Demo 110_110 Drawings GC002 003 004 005.pdf
PDF 2 MB Posted
- Attached to
- B113 Solicitation Federal contract opportunity
- Solicitation number
- W50S98
About this file
This set of construction drawings and specifications is for a federal contract opportunity to replace a 135 maintenance hangar and shops at McGhee Tyson Airport in Knoxville, Tennessee. The project includes demolishing existing Buildings 110 and 111 and constructing a new maintenance hangar and support facilities. Key details include replacing the existing 135 maintenance hangar and shops, demolishing two buildings, installing new utilities including water, sewer and electrical connections, and adhering to strict safety and access requirements for working on an active airfield. The contractor will be responsible for obtaining permits, implementing erosion control measures, maintaining traffic control, and coordinating work windows with airport operations. Construction must comply with Army National Guard, FAA and OSHA regulations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract.pdf | ||
| OF 1419 Abstract.pdf | ||
| Sign in Sheet - 23 Aug 2022 10am.pdf | ||
| W50S98-22-B-000100002.pdf | ||
| P-601_REVISED.pdf | ||
| B 113 As Built Drawings.pdf | ||
| BLDG 111 Asbestos Info.pdf | ||
| 05 40 00 Cold-formed Metal Framing 20220805.pdf | ||
| Demo Drawings CS503-506.pdf | ||
| 1190113_TNANG_B113_FIRE-ADDENDUM 1-072622.pdf | ||
| 28 31 76 - updated.pdf | ||
| REGISTER-upate 07292022.pdf | ||
| 1190113_TNANG_B113_ELEC-ADDENDUM 1-072622.pdf | ||
| W50S98-22-B-000100001.pdf | ||
| Pre-Bid Slides B113.pdf | ||
| Pre-Bid Sign in Sheet B113.pdf | ||
| W50S98-22-B-0001 21 July 2022.pdf | ||
| Repair Building 113 Spec. Volume 1.pdf | ||
| Repair Building 113 Drawings.pdf | ||
| MTANG Demo 110 and 111 drawings.pdf | ||
| Repair Building 113 Spec. Volume 2.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
H T
B
U R
N S
A
D
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
TENNESSEE AIR NATIONAL GUARD
MCGHEE TYSON AIRPORT
KNOXVILLE, TENNESSEE
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
95368
Project No. - PSXE999132
W9133L-15-D-0003
134th AIR REFUELING WING
REPLACE 135 MAINTENANCE
HANGAR AND SHOPS
5 6
D
C
A
B
1 2 3 4
E
D
C
A
B
E
5 61 2 3 4
95368GC001.DWG
CIVIL LEGEND AND ABBREVIATIONS
GC002 D
D. MUETING
R. BARUTH CHECKER
BORING LOCATION
CLEANOUT
FIRE HYDRANT
FINISH GRADE ELEVATION (PLAN)
AIRSIDE PCC PAVEMENT
ASPHALT (SECTION)
EARTH (SECTION)
BUILDINGS AND STRUCTURES
CURB AND GUTTER
ROADS AND PAVED AREAS
SIDEWALKS
GRAVEL PARKING
SECTION INDICATORS
SIGN
ELECTRICAL MANHOLE
TRANSFORMER
VERTICAL CONTROL POINT (BENCH MARK)
CAP, PLUG, BLIND FLANGE
MAJOR CONTOUR (1.00')
DROP INLET
STORM MANHOLE
SANITARY SEWER MANHOLE
710.0
CENTERLINE
STORM SEWER
ROOF DRAIN
SANITARY SEWER
WATER LINE
GAS LINE
POST INDICATOR VALVE
WATER LINE VALVE
X TEMPORARY CONSTRUCTION FENCE
MATCH LINE
GAS LINE VALVE
CO-#
SPOT ELEVATION
END SECTION
ABC- AGGREGATE BASE COURSE
AC- ACRE
ADA- AMERICANS WITH DISABILITIES ACT
ARS AIR RESERVE STATION
ATFP- ANTI-TERRORISM/FORCE PROTECTION
B/C- BACK OF CURB
BCE- BASE CIVIL ENGINEERING
B/L BUILDING LINE
BM- BENCHMARK
CB- CATCH BASIN
C-C- CENTER TO CENTER
COE- CORPS OF ENGINEERS
CONC- CONCRETE
CGI- CURB/GUTTER INLET
CO- CLEAN OUT
COR- CONTRACTING OFFICER'S REPRESENTATIVE
CL- CENTERLINE
DEPT- DEPARTMENT
DI- DUCTILE IRON OR DROP INLET
DIA- DIAMETER
DS- DOWNSPOUT
ECP- ENTRY CONTROL POINT
ELEC- ELECTRICAL
EL/ELEV- ELEVATION
FDC- FIRE DEPARTMENT CONNECTION
FES- FLARED END SECTION
FF- FINISH FLOOR
FH- FIRE HYDRANT
FL- FLOW LINE
FT- FOOT
FW- FIREWATER
GI- GRATED INLET
HDPE- HIGH DENSITY POLYETHYLENE
HQ- HEADQUARTERS
HW- HEADWALL
MAX- MAXIMUM
MH- MANHOLE
MIN- MINIMUM
MUTCD- MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES
MW- MONITORING WELL
NO- NUMBER
NPW- NON-POTABLE WATER
OC- ON CENTER
OD- OUTSIDE DIAMETER
OSHA- OCCUPATIONAL SAFETY &
HEALTH ADMINISTRATION
PCC- PORTLAND CEMENT CONCRETE
PE- POLYETHYLENE
PI- POINT OF INTERSECTION
PVC- POLYVINYL CHLORIDE
RCP- REINFORCED CONCRETE PIPE
RFDC- REMOTE FIRE DEPARTMENT CONNECTION
SS- SANITARY SEWER
SDI- STORM DRAIN INLET
SDMH- STORM DRAIN MANHOLE
ST, SD- STORM SEWER, STORM DRAIN, STREET
SWPPP- STORM WATER POLLUTION PREVENTION PLAN
T/C- TOP OF CURB
TELE- TELEPHONE
