Attachment 4 - FJRP229030 B-3 Rev Drawings.pdf
PDF 21 MB Posted
- Attached to
- Construct 145th Security Forces Building
- Solicitation number
- W50S87-26-B-A002
About this file
This file is a B-3 Submittal Final revision of construction drawings for a New Security Forces Building being constructed for the North Carolina Air National Guard 145th Airlift Wing in Charlotte, North Carolina. The drawings are prepared by AECOM Corporation and serve as architectural and engineering design documents for the project identified as FJRP229030 (ANG Project Number) and 60637899 (AECOM Project Number), dated 30 May 2025.
The document includes a comprehensive cover sheet, general notes, abbreviations legend, sheet index, code information, and accessibility standards diagrams. The project encompasses a multi-disciplinary design with architectural, structural, civil, mechanical, electrical, plumbing, fire protection, and telecommunications systems. Key design elements referenced include two floors, a roof structure, exterior elevations, interior details, and three optional line items: a pedestrian bridge, folding partitions in training rooms, and millwork lockers. The drawings comply with multiple standards including UFC (Unified Facilities Criteria), International Building Code (IBC) 2021, NFPA codes, and accessibility requirements. The facility is classified as Type IIB noncombustible construction with mixed-use occupancy (Business and Storage), requires an automatic sprinkler system and fire alarm detection, accommodates approximately 100 staff members, and includes 8 drinking fountains and 2 water coolers. Construction joints are located at exterior stairs and bridges. The document emphasizes that partial drawing sets are incomplete and should not be distributed, and that all dimensions must be field-verified before construction begins.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T h is d ra w in g h a s b e e n p re p a re d f o r th e u s e o f A
E C
O M
’s c lie n t a n d m a y n o t b e u s e d re p ro d u c e d o r re lie d u p o n b y th ir d p a rt ie s e xc e p t a s a g re e d b y A
E C
O M a n d i ts c lie n t, a s r e q u ir e d b y la w o r fo r u s e b y g o v e rn m e n ta l r e v ie w in g a g e n c ie s
A E
C O
M a c c e p ts n o r e s p o n s ib ili ty a n d d e n ie s a n y lia b ili ty w h a ts o e v e r, t o a n y p a rt y th a t m o d ifi e s t h is d ra w in g w ith o u t
A E
C O
M ’s e x p re s s w ri tt e n c o n s e n t.
D o n o t s c a le t h is d o c u m e n t.
A ll m e a s u re m e n ts m u s t b e o b ta in e d f ro m t h e s ta te d d im e n s io n s
CLIENT
ARCHITECT/DESIGNER
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
L a s t
P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E
"x
P ro je c t
M a n a g e m e n t
In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
B-3 SUBMITTAL - FINAL
KEY PLAN
PROJECT
©2023 AECOM Corporation
M R
PAYNE BLVD.
CHARLOTTE, NORTH CAROLINA 28208
277 W NATIONWIDE BLVD
COLUMBUS, OH 43215
614-464-4500
FJRP229030
/2
/2
:1
:3
P
M
B
IM
/B
P -A
M E
R
U S
A
-S F
N C
A N
G
/6
S
F -N
C A
N G
R
A
.r v t
COVER SHEET
G000
60637899
Y H
S W
M S
5/30/2025
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD - 145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
-G E
N E
R A
L -0
.0
-G
-C
O V
E R
S H
E E
T
Optional Line Item (OLI):
#1 - Pedestrian Bridge #2 - Folding Partition in the Training Rooms #3 - Millwork Lockers
NORTH CAROLINA AIR NATIONAL GUARD
145TH FIGHTER WING
ANG PROJECT NUMBER: FJRP229030
AECOM PROJECT NUMBER: 60637899
B-3 SUBMITTAL - FINAL
30 MAY 2025
NEW SECURITY FORCES BUILDING
CHARLOTTE, NC
I/R DATE DESCRIPTION
1. THE CONSTRUCTION DRAWINGS ILLUSTRATE THE DESIGN INTENT
OF THE WORK. THEY INDICATE LOCATION, DIMENSIONS AND
TYPICAL DETAILS. THE ARCHITECTURAL DRAWINGS ARE PART OF
A LARGER SET OF DRAWINGS WHICH, WHEN COMPLETE, CONSIST
OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS AND THE
PROJECT SPECIFICATIONS. CONSEQUENTLY, THE WORK
DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY
AFFECT THE WORK DESCRIBED ON THE DRAWINGS OF ANOTHER
DISCIPLINE, AND MAY REQUIRE REFERENCE TO THE DRAWINGS
OF ANOTHER DISCIPLINE. THEREFORE, PARTIAL SETS OF
DRAWINGS ARE INCOMPLETE AND SHALL NOT BE DISTRIBUTED
OR UTILIZED BY ANYONE.
2. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL
APPLICABLE STATE AND/OR LOCAL CODES, LAWS, AMENDMENTS,
ORDINANCES, INCLUDING ALL CODES LISTED IN THE APPLICABLE
CODES SECTION.
3. DO NOT SCALE DRAWINGS.
4. FIELD VERIFY ALL DIMENSIONS PRIOR TO START OF WORK.
5. CONTACT THE ARCHITECT FOR DETERMINING A REQUIRED
DIMENSION THAT CANNOT BE OBTAINED BASED ON DRAWING
INFORMATION, BEFORE PROCEEDING WITH THE WORK.
6. WHERE DISCREPANCIES OCCUR BETWEEN FLOOR PLANS,
DETAILS, AND LARGE SCALE PLANS, OR WHERE DISCREPANCIES
OCCUR BETWEEN ARCHITECTURAL DRAWINGS AND
ENGINEERING DRAWINGS, CONTACT THE ARCHITECT FOR
CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
7. CONSTUCTION JOINTS ARE LOCATED AT THE EXTERIOR STAIR
AND BRIDGE. SEE DRAWINGS FOR MORE INFORMATION.
8. THE CONTRACTOR SHALL INSTALL OWNER FURNISHED
EQUIPMENT IDENTIFIED AS "GFCI" IN THE EQUIPMENT
SCHEDULES.
9. THE OWNER IS INSTALLING OWNER FURNISHED EQUIPMENT
IDENTIFIED AS "GFGI" IN THE EQUIPMENT SCHEDULES.
10. THE CONTRACTOR SHALL FURNISH AND INSTALL EQUIPMENT
IDENTIFIED AS "CFCI" IN THE EQUIPMENT SCHEDULES.
11. REFERENCE THE DRAWING SERIES LEGEND FOR INFORMATION
CONTAINED IN EACH ARCHITECTURAL DRAWING SERIES.
12. THE RELATIVE DESIGN REFERENCE ELEVATION OF +0'-0", AS
INDICATED ON THE DRAWINGS, CORRESPONDS TO THE FINISH
FLOOR ELEVATION OF THE FLOOR IN QUESTION.
GENERAL NOTES
SYMBOLOGY LEGEND
A101
SHEET NUMBER SEQUENCE
SHEET TYPE
DISCIPLINE
SHEET NUMBER
DRAWING TITLE
1A
A-101 Scale: 1/8" = 1'-0"
FLOOR PLAN
DRAWING NUMBER
(LOCATION ON SHEET)
DRAWING TITLE
REFERENCING SHEET
NUMBER
DRAWING SCALE
ELEVATION REFERENCE
1A
SHEET NUMBER
DETAIL NUMBER
DETAIL REFERENCE DETAIL CALLOUT REFERENCE
1A A-101
ARROW & TAIL INDICATE
DIRECTION OF VIEW
SHEET NUMBER
DETAIL NUMBER
REVISION IDENTIFICATION NORTH ARROW
SECTION REFERENCE
ARROW & TAIL INDICATE
DIRECTION OF VIEW
1A A-101
SHEET NUMBER
DETAIL NUMBER
1A A-101
DETAIL NUMBER
SHEET NUMBER
ROOM TAGS
ROOM NAME
N
PARTITION TAG
B3.#
DOOR TAG WINDOW TAG
CEILING TAG FINISH TAG
D101A
CEILING HEIGHT
CODED NOTE CENTERLINE
A-101
ARROW INDICATES
DIRECTION OF VIEW
WALL
FLOOR
CLG
BASE
10'-0"
CL
1t
PROJECT LOCATION
SITE FOR NEW SECURITY
FORCES BUILDING
T h is d ra w in g h a s b e e n p re p a re d f o r th e u s e o f A
E C
O M
’s c lie n t a n d m a y n o t b e u s e d re p ro d u c e d o r re lie d u p o n b y th ir d p a rt ie s e xc e p t a s a g re e d b y A
E C
O M a n d i ts c lie n t, a s r e q u ir e d b y la w o r fo r u s e b y g o v e rn m e n ta l r e v ie w in g a g e n c ie s
A E
C O
M a c c e p ts n o r e s p o n s ib ili ty a n d d e n ie s a n y lia b ili ty w h a ts o e v e r, t o a n y p a rt y th a t m o d ifi e s t h is d ra w in g w ith o u t
A E
C O
M ’s e x p re s s w ri tt e n c o n s e n t.
D o n o t s c a le t h is d o c u m e n t.
A ll m e a s u re m e n ts m u s t b e o b ta in e d f ro m t h e s ta te d d im e n s io n s
CLIENT
ARCHITECT/DESIGNER
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
L a s t
P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E
"x
P ro je c t
M a n a g e m e n t
In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
B-3 SUBMITTAL - FINAL
KEY PLAN
PROJECT
©2023 AECOM Corporation
M R
PAYNE BLVD.
