Appendix A5 Second Floor Plan.pdf

PDF 160 KB Posted

Attached to
PRANG - Hangar 1 Demolition Federal contract opportunity
Solicitation number
W50S9320B5001
Issued by
Department of the Army National Guard

About this file

This federal contract opportunity notice is for demolition services at Muniz Air Base in Carolina, Puerto Rico. The USPFO for Puerto Rico intends to issue an IFB to award a firm fixed-price contract to demolish Hangar 1, which is approximately 98,000 square feet, along with related areas. Asbestos and lead testing and abatement are required. Optional work includes demolishing a two-story, 2,500 square foot building and demolishing communications manholes and conduits. The resulting area must be backfilled and seeded. The Department of the Army National Guard is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to PRANG - Hangar 1 Demolition, newest first.
File Type Posted
H1-54-01 DRAWING SCHEDULE.pdf PDF
H1-54-05 RIGHT - LEFT ELEVATIONS.pdf PDF
H1-54-08 HANGAR DOOR DETAIL.pdf PDF
H1-54-10 PARACHUTE TOWER - CHIMNEY DETAILS.pdf PDF
H1-54-07 CROSS - LOGITUDINAL SECCTION.pdf PDF
H1-54-04 FRONT - REAR ELEVATIONS.pdf PDF
H1-54-11 STAIRS - DETAILS.pdf PDF
H1-54-13 STRUCTURAL - FIRST FLOOR.pdf PDF
H1-54-03 SECOND FLOOR PLAN.pdf PDF
H1-54-06 WALL SECTION - WINDOW DETAILS.pdf PDF
H1-54-19 HANGAR DOOR DETAIL CANOPY.pdf PDF
H1-54-12 DOOR SHEDULE - DETAILS.pdf PDF
H1-54-14 TOILET ROOM - DETAILS.pdf PDF
H1-54-24 HEATING PLUMBING SECOND FLOOR PLAN.pdf PDF
H1-54-25 HEATING DETAILS.pdf PDF
S3 H1-54-17 STRUCTURAL ROOF FRAMING PLAN.pdf PDF
S1 H1-54 15 STRUCTURAL FOUNDATION - FIRST FLOOR PLAN.pdf PDF
S5 H1-54-19 STRUCTURAL DETAILS.pdf PDF
O4 Approximate Outside Demo Areas.pdf PDF
S2 H1-54-16 STRUCTURAL SECOND FLOOR FRAMING PLAN.pdf PDF
S6 H1-54-20 STRUCTURAL COLUMN DETAILS.pdf PDF
S8 BLDG_02.pdf PDF
S4 H1-54-18 STRUCRURAL TRUSS.pdf PDF
S7 H1-54-21 STRUCTURAL BRACING DETAILS.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
W50S9320B5001 Hangar 1 Demolition - Solicitation.pdf PDF
Appendix A2 Demolition Site Plan.pdf PDF
Appendix B1.2 ACM Re-inspection Report.pdf PDF
Appendix B2.1 Asbestos_Plan_Building_2_Description.pdf PDF
Appendix A7.3 Existing HANGHAR 1 COMM.pdf PDF
Appendix A4 First Floor Plan.pdf PDF
Appendix O3 Site Plan.pdf PDF
Appendix A6 Elevations Plan.pdf PDF
Synopsis Demolition Hangar 20200331.pdf PDF
Appendix B1.1 ACM Report.pdf PDF
Appendix G2 ISWMP.pdf PDF
Appendix A7.2 Existing HANGAR 1 PLUMBING.pdf PDF
Appendix B2.2 Asbestos_Plan_Building_2_Diagram.pdf PDF
Appendix A3 Hauling Route.pdf PDF
Appendix A8 Project Sign Details.pdf PDF
Appendix C1 Seeding Mix.pdf PDF
Appendix O1 Electric sub station to protect.pdf PDF
Appendix O2 Monitoring wells Final_SI Report_Luis Muniz ANGB_Cmprhnsv_101519_Figure_3.pdf PDF
Appendix G1 HWMP.pdf PDF
Appendix A7 Lighting and Power Plan.pdf PDF
Appendix F1 Key Component Waste Management Plan.pdf PDF
Appendix A7.1 Existing HANGAR 1 ELECTRIC PLAN.pdf PDF
Appendix D1 FAA Form 7460-1.pdf PDF
Appendix A1 Project Location.pdf PDF
Synopsis - Demolition Hangar 1.pdf PDF
Show all 50

PRANG - Hangar 1 Demolition has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA = 188 sf

OFFICE

LG COMMANDER'S

LG CONFERENCE

AREA =259 sf

ROOM

AREA =60 sf

& SHOWER

LG SECRETARIAL

OFFICE

AREA = 196 sf

WOMEN'S RESTROOM

AREA =467 sf

MEN'S RESTROOM

AREA =436 sf

LG BREAK ROOM

AREA = 173 sf

LG TOILET

FEMALE TOILET

AREA =78 sf

MEN'S LOCKER

ROOM

AREA =934 sf

AREA =244 sf

LSF/CC'S OFFICE

AREA =174 sf

RECEPTION

AREA =181 sf

LOGISTIC SUPPORT

FLIGHT

AREA =621 sf

PLANS & SCHEDULING

PRODUCTION ANALYSIS

CONTROL

AREA =476 sf

A R

E A s f

C O

R R

I D

O R

A R s f

B R

E A

K

R

O O

M

CORRIDOR

AREA =74 sf

RECEPTION

AREA = 337 sf

QA NCOIC

AREA = 670 sf

AREA = 128 sf

QA NCOIC

AREA = 182 sf

AREA = 36 sf

TOILET

AREA = 21 sf

STOR

PHOTO LAB.

AREA = 1091 sf

AREA = 133 sf

STORAGE

AREA = 252 sf

VIDEO STUDIO

AREA = 188 sf

VIDEO STUDIO

AREA = 144 sf

AREA = 807 sf

CENTER (MCC)

MOBILITY CONTROL

MCC UNIT OFFICE

AREA = 510 sf

AREA = 249 sf

RECEPTION

AREA = 140 sf

OFFICE

OFFICE

AREA = 184 sf

AREA = 143 sf

OFFICE

AREA =123 sf

TEST AREA

AREA = 96 sf

STORAGE

AREA = 94 sf

TEST AREA

A R s f

R O

O M

TRAINING TRAINING

TRAINING

M E

C H

AREA = 96 sf

TRAINING OFFICE

AREA = xxxxx 319 SF

AREA = 875 sf

TRAINING CLASSROOM

OFFICE

AREA = 213 sf

AREA = 213 sf

OFFICE

AREA =

200SF

ORDERLY RM.

AREA = 96 sf

FIRST SARGENT OFFICE

AREA = 300 sf

SQDN CDR OFFICE

AREA = 187 sf

CONFERENCE ROOM

AREA = 300 sf

AREA = 187 sf

MECH. ROOM

EXISTING

AREA = 34 sf

STORAGE

VAULT

AREA = 114 sf

CLASS "A"

BASE COMM. CENTER

AREA = 581 sf

COMM. STOR.

AREA = 138 sf

AREA = 68 sf

COMM. STOR.

AREA = 2709 sf

CORRIDOR

COM. RM

AREA =60.92 sf

File details come from the government source that posted it. Updated .