HAAW139030 Site Visit Slides.pptx
PPTX presentation 5 MB Posted
- Attached to
- Entry Control Facility Federal contract opportunity
- Solicitation number
- W50S8N21B0001
- Issued by
- Department of the Army National Guard
About this file
This document contains a pre-bid site visit presentation and related federal contract opportunity solicitation. The solicitation is for construction services for a new Entry Control Facility complex at a National Guard base, including a gate house, guard booth, vehicle inspection areas, pavements, fencing, security barriers, lighting and drainage. The work will be performed in accordance with the contract, plans and technical specifications. This is a total Service Disabled Veteran Owned Small Business set-aside with a NAICS code of 236220 and size standard of $39.5M average annual revenue. The project value is between $1M and $5M. The response due date is not provided, but attendance at a pre-bid site visit is encouraged. The contract will be awarded to the responsible bidder providing the most advantageous price.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Site Visit
W50S8N21B0001 / HAAW139030
Construct New Entry Control Facility
Training, Readiness, Time Back to Airmen
UNCLASSIFIED
Brief project overview Site visit Conclusion with Contracting Officer
Note: All questions/RFI’s must be sent to the contracting office (CMSgt Ashley Pace).
Agenda
Contracting Officer: CMSgt Ashley Pace
Base Engineer & COR: Major David Livesay
| Project Managers: | Capt Michael Cutliff | |
| Mr. Mark Palmisano | ||
| MSgt Joshua Fuqua |
Base Facility Manager: CMSgt Wayne Lawton
Introductions
Locations
Existing Entry Control Facility (ECF)
Civil Engineering Work Location
Site
Additional Notes Firm Fixed Price (FFP) Contract Period of Performance (POP) 365 Days after Notice to Proceed (NTP) Begin POP within 30 days of NTP Ensure Construction Schedule is phased, clear and reasonable Existing ECF remains open through Phase 1 & Phase 2 Ensure a Quality Control (QC) Plan exists Match up QC personnel with the Construction Activity on the construction schedule
Questions image4.PNG image5.png image1.png