About this file

This solicitation is for a construction contract to build a new Entry Control Facility complex for Project HAAW139030 at Hancock Field Air National Guard Base in New York. The scope of work includes constructing a gate house, guard booth, vehicle canopies, pavements, fencing, gates, active denial barriers, site lighting, site drainage, and demolition of the existing facility. The project magnitude is between $1 million and $5 million. The North American Industry Classification code is 236220 and it is set aside as a total small business service disabled veteran owned small business opportunity. The solicitation number is W50S8N21B0001 and bids are due through the System for Award Management website. The pre-bid conference and site visit are highly encouraged. Award will be made based on price to the responsible bidder providing the most advantageous offer to the government. The contracting agency is the Department of the Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to Entry Control Facility, newest first.
File Type Posted
HAAW139030 Bid Abstract.pdf PDF
W50S8N21B00010003.pdf PDF
RFI Tracker-HAAW139030 ECP Facility 11-5.pdf PDF
ES101 - ELECTRICAL SITE PLAN - SOUTH.pdf PDF
32 16 19_Addendum003.pdf PDF
CU101_Addendum003.pdf PDF
TS101 - TELECOMMUNICATIONS SITE PLAN.pdf PDF
E-612 - ELECTRICAL SCHEDULES.pdf PDF
Tax Form NY ST120_1_fill_in.pdf PDF
T-111 - ELECTRONIC SECURITY SYSTEM PLAN.pdf PDF
T-502 - TELLECOMMUNICATIONS DETAILS.pdf PDF
34 71 13.19_Addendum003.pdf PDF
C-501_Addendum003.pdf PDF
CD102_Addendum003.pdf PDF
W50S8N21B00010002.pdf PDF
W50S8N21B00010001.pdf PDF
32 12 16.16_Revised2021-10-21.pdf PDF
1200535 NYANG Syracuse ECF - REVISED CIVIL DWGS_2021-10-21.pdf PDF
Section 08 71 00 Spec Edits_ADDENDUM 0001.pdf PDF
RFI Tracker-HAAW139030 ECP Facility 10-26-2021.pdf PDF
Site Visit Sign In Sheet.pdf PDF
HAAW139030 Site Visit Slides.pptx PPTX presentation
1200535_NYANG_SYR Combined Drawings.pdf PDF
W50S8N21B0001 IFB Entry Control Facility.pdf PDF
B3 Specs Vol. 1.pdf PDF
B3 Specs Vol. 2.pdf PDF
1200535_NYANG_SYR Combined Drawings (2).pdf PDF
SOW HAAW152023.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S E

E S

C H

E D

U L E

2"

SEE SCHEDULE

2"

F01

D01

S E

E S

C H

E D

U L E

2"

SEE SCHEDULE

2"

D15

4" VARIES 4"

V A

R

IE

S

F01

T/ CABINET

7' - 2" A.F.F.

1' - 1"

WHITE MEAMINE CABINET

INTERIOR - REFER TO

ELEVATIONS FOR QUANTITY

PLASTIC LAMINATE DOOR

WITH 7/8" X 3 7/8" EDGE

PULL, CLEAR SATIN FINISH

1' - 2"

FACE OF BULKHEAD

WHITE MEAMINE CABINET

INTERIOR AND ADJ.

SHELVES - REFER TO

ELEVATIONS FOR QUANTITY

T/ CABINET

7' - 2" A.F.F.

