless Steel Flashing
Provide stainless steel, ASTM A167, Type 304 or 316, 0.015 inch thick, No. 2D finish. Where indicated, provide with factory-fabricated deformations that mechanically bond flashing against horizontal movement in all directions, where deformations consist of dimples, diagonal corrugations, or a combination of dimples and transverse corrugations.
2.5.7.3 Reinforced Membrane Flashing
Provide polyester film core with a reinforcing fiberglass scrim bonded to one side. Provide membrane that is impervious to moisture, flexible, is not affected by caustic alkalis, and after being exposed for not less than 1/2 hour to a temperature of 32 degrees F, shows no cracking when, at that temperature, it is bent 180 degrees over a 1/16 inch diameter mandrel and then bent at the same point over the same size mandrel in the opposite direction 360 degrees.
2.5.7.4 Rubberized Flashing
Provide self-adhesive rubberized asphalt sheet flashing consisting of 32-mil thick pliable and highly adhesive rubberized asphalt compound bonded completely and integrally to 8-mil thick, high density, cross-laminated polyethylene film to produce an overall thickness of 40 mils. Provide rubberized, asphalt-based mastic and surface conditioner that are each approved by flashing manufacturer for use with flashing material.
2.5.7.5 Weep Ventilators
Provide weep ventilators that are prefabricated from stainless steel or plastic. Provide inserts with grill or louver-type openings designed to allow the passage of moisture from cavities and to prevent the entrance of insects, and with a rectangular closure strip to prevent mortar droppings from clogging the opening. Provide ventilators with compressible flanges to fit in a standard 3/8 inch wide mortar joint and with height equal to the nominal height of the unit.
SECTION 04 20 00 Page 10
2.5.7.6 Single-Wythe Exterior Wall CMU Flashing System
In single-wythe exterior CMU walls, provide a system of CMU cell flashing pans and interlocking CMU web covers made from UV-resistant, high-density polyethylene. For exterior CMU walls, provide a flashing/weep system in open cores that do not receive grout. Cell flashing pans are to have integral weep spouts built into mortar bed joints that extend into the cell to prevent clogging with mortar.
2.5.7.7 Metal Drip Edge
Provide stainless steel drip edge, 15-mil thick, hemmed edges, with down-turned drip at the outside edge and upturned dam at the inside edge for use with membrane flashings.
2.5.8 RIGID BOARD-TYPE INSULATION
Provide rigid board-type insulation as specified in Section 07 21 13 BOARD
AND BLOCK INSULATION.
PART 3 EXECUTION
3.1 EXAMINATION
Prior to start of work, verify the applicable conditions as set forth in TMS MSJC, inspection.
3.2 PREPARATION
3.2.1 Stains
Protect exposed surfaces from mortar and other stains. When mortar joints are tooled, remove mortar from exposed surfaces with fiber brushes and wooden paddles. Protect base of walls from splash stains by covering adjacent ground with sand, sawdust, or polyethylene.
3.2.2 Loads
Do not apply uniform loads for at least 12 hours or concentrated loads for at least 72 hours after masonry is constructed. Provide temporary bracing as required.
3.2.3 Concrete Surfaces
Where masonry is to be placed, clean concrete of laitance, dust, dirt, oil, organic matter, or other foreign materials and slightly roughen to provide a surface texture with a depth of at least 1/8 inch. Sandblast, if necessary, to remove laitance from pores and to expose the aggregate.
3.2.4 Shelf Angles
Adjust shelf angles as required to keep the masonry level and at the proper elevation.
3.3 ERECTION
3.3.1 General
a. Coordinate masonry work with the work of other trades to accommodate
SECTION 04 20 00 Page 11 built-in items and to avoid cutting and patching. Lay masonry units in running bond pattern. Lay facing courses level with back-up courses, unless the use of adjustable ties has been approved in which case the tolerances is plus or minus 1/2 inch. Adjust each unit to its final position while mortar is still soft and has plastic consistency.
b. Remove and clean units that have been disturbed after the mortar has stiffened, and relay with fresh mortar. Keep air spaces, cavities, chases, expansion joints, and spaces to be grouted free from mortar and other debris. Select units to be used in exposed masonry surfaces from those having the least amount of chipped edges or other imperfections detracting from the appearance of the finished work.
c. When necessary to temporarily discontinue the work, step (rack) back the masonry for joining when work resumes. Toothing may be used only when specifically approved by the Contracting Officer. Before resuming work, remove loose mortar and thoroughly clean the exposed joint.