CHARLOTTE, NORTH CAROLINA 28208
277 W NATIONWIDE BLVD
COLUMBUS, OH 43215
614-464-4500
FJRP229030
/2
/2
:1
:3
P
M
B
IM
/B
P -A
M E
R
U S
A
-S F
N C
A N
G
/6
S
F -N
C A
N G
R
A
.r v t
ABBREVIATIONS, LEGENDS, &
SHEET INDEX
G001
60637899
C h e c k e r
D e s ig n e r
A p p ro v e r
5/30/2025
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD - 145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
-G E
N E
R A
L -0
.0
-G
-A B
B R
E V
IA
T
IO
N
S
L E
G E
N D
S
S
H E
E T
I N
D E
X
ABBREVIATIONS
S SOUTH
SB SCUPPER BOX
SBC SINK BASE CABINET
SC SEALED CONCRETE
SCHED SCHEDULE
SD SOAP DISPENSER
SDC SLIDING DOOR CABINET
SECT SECTION
SF SQUARE FOOT (FEET)
SHT SHEET
SI SQUARE INCH(ES)
SIM SIMILAR
SLD SOLID SURFACE
SLV SLEEVE
SOG SLAB ON GRADE
SPEC SPECIFICATION(S)
SPKR SPEAKER
SQ SQUARE
SS/EE SAFETY SHOWER / EMERGENCY EYEWASH
ST STL STAINLESS STEEL
STD STANDARD
STIFF STIFFEN(ER)
STL STEEL
STOR STORAGE
STRUCT STRUCTURE(AL)
SUSP SUSPENDED
SYM SYMMETRICAL
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T/ TOP OF
T/M TOP OF MULLION
TBD TO BE DETERMINED
TEMP TEMPERATURE
TERM TERMINATION
TLT TOILET
TPO THERMPLASTIC POLYOLEFIN
TPTN TOILET PARTITION
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VNR VENEER
VPR VAPOR
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WL WIND LOAD
WP WALL PROTECTION
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
YD YARD
YR YEAR
ABBREVIATIONS
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLED
GLAZ GLAZING
GYP GYPSUM
GYP BD GYPSUM BOARD
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HPL HIGH PRESSURE LAMINATE
HR HOUR
HT HEIGHT
HVAC HEATING-VENTILATING-AIR CONDITIONING
ID INSIDE DIAMETER
IN INCH(ES)
INCL INCLUDE(ED)(ING)
INSUL INSULATED
INT INTERIOR
JAN JANITOR
JST JOIST
JT JOINT
KO KNOCKOUT
LAM LAMINATE(D)
LAV LAVATORY
LB POUND
LEVPL LEVELING PLATE
LF LINEAR FOOT (FEET)
LKR LOCKER
LL LIVE LOAD
LOC LOCATION
LONG LONGITUDINAL
LP LOW POINT
LTG LIGHTING
LVL LEVEL
LVR LOUVER
M METER (METRIC MEASURE)
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MC MICROWAVE CABINET
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MEZZ MEZZANINE
MF MOBILE DRAWER/FILE CABINET
MFR MANUFACTURER
MHO MAGNETIC HOLD OPEN
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
MRT MOISTURE/MILDEW RESISTANT TREATED
MTL METAL
MTR METER (UTILITIES)
N NORTH
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
O/O OUT TO OUT
OC ON CENTER
OD OUTSIDE DIAMETER
OFC OPEN FACE CABINET
OFD OVERFLOW DRAIN
OHC OVERHEAD COILING DOOR
OHD OVERHEAD
OHS OPEN CABINET W/ HORIZONTAL SLOTS
OPNG OPENING
OPP OPPOSITE
OSC OPEN SINK CABINET
OVS OPEN CABINET W/ VERTICAL SLOTS
P/L PROPERTY LINE
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLMB PLUMBING
PLSTR PLASTER
PLY PLYWOOD
PNL PANEL
POL POLISHED
PREFAB PREFABRICATED
PREFIN PREFINISHED
PROJ PROJECTION
PROP PROPERTY
PRTBD PARTICAL BOARD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION (WALL)
PVC POLYVINYL CHLORIDE
PYC POLYURETHANE COATING
QT QUARRY TILE
QTY QUANTITY
R RISER
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
RECT RECTANGULAR
REF REFERENCE
REINF REINFORCE(ING)
REQ REQUIRE(D)
RESIN RESINOUS
REV REVISE (REVISION)
RM ROOM
RND ROUND
RO ROUGH OPENING
ABBREVIATIONS
AAF ABOVE ACCESS FLOOR
ABUT ABUTMENT