1' - 1"

PLASTIC LAMINATE DOOR

WITH 7/8" X 3 7/8" EDGE

PULL, CLEAR SATIN FINISH

1' - 2"

FACE OF BULKHEAD

DRAWER UNIT

/4

3"

PLASTIC LAMINATE DOOR & DRAWER WITH 1

7/8"X3 7/8 EDGE PULL, CLEAR SATIN FINISH

WHITE MELAMINE CABINET

INTERIOR AND ADJ. SHELVES -

REFER TO ELEVATIONS FOR

QUANTITY

2' - 1"

SOLID SURFACE

COUNTER TOP; SS-1

BASE AS SCHEDULED

/2

PLASTIC LAMINATE DOOR W/ ATTACHED

BASE - CREATE CONTINUOUS TOEKICK

WITH ADJACENT CABINETRY

/4

3"

FINISHED FLOOR

OPEN BELOW FOR

WATER HEATER

EDGE PULL 1 7/8"X3 7/8 ,

CLEAR SATIN FINISH

SOLID SURFACE

COUNTER TOP; SS-1

2' - 1"

HM DOOR AS SCHEDULED

HM FRAME AS SCHEDULED

TREATED BLOCKING AS REQUIRED

CONTINUOUS SEALANT AND

BACKER ROD

4" INSULATED METAL PANEL

TRIM BY IMP MANUFACTURER

5/8" GWB

2 1/2" LGMF

5/16" METAL PLATE - SEE

STRUCTURAL DRAWINGS

6" CFMF

HM DOOR AS SCHEDULED

FINISH FLOOR AS

SCHEDULED

CONCRETE BLOCK OUT

10 5/8"

/2

SLOPED SIDEWALK, SEE CIVIL

DRAWINGS

1/2" JOINT FILLER AND SEALANT

SILL EXTENSION AS REQUIRED

TO TRANSITION FROM SLAB TO

SIDEWALK

HM DOOR AS SCHEDULED

HM FRAME AS SCHEDULED

TREATED BLOCKING AS REQUIRED

CONTINUOUS SEALANT AND

BACKER ROD

TRIM BY IMP MANUFACTURER

5/8" GWB

2 1/2" LGMF

5/16" METAL PLATE - SEE

STRUCTURAL DRAWINGS

6" CFMF

4" INSULATED METAL PANEL

PROVIDE INTERVAL WEEPS

DOUBLE EMULSION FOAM TAPE

1/8" (3MM) MATTE ACRYLIC

(COLOR TO COORDINATE

WITH INTERIOR COLOR

SCHEME) - GRAPHICS

APPLIED DIRECTLY TO

FRONT SIDE OF ACRYLIC

DOUBLE EMULSION FOAM TAPE

POLISHED EDGES ALL AROUND

FINISHED WALL

SECTION

BACKGROUND COLOR:

TBD

SYMBOL COLOR:

TBD

/8

/8

/4

MESSAGE LINE

TOILET

5/8" HELVETICA MEDIUM

UPPER CASE LETTERS

(EXAMPLE TEXT SHOWN);

COLOR: TBD

GRADE TWO BRAILLE

BACKER PANEL; COLOR: TBD

9"

SINGLE OCCUPANT - UNISEX

TYPE A2, A3

ROOM IDENTIFICATION

9"4 1/2"

LATCH SIDE

OF SINGLE

DOOR

FRAME OR

ENTRY TO

ROOM

/2

9"

1. SIGNAGE TO COMPLY WITH THE APPLICABLE REQUIREMENTS OF

CURRENT NFPA 101, IBC, AND ICC A 117.1.

2. CONTRACTOR TO COORDINATE SIGNS WITH OWNER

STANDARDS AND TYPES PRIOR TO FABRICATION.

3. VERIFY ROOM NUMBERS, ROOM NAMES, TEXT, GRAPHICS, AND

LOCATIONS, ETC WITH OWNER.

4. COLOR(S) OF PANEL SIGNAGE BACKING MATERIAL TO BE

SELECTED DURING SUBMITTAL REVIEWS.

5. RAISED TEXT AND BRAILLE CHARACTERS SHALL BE WHITE,

UNLESS NOTED OTHERWISE.

6. SIGNAGE FOR FIRE EXTINGUISHERS (FE) AND FE CABINETS TO

BE FURNISHED BY MANUFACTURER AND INSTALLED BY

CONTRACTOR.

