HAAW139030 Site Visit Slides.pptx

PPTX presentation 5 MB Posted

Attached to
Entry Control Facility Federal contract opportunity
Solicitation number
W50S8N21B0001
Issued by
Department of the Army National Guard

About this file

This document contains a pre-bid site visit presentation and related federal contract opportunity solicitation. The solicitation is for construction services for a new Entry Control Facility complex at a National Guard base, including a gate house, guard booth, vehicle inspection areas, pavements, fencing, security barriers, lighting and drainage. The work will be performed in accordance with the contract, plans and technical specifications. This is a total Service Disabled Veteran Owned Small Business set-aside with a NAICS code of 236220 and size standard of $39.5M average annual revenue. The project value is between $1M and $5M. The response due date is not provided, but attendance at a pre-bid site visit is encouraged. The contract will be awarded to the responsible bidder providing the most advantageous price.

View the file

Other files for this federal contract opportunity

Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Site Visit

W50S8N21B0001 / HAAW139030

Construct New Entry Control Facility

Training, Readiness, Time Back to Airmen

UNCLASSIFIED

Brief project overview Site visit Conclusion with Contracting Officer

Note: All questions/RFI’s must be sent to the contracting office (CMSgt Ashley Pace).

Agenda

Contracting Officer: CMSgt Ashley Pace

Base Engineer & COR: Major David Livesay

Project Managers:Capt Michael Cutliff
Mr. Mark Palmisano
MSgt Joshua Fuqua

Base Facility Manager: CMSgt Wayne Lawton

Introductions

Locations

Existing Entry Control Facility (ECF)

Civil Engineering Work Location

Site

Additional Notes Firm Fixed Price (FFP) Contract Period of Performance (POP) 365 Days after Notice to Proceed (NTP) Begin POP within 30 days of NTP Ensure Construction Schedule is phased, clear and reasonable Existing ECF remains open through Phase 1 & Phase 2 Ensure a Quality Control (QC) Plan exists Match up QC personnel with the Construction Activity on the construction schedule

Questions image4.PNG image5.png image1.png