This document is Addendum 02 to the contract for the New Security Forces Building at Charlotte Air National Guard (NC ANG), 124th Fighter Wing, dated July 10, 2026. The addendum supplements the original Plans and Specifications and is transmitted electronically to all bidders and contractors.

The addendum introduces two new specifications and modifies two existing drawings. New Specification 33 71 02 addresses Underground Electrical Distribution, covering conduit, ducts, fittings, low and medium voltage cables, grounding systems, underground structures (including precast concrete manholes and handholes), cable supports, splicing, termination, and field quality control with acceptance testing requirements. New Specification 33 82 00 covers Telecommunications Outside Plant (OSP), including fiber optic and copper conductor cabling, cable splices and connectors, closures, underground duct installation, grounding and bonding, cable pulling, splicing procedures, labeling, and comprehensive field testing protocols. Drawing A201 (Exterior Elevations) was updated to indicate stainless steel materials, and Drawing A900 (OLI #1 Pedestrian Bridge) was similarly updated for stainless steel specifications. Both specifications require government approval of submittals including shop drawings, product data, test reports, and certifications. Contractor qualifications, cable testing procedures, and quality assurance requirements are detailed extensively. The work encompasses complete underground and outside plant telecommunications infrastructure installation with rigorous testing and documentation requirements prior to system activation.

View the file

Other files

File Type Posted
Construct Security Forces Bldg Abstract.pdf PDF
Bid Opening Sign-in Sheet.pdf PDF
Solicitation Amendment W50S8726BA0020006 SF 30.pdf PDF
Attachment 15 - NC ANG SF_Addendum03_07-30-2026.pdf PDF
Solicitation Amendment W50S8726BA0020005 SF 30.pdf PDF
Attachment 14 - Questions and Answers - Final.pdf PDF
Solicitation Amendment W50S8726BA0020003 SF 30.pdf PDF
Attachment 14 - Questions and Answers - Final.pdf PDF
Solicitation Amendment W50S8726BA0020004 SF 30.pdf PDF
Attachment 12 - NC ANG SF_Addendum01_07-01-2026.pdf PDF
Solicitation Amendment W50S8726BA0020002 SF 30.pdf PDF
PreBidSlides_W50S87-26-B-A002 Construct SFS Building.pdf PDF
Site Visit Minutes FINAL (1).pdf PDF
Sign-in sheets.pdf PDF
Solicitation Amendment W50S8726BA0020001 SF 30.pdf PDF
Attachment 11 - Submittal Register.pdf PDF
Attachment 3 - FJRP229030 B-3 Rev Proj Spec Manual vol2.pdf PDF
Attachment 5 Visitor Request Worksheet.pdf PDF
Attachment 2 - FJRP229030 B-3 Rev Proj Spec Manual vol1.pdf PDF
Attachment 8 - Brand name justification-Interior and exterior finishes.pdf PDF
Attachment 10 - Wage Determination.pdf PDF
Attachment 4 - FJRP229030 B-3 Rev Drawings.pdf PDF
Attachment 6 - Limited Competition Justification Alerton -KO signed.pdf PDF
Attachment 9 -Limited Competition Justification Monaco - KO signed.pdf PDF
Solicitation - W50S8726BA002 Final 22 May 26.pdf PDF
Attachment 1 - FJRP229030 - SOW CNS SFS Admin.pdf PDF
Attachment 7 - Limited Competition Justification Door Hardware - KO signed.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Security Forces Building Addendum 02 Page 1 of 1

NC ANG Security Forces Building Charolotte, NC

July 10, 2026

Addendum 02

VIA ELECTRONIC TRANSMISSION

TO THE DRAWINGS AND SPECIFICATIONS FOR:

New Security Forces Building for

North Caroline Air Nation Guard 124th fighter wing

Charlotte, NC

This Addendum supplements and amends the original Plans and Specifications and shall be taken into account in preparing proposals and shall become a part of the contract documents.

1.0 PROJECT MANUAL REVISIONS

1. Specification 33 71 02 Underground Electrical Distribution.

a. Added new specification.

2. Specification 33 82 00 Telecommunications Outside Plant (OSP)

a. Added new specification.

2.0 DRAWINGS REVISIONS

1. Drawing A201 - EXTERIOR ELEVATIONS

a. Updated General notes to indicate stainless steel

2. Drawing A900 - OLI #1 -PEDESTRIAN BRIDGE

a. Updated drawings to indicate stainless steel

Attachments

1. Specification 33 71 02 Underground Electrical Distribution

2. Specification 33 82 00 Telecommunications Outside Plant (OSP)

3. Drawing A201 - EXTERIOR ELEVATIONS

4. Drawing A900 - OLI #1 -PEDESTRIAN BRIDGE

END OF ADDENDUM 02

Charlotte Air National Guard Base Project No.: FJRP229030 Construct Security Forces Building

SECTION TABLE OF CONTENTS

DIVISION 33 - UTILITIES

SECTION 33 71 02

UNDERGROUND ELECTRICAL DISTRIBUTION [ADD02]

02/26, CHG 1: 05/26

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Precast Underground Structures