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJACENT
ADJT ADJUST (ADJUSTABLE)
AF ACCESS FLOOR
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE (ANODIZED)
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTEN ATTENUATION
AUX AUXILIARY
AWP ACOUSTICAL WALL PANEL
B/ BOTTOM OF
BD BOARD
BF BOTH FACES
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BOD BASIS OF DESIGN
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN /
B/N
BETWEEN
C/C CENTER TO CENTER
CAB CABINET
CERT CERTIFIED
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CM CENTIMETER
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
COMPR COMPRESSIBLE
CONC CONCRETE
CONN CONNECTOR
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET TILE
CR CARD READER
CSK COUNTERSINK
CSWK CASEWORK
CT CERAMIC TILE
CTR CENTER
CW CURTAINWALL
DAT DATUM
DB DOOR BASE CABINET
DBL DOUBLE
DD DOOR/DRAWER BASE CABINET
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DFB DRAWER/FILE BASE CABINET
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISPEN DISPENSER
DKG DECKING
DL DEAD LOAD
DN DOWN
DO DOOR/OPEN BASE CABINET
DR DOOR
DS DOWN SPOUT
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EF EACH FACE
EHD ELECTRIC HAND DRYER
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENG ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EPT EPOXY PAINT
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXG EXISTING
EXP EXPOSED
EXP STR EXPOSED TO STRUCTURE
EXT EXTERIOR
F FILLER PIECE (3/4" MIN - 2 1/2" MAX)
F/ FACE OF
F/F FACE TO FACE
F/M FACE OF MULLION
FACT FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FIN FINISH
FIXT FIXTURE
FL FLOOR
FLUOR FLUORESCENT
FNDN FOUNDATION
FRP FIBERGLASS REINFORCED PLASTIC
FRT FIRE RESISTANT TREATED
FT FEET / FOOT
FTG FOOTING
FURN FURNITURE
FUT FUTURE
DRAWING INDEX
NUMBER NAME
FIRE PROTECTION
FA001 FIRE ALARM SYMBOLS, LEGEND, ABBREVIATIONS AND
NOTES
FA101 FIRST FLOOR PLAN - FIRE ALARM
FA201 SECOND FLOOR PLAN - FIRE ALARM
FA501 FIRE ALARM DETAILS
FA502 FIRE ALARM DETAILS
FA503 FIRE ALARM DETAILS
FX001 FIRE SUPPRESSION SYMBOLS, LEGEND, ABBREVIATIONS
AND NOTES
FX101 FIRST FLOOR PLAN - FIRE SUPPRESSION
FX201 SECOND FLOOR PLAN - FIRE SUPPRESSION
FX501 FIRE SUPPRESSION DETAILS
FX801 FIRE EXTINGUISHER LAYOUT
PLUMBING
P001 GENERAL INFO - PLUMBING
P100 UNDERGROUND PLUMBING PLAN
P101 FIRST FLOOR PLUMBING PLAN
P102 SECOND FLOOR PLUMBING PLAN
P103 ROOF PLUMBING PLAN
P301 PLUMBING ENLARGED PLANS
P601 PLUMBING DETAILS
P602 PLUMBING DETAILS
P701 PLUMBING SCHEDULES
P801 PLUMBING STACK DIAGRAM
P802 DOMESTIC RISER DIAGRAM
MECHANICAL
M001 GENERAL INFORMATION - HVAC
M002 HVAC ZONING PLANS
M101 FIRST FLOOR HVAC DUCTWORK PLAN
M102 SECOND FLOOR HVAC DUCTWORK PLAN
M401 HVAC SECTIONS
M601 HVAC DETAILS
M602 HVAC DETAILS
M701 HVAC SCHEDULES
M801 HVAC SEQUENCE OF OPERATIONS
M802 HVAC SEQUENCE OF OPERATIONS
ELECTRICAL
E001 ABBREVIATIONS, LEGENDS & GENERAL NOTES -
ELECTRICAL
E090 GROUNDING AND LIGHTNING PROTECTION PLANS
E100 ELECTRICAL SITE PLAN
E101 POWER PLAN - LEVEL 1
E102 POWER PLAN - LEVEL 2
E201 LIGHTING PLAN - LEVEL 1
E202 LIGHTING PLAN - LEVEL 2
E203 PHOTOMETRIC CALCULATIONS
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E503 ELECTRICAL DETAILS
E601 ELECTRICAL ONE-LINE DIAGRAM
E701 ELECTRICAL SCHEDULES
