This document contains an asbestos management plan and survey results for multiple buildings at McGhee Tyson Air National Guard Base. The plan identifies homogeneous areas and provides sampling results for various materials across several buildings. In Building 111, samples identified asbestos-containing mudded thermal system insulation on the steam supply line fittings, boiler stack duct, and domestic water line fittings. The plan recommends inclusion of these materials in preventative maintenance and notes removal must be considered if repair or construction projects impact the areas. Also provided is a federal contract opportunity solicitation for demolition and renovation work at Buildings 113, 110 and 111 at the base, with response dates and agency information included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 Abstract.pdf | ||
| OF 1419 Abstract.pdf | ||
| Sign in Sheet - 23 Aug 2022 10am.pdf | ||
| B 113 As Built Drawings.pdf | ||
| Demo 110_110 Drawings GC002 003 004 005.pdf | ||
| 05 40 00 Cold-formed Metal Framing 20220805.pdf | ||
| Demo Drawings CS503-506.pdf | ||
| W50S98-22-B-000100002.pdf | ||
| P-601_REVISED.pdf | ||
| REGISTER-upate 07292022.pdf | ||
| 1190113_TNANG_B113_ELEC-ADDENDUM 1-072622.pdf | ||
| W50S98-22-B-000100001.pdf | ||
| 1190113_TNANG_B113_FIRE-ADDENDUM 1-072622.pdf | ||
| 28 31 76 - updated.pdf | ||
| Pre-Bid Sign in Sheet B113.pdf | ||
| Pre-Bid Slides B113.pdf | ||
| MTANG Demo 110 and 111 drawings.pdf | ||
| Repair Building 113 Spec. Volume 2.pdf | ||
| W50S98-22-B-0001 21 July 2022.pdf | ||
| Repair Building 113 Spec. Volume 1.pdf | ||
| Repair Building 113 Drawings.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4.0 FACILITY LIST
ACBM
Present?
Facility Number
Facility Name Drawing Photograph YES NO
M001 Front Traffic Check House M01 X M013 Sanitary Latrine (DEMOLISHED) M013 X M015 Pavilion X M090 Base Exchange/Mini Mall M090 X M100 Base Operations (ABATED JULY 2013) M100 M100 1x1 X M101 Maintenance Control M101 M101 12x12 X M102 CSO – Telecommunications Center M102 X M106 Communications Facility M106 X M110 Avionics M110 \\137.14.17.45\ ce_erm\CEV\A ctive Files\07- Environmental Management and Contingency Plans T32-01 R14.00\07-H
Asbestos Management
Plan\2014 Asbestos
Management Plan\Photograp hs\M110.pdfM1
10 Transite
X
M111 Maintenance Dock, Fuel Systems M111 M111 TSI M111 9x9 FT X
M113 Maintenance Hanger (ABATED) M113 X M120 Security Forces Operations M120 X M123 Petroleum Operations M123 X M124 Fire Station M124 X M125 Comm FLT ITN M125 X M126 Engine Inspection Shop M126 M126 Transite X M129 OPL Storage Jet Fuel M129 X M131 Liquid Fuel Pump Station
(DEMOLISHED)
M131 M131 Gasket X
M134 Reserve Forces Operational Training Group
M134 X
M136 Petroleum OPS Building M136 X M138 AGE Storage M138 X M207 Open Mess, Consolidated (ABATED) M207 M207-FT
M207-transite walls
X
M210 Warehouse M210 X M240 Warehouse, Supply & Contracting M240 M240 9x9 FT
M240 TSI
Enclosure
X
M241 Warehouse , Supply (DEMOLISHED) M241 X M242 Haz-Mat Pharmacy M242 X M243 Storage Mag M243 X M245 Natural Gas Fueling Station M245 X
134th ARW McGhee Tyson ANGB Asbestos Management Plan
Sample Number
Material/ Location Result Friable/ Non Friable
Hazard Rating
101-01 12”x12” FT tan 2C/4C NF NA 101-02 12”x12” FT tan 2C/4C NF NA 101-03 12”x12” FT tan 2C/5C NF NA 101-04 1’x1’ CT ND F NA 101-05 1’x1’ CT ND F NA 101-06 1’x1’ CT ND F NA
M102 CSO – Telecommunications Center
Number
Material/ Location Result Friable/ Non Friable
Hazard Rating