1.4.2 Certificate of Competency for Cable Splicer/Terminator

1.4.3 Cable Installer Qualifications

1.4.4 Regulatory Requirements

1.4.5 Standard Products

1.4.5.1 Alternative Qualifications

1.4.5.2 Material and Equipment Manufacturing Date

PART 2 PRODUCTS

2.1 CONDUIT, DUCTS, AND FITTINGS

2.1.1 Rigid Metal Conduit

2.1.1.1 Rigid Metallic Conduit, PVC Coated

2.1.2 Intermediate Metal Conduit

2.1.2.1 Intermediate Metal Conduit, PVC Coated

2.1.3 Plastic Conduit for Direct Burial and Riser Applications

2.1.4 Plastic Duct for Concrete Encasement

2.1.5 Duct Sealant

2.1.6 Fittings

2.1.6.1 Metal Fittings

2.1.6.2 PVC Conduit Fittings

2.1.6.3 PVC Duct Fittings

2.2 LOW VOLTAGE INSULATED CONDUCTORS AND CABLES

2.2.1 Conductor Types

2.2.2 Conductor Material

2.2.3 In Duct

2.2.4 Cable Marking

2.3 LOW VOLTAGE WIRE CONNECTORS AND TERMINALS

2.4 LOW VOLTAGE SPLICES

2.4.1 Heat Shrinkable Splice

2.4.2 Cold Shrink Rubber Splice

2.5 MEDIUM VOLTAGE CABLE

2.5.1 Cable Configuration

2.5.2 Conductor Material

2.5.3 Insulation

2.5.4 Shielding

2.5.5 Neutrals

2.5.6 Jackets

2.6 MEDIUM VOLTAGE CABLE TERMINATIONS

2.6.1 Cold-Shrink Type

SECTION 33 71 02 Page 1

2.6.2 Heat Shrinkable Type

2.6.3 Separable Insulated Connector Type

2.7 MEDIUM VOLTAGE CABLE JOINTS

2.7.1 Heat-Shrinkable Joint

2.7.2 Cold-Shrink Rubber-Type Joint

2.8 TELECOMMUNICATIONS CABLING

2.9 TAPE

2.9.1 Insulating Tape

2.9.2 Buried Warning and Identification Tape

2.9.3 Fireproofing Tape

2.10 PULL ROPE

2.11 GROUNDING AND BONDING

2.11.1 Driven Ground Rods

2.11.2 Grounding Conductors

2.12 CAST-IN-PLACE CONCRETE

2.13 UNDERGROUND STRUCTURES

2.13.1 Precast Concrete Structures, Risers and Tops

2.13.1.1 General

2.13.1.2 Design for Precast Structures

2.13.1.3 Construction

2.13.1.4 Joints

2.13.2 Manhole Frames and Covers

2.13.3 Handhole Frames and Covers

2.13.4 Composite/Fiberglass Handholes and Covers

2.14 CABLE SUPPORTS (RACKS, ARMS, AND INSULATORS)

2.14.1 Cable Rack Stanchions

2.14.2 Rack Arms

2.14.3 Insulators

2.15 CABLE TAGS IN MANHOLES

2.15.1 Polyethylene Cable Tags

2.16 MEDIUM VOLTAGE ABOVE GROUND CABLE TERMINATING CABINETS

2.17 LOW VOLTAGE ABOVE GROUND TERMINATION PEDESTAL

2.18 SOURCE QUALITY CONTROL

2.18.1 Arc-Proofing Test for Cable Fireproofing Tape

2.18.2 Medium Voltage Cable Qualification and Production Tests

PART 3 EXECUTION

3.1 INSTALLATION

3.2 CABLE INSPECTION

3.3 CABLE INSTALLATION PLAN AND PROCEDURE

3.4 UNDERGROUND FEEDERS SUPPLYING BUILDINGS

3.5 UNDERGROUND STRUCTURE CONSTRUCTION

3.5.1 Precast Concrete Construction

3.5.2 Pulling-In Irons

3.5.3 Cable Racks, Arms and Insulators

3.5.4 Field Painting

3.6 UNDERGROUND CONDUIT AND DUCT SYSTEMS

3.6.1 Requirements

3.6.2 Treatment

3.6.3 Conduit Cleaning

3.6.4 Jacking and Drilling Under Roads and Structures

3.6.5 Galvanized Conduit Concrete Penetrations

3.6.6 Multiple Conduits

3.6.7 Conduit Plugs and Pull Rope

3.6.8 Conduit and Duct Without Concrete Encasement

3.6.8.1 Encasement Under Roads and Structures

3.6.9 Duct Encased in Concrete

3.6.9.1 Connections to Manholes

SECTION 33 71 02 Page 2

3.6.9.2 Connections to Existing Underground Structures

3.6.9.3 Connections to Existing Concrete Pads

3.6.9.4 Connections to Existing Ducts

3.6.9.5 Partially Completed Duct Banks

3.6.10 Duct Sealing

3.7 CABLE PULLING

3.7.1 Cable Lubricants

3.8 CABLES IN UNDERGROUND STRUCTURES

3.8.1 Cable Tag Installation

3.9 CONDUCTORS INSTALLED IN PARALLEL

3.10 LOW VOLTAGE CABLE SPLICING AND TERMINATING

3.11 MEDIUM VOLTAGE CABLE TERMINATIONS

3.12 MEDIUM VOLTAGE CABLE JOINTS

3.12.1 Joints in Shielded Cables

3.13 CABLE END CAPS

3.14 GROUNDING SYSTEMS

3.14.1 Grounding Electrodes

3.14.2 Grounding Connections

3.14.3 Grounding Conductors

3.14.4 Ground Cable Crossing Expansion Joints

3.14.5 Manhole Grounding

3.15 EXCAVATING, BACKFILLING, AND COMPACTING

3.15.1 Reconditioning of Surfaces

3.15.1.1 Unpaved Surfaces

3.15.1.2 Paving Repairs

3.16 FIELD QUALITY CONTROL

3.16.1 Performance of Field Acceptance Checks and Tests

3.16.1.1 Medium Voltage Cables

3.16.1.2 Low Voltage Cables, 600-Volt

3.16.1.3 Grounding System

3.16.2 Follow-Up Verification

-- End of Section Table of Contents --

SECTION 33 71 02 Page 3

SECTION 33 71 02

UNDERGROUND ELECTRICAL DISTRIBUTION [ADD02]

02/26, CHG 1: 05/26

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO HB-17 (2002; Errata 2003; Errata 2005, 17th Edition) Standard Specifications for Highway Bridges

AMERICAN CONCRETE INSTITUTE (ACI)

ACI 318M (2019; Errata 2022) Building Code Requirements for Structural Concrete & Commentary

ACI MNL-66 (2020) ACI Detailing Manual

ASSOCIATION OF EDISON ILLUMINATING COMPANIES (AEIC)

AEIC CS8 (2013) Specification for Extruded Dielectric Shielded Power Cables Rated 5 Through 46 kV

ASTM INTERNATIONAL (ASTM)

ASTM B1 (2013) Standard Specification for Hard-Drawn Copper Wire

ASTM B3 (2013; R 2024) Standard Specification for Soft or Annealed Copper Wire

ASTM B8 (2023) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft

ASTM C309 (2025) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete

ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections

ASTM C857 (2016) Standard Practice for Minimum Structural Design Loading for Underground

SECTION 33 71 02 Page 4

Precast Concrete Utility Structures

ASTM C990 (2009; R 2019) Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants

ASTM F512 (2025) Standard Specification for Smooth-Wall Poly (Vinyl Chloride) (PVC) Conduit and Fittings for Underground Installation