E702 ELECTRICAL PANEL SCHEDULES
TELECOM
T001 TELECOMMUNICATIONS LEGEND. ABBREVIATIONS AND
SYMBOLS
T101 TELECOMMUNICATIONS FIRST FLOOR PLAN
T102 TELECOMMUNICATIONS SECOND FLOOR PLAN
T201 TELECOMMUNICATIONS SITE PLAN
T301 ENLARGED COMMUNICATIONS ROOM FLOOR PLAN
T501 TELECOMMUNICATIONS DETAILS
T502 TELECOMMUNICATIONS DETAILS
T601 TECHNOLOGY RISER DIAGRAMS
DRAWING INDEX
NUMBER NAME
GENERAL
G000 COVER SHEET
G001 ABBREVIATIONS, LEGENDS, & SHEET INDEX
G002 CODE INFORMATION
G101 LIFE-SAFETY PLANS
CIVIL
C001 DEMOLITION PLAN
C002 EROSION CONTROL PLAN
C003 SESC DETAILS
C101 SITE LAYOUT PLAN
C102 LANDSCAPE PLAN
C201 UTILITY PLAN
C301 GRADING AND DRAINAGE PLAN
C501 DETAILS
C502 DETAILS
STRUCTURE
S001 ABBREVIATIONS, LEGENDS, & SYMBOLS
S002 GENERAL NOTES
S003 GENERAL NOTES
S007 TYPICAL DETAILS
S008 TYPICAL DETAILS
S009 TYPICAL DETAILS
S010 TYPICAL DETAILS
S011 TYPICAL DETAILS
S101 STRUCTURAL FOUNDATION PLAN
S102 STRUCTURAL SECOND FLOOR FRAMING PLAN
S103 STRUCTURAL ROOF FRAMING PLAN
S200 STRUCTURAL ELEVATIONS
S201 STRUCTURAL ELEVATIONS
S300 STRUCTURAL DETAILS
S301 STRUCTURAL DETAILS
S302 STRUCTURAL DETAILS
S303 STRUCTURAL DETAILS
S304 STRUCTURAL DETAILS
S305 STRUCTURAL DETAILS
ARCHITECTURE
A101 FLOOR PLAN - LEVEL 1
A102 FLOOR PLAN - LEVEL 2
A103 ROOF PLAN
A150 REFLECTED CEILING PLAN - LEVEL 1
A151 REFLECTED CEILING PLAN - LEVEL 2
A200 EXTERIOR PERSPECTIVES
A201 EXTERIOR ELEVATIONS
A220 ENLARGED EXTERIOR ELEVATIONS
A240 CURTAINWALL / WINDOW ELEVATIONS
A300 BUILDING SECTIONS
A320 WALL SECTIONS
A321 WALL SECTIONS
A400 ENLARGED FLOOR PLANS
A420 ENLARGED REFLECTED CEILING PLANS
A500 EXTERIOR PLAN DETAILS
A501 EXTERIOR PLAN DETAILS
A502 EXTERIOR PLAN DETAILS
A520 EXTERIOR SECTION DETAILS
A521 EXTERIOR SECTION DETAILS
A530 ROOF DETAILS
A600 TYPICAL MOUNTING HEIGHTS
A601 INTERIOR ELEVATIONS
A602 INTERIOR ELEVATIONS
A610 SIGNAGE
A611 SIGNAGE
A630 INTERIOR CEILING DETAILS
A640 INTERIOR MILLWORK ELEVATIONS AND DETAILS
A670 PARTITION TYPE SCHEDULE, NOTES AND DETAILS
A680 DOOR SCHEDULE
A700 ENLARGED STAIR PLANS AND SECTIONS - STAIR 01
A701 ENLARGED ELEVATOR PLANS WALL SECTIONS - ELEV 01
A702 TYPICAL STAIR DETAILS
A800 FINISH LEGENDS AND SCHEDULES
A900 OLI #1 - PEDESTRIAN BRIDGE
e.
UFC 3-120-10 Interior Design, with Change 2, 15 June 2021f.
UFC 3-301-01 Structural Engineering, 11 April 2023 g.
UFC 3-400-02 Engineering Weather Data, 20 September 2018 h.
UFC 3-401-01 Mechanical Engineering, with Change 1, 01 October i.
UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems, with Change 8 , 21 July 2021 j.
UFC 3-410-02 Direct Digital Control for HVAC and Other Building
Control Systems, with Change 2, 12 April 2021 k.
UFC 3-420-01 Plumbing Systems, 01 April 2021 l.
UFC 3-470-01 Utility Monitoring and Control Systems, 12 January m.
UFC 3-501-01 Electrical Engineering, with Change 1, 01 November n.
UFC 3-520-01 Interior Electrical Systems, with Change 2, 12 April o.
UFC 3-530-01 Interior and Exterior Lighting Systems, 09 February p.
UFC 3-550-01 Exterior Electrical Power Distribution, with Change
3, 01 November 2019 q.
UFC 3-575-01 Lightning and Static Electricity Protection Systems, 01 October 2021 r.
UFC 3-580-01 Telecommunications Building Cabling Systems
Planning and Design, with Change 1, 01 June 2016 s.