Cover the top of walls subjected to rain or snow with nonstaining waterproof covering or membrane when work is not in process. Extend the covering a minimum of 610 mm 2 feet down on each side of the wall and hold securely in place.
d. Ensure that units being laid and surfaces to receive units are free of water film and frost. Lay solid units in a nonfurrowed full bed of mortar. Bevel mortar for veneer wythes and slope down toward the cavity side. Shove units into place so that the vertical joints are tight. Completely fill vertical joints between solid units with mortar, except where indicated at control, expansion, and isolation joints. Place hollow units so that mortar extends to the depth of the face shell at heads and beds, unless otherwise indicated. Mortar will be permitted to protrude up to 1/2 inch into the space or cells to be grouted. Provide means to prevent mortar from dropping into the space below or clean grout spaces prior to grouting.
e. In multi-wythe construction with collar joints no more than 3/4 inch wide, bring up the inner wythe not more than 16 inches ahead of the outer wythe. Fill collar joints with mortar during the laying of the facing wythe, and filling shall not lag the laying of the facing wythe by back-buttering each unit as it is laid.
3.3.1.1 Jointing
Tool mortar joints when the mortar is thumbprint hard. Tool horizontal joints after tooling vertical joints. Brush mortar joints to remove loose and excess mortar.
3.3.1.1.1 Tooled Joints
Tool mortar joints in exposed exterior and interior masonry surfaces concave, using a jointer that is slightly larger than the joint width so that complete contact is made along the edges of the unit. Perform tooling so that the mortar is compressed and the joint surface is sealed. Use a jointer of sufficient length to obtain a straight and true mortar joint.
No exterior joints are to be left un-tooled.
3.3.1.1.2 Flush Joints
Flush cut mortar joints in concealed masonry surfaces and joints at electrical outlet boxes in wet areas. Finish flush cut joints by cutting
SECTION 04 20 00 Page 12 off the mortar flush with the face of the wall. Point joints in unparged masonry walls below grade tight. For architectural units, such as fluted units, completely fill both the head and bed joints and flush cut.
3.3.1.1.3 Door and Window Frame Joints
On the exposed interior side of exterior frames, joints between frames and abutting masonry walls shall be raked to a depth of 3/8 inch. On the exterior side of exterior frames, joints between frames and abutting masonry walls shall be raked to a depth of 3/8 inch.
3.3.1.1.4 Joint Widths
a. Construct brick masonry with mortar joint widths equal to the difference between the specified and nominal dimensions of the unit, within tolerances permitted by TMS MSJC.
b. Provide 3/8 inch wide mortar joints in concrete masonry, except for prefaced concrete masonry units.
c. Provide 3/8 inch wide mortar joints on unfaced side of prefaced concrete masonry units and not less than 3/16 inch nor more than 1/4 inch wide on prefaced side.
d. Maintain mortar joint widths within tolerances permitted by TMS MSJC
3.3.1.2 Cutting and Fitting
Use full units of the proper size wherever possible, in lieu of cut units.
Locate cut units where they would have the least impact on the architectural aesthetic goals of the facility. Perform cutting and fitting, including that required to accommodate the work of others, by masonry mechanics using power masonry saws. Concrete masonry units may be wet or dry cut. Before being placed in the work, dry wet-cut units to the same surface-dry appearance as uncut units being laid in the wall. Provide cut edges that are clean, true and sharp.
a. Carefully make openings in the masonry so that wall plates, cover plates or escutcheons required by the installation will completely conceal the openings and will have bottoms parallel with the masonry bed joints. Provide reinforced masonry lintels above openings over 12 inches wide for pipes, ducts, cable trays, and other wall penetrations, unless steel sleeves are used.
b. Do not reduce masonry units in size by more than one-third in height and one-half in length. Do not locate cut products at ends of walls, corners, and other openings.
3.3.1.3 Unfinished Work
Rack back unfinished work for joining with new work. Toothing may be resorted to only when specifically approved by the Contracting Officer.
Remove loose mortar and thoroughly clean the exposed joints before laying new work.
3.3.1.4 Clay Masonry Expansion Joints
Provide clay masonry expansion joints as indicated. Ensure that no mortar or other noncompressible materials are within the joint. Install backer
SECTION 04 20 00 Page 13 rod and sealant in accordance with Section 07 92 00 JOINT SEALANTS.
3.3.1.5 Control Joints
Provide control joints in concrete masonry as indicated. Construct by using sash jamb units with control joint key in accordance with the details shown on the Drawings. Form a continuous vertical joint at control joint locations, including through bond beams, by utilizing half blocks in alternating courses on each side of the joint. Interrupt the control joint key in courses containing continuous bond beam reinforcement. Do not interrupt the horizontal reinforcement and grout at the control joint.