102-01 2’x2’ CT smooth ND F NA 102-02 2’x2’ CT smooth ND F NA 102-03 2’x2’ CT smooth ND F NA 102-04 2’x2’ CT fissured ND F NA 102-05 2’x2’ CT fissured ND F NA 102-06 2’x2’ CT fissured ND F NA 102-07 Sheetrock ND NF NA 102-08 Sheetrock ND NF NA 102-09 Sheetrock ND NF NA 102-10 2’x2 CT ND F NA 102-11 2’x2 CT ND F NA 102-12 2’x2 CT ND F NA 102-13 12”x12” FT gray ND NF NA 102-14 12”x12” FT gray ND NF NA 102-15 12”x12” FT gray ND NF NA
M106 Communications Facility
Number
Material/ Location Result Friable/ Non Friable
Hazard Rating
160-01 Sheetflooring @ copier rear exist ND NF NA 106-02 Sheetflooring @ copier rear exist ND NF NA 106-03 Sheetflooring @ copier rear exist ND NF NA 106-04 Sheetflooring with squares ND NF NA 106-05 Sheetflooring with squares ND NF NA 106-06 Sheetflooring with squares ND NF NA 106-07 2’x4’ CT ND F NA 106-08 2’x4’ CT ND F NA 106-09 2’x4’ CT ND F NA
M110 Avionics (SEE PREVIOUS SURVEY RESULTS)
Transite wall board F 1
M111 Maintenance Dock, Fuel Systems (Renovation Scheduled for FY20)
Number
Material/ Location Result Friable/ Non Friable
Hazard Rating
111-01 12”x12” FT Gray ND NF NA 111-02 12”x12” FT Gray ND NF NA 111-03 12”x12” FT Gray ND NF NA 111-04 2’x2’ CT ND F NA 111-05 2’x2’ CT ND F NA 111-06 2’x2’ CT ND F NA 111-07 Flue Insulation ND F NA 111-08 Flue Insulation ND F NA 111-09 Flue Insulation ND F NA
111-10 9”x9” FT Black 3C/ND NF 1 111-11 9”x9” FT Black 3C/ND NF 1 111-12 9”x9” FT Black 3C/ND NF 1 111-13 2’x4’ CT ND F NA 111-14 2’x4’ CT ND F NA 111-15 2’x4’ CT ND F NA
TSI Steam Supply Line/Fittings F 1 TSI Steam Condensate Return Line/Fittings F 1 TSI Water Tank F 1 TSI Boiler Stack Duct F 1 TSI domestic water F 1
M113 Maintenance Hanger (ABATED 2015)
Number
Material/ Location Result Friable/ Non Friable
Hazard Rating
113-01 TSI 20C F 1
113-02 TSI 20C F 1
113-03 TSI 27C F 1
113-04 2’x4’ CT ND F NA 113-05 2’x4’ CT ND F NA 113-06 2’x4’ CT ND F NA 113-07 Sheetrock ND NF NA 113-08 Sheetrock ND NF NA 113-09 Sheetrock ND NF NA 113-10 2’x2’ CT ND F NA 113-11 2’x2’ CT ND F NA 113-12 2’x2’ CT ND F NA 113-13 12”x12” FT White ND NF NA 113-14 12”x12” FT White ND NF NA 113-15 12”x12” FT White ND NF NA
M120 Security Forces Operations (SEE PREVIOUS SURVEY RESULTS, NO ACM) M123 Petroleum Operations (SEE PREVIOUS SURVEY RESULTS, NO ACM) M124 Fire Station (NEW CONSTRUCTION; built 2011) M125 Comm FLT ITN (NOT SAMPLED; Built 2005) M126 Engine Inspection Shop (PREVIOUSLY ADDRESSED)
12”x12” FT tan stone NF 1 Mastic under 12”x12” FT tan stone NF 1 12”x12” FT beige NF 1 Mastic under 12”x12” FT beige NF 1 12”x12” FT blue NF 1 Mastic under 12”x12” FT blue NF 1 TSI on abandoned Steam lines and fittings F 1 Transite wallboard NF 1
M129 OPL Storage Jet Fuel (NO SUSPECT MATERIAL) M131 Liquid Fuel Pump Station (DEMOLISHED/ABATED)
HVAC vibration material F 1 Gasket material F 1
M134 Reserve Forces Operational Training Group
Client No.I HGA Lab No. Asbestos Present Total % Asbestos
106-09 112051530-63 No NAO Location: 2'x4' CT
Analyst Description:White/Lt .Grey, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types:
Other Material: Cellulose 55 %, Fibrous glass 18 %, Non-fibrous 5 %, Perlite 22 %
{by CVES) by David W. Ralbovsky on 05/17/12
111-01 112051530-64 Location: 12"x12" FT Gray
Analyst Description: Gray, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types:
Other Material: Non-fibrous 100 %
111-02 112051530-65
Analyst Description:Gray,Heterogeneous, Non-Fibrous,Bulk
Other Material: Non-fibrous 100 %
111-03 112051530-66
Other Material: Non-fibrous 100 %
No NAO (by CVES) by David W. Ralbovsky on 05/17/12
No NAO by David W.Ralbovsky on 05/17/12
{by CVES)
111-04 112051530-67 No NAO Location: 2'x2' CT
Analyst Description: White/Lt.Grey, Heterogeneous, Non-Fibrous, Bulk Material