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 48 (2020) Test Procedures and Requirements for Alternating-Current Cable Terminations Used on Shielded Cables Having Laminated Insulation Rated 2.5 kV through 765 kV or Extruded Insulation Rated 2.5 kV through 500 kV

IEEE 81 (2025) IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth

IEEE 386 (2016) Separable Insulated Connector Systems for Power Distribution Systems Rated 2.5 kV through 35 kV

IEEE 400.2 (2024) Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF)

IEEE 404 (2012) Standard for Extruded and Laminated Dielectric Shielded Cable Joints Rated 2500 V to 500,000 V

IEEE C2 (2023; ERTA 1 2023; ERTA 2-3 2025)

National Electrical Safety Code

IEEE C37.20.3 (2013) Standard for Metal-Enclosed Interrupter Switchgear

IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions

INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

NETA ATS (2025) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

ANSI C119.1 (2023) Electric Connectors - Sealed Insulated Underground Connector Systems Rated 600 Volts

NEMA C119.4 (2011) Electric Connectors - Connectors for Use Between Aluminum-to-Aluminum or

SECTION 33 71 02 Page 5

Aluminum-to-Copper Conductors Designed for Normal Operation at or Below 93 Degrees C and Copper-to-Copper Conductors Designed for Normal Operation at or Below 100 Degrees C

NEMA RN 1 (2018) Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit

NEMA TC 2 (2020) Standard for Electrical Polyvinyl Chloride (PVC) Conduit

NEMA TC 3 (2021) Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC Conduit and Tubing

NEMA TC 6 & 8 (2020) Standard for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installations

NEMA TC 9 (2020) Standard for Fittings for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installation

NEMA WC 70 (2021) Power Cable Rated 2000 Volts or Less for the Distribution of Electrical Energy

NEMA WC 74/ICEA S-93-639 (2022) 5-46 kV Shielded Power Cable for Use in the Transmission and Distribution of Electric Energy

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2026; TIA 26-1; ERTA 26-1; TIA 26-2; TIA

26-3; TIA 26-4; TIA 26-5; TIA 26-6; TIA

26-7; ERTA 26-2; ERTA 26-3) National Electrical Code

SOCIETY OF CABLE TELECOMMUNICATIONS ENGINEERS (SCTE)

ANSI/SCTE 77 (2013) Specification for Underground Enclosure Integrity

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-758 (2012b) Customer-Owned Outside Plant Telecommunications Infrastructure Standard

U.S. DEPARTMENT OF AGRICULTURE (USDA)

RUS Bull 1751F-644 (2002) Underground Plant Construction

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

CID A-A-60005 (Basic; Notice 2) Frames, Covers, Gratings, Steps, Sump And Catch Basin, Manhole

SECTION 33 71 02 Page 6

UL SOLUTIONS (UL)

UL 6 (2022) UL Standard for Safety Electrical Rigid Metal Conduit-Steel

UL 44 (2018; Reprint Oct 2025 ) UL Standard for Safety Thermoset-Insulated Wires and Cables

UL 83 (2017; Reprint Oct 2025) UL Standard for Safety Thermoplastic-Insulated Wires and Cables

UL 94 (2023; Reprint Feb 2026) UL Standard for Safety Tests for Flammability of Plastic Materials for Parts in Devices and Appliances

UL 467 (2022) UL Standard for Safety Grounding and Bonding Equipment

UL 486A-486B (2025) UL Standard for Safety Wire Connectors

UL 510 (2020; Dec 2022) UL Standard for Safety Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape

UL 514B (2012; Reprint Mar 2024) UL Standard for Safety Conduit, Tubing and Cable Fittings

UL 651 (2011; Reprint Apr 2026) UL Standard for Safety Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings

UL 854 (2020; Reprint Jul 2024) Standard for Service-Entrance Cables

UL 1072 (2006; Reprint Oct 2024) Medium-Voltage Power Cables

UL 1242 (2025) UL Standard for Safety for Electrical Intermediate Metal Conduit – Steel

1.2 DEFINITIONS

a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in IEEE Stds Dictionary .

b. In the text of this section, the words conduit and duct are used interchangeably and have the same meaning.

c. In the text of this section, "medium voltage cable splices," and "medium voltage cable joints" are used interchangeably and have the same meaning.

SECTION 33 71 02 Page 7

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Precast Underground Structures ; G

SD-03 Product Data

Medium Voltage Cable ; G

Medium Voltage Cable Joints ; G

Medium Voltage Cable Terminations ; G

Precast Concrete Structures ; G

Sealing Material

Pulling-In Irons

Manhole Frames and Covers ; G

Handhole Frames and Covers ; G

Composite/Fiberglass Handholes ; G

Cable Supports (racks, arms and insulators); G

SD-06 Test Reports

Medium Voltage Cable Qualification and Production Tests ; G

Field Acceptance Checks and Tests ; G

Arc-proofing Test for cable fireproofing tape; G

Cable Installation Plan and Procedure ; G

SD-07 Certificates

Cable splicer/terminator ; G

Cable Installer Qualifications ; G

1.4 QUALITY ASSURANCE

1.4.1 Precast Underground Structures

Submittal required for each type used. Provide calculations and drawings for precast manholes and handholes bearing the seal of a registered professional engineer including:

a. Material description (i.e., f'c and Fy)

SECTION 33 71 02 Page 8

b. Manufacturer's printed assembly and installation instructions

c. Design calculations

d. Reinforcing shop drawings in accordance with ACI MNL-66

e. Plans and elevations showing opening and pulling-in iron locations and details

1.4.2 Certificate of Competency for Cable Splicer/Terminator

The cable splicer/terminator must have a certification from the National Cable Splicing Certification Board (NCSCB) in the field of splicing and terminating shielded medium voltage (5 kV to 35 kV) power cable using pre-manufactured kits (pre-molded, heat-shrink, cold shrink). Submit "Proof of Certification" for approval, for the individuals that will be performing cable splicer and termination work, 30 days before splices or terminations are to be made.