SIGNAGE GENERAL NOTES

1 2 3 4 5

A

B

C

D

SHEET OF

SHEET ID

P a rk w a y L a n e

S u it e

P e a c h tr e e C o rn e rs

G

A

P h o n e

-7

F a x

(6

-7

S

IZ

E

A N

S I D

F

IL

E N

A M

E

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

F

IL

E N

U M

B E

R

ORIGINAL SHEET SIZE: 22" X 34"

M A

/1 /2

:3

:2

P M

B

IM

/1

N Y

A N

G S

Y R

E n tr y C o n tr o l/

N Y

A N

G

S Y

R

A rc h v

.r v t

A-601

B3 - 100% SUBMITTAL

D O

O R

S C

H E

D U

L E

A N

D D

E T

A

IL

S

C O

N S

T R

U C

T E

N T

R Y

C O

N T

R O

L F

A C

IL

IT

Y T

H A

T T

A C

K W

IN

G

H A

N C

O C

K F

IE

L D

A N

G B

M A

T T

Y D

A L E

N

E W

Y O

R K

N E

W Y

O R

K

A

IR

N A

T

IO

N A

L G

U A

R D

H A

N C

O C

K F

IE

L D

A N

G B

N

E W

Y O

R K

J O

B N

O

M B

L

M B

L

R T

J

J

U L Y

W P

Q F

X X

-X -X

X X

X

DOOR SCHEDULE

MARK

DOOR FRAME FIRE

RATING HARDWARE COMMENTSTYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH

100A D15 3' - 0" 7' - 9 1/4" ALUM/GLASS PREFIN. F01 ALUM PREFIN. GLASS TO BE BALLISTIC III GLAZING

100B D15 3' - 0" 7' - 9 1/4" ALUM/GLASS PREFIN. F01 ALUM PREFIN. GLASS TO BE BALLISTIC III GLAZING

103 D01 2' - 8" 7' - 0" WD STAIN F01 HM PAINT DOOR TO HAVE 45 STC RATING MINIMUM. PROVIDE STAIN COLOR SAMPLES OF MANUFACTURER'S FULL

RANGE FOR ARCHITECT TO SELECT FROM.

104 D01 3' - 0" 7' - 0" HM PAINT F01 HM PAINT PAINT DOOR AND FRAME TO MATCH IMP-1 / ENSURE DOOR CAN ONLY OPEN 90 DEGREES WITH CLOSER /

DOOR MUST MEET BALLISTIC III REQUIREMENTS

105 D15 2' - 8" 6' - 9 1/4" ALUM/GLASS PREFIN. F01 ALUM PREFIN. GUARD BOOTH DOOR / GLASS TO BE BALLISTIC III GLAZING

DOOR & FRAME TYPES

1.0

1.0

4.0

3.0

2.0

SCALE: 1" = 1'-0"A3

SMALL UPPER WALL CABINET

SCALE: 1" = 1'-0"A2

UPPER WALL CABINET

SCALE: 1" = 1'-0"A1

TYPICAL BASE CABINET

SCALE: 1" = 1'-0"A5

CABINTER BASE FOR WATER HEATER

SCALE: 3" = 1'-0"B1

DETAIL - HOLLOW METAL DOOR JAMB

SCALE: = 1'-0"

0 1 21

1"SCALE: = 1'-0"3"

SCALE: 3" = 1'-0"B3

DETAIL - HOLLOW METAL DOOR SILL

SCALE: 3" = 1'-0"B5

DETAIL - HOLLOW METAL DOOR HEAD

SCALE: 3" = 1'-0"D2

SIGNAGE ELEVATION

SCALE: 1/2" = 1'-0"D4

SIGNAGE PLACEMENT

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A A

D D

E N

D U

M

/1

/2

A

A

Sheets
A-601 - DOOR SCHEDULE AND DETAILS

File details come from the government source that posted it. Updated .