TYP- TYPICAL
USAF- UNITED STATES AIR FORCE
WM- WATER METER
WV- WATER VALVE
WWF- WELDED WIRE FABRIC
LETTER DESIGNATION
OF SECTION/DETAIL
DWG. NO. WHERE
SECTION IS DETAILED
DESCRIPTION ABBREVIATIONS DESCRIPTION
CONTRACTORS TEMPORARY
CONSTRUCTION FENCE
XX
XXX
NEW DESCRIPTION
PROPOSED LEGEND
NEW DESCRIPTION
ABBREVIATIONS
XX
XXX
WATER VALVE BOX
WATER METER
AIRFIELD
GAS METER
FIRE HYDRANT
GAS VAULT
WATER VAULT
GAS VALVE
FUEL VAULT MANHOLE
FUEL VENT
TRANSFORMER
POWER POLE
LIGHT POLE
SANITARY SEWER MANHOLE
CABLE TV PEDESTAL
GUY ANCHOR
ROOF DRAIN
JUNCTION BOX
AIR CONDITIONER
ROAD SIGN
STORM WATER SEWER MANHOLE
BOLLARD
HIGH LINE POWER POLE
POST INDICATOR VALVE
HANDICAP PARKING SPACE
FIBER OPTIC VAULT
FIBER OPTIC MANHOLE
STORM WATER CATCH BASIN
CLEAN OUT
MANHOLE (UTILITY UNKNOWN)
GUY POLE
COMMUNICATION MANHOLE
ELECTRIC VAULT MANHOLE
ELECTRIC VAULT
GROUNDING WIRE/ROD
EXISTING DESCRIPTION
SURVEY LEGEND
EXISTING
SAWCUT
MISCELLANEOUS STRUCTURE
DEMOLITION
VEHICULAR PCC PAVEMENT
1360.50
STABILIZED CONSTRUCTION ENTRANCE
RD
INLET PROTECTION
1000.00
SANITARY SEWER
STORM WATER SEWER
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND TELEPHONE
FUEL MAIN PIPE
GAS LINE
WATER MAIN
FENCE
STEAM
SS
ST
E
E
COMM
F
G
W
UNDERGROUND FIBER OPTIC
EM
XX
S
ROOF DRAIN LEADER
STORM CLEANOUTCO
CONCRETE PAVEMENT DEMOLITION
MISCELLANEOUS DEMOLITION
LIMITS OF SURVEY
OBJECT FREE AREA
OFA
ASPHALT DEMOLITION
RD
SPOT ELEVATION
LIGHT
MANHOLE
OPEN GRATE MANHOLE
VAULT
ELECTRIC METER
COMMUNICATIONS J BOX
SANITARY SEWER PUMP
ELECTRICAL DEVICE
CO
FILTER SOCK
10" WA1
10" GA1
18" SD1
12" SS1
A 06-22-17 A.2 SUBMITTAL RB
FENCE
TEMPORARY FENCE
B 10-10-17 B.1 SUBMITTAL RB
C 01-17-18 B.2 SUBMITTAL RB
BUILDING DEMOLITION
GRAVEL DEMOLITION
D 03-27-18 B.3 SUBMITTAL RB
UTILITY DEMOLITION
LIMITS OF DISTURBANCE
RIVER ROCK LANDSCAPING
SIDEWALK CONCRETE
project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
TENNESSEE AIR NATIONAL GUARD
MCGHEE TYSON AIRPORT
KNOXVILLE, TENNESSEE
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
95368
Project No. - PSXE999132
W9133L-15-D-0003
134th AIR REFUELING WING
REPLACE 135 MAINTENANCE
HANGAR AND SHOPS
5 6
D
C
A
B
1 2 3 4
E
D
C
A
B
E
5 61 2 3 4
95368GC002-GC003.DWG
GENERAL CIVIL NOTES
GC003 D
D. MUETING
R. BARUTH CHECKER
GENERAL NOTES:
1. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET UNLESS INDICATED.
2. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.
3. CALLOUTS, COORDINATES, ELEVATIONS, AND DIMENSIONS ARE POINTED TO OR
MEASURED TO STRUCTURE CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE
FACE OF FOUNDATION WALL, UNLESS INDICATED OTHERWISE.
4. COORDINATES SHOWN LOCATING SITE FEATURES ARE EXPRESSED IN MODIFIED
GROUND COORDINATES. SEE SHEET V-100 FOR HORIZONTAL AND VERTICAL CONTROL
INFORMATION.
5. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL
AND GOVERNMENT REGULATORY AGENCIES AND THE COR.
6. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS AND LOCAL AND GOVERNMENT CODES, ORDINANCES, AND
REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN
REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST STRINGENT.
WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT,
CONTRACTOR SHALL SUBMIT ISSUE TO THE COR IN WRITING. THE DECISION OF THE
COR SHALL BE CONSIDERED FINAL.
7. ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL WORKMANSHIP MANNER USING
QUALITY MATERIALS.
RECORD DRAWING NOTES:
1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES THROUGH
THE DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE
SUBMITTED TO THE COR.
2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR
KEEPING TRACK OF ANY COR-APPROVED FIELD CONSTRUCTION REVISIONS TO THE
DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. CONTRACTOR SHALL USE
THESE REVISIONS TO PREPARE RECORD DRAWINGS OF COMPLETED CONSTRUCTION.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY
OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE
ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES
BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED
DURING CONSTRUCTION.
4. THE COR SHALL REVIEW COMPLETENESS, ACCURACY, AND FORMAT OF SUBMITTED
RECORD DRAWINGS. IF THE RECORD DRAWINGS ARE CONSIDERED UNACCEPTABLE,
THEY SHALL BE RETURNED TO THE CONTRACTOR FOR CORRECTION AND
RESUBMISSION.
