This invitation for bid solicits construction services for a 115th Fighter Wing F-35 repair building project at Truax Field in Madison, Wisconsin. The project scope includes modifying an existing aircraft organization shop and weapons system management flight to accommodate the unit's transition from supporting F-16s to F-35s. Work will upgrade building systems and reconfigure spaces to provide adequate maintenance areas and warm storage for aircraft maintenance equipment. The base award is for all labor, materials, equipment, and supervision to construct the project ensuring a complete and usable facility. The solicitation also includes an option for ISP communication equipment and cabling. The contract duration is 180 days from notice to proceed. Interested contractors must register in SAM and the solicitation and plans are available on SAM.gov. The pre-bid conference will be held at Truax Field and the bid opening conducted according to FAR Subpart 14.4. The project magnitude is between $1-5 million and the NAICS code is 236220.

View the file

Other files

File Type Posted
20230308 Alter B420 Abstract of Offers.pdf PDF
20230308 Alter B420 Attendance Sheet.pdf PDF
Questions and Answers 4.pdf PDF
QA3 Attachment 3 P-4A Walltype.pdf PDF
FSB2021-613-00 - WI-ANG - B420 - Addendum 01 COMBINED SPECIFICATIONS.pdf PDF
QA3 Attachment 1 P-8 Walltype.pdf PDF
B420 Environmental Site Characterization Sampling Analysis Plan.pdf PDF
QA3 Attachment 2 P-17 Walltype.pdf PDF
B.08.W50S9F23B0001 Solicitation Amendment 0002.pdf PDF
Questions and Answers 3.pdf PDF
FSB2021-613-00 - WI-ANG - B420 - Addendum 01 COMBINED DRAWINGS.pdf PDF
Questions and Answers 2.pdf PDF
E.01.W50S9F23B0001 Solicitation Amendment 0001.pdf PDF
Questions and Answers 1.pdf PDF
F-35 B420 Site Visit 20230208.pdf PDF
B.07.Pre-Proposal Slides - F-35 Repair B420.pptx PPTX presentation
ATTACHMENT 6 - XGFG182019 F-35 Repair B420 - Single Source Doc - Monaco.pdf PDF
E.01.W50S9F23B0001 Solicitation.pdf PDF
ATTACHMENT 2 - WI-ANG - F-35 B420 CD Drawings Type B-3.pdf PDF
ATTACHMENT 4 - XGFG182019 F-35 Repair B420 - Single Source Doc - Andover.pdf PDF
ATTACHMENT 1 - Volume 4 - WI ANG F-35 B420 Specifications Type B-3.pdf PDF
ATTACHMENT 5 - XGFG182019 F-35 Repair B420 - Single Source Doc - Marshall Best.pdf PDF
ATTACHMENT 3 - SFS Form 12 - Template.xls XLS spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

h:\prj\2021\fsb2021-613-00\08-submissions\2023-02-28-addendum 1\narrative\2023-02-28 b420 wisconsin - addm no 1.docx Page 1 of 4

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

ADDENDUM NO. 1

Date: February 28, 2023

To: ALL BIDDERS OF RECORD

From: Frankfurt-Short-Bruza Associates, P.C.

5801 N. Broadway Ext., Suite 500 Oklahoma City, OK 73118

Subject: WI ANG PN: XGFG182019 - WI ANG F-35 GUN SHOP – REPAIR B420, TRUAX FIELD, WI

FSB Project No.: FSB2022-613-00

NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated October 14, 2022. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

ATTACHMENTS

Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of (6) pages and the following attachments:

Specifications:

PROJECT TABLE OF CONTENTS – (Vol 1 ONLY) February 28, 2023 07 24 00 – EXTERIOR INSULATION AND FINISH SYSTEM February 28, 2023

Drawings:

G-002 – SHEET INDEX February 28, 2023 C-301 – REMOVAL PLAN February 28, 2023 C-501 – UTILITY PLAN AND SCHEDULE February 28, 2023 C-504 – WATER DETAILS February 28, 2023 C-505 – WATER DETAILS February 28, 2023 SF101 – ROOF FRAMING PLAN AND DETAILS February 28, 2023 AD100 – COMPOSITE DEMOLITION FLOOR PLAN February 28, 2023 A-002 – PARTITION TYPES February 28, 2023 AE100 – COMPOSITE GROUND FLOOR PLAN February 28, 2023 AE201 – BUILDING ELEVATIONS February 28, 2023 AE401 – ENLARGED PLANS February 28, 2023 AE600 – DOOR SCHEDULE February 28, 2023

MODIFICATIONS TO THE CONDITIONS OF THE CONTRACT

None

FSB | DefineDesignDeliver

MODIFICATIONS TO THE SPECIFICATIONS

ITEM 001.2-1 Refer to attached revised Table of Contents dated February 28, 2023:

A. Specification 07 24 00 is hereby added in its entirety.

ITEM 001.2-2 Refer to attached Specification 07 24 00 – EXTERIOR INSULATION AND FINISH SYSTEM, dated February 28, 2023:

A. Specification 07 24 00 is hereby added in its entirety.

MODIFICATIONS TO THE DRAWINGS

ITEM 001.3-1 Refer to attached Drawing G-002 – SHEET INDEX, (Revision) dated February 28, 2023:

1. Drawing G-002 is hereby revised and re-issued in its entirety. Replace Drawing G-002 dated October 14, 2022 with attached revised Drawing G-002 (Revision) dated February 28, 2023.