Other Material:Cellulose 55 %, Fibrous glass 22 %, Non-fibrous 5 %, Perlite 18 %
{by CVES)
111-05 112051530-68 No NAO
Analyst Description: White/Lt.Grey, Heterogeneous, Fibrous, Bulk Material
Other Material: Cellulose 55 %, Fibrous glass 22 %, Non-fibrous 5 %, Perlite 18 %
(by CVES)
Client No.I HGA Lab No. Asbestos Present Total % Asbestos
111-06 112051530-69 No NAO
Analyst Description: White/Lt.Grey, Heterogeneous, Fibrous, Bulk Material
Other Material: Cellulose 55 %, Fibrous glass 22 %, Non-fibrous 5 %, Perlite 18 %
(by CVES}
111-07 112051530-70 No NAO
Location: Flue Insulation
Other Material: Cellulose 5 %, Non-fibrous 95 %
(by CVES}
111-08 112051530-71 No NAO
Other Material: Cellulose 5 %, Non-fibrous 95 %
(by CVES} by David W.Ralbovsky on
111-09 112051530-72 No NAO
Analyst Description:Gray, Heterogeneous, Non-Fibrous,Bulk Material
Other Material: Cellulose 5 %, Non-fibrous 95 %
111-10 112051530-73L1 Location: 9"x9" FT Black
Analyst Description:Green, Heterogeneous, Non-Fibrous , Floor Tile Asbestos Types: Chrysotile 3.0 % Other Material: Non-fibrous 97 %
111-10 112051530-73L2
Analyst Description: Black, Heterogeneous, Non-Fibrous,Mastic
Other Material: Cellulose Trace, Fibrous glass Trace, Non-fibrous 100 % by David W . Ralbovsky on 05/17/12
Yes 3 % (by CVES} by David W . Ralbovsky on 05/17/12
(by CVES}
Client No. I HGA Lab No. Asbestos Present Total % Asbestos
111-11 112051530-74L1 Yes 3 %
Analyst Description: Green, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types: Chrysotile 3.0 % Other Material: Non-fibrous 97 %
111-11 112051530-74L2
Analyst Desc ription:Black, Heterogeneous, Non-Fibrous,Mastic
Other Material:Cellulose Trace, Fibrous glass Trace, Non-fibrous 100 %
111-12 112051530-75 L1
Analyst Description: Green, Heterogeneous, Non-Fibrous, Floor Tile Asbestos Types: Chrysotile 3.0 % Other Material: Non-fibrous 97 %
111-12 112051530-75L2
Analyst Description: Black, Heterogeneous, Non-Fibrous, Mastic
Other Material: Cellulose Trace, Non-fibrous 100 %
Yes 3 %
111-13 112051530-76 No NAO
Analyst Description:White/Lt.Grey,Heterogeneous,Fibrous, Bulk Material
Other Material: Cellulose 55 %, Fibrous glass 15 %, Non-fibrous 5 %, Perlita 25 %
{by CVES) by David W. Ralbovsky on 05/17/12
111-14 112051530-77 No NAO
Analyst Description:White/Lt.Grey, Heterogeneous, Fibrous, Bulk Material
Other Material: Cellulose 55 %, Fibrous glass 15 %, Non-fibrous 5 %, Perlite 25 %
(by CVES)
Client No.I HGA Lab No. Asbestos Present Total % Asbestos
111-15 112051530-78 No NAO
Other Material: Cellulose 55 %, Fibrous glass 15 %, Non-fibrous 5 %, Perlite 25 %
{by CVES)
113-01 112051530-79 Yes 20 %
Location: TSI
Analyst Description: Gray, Heterogeneous, Fibrous, Bulk Material Asbestos Types: Chrysotile 20.0 % Other Material:Cellulose 70 %, Non-fibrous 10 %
(by CVES)
113-02 112051530-80 Yes 20 %
Analyst Description: Gray, Heterogeneous, Fibrous, Bulk Material Asbestos Types: Chrysotile 20.0 % Other Material:Cellulose 70 %, Non-fibrous 10 %
{by CVES)
113-03 112051530-81 Yes 27 %
Analyst Description:Gray, Heterogeneous, Non-Fibrous, Bulk Material Asbestos Types: Chrysotile 27.0 % Other Material: Cellulose 63 %, Non-fibrous 10 %
(by CVES)
113-04 112051530-82 No NAO
Other Material: Cellulose 55 %, Fibrous glass 22 %, Non-fibrous 5 %, Perlite 18 %
{by CVES)
113-05 112051530-83 No NAO
Other Material: Cellulose 55 %, Fibrous glass 22 %, Non-fibrous 5 %, Perlite 18 % i
2006 ASBESTOS MANAGEMENT PLAN DATA
Building 13: Building 13 is the SAN LATRINE facility that was constructed in 1953 with a total floor space of799 sq. ft. Walk through inspection revealed no suspect material found at this time.
