19045-210608-E6.3.pdf
PDF 248 KB Posted
- Solicitation number
- W50S9C-21-B-0002
About this file
This document includes plans and details for upgrading an electrical distribution system at a Vermont Air National Guard base, as well as information about a related federal contract solicitation. The solicitation seeks a firm fixed-price contract to provide all labor, materials, equipment, and supervision necessary to demolish the existing 12kVA primary and secondary electrical distribution system and install an updated system. The scope of work involves trenching, pavement and sidewalk restoration, transformer and switch work, and high and medium voltage electrical upgrades. Offerors must complete all work within 365 days of receiving the notice to proceed. The soliciting agency is the Department of the Army Vermont Army National Guard.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
E6.3
ELECTRICAL
DETAILS