Amendment 2 B420.pdf
PDF 120 KB Posted
- Attached to
- Building 420 Renovation Federal contract opportunity
- Solicitation number
- W50S98-21-B-0001
About this file
This document summarizes Amendment 2 to a proposed task order project and the related federal contract opportunity. The amendment clarifies that site visits for subcontractors should be coordinated with the specified point of contact with 48 hours' notice. It incorporates 16 questions and answers into the solicitation documents and attaches drawings pertaining to roof support columns. The opportunity is for construction services for a building renovation project at a National Guard base in Tennessee with a magnitude between $5 million and $10 million. Proposals are due by March 1st to the listed points of contact. The project is set aside for small businesses under NAICS code 236220 with a $39.5 million size standard. Award will be made considering only price and is contingent on available funds by September 30th.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED TASK ORDER PROJECT
AMENDMENT NO. 2
W50S98-21-B-0001 PROJECT TITLE: PSXE162007, Repair Dining and Medical Training Facility B420
DATE: 9 February 2021
TO: Interested Contractors
1. This amendment corrects the “TO: MATOC Contractors” to read “TO: Interested Contractors” on
Amendment 1.
2. This amendment incorporates questions 1 – 16 and all pertaining documents into the solicitation documents.
Question 10 - On the roof support columns, are there any as-built designs for the footers for those columns?
Answer 10- Please see attachments Building 420 A3.2, Building 420 A4.0, Building 420A4.1, Building 420 S1.2, and S1.1. **These drawings are for reference only and may not reflect the true as-built layout. The original building plans for the original column footings, original wall section with footing, and the foundation plan for the addition to the building. The footing sizes are believed to be correct as shown for the columns for building structure and the roof, but the footings for the stair towers were not stepped as shown**
Question 10 Attachments: Building 420 A3.2. Building 420 A4.0, Building 420 A4.1, Building 420 S1.2 and S1.1. These attachments were uploaded to FBO on 29 January 2021.
3. For sub-contractor site visits, please contact Capt Travis Vaughn at 865-336-4228 or travis.vaughn.1@us.af.mil. Forty-eight (48) hours in advance.
4. REMINDER: Please re-send any questions you submitted after 1 February 2021 to the above email address.
PRE-PROPOSAL MEETING: Another pre-proposal meeting ( ) will (X) will not be conducted. The pre-proposal meeting will be N/A
THE PROPOSAL DUE DATE () IS (X) IS NOT CHANGED. PROPOSALS ARE DUE NOT LATER THAN
2:00 P.M (EST), 1 March 2021 mailto:travis.vaughn.1@us.af.mil
CONTRACTORS INDICATE RECEIPT OF THIS CHANGE WITH YOUR SIGNATURE BELOW AND
EMAIL THE SIGNED FORM TO paula.sales.1@us.af.mil and brian.morelock.1@us.af.mil
CONTRACTORS ACKNOWLEDGEMENT OF AMENDMENT:
CONTRACTORS SIGNATURE DATE
COMPANY
mailto:paula.sales.1@us.af.mil mailto:brian.morelock.1@us.af.mil
File details come from the government source that posted it. Updated .