(BUILDING HAS BEEN DEMOLISHED)
Building 15: Building 15 is the 0/D RECTN PAVILION facility that was constructed in 1983 with a total floor space of 1,200 sq. ft. Walk through inspection r e v e a l e d no suspect material found at this time.
Building 90: Building 90 is the EXCH, BRANCH facility that was constructed in 1993 with a total floor space of 15,300 sq. ft. Walk through inspection revealed no suspect material found at this time.
Building 100: Building 100 is the OPS, BSE facility that was constructed in 1952 with a total floor space of 2,655 sq. ft. Walk through inspection revealed no suspect material found at this time.
Building 101: Building 101 is the WPN SYS/M MGT facility that was constructed in 1981 with a total floor space of 7,356 sq. ft. Walk through inspection r e v e a l e d no suspect material found at this time.
Building 102: Building 102 is the SQ OPS facility that was constructed in 1988 with a total floor space of 26,969 sq. ft. Walk through inspection re vea l e d no suspect material found at this time.
Building 105: DEMOLISHED
Building 106: Building 106 is the COMM facility that was constructed in 1992 with a total floor space of 1,200 sq. ft. Walk through inspection revealed no suspect material found at this time.
Building 110: Building 110 is the SHP, AVIONICS facility that was constructed in 1952 with a total floor space of3,996 sq. ft.
Homogeneous Areas: The visual survey resulted in the identification of one homogeneous area as described below.
1. Transite wall board in mechanical room (painted blue)
Location of Homogeneous Areas:
Homogeneous Area #1: Previous testing and experience have proven this material to contain asbestos.
It is determined that the wall board in the mechanical room and throughout the building is considered
ACM.
Recommended Action: Since the asbestos containing material was found to be in good condition and does not pose a threat, no immediate action is required. The material should also be included in a recurring preventative maintenance program whereby inspections are made every six months or as needed. If the condition deteriorates, repair or removal should be performed. Removal must be considered if the areas are ever included in a repair or construction project. Actions taken to repair or remove the ACM should be annotated in the "Changes -That May Affect Sample Summary"section of the plan.
Building 111: Building 111 is the MAINT DOCK, FL SYS facility that was constructed in 1953 with a total floor space of 33,954 SF
Homogeneous Area: The visual survey resulted in the identification of five homogeneous areas as described below.
1. The mudded thermal system insulation on the steam supply line fittings.
2. The mudded thermal system insulation on the condensate return line fittings.
3. The thermal system insulation on the water tank.
4. The thermal system insulation on the boiler stack duct.
5. The mudded thermal system insulation on the domestic water line fittings.
Location of Homogeneous Areas:
Homogeneous Area #1: Three samples (#111-01, 02, and 03) were taken. Sample #111-01 tested positive with 30% chrysotile asbestos. One positive sample identifies the system as asbestos; therefore, the mudded thermal system insulation on the steam supply line fittings located on the front and above the boiler in the mechanical room and throughout the building is considered ACM.
Homogeneous Area #2: Three samples (#111-04, 05, and 06) were taken. All samples tested negative for asbestos; therefore, the mudded thermal system insulation on the condensate return line fittings located on the boiler in the mechanical room and throughout the building is considered NON-ACM.
Homogeneous Area #3: Three samples (#111-07, 08, and 09) were taken. All samples tested negative for asbestos; therefore, the thermal system insulation on the water tank located in the mechanical room is considered NON-ACM.