UFC 3-600-01 Fire Protection Engineering for Facilities, with
Change 6, 06 May 2021 t.
UFC 4-010-01 DoD Minimum Antiterrorism Standards for
Buildings, with Change 2, 30 July 2022 u.
v.
UFC 4-021-01 Design and O&M: Mass Notification Systems, with
Change 1, January 2010
e. NFPA 70, National Electric Code, 2020 Edition
f. NFPA 72, National Fire Alarm and Signaling Code, 2022 Edition
g. NFPA 101, Life Safety Code, 2021 Edition
4 Architectural Barriers Act (ABA) Accessibility Standard for Department of Defense Facilities , 2015
1 Department of Defense – Unified Facilities Criteria (UFC) that directly relate to the project.
a. UFC 1-200-01 DoD Building Code, with Change 3, 26 February
b. UFC 1-200-02 High Performance and Sustainable Building
Requirements, with Change 2, 01 June 2022
c. UFC 3-101-01 Architecture, with Change 4, 08 January 2024
d. UFC 3-110-03 Roofing, with Change 5, 12 June 2020 w.
In addition to the “Core UFC” requirements, comply with other
UFC requirements as applicable to the system, structure, or facility type defined in the scope of the construction project
2 International Codes
a. International Building Code (IBC) – 2021 Edition
b. International Mechanical Code (IMC) – 2021 Edition
c. International Plumbing Code (IPC) – 2021 Edition
3 National Fire Protection Association – National Fire Codes
a. NFPA 1 , Fire Code, 2021 Edition
b. NFPA 10, Standard for Portable Fire Extinguishers, 2022 Edition
c. NFPA 13, Standard for the Installation of Sprinkler Systems, 2022
Edition
d. NFPA 24, Standard for the Installation of Private services Mains and Their Appurtenances, 2022 Edition
UFC 3-490-06 Elevators, with Change 1, 13 January 2021
UFC 3-490-06 Elevators, with change 1, 13 January 2021 x.
UFC 3-120-01 Design: Sign Standards, with Change 4, 1 February y.
h. NFPA 220, Standard on Types of Building Construction, 2021
Edition
VESTIBULES / TWO DOORS IN A SERIES
PROVIDE THIS ADDITIONAL
SPACE IF DOOR IS
EQUIPPED WITH BOTH A
LATCH AND A CLOSER
BOTH DOORS OPEN OUTDOORS IN SERIES
DOORS AT OPPOSITE WALLSDOORS AT ADJACENT WALLS
48" M
IN
48" MIN.
M
IN
M
IN
48" MIN.
M
IN
M
IN
48" MIN.
M
IN
CARPET PILE THICKNESS
1KNEE CLEARANCE
PLAN
CLEAR
FLOOR
SPACE
FLOOR/LEVEL CHANGES
SPACE ALLOWANCES
COUNTER
FINISHED
FLOOR
CHANGES IN LEVEL
CLEAR FLOOR SPACE REQUIREMENTSWHEELCHAIR TURNING SPACE
ADJUSTABLE
SHELVING
1'-9"
MAX.
FORWARD REACH MAXIMUM SIDE REACH
OVER AN OBSTRUCTION
HIGH AND LOW SIDE REACH HIGH AND LOW REACH
(ADJUSTABLE SHELVES)
MAXIMUM FRONT REACH
OVER AN OBSTRUCTION
ACCESSIBLE COUNTER
ELEVATION W/ PARALLEL
APPROACH
M A
X
M
IN
2'-6"
Ø5'-0"
M A
X
/2
"1 /4
T
O
/2
/4
M
A X
4'-0" 2'-6"
MIN.
2'-0"
MAX.
2'-0"
MAX.
M A
X
2'-6"
MIN.
10"
MAX.
M
IN
M A
X
M
IN
M A
X
MIN.
3'-0"
M A
X
T O
M A
X
H O
R
IZ
O N
T A
L
F O
R R
E A
C H
20-25"
MAX.
M
IN
48"
MIN.
25" MAX.