Submit certification of the qualification of the cable splicer/terminator for approval, 30 days before splices or terminations are to be made in medium voltage (5 kV to 35 kV) cables. Include the training, and experience of the individual on the specific type and classification of cable to be provided under this contract. Indicate that the individual has had three or more years recent experience splicing and terminating medium voltage cables. List a minimum of three splices/terminations that have been in operation for more than one year. In addition, the individual may be required to perform a dummy or practice splice/termination in the presence of the Contracting Officer, before being approved as a qualified cable splicer. If that additional requirement is imposed, the Contractor must provide short sections of the approved types of cables along with the approved type of splice/termination kit, and detailed manufacturer's instructions for the cable to be spliced. The Contracting Officer reserves the right to require additional proof of competency or to reject the individual and call for certification of an alternate cable splicer.

1.4.3 Cable Installer Qualifications

Provide at least one onsite person in a supervisory position with a documentable level of competency and experience to supervise all cable pulling operations. Provide a resume showing the cable installers' experience in the last three years, including a list of references complete with points of contact, addresses and telephone numbers. Cable installer must demonstrate experience with a minimum of three medium voltage cable installations. The Contracting Officer reserves the right to require additional proof of competency or to reject the individual and call for an alternate qualified cable installer.

1.4.4 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship must be in accordance with the mandatory and advisory provisions of IEEE C2 and NFPA 70 unless more stringent requirements are specified or indicated.

SECTION 33 71 02 Page 9

1.4.5 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items must be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

1.4.5.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.4.5.2 Material and Equipment Manufacturing Date

Products manufactured more than 3 years prior to date of delivery to site are not acceptable, unless specified otherwise.

PART 2 PRODUCTS

2.1 CONDUIT, DUCTS, AND FITTINGS

2.1.1 Rigid Metal Conduit

UL 6 .

2.1.1.1 Rigid Metallic Conduit, PVC Coated

NEMA RN 1, Type A40, except that hardness must be nominal 85 Shore A durometer, dielectric strength must be minimum 400 volts per mil at 60 Hz, and tensile strength must be minimum 3500 psi .

2.1.2 Intermediate Metal Conduit

UL 1242 .

2.1.2.1 Intermediate Metal Conduit, PVC Coated

NEMA RN 1, Type A40, except that hardness must be nominal 85 Shore A durometer, dielectric strength must be minimum 400 volts per mil at 60 Hz, and tensile strength must be minimum 3500 psi .

2.1.3 Plastic Conduit for Direct Burial and Riser Applications

UL 651 and NEMA TC 2, EPC-80.

2.1.4 Plastic Duct for Concrete Encasement

Provide Type EB-35 in accordance with UL 651 , ASTM F512, and NEMA TC 6 & 8 or Type EPC-40 in accordance with UL 651 and NEMA TC 2.

SECTION 33 71 02 Page 10

2.1.5 Duct Sealant

UL 94 , Class HBF. Provide high-expansion urethane foam duct sealant that expands and hardens to form a closed, chemically and water resistant, rigid structure. Sealant must be compatible with common cable and wire jackets and capable of adhering to metals, plastics and concrete. Sealant must be capable of curing in temperature ranges of 35 degrees F to 95 degrees F . Cured sealant must withstand temperature ranges of -20 degrees F to 200 degrees F without loss of function.

2.1.6 Fittings

2.1.6.1 Metal Fittings

UL 514B .

2.1.6.2 PVC Conduit Fittings

UL 514B , UL 651 , NEMA TC 3.

2.1.6.3 PVC Duct Fittings

NEMA TC 9.

2.2 LOW VOLTAGE INSULATED CONDUCTORS AND CABLES

Insulated conductors must be rated 600 volts and conform to the requirements of NFPA 70 , including listing requirements, or in accordance with NEMA WC 70. Wires and cables manufactured more than 24 months prior to date of delivery to the site are not acceptable. Service entrance conductors must conform to UL 854 , type USE.

2.2.1 Conductor Types

Cable and duct sizes indicated are for copper conductors and THHN/THWN unless otherwise noted. Conductors No. 10 AWG and smaller must be solid. Conductors No. 8 AWG and larger must be stranded. All conductors must be copper.

2.2.2 Conductor Material

Unless specified or indicated otherwise or required by NFPA 70 , wires in conduit, other than service entrance, must be 600-volt, Type THWN/THHN conforming to UL 83 or Type XHHW or RHW conforming to UL 44 . Copper conductors must be annealed copper complying with ASTM B3 and ASTM B8.

2.2.3 In Duct

Cables must be single-conductor cable.

2.2.4 Cable Marking

Insulated conductors must have the date of manufacture and other identification imprinted on the outer surface of each cable at regular intervals throughout the cable length.

Identify each cable by means of a fiber, laminated plastic, or non-ferrous metal tags in each manhole, handhole, junction box, and each terminal.

SECTION 33 71 02 Page 11

Each tag must contain the following information; cable type, conductor size, circuit number, circuit voltage, cable destination and phase identification.

Color code conductors. Provide conductor identification within each enclosure where a tap, splice, or termination is made. Conductor identification must be by color-coded insulated conductors, plastic-coated self-sticking printed markers, colored nylon cable ties and plates, heat shrink type sleeves,or colored electrical tape. Properly identify control circuit terminations. Color must be green for grounding conductors and white for neutrals; except where neutrals of more than one system are installed in same raceway or box, other neutrals may be white with a different colored (not green) stripe for each. Color of ungrounded conductors in different voltage systems are as follows:

a. 208/120 volt, three-phase

(1) Phase A - black

(2) Phase B - red

(3) Phase C - blue

b. 480/277 volt, three-phase

(1) Phase A - brown

(2) Phase B - orange

(3) Phase C - yellow

c. 120/240 volt, single phase: Black and red

d. On three-phase, four-wire delta system, high leg must be orange, as required by NFPA 70 .

2.3 LOW VOLTAGE WIRE CONNECTORS AND TERMINALS

Provide a uniform compression over the entire conductor contact surface.

Use solderless terminal lugs on stranded conductors.

a. For use with copper conductors: UL 486A-486B .

2.4 LOW VOLTAGE SPLICES

Provide splices in conductors with a compression connector on the conductor and by insulating and waterproofing using one of the following methods which are suitable for continuous submersion in water and comply with ANSI C119.1 .

2.4.1 Heat Shrinkable Splice

Provide heat shrinkable splice insulation by means of a thermoplastic adhesive sealant material applied in accordance with the manufacturer's written instructions.

