This statement of work and related federal contract opportunity document outline requirements for construction services. The statement of work provides specifications for constructing a new Entry Control Facility complex at Hancock Field Air National Guard Base in Syracuse, New York within 365 calendar days. The scope of work includes site work, utilities, building envelope, interior finishes, security systems and fencing. The solicitation seeks bids for Project No. HAAW139030 until the closing date to complete the $1-5 million project, which is a total small business set-aside for Service Disabled Veteran Owned Small Businesses. The North American Industry Classification code is 236220. The Department of the Army National Guard will award a firm fixed-price construction contract to the responsible bidder offering the lowest price.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
HAAW139030
Entry Control Facility
174th Attack Wing
Hancock Field ANG Base 6001 East Molloy Road Syracuse, New York 13211
17 August 2021
Table of contents
1. SCOPE OF WORK
2. AREA OF WORK
3. DESCRIPTION OF WORK
4. PERIOD OF PERFORMANCE
5. MATERIALS
6. MATERIAL SUBMITTALS
7. GENERAL CONDITIONS
8. GOVERNMENT WORKING HOURS
9. DIFFERING SITE CONDITIONS
10. UTILITIES
11. DISPOSAL OF MATERIALS AND CLEANUP
12. MATERIAL & EQUIPMENT ACCOUNTABILITY
13. SECURITY
14. ESCORTS
1. SCOPE OF WORK:
The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to complete the work as described in this Statement of Work, the B-3 Submittal Project Specifications Volumes 1 & 2, and B-3 Submittal Project Drawing Set. Work location is the 174th Attack Wing (174 ATKW), 6001 East Molloy Road, Syracuse, New York 13211 on Hancock Field Air National Guard Base, Syracuse, New York 13211.
2. AREA OF WORK:
Contractor shall work only in the areas designated by Contracting Officer Representative (COR).
3. DESCRIPTION OF WORK:
The work includes furnishing all plant, equipment, labor, devices, tools, materials, transportation, services, supervision and all miscellaneous requirements to perform all operations in conjunction with the efforts to accomplish the work. Work at Hancock Field ANGB consists of, but is not limited to constructing a new Entry Control Facility complex, including a gate house, a guard booth, canopies over vehicle ID check stations and commercial vehicle inspection bay, pavements, fencing, gates, active denial barriers, site lighting, and site drainage, and demolition of the existing Entry Control Facility. All work shall be complete and function as intended, as if identified exclusively. All work shall be accomplished in accordance with applicable drawings, specifications, industry standards, applicable Building and Environmental Codes, Regulations, and Laws. Project elements include, but are not limited to: site work, utilities, building envelope, roofing, interior partitions, interior finishes, HVAC systems, plumbing, restroom, power, lighting, and telecommunications. Contractor shall comply with all applicable Unified Facilities Criteria (UFC) and Air National Guard Engineering Technical Letters (ANG ETL) in addition to Federal, State and local requirements. Work will include construction of, and work within, secured areas. Government escorts will be required for some portions of the work.
4. PERIOD OF PERFORMANCE:
Work must be completed in 365 days to support the duties of 174 ATKW personnel and safety of the Mission.
5. MATERIALS:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.
6. MATERIAL SUBMITTALS:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.
7. GENERAL CONDITIONS:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.
8. DIFFERING SITE CONDITIONS:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.
9. GOVERNMENT WORKING HOURS:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.
10. UTILITIES:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for Entry Control Facility.
11. DISPOSAL OF MATERIALS AND CLEANUP:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for Entry Control Facility.
12. MATERIAL & EQUIPMENT ACCOUNTABILITY:
See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for Entry Control Facility.
13. SECURITY:
Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
AT Level I Training. This standard language is for contractor employees with an area of performance within a Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available through ADLS by completing the Force Protection CBT.
174th ATKW Security Forces shall monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the COR to arrange for their entrance onto 174th ATKW property. Additionally, See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.
14. ESCORTS:
14.1. A security briefing will be conducted prior to the start of the contract.
14.2. All Contractor personnel shall have a minimum of one (1) Form of Photo Identification with them at all times.
14.3. See B-3 Submittal Project Specifications and B-3 Submittal Project Drawing Set for HAAW139030 Entry Control Facility.