11"
MIN
6"
MAX
M
IN
M
IN
MIN
8"
M A
X
CLEAR WIDTH> 4"
4" MAX
W H
E N
H
IG
H E
R T
H A
N
M
IN
M
IN
CANE RANGE
WALKING PARALLEL TO WALL WALKING PARALLEL TO WALL WALKING PERPENDICULAR TO WALL
W H
E N
O R
B E
L O
W
1' - 0" MAX
2' - 6" MIN
> 1' - 3"
2' - 6" MIN
FORWARD APPROACH SIDE APPROACH
M
IN
M
IN
5' - 0" MIN
36" MIN SECONDARY CORRIDOR
44" MIN EGRESS CORRIDOR
MINIMUM CLEAR WIDTH FOR TWO
WHEELCHAIRS
MINIMUM CLEAR WIDTH FOR SINGLE
WHEELCHAIR
M
IN
5' - 0" MIN
M
IN
3' - 0" MIN > 4' - 0" 3' - 0" MIN
90 DEGREE TURN
M
IN
3' - 0" MIN3' - 0" MIN
180 DEGREE TURN
M
IN
3' - 6" MIN
NOTE: DIMENSIONS SHOWN APPLY WHEN X < 48"
3' - 6" MIN X < 48"
180 DEGREE TURN
WHEELCHAIR TURNING DIAGRAM
Number of Employees Required
100 Staff Members Max 1 per 20 persons up to 100 5
Total Provided
Drinking Fountains Per UFC 403.1.3 Required
100 Staff Members Max 1 per 100 persons 1
Total Provided 2
Fire Rating of Exterior Walls IBC Table 601 0-HR / Bearing
Primary Structural Frame IBC Table 601 0-HR
Bearing Walls – Exterior IBC Table 601 0-HR
Bearing Wall – Interior IBC Table 601 0-HR
Non Bearing – Exterior IBC Table 705 0-HR > 30'
Non Bearing – Interior IBC Table 601 0-HR
Floor Construction IBC Table 601 0-HR
Roof Construction IBC Table 601 0-HR
Fire Separation Distance IBC Table 705 0-HR > 30'
Occupancy Separation IBC Section 508.3 Non- Separated Occupancies-B/S-1
IBC Table 508.4 No Separation Requirement
Vertical Separation of IBC Section 705.8.5 Not required w/ automatic sprinkler system
Openings in Exterior Wall NFPA N/A
Occupant Load NFPA 101 Table 7.3.1.2 Occupant Load Factors by use
UFC 3-600-1, Table 10-1 Supplemental Occupant Load Factors
Fire Protection Systems UFC 3-600-1, Section 9-7.2.1.2 Required
(A.S.S.)
Fire Alarm - IBC Section 907 UFC 3-600-1, Section 9-18 Required
Detection System NFPA 38.3.4.1
Corridor Fire NFPA 101, 38.3.6.1 Exception 3: 0-HR w/A.S.S.
Resistance Rating
Dead End Corridor NFPA 101, 38.2.5.2.1 50 FT w/A.S.S.
Minimum Number of NFPA 101, 38.2.4 1-500 Occupants-2 exits required
Means of egress from a (With exceptions for special conditions) room or area 1 in low hazard storage occupancies.
Minimum Corridor Width NFPA 101, 38.2.3.2 44 inches if serving occ. load > 50
Max. Exit Access NFPA 101, 38.2.6.3 300 FT w/A.S.S.
Travel Distance IBC Table 1017.2
Common Path of Travel NFPA 101, 38.2.5.3.1 100 FT w/A.S.S.
Min. Ceiling Height NFPA 101, 7.1.5 7’-6” min.
Means of Egress
Protection of Exits NFPA 101, 7.1.3.2.1 1-HR rated enclosure < 4 stories
NC ANG 145 NEW SECURITY FORCES BUILDING CHARLOTTE, NC
Code Item Code Reference Code Requirement
Use Group IBC Section 304 B, Business
(Non Separated Mixed Use) S-1, Moderate Hazard Storage
NFPA 101 Chapter 38, New Business Occupancies Chapter 42, Storage Occupancies (Ordinary Hazard)
Classification
Type of Construction IBC Table 601 & 705.5 IIB Noncombustible
NFPA 220 Table 4.1.1 Type II (000)
Protection of Vertical NFPA 101, 8.6.5(2) 1-HR fire barriers (<3 stories)
Openings
Protection from Hazards NFPA 101 Smoke Partition w/A.S.S /, Doors to be self closing
Plumbing Fixture Counts (Per UFC 3-420-01, change 12, 01 April 2021)
With Note D
Water Closet Allowances (From Table 403-1) Required
Number of Employees
100 Staff Members Max 1 per 20 persons up to 100 5
Total Provided 7, (with an additional (4) urinals)
Lavatory Allowances (From Table 403-2)
Allowable Height and Number of Stories
IBC Section 504
IBC Table 504.3 & 504.4 4 stories, 75 feet
Allowable Area IBC Section 506, 508.3.2 Building Type = SM
IBC Table 506.2 52,500SF/Floor (Non-Separated Mixed Use most stringent applies: based on S-1)
Actual Height and Area 2 stories, 32’-4” / 9,530 GSF
Fire Ratings
Fire Rating of Exterior Walls IBC Table 705.5 0-HR / Non Bearing
NFPA 220, Table 4.1.1
Service Sink Per UFC 403.1.3 Required
100 Staff Members Max 1 required 1
Total Provided 1
T h is d ra w in g h a s b e e n p re p a re d f o r th e u s e o f A
E C
O M
’s c lie n t a n d m a y n o t b e u s e d re p ro d u c e d o r re lie d u p o n b y th ir d p a rt ie s e xc e p t a s a g re e d b y A
E C
O M a n d i ts c lie n t, a s r e q u ir e d b y la w o r fo r u s e b y g o v e rn m e n ta l r e v ie w in g a g e n c ie s
A E
C O
M a c c e p ts n o r e s p o n s ib ili ty a n d d e n ie s a n y lia b ili ty w h a ts o e v e r, t o a n y p a rt y th a t m o d ifi e s t h is d ra w in g w ith o u t
A E
C O
M ’s e x p re s s w ri tt e n c o n s e n t.