2.4.2 Cold Shrink Rubber Splice

Provide a cold-shrink rubber splice which consists of EPDM rubber tube

SECTION 33 71 02 Page 12 which has been factory stretched onto a spiraled core which is removed during splice installation. The installation must not require heat or flame, or any additional materials such as covering or adhesive. It must be designed for use with inline compression type connectors, or indoor, outdoor, direct-burial or submerged locations.

2.5 MEDIUM VOLTAGE CABLE

Cable (conductor) sizes are designated by American Wire Gauge (AWG) and Thousand Circular Mils (Kcmil). Conductor and conduit sizes indicated are for copper conductors unless otherwise noted. Insulated conductors must have the date of manufacture and other identification imprinted on the outer surface of each cable at regular intervals throughout cable length.

Wires and cables manufactured more than 12 months prior to date of delivery to the site are not acceptable. Provide single conductor type cables unless otherwise indicated.

2.5.1 Cable Configuration

Provide Type MV cable, conforming to NEMA WC 74/ICEA S-93-639 and UL 1072 .

Provide cables manufactured for use in duct applications . Cable must be rated 15 kV with 133 percent insulation level.

2.5.2 Conductor Material

Provide concentric-lay-stranded, Class B compact round conductors.

2.5.3 Insulation

Provide tree-retardant cross-linked thermosetting polyethylene (XLP) insulation conforming to the requirements of NEMA WC 74/ICEA S-93-639 and

AEIC CS8 .

2.5.4 Shielding

Cables rated for 2 kV and above must have a semiconducting conductor shield, a semiconducting insulation shield, and an overall copper tape shield for each phase.

2.5.5 Neutrals

Neutral conductors must be copper, employing the same insulation and jacket materials as phase conductors, except that a 600-volt insulation rating is acceptable.

2.5.6 Jackets

Provide cables with a PVC jacket. Provide PVC jackets with a separator that prevents contact with underlying semiconducting insulating shield.

2.6 MEDIUM VOLTAGE CABLE TERMINATIONS

IEEE 48 Class 1; of the molded elastomer, prestretched elastomer, or heat-shrinkable elastomer. Acceptable elastomers are track-resistant silicone rubber or track-resistant ethylene propylene compounds, such as ethylene propylene rubber or ethylene propylene diene monomer. Separable insulated connectors may be used for apparatus terminations, when such apparatus is provided with suitable bushings. Provide terminations, where required, with mounting brackets suitable for the intended installation

SECTION 33 71 02 Page 13 and with grounding provisions for the cable shielding, metallic sheath, or armor. Provide terminations in a kit, including: skirts, stress control terminator, ground clamp, connectors, lugs, and complete instructions for assembly and installation. Terminations must be the product of one manufacturer, suitable for the type, diameter, insulation class and level, and materials of the cable terminated. Do not use separate parts of copper or copper alloy in contact with aluminum alloy parts in the construction or installation of the terminator.

2.6.1 Cold-Shrink Type

Terminator must be a one-piece design, utilizing the manufacturer's latest technology, where high-dielectric constant (capacitive) stress control is integrated within a skirted insulator made of silicone rubber.

Termination must not require heat or flame for installation. Termination kit must contain all necessary materials (except for the lugs). Design termination for installation in low or highly contaminated indoor and outdoor locations and must resist ultraviolet rays and oxidative decomposition.

2.6.2 Heat Shrinkable Type

Terminator must consist of a uniform cross section heat shrinkable polymeric construction stress relief tubing and environmentally sealed outer covering that is nontracking, resists heavy atmospheric contaminants, ultra violet rays and oxidative decomposition. Provide heat shrinkable sheds or skirts of the same material. Design termination for installation in low or highly contaminated indoor or outdoor locations.

2.6.3 Separable Insulated Connector Type

IEEE 386 . Provide connector with steel reinforced hook-stick eye, grounding eye, test point, and arc-quenching contact material. Provide connectors of the loadbreak or deadbreak type as indicated, of suitable construction for the application and the type of cable connected, and that include cable shield adaptors. Provide external clamping points and test points. Do no use separable connectors in manholes/handholes.

a. 200 Ampere loadbreak connector ratings: Voltage: 15 kV, 95 kV BIL.

Short time rating: 10,000 rms symmetrical amperes.

2.7 MEDIUM VOLTAGE CABLE JOINTS

Provide joints (splices) in accordance with IEEE 404 suitable for the rated voltage, insulation level, insulation type, and construction of the cable. Joints must be certified by the manufacturer for waterproof, submersible applications. Upon request, supply manuacturer's design qualification test report in accordance with IEEE 404 . Connectors for joint must be tin-plated electrolytic copper, having ends tapered and having center stops to equalize cable insertion.

2.7.1 Heat-Shrinkable Joint

Consists of a uniform cross-section heat-shrinkable polymeric construction with a linear stress relief system, a high dielectric strength insulating material, and an integrally bonded outer conductor layer for shielding.

Replace original cable jacket with a heavy-wall heat-shrinkable sleeve with hot-melt adhesive coating.

SECTION 33 71 02 Page 14

2.7.2 Cold-Shrink Rubber-Type Joint

Joint must be of a cold shrink design that does not require any heat source for its installation. Splice insulation and jacket must be of a one-piece factory formed cold shrink sleeve made of black EPDM rubber.

Splice should be packaged three splices per kit, including complete installation instructions.

2.8 TELECOMMUNICATIONS CABLING

Provide telecommunications cabling in accordance with Section 33 82 00

TELECOMMUNICATIONS OUTSIDE PLANT (OSP).

2.9 TAPE

2.9.1 Insulating Tape

UL 510 , plastic insulating tape, capable of performing in a continuous temperature environment of 80 degrees C.

2.9.2 Buried Warning and Identification Tape

Provide detectable tape in accordance with Section 31 00 00 EARTHWORK.

2.9.3 Fireproofing Tape

Provide tape composed of a flexible, conformable, unsupported intumescent elastomer. Tape must be not less than .030 inch thick, noncorrosive to cable sheath, self-extinguishing, noncombustible, adhesive-free, and must not deteriorate when subjected to oil, water, gases, salt water, sewage, and fungus. Provide where indicated on drawings.

2.10 PULL ROPE

Plastic or flat pull line (bull line) having a minimum tensile strength of 200 pounds .

2.11 GROUNDING AND BONDING

2.11.1 Driven Ground Rods

Provide copper-clad steel ground rods conforming to UL 467 not less than 3/4 inch in diameter by 10 feet in length. Sectional type rods may be used for rods 20 feet or longer.