EXISTING CONDITION NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE
BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND
STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR
LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE
THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY
DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE COR
BEFORE ANY FURTHER WORK COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING
STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY
PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY
EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS
TO UNDERGROUND UTILITIES PRIOR TO BEGINNING WORK. CONTRACTOR SHALL
CONTACT THE COR AND ALL ASSOCIATED UTILITY COMPANIES AND AGENCIES TO
IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED
OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING
UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE
ENCOUNTERED DURING CONSTRUCTION.
TENNESSEE ONE CALL: (800) 351-1111
ALCOA ELECTRIC POC: MIKE LINDSEY (865) 380-4856
ALCOA WATER POC: SIMON DEVENTE (865) 380-4810
CE WORK CONTROL: (865) 336-4219
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE COR OF OPERATIONAL
PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR
CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE COR. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY
THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT
CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE COR.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED
DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR
REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE COR.
6. THERE ARE NO KNOWN CONTAMINATED SOILS ON THE SITE, IF THE CONTRACTOR
ENCOUNTERS SUCH MATERIAL, SPECIAL HANDLING AND CONSIDERATION SHALL BE
REQUIRED FOR EXCAVATED SOILS THOUGHT TO CONTAIN CONTAMINATED SUBSTANCES.
CONTRACTOR SHALL PERIODICALLY MONITOR EXCAVATED SOILS. SOILS SHALL BE
TREATED ON SITE OR DISPOSED OF PROPERLY IN ACCORDANCE WITH ALL FEDERAL,
STATE, AND LOCAL REQUIREMENTS AND THE PROJECT SPECIFICATIONS. CONTRACTOR
SHALL COORDINATE REMOVAL OF CONTAMINATED MATERIALS WITH THE COR.
SURVEY NOTES:
1. THE SURVEY WAS PERFORMED BY C2RL, INC. IN MAY 2017. SURVEY CONTROL POINTS
SHALL BE PROVIDED PRIOR TO CONSTRUCTION AND SHALL BE RESET BY A LICENSED
LAND SURVEYOR, PROVIDED BY THE CONTRACTOR, IF DISTURBED DURING
CONSTRUCTION. SEE SHEET V-100.
2. CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR, IN THE STATE OF TENNESSEE, TO
SURVEY PROJECT IMPROVEMENTS. IF BENCHMARKS SHOWN ARE IN AREAS THAT
REQUIRE DEMOLITION, OTHER BENCHMARKS SHALL BE ESTABLISHED BEFORE
DEMOLITION AND CONSTRUCTION WORK BEGINS. CONTRACTOR SHALL SUPPLY
CERTIFIED, CONTROL POINT DATA TO COR AFTER COMPLETION OF CONSTRUCTION.
CONTRACTOR PERMITTING REQUIREMENTS
1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER PERMIT FOR LAND
DISTURBANCE OF MORE THAN 1 ACRE PRIOR TO CONSTRUCTION. EOR IS RESPONSIBLE
FOR COORDINATING WITH LOCAL AUTHORITIES TO COMPLETE AND SUBMIT THE STORM
WATER POLLUTION PREVENTION PLAN (SWPPP) FOR APPROVAL. LOCAL AUTHORITIES
INCLUDE BUT ARE NOT LIMITED TO COUNTY AND CITY STORMWATER MANAGEMENT
GROUPS. EOR SHALL COORDINATE ALL ENVIRONMENTAL AND STORM WATER
CORRESPONDENCE, DOCUMENTATION, AND PERMITTING WITH COR. THE STORMWATER
PERMITTING PROCESS MAY INCLUDE THE FOLLOWING:
a. EOR TO SUBMIT STORM WATER QUALITY PERMIT APPLICATION FEE.
b. EOR TO SUBMIT NPDES GENERAL CONSTRUCTION PERMIT.
c. EOR TO SUBMIT STORM WATER POLLUTION PREVENTION PLAN.
d. EOR TO SUBMIT AFFIDAVIT STATING PROPERTY OWNER'S COMMITMENT TO
COMPLY WITH STORM WATER QUALITY MANAGEMENT PLAN AND LOCAL
REGULATIONS FOR STORM WATER QUALITY MANAGEMENT.
e. CONTRACTOR TO SUBMIT COPY OF APPROVED PROJECT DRAWING SET.
f. CONTRACTOR TO SUBMIT CO-PERMITTEE LIABILITY RELEASE FORM PRIOR TO
BEGINNING ANY CONSTRUCTION OR EARTHWORK OPERATIONS.
g. CONTRACTOR TO SUBMIT NOT TO TENNESSEE DEPARTMENT OF ENVIRONMENTAL
AND CONSERVATION (TDEC).
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY WITH ALL
FEDERAL, STATE, AND LOCAL REGULATORY REQUIREMENTS. THE PERMITTING PROCESS
MAY INCLUDE THE SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
a. NPDES CONSTRUCTION PERMIT
b. STORMWATER MANAGEMENT.
c. WATER POLLUTION.
d. DISCHARGE PERMIT.
e. SOLID AND HAZARDOUS WASTE.
f. CLEARING.
g. DIG PERMIT.
h. AIR QUALITY.
i. AIR EMISSIONS.
j. AIRPORT HAZARD/AIRFIELD SAFETY CLEARANCES.
k. BURN (HOT WORK) PERMIT
3. THE CONTRACTOR MUST HAVE A DESIGNATED EROSION CONTROL INSPECTOR THAT
PERFORMS INSPECTIONS TWICE WEEKLY. THE INSPECTOR SHALL BE ONE OF THE
FOLLOWING:
a. A PERSON WITH A VALID CERTIFICATION FROM THE "FUNDAMENTALS OF EROSION
PREVENTION AND SEDIMENT CONTROL LEVEL 1" COURSE
b. A LICENSED PROFESSIONAL ENGINEER OR LANDSCAPE ARCHITECT
c. A CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL
d. A PERSON WHO HAS SUCCESSFULLY COMPLETED THE "LEVEL II DESIGN
PRINCIPLES FOR EROSION PREVENTION AND SEDIMENT CONTROL FOR
CONSTRUCTION SITES" COURSE
ALL INSPECTIONS SHALL BE DOCUMENTED ON THE CONSTRUCTION STORMWATER
INSPECTION CERTIFICATION FORM THAT CAN BE FOUND IN THE STATE OF TENNESSEE
NPDES PERMIT DOCUMENTATION.
