W50S9C-21-B-0002 Amendment 0002.pdf

PDF 154 KB Posted

Attached to
Repair/Upgrade Base Electrical Distribution System - Vermont Air National Guard Base
Solicitation number
W50S9C-21-B-0002
Issued by

About this file

This amendment modifies a solicitation for electrical system upgrades at a National Guard base in Vermont. The amendment replaces two specification sections and updates eight drawings to reflect revisions to the site plans for work around Building 60 and in the TACAN area. The specification sections covering medium voltage cables and low-voltage power conductors and cables are fully replaced. Notes on some drawings are updated to change terminal cabinet references to match the site plans. While the scope of work does not fundamentally change, the circuit distances and paths shown on some drawings are revised to reflect the updated site layout.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Specification Section 26 0513 and 26 0519 are replaced in their entirety w ith Rev1. Draw ings ES0.1; ES1.1; ES1.2; ES1.3; ES1.4; ES1.5;

E3.1; and E3.2 are updated w ith Revision " Addendum 0002 " as detailed herein.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9C21B0002

X 9B. DATED (SEE ITEM 11)

20-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jun-2021

CODE

USPFO VT 158 MISSION SUPPORT CONTRACTING

45 NCO DR SUITE A

SOUTH BURLINGTON VT 05403-5867

W50S9C 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9C21B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

1. SOLICITATION SPECIFICATIONS

The project solicitation specifications are revised as follows:

a. Specification Section 26 0513 is replaced in its’ entirety with 26 0513 USER-Medium Voltage Cables – Rev1

b. Specification Section 26 0519 is replaced in its’ entirety with 26 0519 USER-Low-Voltage Electrical Power Conductors and Cables – Rev1

2. SOLICITATION DRAWINGS

The project solicitation drawings are revised as follows. A summary of revisions to each drawing is listed below.

ES0.1: Drawing revised to reflect updated site plan drawing for the area north of Building 60 near the TACAN area.

No change in scope.

ES1.1: Drawing revised to reflect updated site plan drawings for the area north of Building 60 near the TACAN area. Although fundamental scope does not change, the circuit distances are different than the original plans.

ES1.2: Revised Electrical Specific New Work Note 21. Change "STCB-9" to "STCB-1" to reflect site plan drawings. No change in scope.

ES1.3: Revised Electrical Specific New Work Note 21. Change "STCB-9" to "STCB-1" to reflect site plan drawings. No change in scope.

ES1.4: Drawing revised to reflect updated site plan drawing for the area north of Building 60 near the TACAN area.

No change in scope. Revised Electrical Specific New Work Note 21. Change "STCB-9" to "STCB-1" to reflect site plan drawings. No change in scope.

ES1.5: Drawing revised to reflect updated site plan drawings for the area north of Building 60 near the TACAN area. Although fundamental scope does not change, the circuit distances are different than the original plans.

E3.1: Drawing revised to reflect updated site plan drawing for the area north of Building 60 near the TACAN area.

Revised circuit path, vaults and vault names north of Bldg 60 to match site plans.

E3.2: Drawing revised to reflect updated site plan drawing for the area north of Building 60 near the TACAN area.

Revised circuit path, vault and vault names north of Bldg 60 to match site plans. Termination cabinet TCB-11 added to one-line to match site plans.

(End of Summary of Changes)