2.11.2 Grounding Conductors

Stranded-bare copper conductors must conform to ASTM B8, Class B, soft-drawn unless otherwise indicated. Solid-bare copper conductors must conform to ASTM B1 for sizes No. 8 and smaller. Insulated conductors must be of the same material as phase conductors and green color-coded, except that conductors must be rated no more than 600 volts. Aluminum is not acceptable.

2.12 CAST-IN-PLACE CONCRETE

Provide concrete in accordance with Section 03 30 00 CAST-IN-PLACE CONCRETE. In addition, provide concrete for encasement of underground ducts with 3000 psi minimum 28-day compressive strength. Concrete

SECTION 33 71 02 Page 15 associated with electrical work for other than encasement of underground ducts must be 4000 psi minimum 28-day compressive strength unless specified otherwise.

2.13 UNDERGROUND STRUCTURES

Provide precast concrete underground structures or standard type cast-in-place manhole types as indicated, conforming to ASTM C857 and ASTM C478. Top, walls, and bottom must consist of reinforced concrete.

Walls and bottom must be of monolithic concrete construction. Locate duct entrances and windows near the corners of structures to facilitate cable racking. Covers must fit the frames without undue play. Form steel and iron to shape and size with sharp lines and angles. Castings must be free from warp and blow holes that may impair strength or appearance. Exposed metal must have a smooth finish and sharp lines and arises. Provide necessary lugs, rabbets, and brackets. Set pulling-in irons and other built-in items in place before depositing concrete. Install a pulling-in iron in the wall opposite each duct line entrance. Cable racks, including rack arms and insulators, must be adequate to accommodate the cable.

2.13.1 Precast Concrete Structures, Risers and Tops

Precast concrete underground structures may be provided in lieu of cast-in-place subject to the requirements specified below. Precast units must be the product of a manufacturer regularly engaged in the manufacture of precast concrete products, including precast manholes.

2.13.1.1 General

Precast concrete structures must have the same accessories and facilities as required for cast-in-place structures. Likewise, precast structures must have plan area and clear heights not less than those of cast-in-place structures. Concrete materials and methods of construction must be the same as for cast-in-place concrete construction, as modified herein.

Slope in floor may be omitted provided precast sections are poured in reinforced steel forms. Concrete for precast work must have a 28-day compressive strength of not less than 4000 psi . Structures may be precast to the design and details indicated for cast-in-place construction, precast monolithically and placed as a unit, or structures may be assembled sections, designed and produced by the manufacturer in accordance with the requirements specified. Structures must be identified with the manufacturer's name embedded in or otherwise permanently attached to an interior wall face.

2.13.1.2 Design for Precast Structures

ACI 318M . In the absence of detailed on-site soil information, design for the following soil parameters/site conditions:

a. Angle of Internal Friction (phi) = 30 degrees

b. Unit Weight of Soil (Dry) = 110 pcf , (Saturated) = 130 pcf

c. Coefficient of Lateral Earth Pressure (Ka) = 0.33

d. Ground Water Level = 3 feet below ground elevation

e. Vertical design loads must include full dead, superimposed dead, and

SECTION 33 71 02 Page 16 live loads including a 30 percent magnification factor for impact.

Live loads must consider all types and magnitudes of vehicular (automotive, industrial, or aircraft) traffic to be encountered. The minimum design vertical load must be for H20 highway loading in accordance with AASHTO HB-17.

f. Horizontal design loads must include full geostatic and hydrostatic pressures for the soil parameters, water table, and depth of installation to be encountered. Also, horizontal loads imposed by adjacent structure foundations, and horizontal load components of vertical design loads, including impact, must be considered, along with a pulling-in iron design load of 6000 pounds .

g. Each structural component must be designed for the load combination and positioning resulting in the maximum shear and moment for that particular component.

h. Design must also consider the live loads induced in the handling, installation, and backfilling of the manholes. Provide lifting devices to ensure structural integrity during handling and installation.

2.13.1.3 Construction

Provide a uniform thickness for structure top, bottom, and wall not less than 6 inches . Thin-walled knock-out panels for designed or future duct bank entrances are not permitted. Provide quantity, size, and location of duct bank entrance terminators as directed, and cast completely open by the precaster. The distance of the duct terminals must be a minimum of 6 inches from the inside surface of adjacent walls, floors, or ceilings.

Form the perimeter of the duct terminal areas to have a keyed or inward flared surface to provide a positive interlock with the mating duct bank envelope with a 2 inch recessed opening on all sides. Provide welded wire fabric reinforcing through window openings for in-field cutting and flaring into duct bank envelopes. Provide additional reinforcing steel comprised of at least two No. 4 bars around window openings. Provide drain sumps a minimum of 12 inches in diameter and 4 inches deep for precast structures.

2.13.1.4 Joints

Provide tongue-and-groove joints or shiplap on mating edges of precast components. Design joints to firmly interlock adjoining components and to provide waterproof junctions and adequate shear transfer. Seal joints watertight using preformed plastic strip conforming to ASTM C990. Install sealing material in strict accordance with the sealant manufacturer's printed instructions. Provide waterproofing at conduit/duct entrances into structures, and where access frame meets the top slab, provide continuous grout seal.

2.13.2 Manhole Frames and Covers

Provide cast iron frames and covers for manholes conforming to CID A-A-60005 . Cast the words "ELECTRIC" or "TELECOMMUNICATIONS" in the top face of power and telecommunications manhole covers, respectively.

2.13.3 Handhole Frames and Covers

Frames and covers of steel must be welded by qualified welders in

SECTION 33 71 02 Page 17 accordance with standard commercial practice. Provide rolled-steel floor plate covers having an approved antislip surface. Hinges must be of stainless steel with bronze hinge pin, 5 by 5 inches by approximately 3/16 inch thick, without screw holes, and must be for full surface application by fillet welding. Hinges must have nonremovable pins and five knuckles.

The surfaces of plates under hinges must be true after the removal of raised antislip surface, by grinding or other approved method.

2.13.4 Composite/Fiberglass Handholes and Covers

ANSI/SCTE 77 . Provide handholes and covers of polymer concrete, reinforced with heavy weave fiberglass with a design load (Tier rating) appropriate for or greater than the intended use. All covers are required to have the Tier level rating embossed on the surface which must not exceed the design load of the box.