Homogeneous Area #4: Three samples (#111-10, 11, and 12) were taken. Sample #111-10 tested positive with 20% chrysotile asbestos. One positive sample identifies the system as asbestos; therefore, the thermal system insulation on the boiler stack duct located in the mechanical room is considered ACM.
Homogeneous Area #5: Three samples (#111-13, 14, and 15) were taken. Sample #111-13 tested positive with 10% chrysotile asbestos. One positive sample identifies the system as asbestos; therefore, the mudded thermal system insulation on the domestic water line fittings located in the mechanical room and throughout the building is considered ACM.
Recommended Action: Since the asbestos containing material was found to be in good condition and does not pose a threat, no immediate action is required. The material should also be included in a recurring preventative maintenance program whereby inspections are made every six months or as needed. If the condition deteriorates, repair or removal should be performed. Removal must be considered if the areas are ever included in a repair or construction project. Actions taken to repair or remove the ACM should be annotated in the "Changes That Affect Sample Summary" section of the plan.
Building 113: Building 113 is the HG MAINT facility that was constructed in 1952 with a total floor space of 35,908 sq. ft. Walk through inspection re vea le d no suspect material found at this time.
Building 120: Building 120 is the FIRE CRASH/RESCUE STN facility that was constructed in 1986 with a total floor space of 8,743 sq. ft.
Homogeneous Areas: The visual survey resulted in the identification of five homogeneous areas as described below.
1. The sheet rock.
2. The seam tape on the sheet rock.
3. The seam mud on the sheet rock.
4. The beige linoleum.
5. The white mastic under the beige linoleum.
L O
G I S
T I C
S
G
R O
U P
C
M
D R
A
C O
M M
U N
I C
A T
I O
N S
R O
O M
A
N O
F A C I L I T Y
R O O M
N O
O P
E N
S
T O
R A
G x
C O
M P
O N
E N
T
R
E P
A I R
S U
P V
R
H A
L L
W A
Y
C O
R R
I D
O R
T O
O L
R O
O M
B O
I L
R
O
M
L A
T R
I N
E
A
A
H
A N
G E
R S
P A
C E
T I R
E W
A S
H S
H O
W E
R
L A
S E
R
W
I R
E
M
A R
K I N
G
S
T O
R A
G E
R E
C L
A M
A T
I O
N
R
E P
A I
H O
P
P N
E U
D R
A U
L
N
F
F
S
H O
P
C L
A S
S R
O
M
B
R E
A K
L O
C K
E R
R O
O M
A N
D S
H O
W E
R S
D R
O G
K
Z
Z L
E
S
H O
P
B A
T T
E R
Y
S
H O
P
F U
E L
S
S
H O
P
O
F F
I C
E
E L
E C
T R
H O
P
W H
E E
L
A
D
R
E
S
H O
P
L O
G I S
T I C
S
G
R O
P
M
D R
I N
F O
M
G M
T
E M
S
C
H I E
F
F I E
I N
T
C
H I E
F
M E
N 'S
R E
S T
R O
O M
W O
M E
N 'S
R E
S T
R O
O M
F I E
I N
T E
N A
N C
E
M E
C H
R O
O M
A D
M
E
A
A G
S C
O M
D R
S T O
R A
G E
L O
F T
A
B O
V E
A E
R O
S P
A C
E
S
Y S
T E
F F
I C
E
N O
S E
W H
E E
L A
R E
A
S T
O R
A G
E
M E
C H
A N
I C
A L
A
A
F U
Y S
T E
M S
R E
V I S
I O
N S
Q
F
T
F L
O O
R
S
P A
C E
C i v i l E n g i n e e r in g
M c G
H E
E
T
Y S
S
E
L O
U I S
V I L L E
T
N
F I R
M
N
A M
E
A
D
R E
S S
P
O S
T
A
V E
N U
E
T H
M c G
H E
E
T
Y S
S
E
T
N
M A
I N
T
D
O C
K
B U
I L
D I N
G
B U
I L
D I N
G
I N
V E
N T
O R
Y
A
T L
A S
T E
N N
E S
S E
E
A
T
I O
N A
L
G U
A R
D
T
H
A
R W
N o
D a t e
P lo t
S c a le
S E
R
D H
D w g
B y
A p p d
B y
P r o je c t
D a t e
P S
X E
S E
R
M
B u il d in g n v e n t o r y
A t la s d w g
L e g e n d
S a m p le o c a t io n
A C
M x
F lo o r
T le b la c k a n d
M a s t ic
File details come from the government source that posted it. Updated .