A 06-22-17 A.2 SUBMITTAL RB
B 10-10-17 B.1 SUBMITTAL RB
C 01-17-18 B.2 SUBMITTAL RB
D 03-27-18 B.3 SUBMITTAL RB
project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
TENNESSEE AIR NATIONAL GUARD
MCGHEE TYSON AIRPORT
KNOXVILLE, TENNESSEE
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
95368
Project No. - PSXE999132
W9133L-15-D-0003
134th AIR REFUELING WING
REPLACE 135 MAINTENANCE
HANGAR AND SHOPS
5 6
D
C
A
B
1 2 3 4
E
D
C
A
B
E
5 61 2 3 4
95368GC002-GC003.DWG
GENERAL UTILITY NOTES
GC004 D
D. MUETING
R. BARUTH CHECKER
GENERAL UTILITY NOTES:
1. ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING CONNECTIONS
WITH BUILDING CONTRACTOR AND THE INFORMATION PROVIDED ON MECHANICAL
AND ELECTRICAL DRAWINGS.
3. CONTRACTOR SHALL CONTACT THE COR AND ALL ASSOCIATED UTILITY
COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES PRIOR TO
COMMENCEMENT OF WORK.
4. CONTRACTOR SHALL COORDINATE ALL REQUIRED UTILITY SHUTDOWNS FOR
UTILITY CONNECTIONS WITH THE COR. CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 14 DAYS.
5. CONNECTION TO EXISTING WATER, SEWER, AND GAS MAINS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH ALL REQUIREMENTS OF ASSOCIATED
UTILITY COMPANIES AND AGENCIES.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL UTILITY
CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR THE UTILITY
CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED WITH
CONNECTION CHARGES AND METERS.
7. SEE DETAIL D1 ON SHEET CU500 FOR TYPICAL PIPE TRENCH DETAIL.
8. THE MINIMUM DEPTH OF COVER FOR UTILITIES SHALL BE AS FOLLOWS UNLESS
INDICATED OTHERWISE:
a. WATER: 42 INCHES
b. FIRE PROTECTION: 48 INCHES
c. ELECTRICAL AND COMMUNICATION: 36 INCHES
d. ALL OTHER UTILITIES: 36 INCHES
9. ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND
INSPECTION METHODS DETAILED IN THE SPECIFICATIONS, WHICH MAY INCLUDE
VIDEO CAMERA INSPECTION.
10. ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY THE COR.
11. ALL STORM DRAIN PIPING SUBJECT TO AIRCRAFT LOADING SHALL BE CLASS IV
RCP, UNLESS NOTED OTHERWISE.
12. LOCATION OF THE EXISTING ABOVE GROUND AND UNDERGROUND UTILITIES AND
STRUCTURES INDICATED ARE APPROMIXATE ONLY AND THOSE INDICATED ARE
NOT NECESSARILY ALL WHICH MAY EXIST ON THE PROJECT SITE WHETHER THEY
ARE INDICATED OR NOT. CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY
DAMAGE TO THE UTILITY LINES. WHETHER SHOWN ON CONSTRUCTION PLANS OR
NOT. CONTRACTOR SHALL ALSO CONTACT THE TENNESSEE ONE CALL CENTER AT
811 FOR LOCATION OF ANY/ALL ELECTRICAL FACILITIES. THE PRIMARY ELECTRICAL
SERVICE ON BASE IS OWNED AND OPERATED BY THE CITY OF ALCOA ELECTRIC
SYSTEM. THE CONTACT FOR THE CITY OF ALCOA ELECTRIC SYSTEM IS MR. MIKE
LINDSEY (865) 380-4800
13. CONTRACTOR IS ADVISED THAT A DIG PERMIT IS REQUIRED BEFORE BEGINNING
ANY SUBSURFACE WORK. CONTACT WORK CONTROL TO OBTAIN THIS PERMIT AT
(865)336-4219. THERE IS NO FEE FOR THIS PERMIT.
14. ALL INORGANIC MATERIALS IDENTIFIED FOR DEMOLITION AND REMOVAL SHALL BE
DISPOSED OF OFF BASE AND IN ACCORDANCE WITH ALL LOCAL, STATE, AND
FEDERAL REGULATIONS. SUCH MATERIAL SHALL INCLUDE, BUT IS NOT LIMITED TO,
BRICK TILE, FIXTURES, UTILITY COMPONENTS AND OTHER SUCH ITEMS. ANY
APPLICABLE MATERIALS SHALL BE CONSIDERED FOR RECYCLE.
15. CONTRACTOR SHALL MAINTAIN EXISTING UTILITY SERVICES (WATER, SEWER,
ELECTRICAL, NATURAL GAS AND COMMUNICATIONS) AND/OR MAKE PROVISIONS
FOR OUTAGES WITH THE COR.
WATER UTILITY NOTES:
1. THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL TEES, BENDS, OR
ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE WITH THE DRAWINGS,
SPECIFICATIONS, AND MANUFACTERER'S RECOMMENDATIONS. SEE DETAIL A1 ON
SHEET CU500 FOR TYPICAL THRUST BLOCK DETAIL.