2.14 CABLE SUPPORTS (RACKS, ARMS, AND INSULATORS)

Zinc coat the metal portion of racks and arms after fabrication.

2.14.1 Cable Rack Stanchions

The wall bracket or stanchion must be 4 inches by approximately 1-1/2 inch by 3/16 inch channel steel, or 4 inches by approximately 1 inch glass-reinforced nylon with recessed bolt mounting holes, 48 inches long (minimum) in manholes. Space slots for mounting cable rack arms at 8 inch intervals.

2.14.2 Rack Arms

Cable rack arms must be steel or malleable iron or glass reinforced nylon and must be of the removable type. Rack arm length must be a minimum of 8 inches and a maximum of 12 inches .

2.14.3 Insulators

Insulators for metal rack arms must be dry-process glazed porcelain.

Insulators are not required for nylon arms.

2.15 CABLE TAGS IN MANHOLES

Provide polyethylene tags for each power cable located in manholes. Do not provide handwritten letters. The first position on the power cable tag denotes the voltage. The second through sixth positions on the tag identifies the circuit. The next to last position denotes the phase of the circuit and include the Greek "phi" symbol. The last position denotes the cable size. As an example, a tag could have the following designation: "11.5 NAS 1-8(Phase A)500," denoting that the tagged cable is on the 11.5kV system circuit number NAS 1-8, underground, Phase A, sized at 500 kcmil.

2.15.1 Polyethylene Cable Tags

Provide tags of polyethylene having an average tensile strength of 3250 pounds per square inch ; and that are 0.08 inch thick (minimum), non-corrosive non-conductive; resistive to acids, alkalis, organic solvents, and salt water; and distortion resistant to 170 degrees F .

Provide 0.05 inch (minimum) thick black polyethylene tag holder. Provide a one-piece nylon, self-locking tie at each end of the cable tag, having a

SECTION 33 71 02 Page 18 minimum loop tensile strength of 175 pounds and black block letters, numbers, and symbols one inch high on a yellow background. Letters, numbers, and symbols must not fall off or change positions regardless of the cable tags' orientation.

2.16 MEDIUM VOLTAGE ABOVE GROUND CABLE TERMINATING CABINETS

Cable terminating cabinets must be hook-stick operable, deadfront construction conforming to the requirements of IEEE C37.20.3 , Category A.

Provide cabinets with 200 A. loadbreak junctions and elbow-type separable loadbreak connectors, cable parking stands, and grounding lugs . Provide cable terminating equipment in conformance with IEEE 386 .

Ratings at 60 Hz must be:

Nominal voltage (kV) 12.48 KV

Rated maximum voltage (kV) 15

Rated continuous current (A) 200

One-second short-time current-carrying capacity (kA) 10

BIL (kV) 95

2.17 LOW VOLTAGE ABOVE GROUND TERMINATION PEDESTAL

Provide copolymer polypropylene, low voltage above ground termination pedestal manufactured through an injection molding process. Pedestals must resist fertilizers, salt air environments and ultra-violet radiation. Pedestal top must be imprinted with a "WARNING" and "ELECTRIC" identification. Pedestal must contain four lay-in six port connectors, NEMA C119.4 , Class "A", dual rated for aluminum or copper, and capable of terminating conductors ranging from 10 AWG to 500 kcmil. Protect each connector with a clear, hard lexan (plastic) cover. Provide pedestal with rust-free material and stainless steel hardware that is lockable.

2.18 SOURCE QUALITY CONTROL

2.18.1 Arc-Proofing Test for Cable Fireproofing Tape

Manufacturer must test one sample assembly consisting of a straight lead tube 12 inches long with a 2 1/2 inch outside diameter, and a 1/8 inch thick wall, and covered with one-half lap layer of arc and fireproofing tape in accordance with manufacturer's instructions. The arc and fireproofing tape must withstand extreme temperature of a high-current fault arc 13,000 degrees K for 70 cycles as determined by using an argon directed plasma jet capable of constantly producing and maintaining an arc temperature of 13,000 degrees K. Temperature (13,000 degrees K) of the ignited arc between the cathode and anode must be obtained from a dc power source of 305 (plus or minus 5) amperes and 20 (plus or minus 1) volts.

Direct the arc toward the sample assembly accurately positioned 5 (plus or minus 1) millimeters downstream in the plasma from the anode orifice by fixed flow rate of argon gas (0.18 g per second). Test each sample assembly at three unrelated points. Start time for tests must be taken from recorded peak current when the specimen is exposed to the full test temperature. Surface heat on the specimen prior to that time must be minimal. The end point is established when the plasma or conductive arc

SECTION 33 71 02 Page 19 penetrates the protective tape and strikes the lead tube. Submittals for arc-proofing tape must indicate that the test has been performed and passed by the manufacturer.

2.18.2 Medium Voltage Cable Qualification and Production Tests

Results of AEIC CS8 qualification and production tests as applicable for each type of medium voltage cable.

PART 3 EXECUTION

3.1 INSTALLATION

Install equipment and devices in accordance with the manufacturer's published instructions and with the requirements and recommendations of NFPA 70 as applicable. In addition to these requirements, install telecommunications in accordance with TIA-758 and RUS Bull 1751F-644 .

3.2 CABLE INSPECTION

Inspect each cable reel for correct storage positions, signs of physical damage, and broken end seals prior to installation. If end seal is broken, remove moisture from cable prior to installation in accordance with the cable manufacturer's recommendations.

3.3 CABLE INSTALLATION PLAN AND PROCEDURE

Obtain from the manufacturer an installation manual or set of instructions which addresses such aspects as cable construction, insulation type, cable diameter, bending radius, cable temperature limits for installation, lubricants, coefficient of friction, conduit cleaning, storage procedures, moisture seals, testing for and purging moisture, maximum allowable pulling tension, and maximum allowable sidewall bearing pressure. Perform pulling calculations and prepare a pulling plan and submit along with the manufacturer's instructions in accordance with SUBMITTALS. Install cable strictly in accordance with the cable manufacturer's recommendations and the approved installation plan.

Calculations and pulling plan must include:

a. Site layout drawing with cable pulls identified in numeric order of expected pulling sequence and direction of cable pull.

b. List of cable installation equipment.

c. Lubricant manufacturer's application instructions.

d. Procedure for resealing cable ends to prevent moisture from entering cable.

e. Cable pulling tension calculations of all cable pulls.

f. Cable percentage conduit fill.

g. Cable sidewall bearing pressure.

h. Cable minimum bend radius and minimum diameter of pulling wheels used.

i. Cable jam ratio.