• Revise Sheet Index to add Sheets C-504 and C-505.

ITEM 001.3-2 Refer to attached Drawing C-301 – REMOVAL PLAN, (Revision) dated February 28, 2023:

2. Drawing C301 is hereby revised and re-issued in its entirety. Replace Drawing C301 dated October 14, 2022 with attached revised Drawing C301 (Revision) dated February 28, 2023.

• Revise drawing scale

• Revise sheet notes 2 and 3.

ITEM 001.3-3 Refer to attached Drawing C-501 – UTILITY PLAN AND SCHEDULE (Revision) dated February 28, 2023:

1. Drawing C-501 is hereby revised and re-issued in its entirety. Replace Drawing C-501 dated October 14, 2022 with attached revised Drawing C-501 (Revision) dated February 28, 2023.

• Revise project sheet notes.

ITEM 001.3-4 Refer to attached Drawing C-504 – WATER DETAILS, (Addition) dated February 28, 2023:

1. Drawing C-504 is hereby added in its entirety.

• Add sheet C-504 WATER DETAILS to the project.

ITEM 001.3-5 Refer to attached Drawing C-505– WATER DETAILS, (Addition) dated February 28, 2023:

1. Drawing C-505 is hereby added in its entirety.

• Add sheet C-505 WATER DETAILS to the project.

ITEM 001.3-6 Refer to attached Drawing SF101 – ROOF FRAMING PLAN AND DETAILS, (Revision) dated February 28, 2023:

2. Drawing SF101 is hereby revised and re-issued in its entirety. Replace Drawing SF101 dated October 14, 2022 with attached revised Drawing SF101(Revision) dated February 28, 2023.

• Revise detail B5 and detail C4 to show correct demolition conditions at new exterior door 136B and OH door 136A.

ITEM 001.3-7 Refer to attached Drawing AD100 – COMPOSITE DEMOLITION FLOOR PLAN, (Revision) dated February 28, 2023:

1. Drawing AD100 is hereby revised and re-issued in its entirety. Replace Drawing AD100 dated October 14, 2022 with attached revised Drawing AD100 (Revision) dated February 28, 2023.

• Revise dimensions at demolished exterior door (Grid 9 at Grid H through Grid K).

• Delete keynote 3, located at Grid B between Grid A and B. Window is to remain.

ITEM 001.3-8 Refer to attached Drawing AE002 – PARTITION TYPES, (Revision) dated February 28, 2023:

1. Drawing AE002 is hereby revised and re-issued in its entirety. Replace Drawing AE002 dated October 14, 2022 with attached revised Drawing AE002 (Revision) dated February 28, 2023.

• Revise Partition Types A3a to accurately reflect intent of design.

• Delete Partition Type A3b.

ITEM 001.3-9 Refer to attached Drawing AE100 – COMPOSITE GROUND FLOOR PLAN, (Revision) dated February 28, 2023:

2. Drawing AE100 is hereby revised and re-issued in its entirety. Replace Drawing AE100 dated October 14, 2022 with attached revised Drawing AE100 (Revision) dated February 28, 2023.

• Revise dimensions at demolished exterior door. (Grid 9 at Grid H through K).

• Remove door tags for doors to remain (Grid 9 between Grid L and M).

• Revise Partition Type tags at several Interior Partition locations.

ITEM 001.3-10 Refer to attached Drawing AE201 – BUILDING ELEVATIONS, (Revision) dated February 23, 2023:

2. Drawing AE201 is hereby revised and re-issued in its entirety. Replace Drawing AE201 dated October 14, 2022 with attached revised Drawing AE201 (Revision) dated February 28, 2023.

• Add building section, Detail D2.

• Revise North Elevation, Detail D1 to show revised dimensions, notations, and Exterior Insulation Finish

System.

• Add building section, Detail B3.

• Revise South Elevation, Detail A1, to show window tag clearly.

ITEM 001.3-11 Refer to attached Drawing AE401 – ENLARGED PLANS, (Revision) dated February 28, 2023:

1. Drawing AE401 is hereby revised and re-issued in its entirety. Replace Drawing AE401 dated October 14, 2022 with attached revised Drawing AE401 (Revision) dated February 28, 2023.

• Revise Enlarged Plan – RESTROOMS/LOCKERS, Detail C1, to show correct partition types.

• Revise Enlarged Plan – MOTHER’S ROOM, Detail C3, to show correct partition types.

ITEM 001.3-12 Refer to attached Drawing AE600 – DOOR SCHEDULE, (Revision) dated February 28, 2023:

1. Drawing AE600 is hereby revised and re-issued in its entirety. Replace Drawing AE600 dated October 14, 2022 with attached revised Drawing AE600 (Revision) dated February 28, 2023.

• Revised Door Schedule to show correct door types and dimensions.

• Add Head/Jamb Details A4, B3, B4, B5, and C4 to show correct conditions at exterior door head and jambs.

BIDDER RFI RESPONSES

N/A.

SUSTITUTION REQUESTS

N/A.

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

GENE O.

BROWN

E-47748

OKLAHOMA CITY

OK

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

File details come from the government source that posted it. Updated .