Where mortar was placed in the joint, rake both faces of the control joints to a depth of 3/4 inch. Install backer rod and sealant on both faces in accordance with Section 07 92 00 JOINT SEALANTS.
3.3.1.6 Decorative Architectural Units
Place decorative masonry units with the patterned face shell properly aligned in the completed wall.
3.3.2 Claye Brick Masonry
3.3.2.1 Brick Placement
Blend all brick at the jobsite from several cubes to produce a uniform appearance when installed. An observable "banding" or "layering" of colors or textures caused by improperly mixed brick is unacceptable. Lay brick facing with the better face exposed. Lay brick in running bond with each course bonded at corners, unless otherwise indicated. Lay molded brick with the frog side down. Do not lay brick that is cored, recessed, or has other deformations in a manner that allows those deformations to be exposed to view; lay 100 percent solid units in these areas. Completely fill head and bed joints of solid units with mortar. Lay hollow units with mortar joints as specified for concrete masonry units.
3.3.2.2 Wetting of Units
Wetting of clay, shale brick, or hollow brick units having an initial rate of absorption of more than 1 gram per minute per square inch of bed surface shall be in conformance with ASTM C67/C67M. Ensure that each unit is nearly saturated when wetted but surface dry when laid.
Test clay or shale brick daily on the job, prior to laying, as follows:
Using a wax pencil, draw a circle the size of a quarter on five randomly selected bricks. Apply 20 drops of water with a medicine dropper to the surface within the circle on each brick. If the average time that the water is completely absorbed in the five bricks is less than 1-1/2 minutes, wet bricks represented by the five bricks tested.
3.3.2.3 Brick Sills
Lay brick on edge, slope not less than 3/4 inch downward to the outside, and project not less than 1/2 inch beyond the face of the wall to form a wash and drip. Fill all joints solidly with mortar and tool.
3.3.3 Anchored Veneer Construction
a. Construct exterior masonry wythes to the thickness indicated on the
SECTION 04 20 00 Page 14 drawings. Provide means to ensure that the cavity space and flashings are kept clean of mortar droppings and other loose debris. Maintain chases and raked-out joints free from mortar and debris.
b. Place masonry in running bond pattern.
c. For veneer over stud framing, do not install veneer until the exterior sheathing, moisture barrier, veneer anchors and flashing have been installed on the backing. Take extreme care to avoid damage to the moisture barrier and flashing during construction of the masonry veneer. Repair or replace portions of the moisture barrier and flashing that are damaged prior to completion of the veneer. Provide a continuous cavity as indicated.
d. For veneer with a masonry backup wythe, lay up both the inner and the outer wythes together except when adjustable joint reinforcement assemblies are approved for use. When both wythes are not brought up together, install through-wall flashings with the exterior wythe, securing the top edge of the flashing with a termination bar and sealant, or protect flashings that are installed with the interior wythe from damage until they are fully enclosed in the wall.
e. Provide anchors (ties) to connect the veneer to its backing in sufficient quantity to comply with the following requirements: maximum wall area per anchor {tie) of 2.67 sqft, and maximum vertical spacing of 18 inch, and maximum horizontal spacing of 32. Provide additional anchors around openings larger than 16 inch in either direction. Space anchors around perimeter of opening at a maximum of 16 inches on center. Place anchors within 12 inches of openings. Anchors with drips are not permitted.
f. With solid units, embed anchors in mortar joint and extend into the veneer a minimum of 1-1/2 inch, with at least 5/8 inch mortar cover to the outside face.
g. With hollow units, embed anchors in mortar or grout and extend into the veneer a minimum of 1-1/2 inch, with at least 5/8 inch mortar or grout cover to outside face.
3.3.4 Composite Walls
Tie masonry wythes together with joint reinforcement or with unit wall ties. Embed wall ties at least 1-1/2 inch into mortar of solid units and at least 1/2 inch into the mortar of the outer face shell of hollow units.
Provide at least one tie every 2.67 square feet for wire size W1.7 and at least one tie every 4.50 square feet for wire size W2.8. Space ties at a maximum of 36 inches horizontally and 24 inches vertically. Do not cross expansion joints or control joints with ties. Fill collar joints between masonry facing and masonry backup solidly with grout.
