OF 1419 Abstract.pdf
PDF 2 MB Posted
- Attached to
- B113 Solicitation Federal contract opportunity
- Solicitation number
- W50S98
About this file
This abstract of offers document summarizes four bids received in response to Solicitation Number W50S98 for repair and renovation work at Building 113 and demolition of Buildings 110 and 111 issued by the Department of the Army Tennessee Army National Guard. The estimated costs for repairing Building 113 ranged from $6,957,169 to $7,980,000, while estimates for demolishing Buildings 110 and 111 ranged from $1,041,870 to $1,446,982.70. All four bidders submitted bid bonds of 20% and acknowledged Amendment 1 to the solicitation. The government estimate for repairing Building 113 was $6,957,169 and $1,041,870 for demolishing Buildings 110 and 111.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract.pdf | ||
| Sign in Sheet - 23 Aug 2022 10am.pdf | ||
| B 113 As Built Drawings.pdf | ||
| 05 40 00 Cold-formed Metal Framing 20220805.pdf | ||
| Demo Drawings CS503-506.pdf | ||
| Demo 110_110 Drawings GC002 003 004 005.pdf | ||
| BLDG 111 Asbestos Info.pdf | ||
| W50S98-22-B-000100002.pdf | ||
| P-601_REVISED.pdf | ||
| REGISTER-upate 07292022.pdf | ||
| 1190113_TNANG_B113_ELEC-ADDENDUM 1-072622.pdf | ||
| W50S98-22-B-000100001.pdf | ||
| 1190113_TNANG_B113_FIRE-ADDENDUM 1-072622.pdf | ||
| 28 31 76 - updated.pdf | ||
| Pre-Bid Sign in Sheet B113.pdf | ||
| Pre-Bid Slides B113.pdf | ||
| MTANG Demo 110 and 111 drawings.pdf | ||
| Repair Building 113 Spec. Volume 2.pdf | ||
| W50S98-22-B-0001 21 July 2022.pdf | ||
| Repair Building 113 Spec. Volume 1.pdf | ||
| Repair Building 113 Drawings.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
134 Mission Support Contracting
5. PROJECT TITLE
PSXE152020 Repair B113
Renovate B113 in to a Fuel cell and demo Bldg 110 and 111.
B113
B110-111
JB
JB
5,488,393.20
1,446,982.70
5,488,393.20
1,446,982.70
7,980,000.00
1,037,000.00
7,980,000.00
1,037,000.00
6,957,169.00
1,041,870.00
6,957,169.00
1,041,870.00
W50S98-22-B-0001 1 2
Lisa Fingland, MSgt
V-Line Nisou
20% not to exceed $8M 20%
Yes Yes
FINGLAND.LISA.LORA
INE.1266294472
Digitally signed by
FINGLAND.LISA.LORAINE.1266294472
Date: 2022.08.23 13:14:21 -04'00'
08/23/202207/21/2022
08/23/2022
1266294472N Typewritten Text
CUI
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W50S98-22-B-0001
PSXE152020 Repair B113
20% 20% 20% 20%
Yes Yes Yes Yes
1,680,000.001,680,000.00747,000.00747,000.001,130,905.001,130,905.00821,000.00821,000.00JB12
1 JB 6,161,000.00 6,161,000.00 8,885,667.00 8,885,667.00 6,577,700.00 6,577,700.00 8,168,100.00 8,168,100.00
2 2
3 4 5 6
Wright Pence P&W Federal
1266294472N Typewritten Text
CUI
File details come from the government source that posted it. Updated .