SECTION 33 71 02 Page 20

j. Maximum allowable pulling tension on each different type and size of conductor.

k. Maximum allowable pulling tension on pulling device.

3.4 UNDERGROUND FEEDERS SUPPLYING BUILDINGS

Terminate underground feeders supplying building at a point 5 feet outside the building and projections thereof, except that conductors must be continuous to the terminating point indicated. Coordinate connections of the feeders to the service entrance equipment with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide RGS conduit from the supply equipment to a point 5 feet outside the building and projections thereof.

Protect ends of underground conduit with plastic plugs until connections are made.

Encase the underground portion of the conduit in a concrete envelope and bury as specified for underground duct with concrete encasement.

3.5 UNDERGROUND STRUCTURE CONSTRUCTION

Provide standard type cast-in-place construction as specified herein and as indicated, or precast construction as specified herein. Horizontal concrete surfaces of floors must have a smooth trowel finish. Cure concrete by applying two coats of white pigmented membrane forming-curing compound in strict accordance with the manufacturer's printed instructions, except that precast concrete may be steam cured. Curing compound must conform to ASTM C309. Locate duct entrances and windows in the center of end walls (shorter) and near the corners of sidewalls (longer) to facilitate cable racking and splicing. Covers for underground structures must fit the frames without undue play. Form steel and iron to shape and size with sharp lines and angles. Castings must be free from warp and blow holes that may impair strength or appearance. Exposed metal must have a smooth finish and sharp lines and arises. Provide necessary lugs, rabbets, and brackets. Set pulling-in irons and other built-in items in place before depositing concrete. Manhole locations, as indicated, are approximate. Coordinate exact manhole locations with other utilities and finished grading and paving.

3.5.1 Precast Concrete Construction

Set commercial precast structures on 6 inches of level, 90 percent compacted granular fill, 3/4 inch to 1 inch size, extending 12 inches beyond the structure on each side. Compact granular fill by a minimum of four passes with a plate type vibrator. Installation must additionally conform to the manufacturer's instructions.

3.5.2 Pulling-In Irons

Provide steel bars bent as indicated, and cast in the walls and floors.

Alternatively, pipe sleeves may be precast into the walls and floors where required to accept U-bolts or other types of pulling-in devices possessing the strengths and clearances stated herein. The final installation of pulling-in devices must be made permanent. Cover and seal exterior projections of thru-wall type pulling-in devices with an appropriate protective coating. In the floor, locate the irons a minimum of 6 inches from the edge of the sump, and in the walls, locate the irons within 6 inches of the projected center of the duct bank pattern or precast window

SECTION 33 71 02 Page 21 in the opposite wall. However, the pulling-in iron must not be located within 6 inches of an adjacent interior surface, or duct or precast window located within the same wall as the iron. If a pulling-in iron cannot be located directly opposite the corresponding duct bank or precast window due to this clearance limitation, locate the iron directly above or below the projected center of the duct bank pattern or precast window the minimum distance required to preserve the 6 inch clearance previously stated. In the case of directly opposing precast windows, pulling-in irons consisting of a 3 foot length of No. 5 reinforcing bar, formed into a hairpin, may be cast-in-place within the precast windows simultaneously with the end of the corresponding duct bank envelope. Irons installed in this manner must be positioned directly in line with, or when not possible, directly above or below the projected center of the duct bank pattern entering the opposite wall, while maintaining a minimum clear distance of 3 inches from any edge of the cast-in-place duct bank envelope or any individual duct. Pulling-in irons must have a clear projection into the structure of approximately 4 inches and must be designed to withstand a minimum pulling-in load of 6000 pounds . Hot-dip galvanize irons after fabrication.

3.5.3 Cable Racks, Arms and Insulators

Cable racks, arms and insulators must be sufficient to accommodate the cables. Space racks in power manholes not more than 3 feet apart, and provide each manhole wall with a minimum of two racks. Space racks in signal manholes not more than 16 1/2 inches apart with the end rack being no further than 12 inches from the adjacent wall. Methods of anchoring cable racks are as follows:

a. Provide a 5/8 inch diameter by 5 inch long anchor bolt with 3 inch foot cast in structure wall with 2 inch protrusion of threaded portion of bolt into structure. Provide 5/8 inch steel square head nut on each anchor bolt. Coat threads of anchor bolts with suitable coating immediately prior to installing nuts.

b. Provide concrete channel insert with a minimum load rating of 800 pounds per foot . Insert channel must be steel of the same length as "vertical rack channel;" and cast flush in structure wall. Provide 5/8 inch steel nuts in channel insert to receive 5/8 inch diameter by 3 inch long steel, square head anchor bolts.

c. Provide concrete "spot insert" at each anchor bolt location, cast flush in structure wall. Each insert must have minimum 800 pound load rating. Provide 5/8 inch diameter by 3 inch long steel, square head anchor bolt at each anchor point. Coat threads of anchor bolts with suitable coating immediately prior to installing bolts.

3.5.4 Field Painting

Clean cast-iron frames and covers not buried in concrete or masonry of mortar, rust, grease, dirt and other deleterious materials, and coat with bituminous paint.

3.6 UNDERGROUND CONDUIT AND DUCT SYSTEMS

3.6.1 Requirements

Run conduit in straight lines except where a change of direction is

SECTION 33 71 02 Page 22 necessary. Provide numbers and sizes of ducts as indicated. Provide a 4/0 AWG bare copper grounding conductor above medium-voltage distribution duct banks. Bond bare copper grounding conductor to ground rings (loops) in all manholes and to ground rings (loops) at all equipment slabs (pads). Route grounding conductor into manholes with the duct bank (sleeving is not required). Ducts must have a continuous slope downward toward underground structures and away from buildings, laid with a minimum slope of 3 inches per 100 feet . Depending on the contour of the finished grade, the high-point may be at a terminal, a manhole, a handhole, or between manholes or handholes. Terminate all PVC conduit end points in utility holes, switching cabinets, transform handholes and buildings with end bells. The bell end of the conduits that enter manholes and handholes must be flush with the wall.

Perform changes in ductbank direction as follows:

a. Short-radius manufactured 90-degree duct bends may…