3.3.5 Reinforced, Single Wythe Concrete Masonry Units Walls
3.3.5.1 Concrete Masonry Unit Placement
a. Fully bed units used to form piers, pilasters, columns, starting courses on footings, solid foundation walls, lintels, and beams, and where cells are to be filled with grout in mortar under both face shells and webs. Provide mortar beds under both face shells for other units. Mortar head joints for a distance in from the face of the unit
SECTION 04 20 00 Page 15 not less than the thickness of the face shell.
b. Solidly grout foundation walls below grade.
c. Stiffen double walls at wall-mounted plumbing fixtures by use of strap anchors, two above each fixture and two below each fixture, located to avoid pipe runs, and extending from center to center of each wall within the double wall. Adequately reinforce walls and partitions for support of wall-hung plumbing fixtures when chair carriers are not specified.
d. Submit drawings showing elevations of walls exposed to view and indicating the location of all cut CMU products.
3.3.5.2 Preparation for Reinforcement
Lay units in such a manner as to preserve the unobstructed vertical continuity of cores to be grouted. Remove mortar protrusions extending 1/2 inch or more into cells before placing grout. Position reinforcing bars accurately as indicated before placing grout. Where vertical reinforcement occurs, fill cores solid with grout in accordance with paragraph PLACING GROUT in this Section.
3.3.6 Cavity Walls (Multi-Wythe Noncomposite Walls
Provide a continuous cavity as indicated. Bevel mortar beds away from cavity to prevent projection into cavity when bricks are shoved in place.
Keep cavities clear and clean of mortar droppings. At the bottom of cavity walls, in the course immediately above the through-wall flashing, temporarily omit one brick every 4 feet. Clean mortar droppings and debris out of the cavity through the temporary openings at least once each day masonry is laid, and more often when required to keep the cavities clean.
Fill in the openings with bricks and mortar after the wall is complete and the cavity has been inspected and found clean.
Securely tie the two wythes together with horizontal joint reinforcement, or provide ties to connect the masonry wythes in sufficient quantity to comply with the following requirements: maximum wall area per tie of 2.67 sqft, and maximum vertical spacing of 16 inch, and maximum horizontal spacing of 32 inch. Provide additional ties around openings larger than 16 inches in either direction. Space ties around perimeter of opening at a maximum of 3 feet on center. Place ties within 12 inches of openings.
Ties with drips are not permitted.
3.3.7 ANCHORAGE
3.3.7.1 Anchorage to Concrete
Anchorage of masonry to the face of concrete columns, beams, or walls shall be with dovetail anchors spaced not over 16 inches on centers vertically and 24 inches on center horizontally.
3.3.7.2 Anchorage to Structural Steel
Masonry shall be anchored to vertical structural steel framing with adjustable steel wire anchors spaced not over 16 inches on centers vertically, and if applicable, not over 24 inches on centers horizontally.
SECTION 04 20 00 Page 16
3.3.7.3 Anchorage at Intersecting Walls
Provide wire mesh anchors at maximum 16 inches spacing at intersections of interior non-bearing masonry walls.
Anchor structural masonry walls with overlapping masonry units, unless the drawings indicate a movement joint at the intersection.
3.3.8 Lintels
3.3.8.1 Masonry Lintels
Construct masonry lintels with lintel units filled solid with grout in all courses and reinforced with a minimum of two No. 4 bars in the bottom course unless otherwise indicated. Extend lintel reinforcement beyond each side of masonry opening 40 bar diameters or 24 inches, whichever is greater. Support reinforcing bars in place prior to grouting and locate 1/2 inch above the bottom inside surface of the lintel unit.
3.3.8.2 Precast Concrete and Steel Lintels
Provide precast concrete and steel lintels as shown on the Drawings. Set lintels in a full bed of mortar with faces plumb and true. Provide steel and precast lintels with a minimum bearing length of 8 inches unless otherwise indicated. In partially grouted masonry, provide fully grouted units under the full lintel bearing length, unless otherwise indicated.
3.3.9 Sills and Copings
Set sills and copings in a full bed of mortar with faces plumb and true.
Slope sills and copings to drain water. Mechanically anchor copings and sills longer than 4 feet as indicated.
3.4 INSTALLATION
3.4.1 Bar Reinforcement Installation
3.4.1.1 Preparation
Submit detail drawings showing bar splice locations. Identify bent bars on a bending diagram and reference and locate such bars on the drawings.
Show wall dimensions, bar clearances, and wall openings. Utilize bending details that conform to the requirements of ACI SP-66. No approval will be given to the shop drawings until the Contractor certifies that all openings, including those for mechanical and electrical service, are shown. If, during construction, additional masonry openings are required, resubmit the approved shop drawings with the additional openings shown along with the proposed changes. Clearly highlight location of these additional openings. Provide wall elevation drawings with minimum scale of 1/4 inch per foot. Submit drawings including plans, elevations, and details of wall reinforcement; details of reinforcing bars at corners and wall intersections; offsets; tops, bottoms, and ends of walls; control and expansion joints; lintels; and wall openings.