2. WATER LINES SHALL BE INSTALLED A MINIMUM OF 3.00 FEET BEHIND THE EDGE OF
PAVEMENT OR FACE OF CURB UNLESS INDICATED OTHERWISE. SEE
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR WATER
PIPING.
3. FIRE HYDRANTS SHALL BE INSTALLED A MINIMUM OF 3.00 FEET AND A MAXIMUM OF
6.00 FEET FROM EDGE OF PAVEMENT OR FACE OF CURB AND A MINIMUM OF 1.00
FEET FROM EDGE OF SIDEWALK UNLESS INDICATED OTHERWISE. A RADIUS OF
3.00 FEET AROUND HYDRANT SHALL BE KEPT CLEAR FOR FIRE DEPARTMENT
ACCESS. AREA BETWEEN CURB AND HYDRANTS SHALL BE KEPT CLEAR OF
OBSTRUCTIONS.
4. CONTRACTOR SHALL COORDINATE THE INSTALLATION, TESTING, AND INSPECTION
OF ALL DOMESTIC WATER AND FIRE WATER SYSTEMS WITH THE ASSOCIATED
UTILITY COMPANIES AND AGENCIES. SEE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS ON WATER UTILITY TESTING AND INSPECTION.
SANITARY UTILITY NOTES:
1. ALL SANITARY SEWER BUILDING CONNECTIONS ARE TO BE MADE USING 6.00 INCH
LINES UNLESS INDICATED OTHERWISE.
2. ALL SANITARY LINES ARE TO BE LAID AT A UNIFORM SLOPE FROM THE BUILDING
CONNECTIONS TO THE CONNECTING SEWER AND BETWEEN UTILITY STRUCTURES.
3. SEWER LINES SHALL BE INSTALLED A MINIMUM OF 10.00 FEET HORIZONTALLY
FROM ADJACENT WATER LINES UNLESS INDICATED OTHERWISE. SEE
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR SANITARY
PIPING.
4. SEWER LINES SHALL BE INSTALLED BELOW WATER LINES WITH A MINIMUM
VERTICAL SEPARATION OF 24 INCHES UNLESS INDICATED OTHERWISE. SEE
DETAIL A3 ON SHEET CU501 FOR SANITARY SEWER ENCASEMENT DETAIL WHERE
SANITARY SEWER WILL BE INSTALLED ABOVE WATER LINES.
5. IF MANHOLES ARE INDICATED ON SANITARY LINES, A 2.00 INCH DROP IN ELEVATION
BETWEEN THE INCOMING AND OUTGOING SEWER SHALL BE PROVIDED IN EACH
MANHOLE UNLESS INDICATED OTHERWISE. INVERT FLOW CHANNELS SHALL BE
CONSTRUCTED TO PROVIDE SMOOTH AND UNIFORM SLOPE WITH GRADUAL
TRANSITION SECTIONS.
UTILITY STRUCTURE NOTES:
1. ALL LANDSIDE UTILITY STRUCTURES ARE TO BE H-20 RATED. ALL AIRSIDE UTILITY
STRUCTURES ARE TO BE AIRCRAFT RATED FOR THE FOLLOWING TRAFFIC LOADS:
a. NOSE GEAR - 77,000 POUNDS, 187 PSI TIRE PRESSURE, H37x14-15, 24PR TIRE
SIZE.
b. MAIN GEAR - 191,000, 200 PSI TIRE PRESSURE, H46X18-20, 32PR TIRE SIZE.
c. CONTRACTOR SHALL SUBMIT STRUCTURAL DRAWINGS, DESIGN
CALCULATIONS, AND WATERPROOFING METHOD FOR ALL PRECAST OR
PREFABRICATED STRUCTURES, DESIGNED AND SEALED BY A PROFESSIONAL
ENGINEER REGISTERED IN THE STATE OF TENNESSEE FOR APPROVAL.
2. ALL MANHOLE TOPS/RIMS SHALL BE FLUSH WITH FINAL GRADE.
3. COVERS AND CASTINGS OF MANHOLES AND STRUCTURES SHALL BE STAMPED
PER THE APPROPRIATE UTILITY TYPE OR PER THE LOCAL STANDARDS, AND SHALL
BE STAMPED PER THE ORIGIN OF MANUFACTURE.
4. COVERS AND CASTINGS FOR COMMUNICATION MANHOLES SHALL BE
TAMPER-PROOF.
5. ANY LIFT LOOPS FOR UTILITY STRUCTURES SHALL BE GROUTED FLUSH AFTER
INSTALLATION.
6. PIPE MAY EXTEND 2 INCHES MAXIMUM BEYOND INTERIOR MANHOLE WALL.
MANHOLE FRAME ADJUSTMENT NOTES:
1. AREA REQUIRING MANHOLE ADJUSTMENT SHALL BE SAWCUT SQUARE OR
CIRCULAR 12.00” MINIMUM AROUND MANHOLE FRAME.
2. MANHOLE COVER AND FRAME SHALL BE RAISED TO FINISH GRADE BY INSTALLING
PRECAST MANHOLE ADJUSTMENT RINGS AND LEVELING MORTAR.
3. GRADE ADJUSTMENT AREA SHALL BE BACKFILLED WITH EARLY STRENGTH PCC.
BEST MANAGEMENT PRACTICES:
1. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS REQUIRED FOR THIS
PROJECT. PREVENTION OF POLLUTION RESULTING FROM CONSTRUCTION
ACTIVITIES SHALL BE ACCOMPLISHED BY CONTROLLING SOIL EROSION,
WATERWAY SEDIMENTATION, AND AIRBORNE DUST GENERATION. CONTRACTOR
SHALL ENSURE THAT NO SEDIMENT RESULTING FROM CONSTRUCTION ACTIVITIES
INFRINGES ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL COORDINATE
EROSION AND SEDIMENT CONTROL WITH OTHER CONSTRUCTION ENTITIES
PERFORMING WORK ON ADJACENT PROPERTIES.
2. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES USED TO REDUCE THE
AMOUNT OF SOIL PARTICLES THAT ARE CARRIED OFF AN AREA AND DEPOSITED
INTO A DRAINAGE COLLECTION SYSTEM OR INTO A BODY OF WATER. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT EROSION AND
SEDIMENTATION ARE CONTROLLED TO THE EXTENT PRACTICABLE. ALL
APPLICABLE SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION
ACTIVITIES. PRIOR TO INITIATING CONSTRUCTION IN AN AREA, ALL TEMPORARY
EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN PLACE. UPON
PROJECT COMPLETION ALL TEMPORARY SOIL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE REMOVED.
3. TEMPORARY EROSION CONTROL SHALL BE THE CONTRACTOR'S RESPONSIBILITY,
WHO SHALL UTILIZE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). THOSE
BMPS SHALL CONSIST OF SILT FENCE, WATTLES OR OTHER MEANS TO CONTROL
EROSION AS NEEDED. THE CONTRACTOR SHALL PROVIDE AND FOLLOW THE
EROSION AND SWPPP PLANS AS NEEDED.
4. CONTRACTOR SHALL PLACE SILT FENCE AS SHOWN PRIOR TO BEGINNING WORK.
THE DEVICES SHALL BE PLACED DOWN-SLOPE OF DISTURBED AREAS WHERE
SHEET EROSION WOULD OCCUR. SILT FENCE SHALL BE CLEANED AND REPAIRED
WHEN SEDIMENT BUILDUP REACHES ONE-THIRD OF SILT FENCE HEIGHT. AFTER
SIGNIFICANT RUNOFF EVENTS, THE CONTRACTOR SHALL INSPECT ALL EROSION
CONTROL STRUCTURES FOR SILT BUILD-UP THAT INTERFERES WITH THE
PERFORMANCE OF THE EROSION CONTROL STRUCTURE AND REPAIR OR REPLACE
THOSE STRUCTURES, AS NECESSARY. IF MORE THAN 1 ACRE IS DISTURBED,
CONTRACTOR MUST INSPECT WEEKLY AT A MINIMUM AND DOCUMENT
CONDITIONS.
5. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS DURING
CONSTRUCTION, UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGE TO THE
INLETS HAVE BEEN STABILIZED.
6. ALL EXISTING DRAIN INLETS SHALL HAVE FILTER SOCK PROTECTION INSTALLED IN
ACCORDANCE WITH DETAIL A5 ON SHEET CG500. EROSION PROTECTION MAY BE
REMOVED WHEN VEGETATION IS ESTABLISHED.
7. SEE SHEET CG500 FOR ADDITIONAL DETAILS ON EROSION AND SEDIMENT
CONTROL.
PETROLEUM PRODUCTS:
1. ALL ON-SITE VEHICLES SHALL BE MONITORED FOR PETROLEUM LEAKS AND SHALL
RECEIVE PROPER PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF
LEAKAGE. PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY-SEALED
CONTAINERS THAT ARE CLEARLY LABELED. ALL SPILLS SHALL BE CLEANED UP
IMMEDIATELY AFTER DISCOVERY. WASTE OIL AND OTHER PETROLEUM PRODUCTS
SHALL NOT BE DISCHARGED ONTO THE GROUND OR INTO WATER BODIES.
PETROLEUM PRODUCTS USED ON-SITE SHALL BE APPLIED ACCORDING TO THE
MANUFACTURER RECOMMENDATIONS.
A 06-22-17 A.2 SUBMITTAL RB
B 10-10-17 B.1 SUBMITTAL RB
project contract rev.drawing file
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
TENNESSEE AIR NATIONAL GUARD
MCGHEE TYSON AIRPORT
KNOXVILLE, TENNESSEE
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
95368
Project No. - PSXE999132
W9133L-15-D-0003
134th AIR REFUELING WING
REPLACE 135 MAINTENANCE
HANGAR AND SHOPS
5 6
D
C
A
B
1 2 3 4
E
D
C
A
B
E
5 61 2 3 4
95368GC005-GC006.DWG
GENERAL ACCESS & SAFETY NOTES
GC005 D
D. MUETING
R. BARUTH CHECKER
ACCESS AND SAFETY NOTES
ACCESS AND STAGING
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND
DELIVERIES ARE ILLUSTRATED ON SHEET GC006 AND ARE SUBJECT TO THE APPROVAL OF THE
COR. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES
WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS
ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE COR AND MAY
CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE BASE.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN
A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS,
AIRFIELD/AIRPORT AREAS, AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO
EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES,
CONTRACTOR SHALL NOTIFY THE COR, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER
EMERGENCY SERVICES OF THE CLOSURE 14 DAYS IN ADVANCE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED
FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS
UNLESS COORDINATED OTHERWISE WITH THE COR.
6. TEMPORARY CONSTRUCTION FENCING WILL BE REQUIRED BY THE CONTRACTOR AND THE
CONTRACTOR SHALL COORDINATE REQUIRED RELOCATION OF FENCE DURING CONSTRUCTION
WITH THE CONTRACTING OFFICER.
7. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR
MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING SHALL BE AS ILLUSTRATED
ON SHEET GC006 AND IS SUBJECT TO THE APPROVAL OF THE COR. CONTRACTOR MAY SUBMIT
ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA IS
SUBJECT TO CHANGE AT THE DIRECTION OF THE COR AND MAY CHANGE BASED ON
OPERATIONAL REQUIREMENTS OF THE BASE.
8. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES
SHALL BE PARKED IN THE STAGING AREA.
9. CONTRACTOR SHALL PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A
PROFESSIONALLY PAINTED SIGN, MEETING COR APPROVAL, TO DIRECT MATERIAL SUPPLIERS,
EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION SITE. THE SIGN SHALL READ
“CONSTRUCTION VEHICLES ONLY - NO VENDORS ALLOWED.”
10. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO SEARCH BY SECURITY WHEN
ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT
AND VALID PHOTO IDENTIFICATION PER BASE SECURITY REQUIREMENTS, AND ALL VEHICLES
MUST HAVE CURRENT AND VALID REGISTRATION AND INSURANCE. REGISTERED VISA HOLDERS
ARE AUTHORIZED TO PERFORM WORK WITHIN A FEDERAL INSTALLATION AREA.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH
THE BASE SECURITY OFFICE IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR
TO ENTERING SECURE AREAS.
12. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE
CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO THE
SATISFACTION OF THE COR.
COORDINATION AND COMMUNICATION
1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE
APPROVAL OF THE COR, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES
DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE
PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE
CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE
CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR
SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE COR PRIOR
TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN
ANY SUBCONTRACTORS AND THE COR. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE
CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE COR.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN
EMERGENCY:
a. ON-BASE EMERGENCY BASE EMERGENCY CENTER 865-336-3091
b. STANDARD SECURITY FORCES BASE DEFENSE OPERATIONS CENTER (BDOC) 865-336-3274
c. OWNER COR - MAJ J. DAVID BARRETT 865-336-4212
d. OTHER CONTACTS CONTRACTING OFFICER - CHIEF RICHARD LUSBY 865-336-3353
TRAFFIC CONTROL
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA
AND ASSOCIATED ROADWAYS AND AIRFIELD AREAS BY USING BARRICADES APPROVED BY THE
COR.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS,
INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM
WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN.
5. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 10 BUSINESS DAYS TO BASE AND THE COR
FOR ROAD CLOSURE PRIOR TO THE ROAD REQUIRING CLOSURE.
6. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE CONTRACTOR
SHALL REQUEST THE COR TO SCHEDULE AN INSPECTION. NO ROADWAY OR PORTION OF THE
AIRFIELD SHALL BE RE-OPENED UNTIL THE COR HAS COMPLETED INSPECTION AND APPROVED
THE RE-OPENING OF ACTIVE AREAS.
7. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION EQUIPMENT OR
TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL
CONDITION TO THE SATISFACTION OF THE COR.
AIRFIELD OPERATIONS COORDINATION
1. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS AREA WITHOUT CLEARANCE
FROM BASE AND THE COR, AND SHALL CONDUCT WORK IN SUCH A MANNER TO ENSURE A
MINIMUM HINDRANCE TO AVIATION OPERATIONS. CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 14 DAYS TO BASE FOR ACCESS TO AN AIRCRAFT OPERATIONS AREA. PEDESTRIAN
TRAFFIC AND PRIVATELY OWNED VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT
OPERATIONS AREA. GOVERNMENT ESCORT IS REQUIRED AT ALL TIMES WHEN OPERATING IN THE
A.O.A.
2. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING DAMAGE TO AIRCRAFT AND
HELICOPTER LANDING GEAR, PROPELLERS AND ROTORS, OR OF BEING INGESTED BY JET
ENGINES SHALL NOT BE LEFT WITHIN ACTIVE AIRFIELD OPERATIONS AREAS. CONTRACTOR IS
REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS CARRIED ONTO AIRFIELD FROM CONTRACTOR'S
EQUIPMENT OR OPERATIONS TO PREVENT FOREIGN OBJECT DAMAGE (FOD). MATERIAL
DROPPED WITHIN THESE AREAS SHALL BE CONTINUOUSLY REMOVED BY SURFACE SWEEPERS
OR OTHER APPROVED METHODS DURING WORKING HOURS. CONSTRUCTION FENCE MAY BE
REQUIRED TO FULFILL THIS RESPONSIBILITY. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN
A MANNER TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR JET BLAST
3. CONTRACTOR TO ATTACH A LAYER OF SILT FENCE TO THE BOTTOM OF TEMPORARY
CONSTRUCTION FENCE TO CONTROL FOD OR MATERIALS FROM GOING UNDER THE FENCES.
EXCAVATION AND TRENCHES
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF EM 385-1-1 REGULATIONS
AND THE STATE OF TENNESSEE LAWS CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING, AND
SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND EM
385-1-1 REGULATIONS FOR CONSTRUCTION.
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY
MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE COR.
4. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED.
5. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING
THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK
APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED.
OTHER SAFETY REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO EM385-1-1 SAFETY AND
HEALTH REQUIREMENTS MANUAL, CURRENT EDITION.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE
PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS THROUGHOUT THE PROJECT AND
REMEDY ANY SAFETY CONCERNS IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE PROPERTY. ANY TEMPORARY WASTE
AREA SHALL BE APPROVED BY THE COR AND SHALL BE KEPT IN AN ORDERLY CONDITION.
REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF THE
COR.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY GOVERNMENT-OWNED EQUIPMENT
WITH THE COR.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS WITH STATE AND LOCAL
AUTHORITIES AND SUBMITTING DOCUMENTS FOR PERMITTING FOR EROSION, SEDIMENT
CONTROL, AND STORMWATER POLLUTION PREVENTION.
7. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING
AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM
WATER RUNOFF. SEE SHEET CG100 THRU CG500 FOR EROSION AND SEDIMENT CONTROL
REQUIREMENTS.
8. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT
RESULTING FROM WIND CONDITIONS.
9. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION
ACTIVITIES TO A LIMIT ACCEPTABLE TO THE COR. THE CONTRACTOR SHALL CONTROL BLOWING
DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION
PERSONNEL AND ACTIVITIES SHALL BE REMOVED FROM THE PROJECT LIMITS.
11. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S
OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE
SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE
PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING
CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR.
12. IF CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION OF ANY WATER LINES OR
FIRE HYDRANTS ON PROJECT PROPERTY OR ADJOINING PROPERTY, THE CONTRACTOR SHALL
PROVIDE A MINIMUM ADVANCE NOTICE OF 14 WORKING DAYS TO THE COR.
