19045-210615-Addendum 0002 Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- W50S9C-21-B-0002
About this file
This document contains drawings and specifications for an electrical distribution system upgrade project. The project involves demolishing and upgrading the 12kVA primary and secondary electrical distribution systems at the Vermont Air National Guard Base in South Burlington, Vermont. Work includes trenching, pavement, curb, and sidewalk restoration, transformer and switch work, and high and medium voltage electrical upgrades. The contract will be a firm fixed-price awarded for a period of 365 days after notice to proceed. The solicitation was issued by the US Property and Fiscal Office for Vermont under solicitation number W50S9C-21-B-0002 to upgrade the base electrical distribution system at the 158th Fighter Wing of the Vermont Air National Guard.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O N S U L T A N T S
A R C H I T E C T S
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
ES0.1
ELECTRICAL
PRIMARY VOLTAGE
SITE PLAN
DEMOLITION PLAN
1" = 200'
1- ADDENDUM 0002
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
ES1.1
ELECTRICAL
PRIMARY VOLTAGE
OVERALL SITE PLAN
NEW WORK PLAN
1" = 200'
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
ES1.2
ELECTRICAL
PRIMARY VOLTAGE
PARTIAL SITE PLAN
NEW WORK PLAN
1" = 50'
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
ES1.3
ELECTRICAL
PRIMARY VOLTAGE
PARTIAL SITE PLAN
NEW WORK PLAN
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
ES1.4
ELECTRICAL
PRIMARY VOLTAGE
PARTIAL SITE PLAN
NEW WORK PLAN
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
ES1.5
ELECTRICAL
PRIMARY VOLTAGE
PARTIAL SITE PLAN
NEW WORK PLAN
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
E3.1
ELECTRICAL
PRIMARY VOLTAGE
ONE-LINE PROPOSED
DEMOLITION PLAN
NONE
1 1 7 S t. P a u l S t r e e t 3 r d F l o o r
B u r l i n g t o n, V T 0 5 4 0 1
P: 8 0 2 • 8 6 3 • 2 2 2 7
F: 8 0 2 • 8 6 3 • 0 0 9 3
ALVAR E Z
SIENKIEWYCZ
S M I T H
R E V I S I O N S
DATE: APRIL 6, 2021
SCALE:
CHECKED: L.N.C.
DRAWN: L.N.C.
CURZ 182806
P R O J E C T
BASE
ELECTRICAL
DISTRIBUTION
SYSTEM
VERMONT AIR
NATIONAL GUARD
COPYRIGHT SMITH ALVAREZ SIENKIEWYCZ ARCHITECTS, PC
SOUTH
BURLINGTON,
VERMONT
C I V I L
KREBS & LANSING
164 MAIN ST.
COLCHESTER, VT 05446
P: 802-787-0375
M E C H A N I C A L / E L E C T R I C A L
LN CONSULTING
ENGINEERS
208 FLYNN AVE
SUITE 2J
BURLINGTON, VT 05401
P: 802-655-1753
SAS PROJECT NO: 1016
LNC PROJECT NO: 19045
E3.2
ELECTRICAL
PRIMARY VOLTAGE
ONE-LINE PROPOSED
NEW WORK PLAN
NONE
File details come from the government source that posted it. Updated .