This document is a Heat Load Calculator worksheet used to determine cooling capacity requirements for IT equipment in a facility. The calculation is based on one IT equipment unit with a power supply wattage of 8,697 watts, which at 70% load generates 6,087.9 watts or 20,759.74 BTU/hour. The worksheet applies two additional buffers to the base equipment heat load: a 10% buffer for occupancy and lighting, and a 20% buffer for environmental radiating heat in the building and surge capacity. These buffers increase the total heat load from 20,759.74 BTU/hour to 26,987.66 BTU/hour.

The final calculation converts the total heat load to cooling capacity by dividing the total BTU/hour by 12,000 (the standard conversion factor), resulting in a requirement of 3 tons of cooling capacity necessary for the facility. This worksheet appears to be a technical planning tool for determining HVAC cooling system specifications rather than a formal contract solicitation document.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Replacement/Repair Base-wide, newest first.
File Type Posted
SOW Base Wide HVAC Repair XHZG262004_10 Sept 26.pdf PDF
RFIs HVAC_11Sep26.pdf PDF
Solicitation Amendment - W50S8U26RA0140002.pdf PDF
HVAC RFI answers Batch 1.pdf PDF
Copy of RFIs HVAC_27 Aug 26.pdf PDF
Solicitation Amendment - W50S8U26RA0140001.pdf PDF
SOW Base Wide HVAC Repair XHZG262004_27Aug26_.pdf PDF
Site Visit Minutes HVAC.pdf PDF
RFIs HVAC_26 Aug 26.pdf PDF
Site Visit Sign In Sheet_Redacted.pdf PDF
Site Visit Slides HVAC.pptx PPTX presentation
SOW Base Wide HVAC Repair XHZG262004.pdf PDF
Solicitation - W50S8U26RA014.pdf PDF
2026_EMSCommitStatement.pdf PDF
Wage Determination.pdf PDF
138FW Safety Accident Prevention Guide_2026.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment PS Wattage # of PS * 70% load ** BTU/HR IT Equipment 8697 1 6087.9 20759.74

Total Watts 6087.9

TOTAL BTU/HR 20759.74

Total equipment Heat load 20759.739 buffer for occupancy, lighting, etc 10% 20% buffer env radiating heat in building, and surge capacity 20% Total Heat Load 26987.6607 BTU/hr to Tons of Cooling 12000

Total Tons of cooling necessary 3