Clean reinforcement of loose, flaky rust, scale, grease, mortar, grout, and other coatings that might destroy or reduce its bond prior to placing grout. Do not use bars with kinks or bends not shown on the approved shop drawings. Place reinforcement prior to grouting. Unless otherwise indicated, extend vertical wall reinforcement to within 2 inches of tops of
SECTION 04 20 00 Page 17 walls.
3.4.1.2 Positioning Bars
a. Accurately place vertical bars within the cells at the positions indicated on the drawings. A minimum clearance of 1/2 inch shall be maintained between the bars and masonry units. Provide minimum clearance between parallel bars of 1/2 inch between the bars and masonry units for coarse grout and a minimum clearance of 1/4 inch between the bars and masonry units for fine grout. Provide minimum clearance between parallel bars of 1 inch or one diameter of the reinforcement, whichever is greater. Vertical reinforcement may be held in place using bar positioners located near the ends of each bar and at intermediate intervals of not more than 192 diameters of the reinforcement or by other means to prevent displacement beyond permitted tolerances. As masonry work progresses, secure vertical reinforcement to prevent displacement beyond allowable tolerances.
b. Wire column and pilaster lateral ties in position around the vertical reinforcing bars. Place lateral ties in contact with the vertical reinforcement and do not place in horizontal mortar bed joints.
c. Position horizontal reinforcing bars as indicated. Stagger splices in adjacent horizontal bars, unless otherwise indicated.
d. Form splices by lapping bars as indicated. Do not cut, bend or eliminate reinforcing bars. Foundation dowel bars may be field-bent when permitted by TMS MSJC.
3.4.1.3 Splices of Bar Reinforcement
Lap splice reinforcing bars as indicated. When used, provide welded or mechanical connections that develop at least 125 percent of the specified yield strength of the reinforcement.
3.4.2 Placing Grout
3.4.2.1 General
Fill cells containing reinforcing bars with grout. Solidly grout hollow masonry units in walls or partitions supporting plumbing, heating, or other mechanical fixtures, voids at door and window jambs, and other indicated spaces. Solidly grout cells under lintel bearings on each side of openings for full height of openings. Solidly grout walls below grade, lintels, and bond beams. Units other than open end units may require grouting each course to preclude voids in the units.
Discard site-mixed grout that is not placed within 1-1/2 hours after water is first added to the batch or when the specified slump is not met without adding water after initial mixing. Discard ready-mixed grout that does not meet the specified slump without adding water other than water that was added at the time of initial discharge. Allow sufficient time between grout lifts to preclude displacement or cracking of face shells of masonry units. Provide a grout shear key between lifts when grouting is delayed and the lower lift loses plasticity. If blowouts, flowouts, misalignment, or cracking of face shells should occur during construction, tear down the wall and rebuild.
SECTION 04 20 00 Page 18
3.4.2.2 Vertical Grout Barriers for Multi-Wythe Composite Walls
In multi-wythe composite walls, provide grout barriers in the collar join not more than 30 feet apart, or as required, to limit the horizontal flow of grout for each pour.
3.4.2.3 Horizontal Grout Barriers
Embed horizontal grout barriers in mortar below cells of hollow units receiving grout.
3.4.2.4 Grout Holes and Cleanouts
3.4.2.4.1 Grout Holes
Provide grouting holes in slabs, spandrel beams, and other in-place overhead construction. Locate holes over vertical reinforcing bars or as required to facilitate grout fill in bond beams. Provide additional openings spaced not more than 16 inches on centers where grouting of hollow unit masonry is indicated. Fom such openings not less than 4 inches in diameter or 3 by 4 inches in horizontal dimensions. Upon completion of grouting operations, plug and finish grouting holes to match surrounding surfaces.
3.4.2.4.2 Cleanouts for Hollow Unit Masonry Construction
For hollow masonry units. provide cleanout holes at the bottom of every grout pour in cores containing vertical reinforcement when the height of the grout pour exceeds 5 feet 4 inches. Where all cells are to be grouted, construct cleanout courses using bond beam units in an inverted position to permit cleaning of all cells. Provide cleanout holes at a maximum spacing of 32 inches where all cells are to be filled with grout.
Establish a new series of cleanouts if grouting operations are stopped for more than 4 hours. Provide cleanouts not less than 3 by 3 inch by cutting openings in one face shell. Manufacturer's standard cutout units may be used at the Contractor's option. Do not cleanout holes until masonry work, reinforcement, and final cleaning of the grout spaces have been completed and inspected.