13. FAILURE TO COMPLY WITH SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF
CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY THE
CONTRACTOR TO THE SATISFACTION OF THE COR.
14. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR BASE OPERATIONS
SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO
RETURN THROUGHOUT THE REMAINDER OF THE PROJECT.
NOTIFICATION PROCEDURES FOR HIGH LEVEL OBSTRUCTIONS
DEFINITIONS:
HIGH LEVEL EQUIPMENT: THIS TERM REFERS TO EQUIPMENT THAT DURING USE WILL EXTEND TO A
HEIGHT ABOVE THE SURROUNDING BUILDINGS, INFRASTRUCTURE, AND TOPOGRAPHY.
USING ORGANIZATION: THIS TERM REFERS TO THE ORGANIZATION THAT REQUIRES THE USE OF
TEMPORARY OR PERMANENT OBSTRUCTIONS TO COMPLETE THEIR MISSION.
NOTIFICATION PROCESS FOR PERMANENT OBSTRUCTIONS:
STEP 1: USING ORGANIZATION NOTIFIES THE 134TH AIRFIELD MANAGEMENT OFFICE AT (865) 336-4419
OF THE REQUIREMENT FOR THE OBSTRUCTION AND THE PROPOSED LOCATION.
STEP 2: ONCE COORDINATION AND APPROVAL IS RECEIVED BY AIRFIELD MANAGEMENT, THE USING
ORGANIZATION SHALL SUBMIT AN AF FORM 332 TO THE CE CUSTOMER SERVICE MAILBOX
REQUESTING ENGINEERING SUPPORT AND APPROVAL OF THE PROPOSED OBSTRUCTION.
STEP 3: ONCE COORDINATION AND APPROVAL IS RECEIVED BY CIVIL ENGINEERING, THE USING
ORGANIZATION SHALL COMPLETE A FORM FAA 7460-1 – NOTICE OF PROPOSED
CONSTRUCTION OR ALTERATION. THE DRAFT 7460 SHALL BE REVIEWED AND APPROVED BY
THE 134TH AIRFIELD MANAGEMENT, FLIGHT SAFETY, AND CIVIL ENGINEERING.
STEP 4: THE 134TH CIVIL ENGINEERING WILL FINALIZE AND SUBMIT THE COMPLETED 7460 TO MKAA
ENGINEERING FOR FURTHER REVIEW AND COORDINATION THROUGH FAA.
STEP 5: THE FAA WILL REVIEW AND PROVIDE FINAL APPROVAL ONCE ALL QUESTIONS AND CONCERNS
ARE ADDRESSED.
STEP 6: DURING CONSTRUCTION OF THE PERMANENT OBSTRUCTION THE USER SHALL FOLLOW ALL
NOTIFICATION STEPS ASSOCIATED WITH TEMPORARY OBSTRUCTIONS SECTION ABOVE.
OBSTRUCTION MARKING REQUIREMENTS FLAG MARKERS. FLAGS ARE USED TO MARK
CERTAIN STRUCTURES OR OBJECTS WHEN IT IS TECHNICALLY IMPRACTICAL TO USE
SPHERICAL MARKERS OR PAINTING. SOME EXAMPLES ARE TEMPORARY CONSTRUCTION
EQUIPMENT, CRANES, DERRICKS, OIL AND OTHER DRILLING RIGS. CATENARIES SHOULD USE
SPHERICAL MARKERS.
OBSTRUCTION MARKING REQUIREMENTS
1. MINIMUM SIZE. EACH SIDE OF THE FLAG MARKER SHOULD BE AT LEAST 2 FEET (0.6M) IN LENGTH.
2. COLOR PATTERNS. FLAGS SHOULD BE COLORED AS FOLLOWS:
(a) SOLID. AVIATION ORANGE.
(b) ORANGE AND WHITE. ARRANGE TWO TRIANGULAR SECTIONS, ONE AVIATION ORANGE AND
THE OTHER WHITE TO FORM A RECTANGLE.
(c) CHECKERBOARD. FLAGS 3 FEET OR LARGER SHOULD BE A CHECKERBOARD PATTERN OF
AVIATION ORANGE AND WHITE SQUARES, EACH 1 FOOT PLUS OR MINUS 10 PERCENT.
3. SHAPE. FLAGS SHOULD BE RECTANGULAR IN SHAPE AND HAVE STIFFENERS TO KEEP THEM
FROM DROOPING IN CALM WIND.
4. DISPLAY. FLAG MARKERS SHOULD BE DISPLAYED AROUND, ON TOP, OR ALONG THE HIGHEST
EDGE OF THE OBSTRUCTION. WHEN FLAGS ARE USED TO MARK EXTENSIVE OR CLOSELY
GROUPED OBSTRUCTIONS, THEY SHOULD BE DISPLAYED APPROXIMATELY 50 FEET APART. THE
FLAG STAKES SHOULD BE OF SUCH STRENGTH AND HEIGHT THAT THEY WILL SUPPORT THE
FLAGS ABOVE ALL SURROUNDING GROUND, STRUCTURES, AND/OR OBJECTS OF NATURAL
GROWTH.
** IF NIGHT OPERATIONS ARE REQUIRED SPECIAL COORDINATION WITH AIRFIELD MANAGEMENT
MUST OCCUR TO ENSURE PROPER LIGHTING OF THE OBSTRUCTION BEFORE ADVISORY
APPROVAL. **
A 06-22-17 A.2 SUBMITTAL RB
B 10-10-17 B.1 SUBMITTAL RB
| MTANG civil combined, updated June 19 2 |
| MTANG civil combined, updated June 19 3 |
| MTANG civil combined, updated June 19 4 |
| MTANG civil combined, updated June 19 5 |
File details come from the government source that posted it. Updated .