D o n o t s c a le t h is d o c u m e n t.
A ll m e a s u re m e n ts m u s t b e o b ta in e d f ro m t h e s ta te d d im e n s io n s
CLIENT
ARCHITECT/DESIGNER
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
L a s t
P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E
"x
P ro je c t
M a n a g e m e n t
In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
B-3 SUBMITTAL - FINAL
KEY PLAN
PROJECT
©2023 AECOM Corporation
M R
PAYNE BLVD.
CHARLOTTE, NORTH CAROLINA 28208
277 W NATIONWIDE BLVD
COLUMBUS, OH 43215
614-464-4500
FJRP229030
/2
/2
:1
:3
P
M
B
IM
/B
P -A
M E
R
U S
A
-S F
N C
A N
G
/6
S
F -N
C A
N G
R
A
.r v t
CODE INFORMATION
G002
60637899
C h e c k e r
D e s ig n e r
A p p ro v e r
5/30/2025
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD - 145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
-G
E N
E R
A L -0
.0
-G
-C
O D
E I
N F
O R
M A
T
IO
N
Scale: 1/2" = 1'-0"
1 ABA DOOR CLEARANCES
Scale: 1/4" = 1'-0"
4 ABA REACH CLEARANCES
Scale: 1/4" = 1'-0"
3 ABA WALKING CLEARANCES
Scale: 1/2" = 1'-0"
2 ABA WHEELCHAIR CLEARANCES
A B B.4 B.7 B.8 C
3.7
BDOC
COMMUNICATIONS
ROOM
LOCKERS
WEAPONS
VAULT
CORR
WOMENS
MENS
TRAINING
102B
ACTIVE
TRAINING
102A
ID ENTRY
VEST
PASS ID
ELEC ROOM
PPE
STO/WEAPONS
CLEANING
MECH ROOM
BREAK
CORR
ELEVATOR
STAIR
HOUSE
KEEPING
EXIT
EXIT
T R
A V
E L P
A T
H A
5.2
A.3
5.1
FEC
FEC
UNISEX
TOILET
115A
FEC
4.7
18017
A B B.4 B.7 B.8 C
3.7
FLIGHT
CHIEFS
VEST
QC/STAN/
EVAL/
TESTING
STAIR
ELEVATOR
PRINT/COPY/
ELEV.EQ.RM.
TRAINING
MANAGER
PROGRAM
MANAGER
HOTELING
STATION
S5
SUPPLY
MOBILITY
MANAGEMENT
OPERATIONS
SUPERVISOR
CONF. ROOM
COMMANDER
SUPPORT
STAFF
HOTELING
STATIONS
COMMANDER
EXECUTIVE
OFFICER
FIRST
SERGEANT
SECURITY
MGR/INVEST
S2
SECURITY
FORCES
MGR
HOTELING
STATIONS
UNISEX
TOILET
COFFEE
EXIT
T R
A V
E L P
A T
H B
5.2
A.3
5.1
FEC
4.7
CORR
FEC
LIFE SAFETY LEGEND
1 HR RATED BARRIER
FIRE PARTITIONS (IBC 708)
BASED ON 2021 IBC
1FP
FE FIRE EXTINGUISHER,
WALL MOUNTED BRACKET
FEC FIRE EXTINGUISHER CABINET
XX
XX
ACTUAL LOAD
ALLOWABLE CAPACITY
A-3 ASSEMBLY
B BUSINESS
S-1 STORAGE
OCCUPANCY LEGEND
N
T h is d ra w in g h a s b e e n p re p a re d f o r th e u s e o f A
E C
O M
’s c lie n t a n d m a y n o t b e u s e d re p ro d u c e d o r re lie d u p o n b y th ir d p a rt ie s e xc e p t a s a g re e d b y A
E C
O M a n d i ts c lie n t, a s r e q u ir e d b y la w o r fo r u s e b y g o v e rn m e n ta l r e v ie w in g a g e n c ie s
A E
C O
M a c c e p ts n o r e s p o n s ib ili ty a n d d e n ie s a n y lia b ili ty w h a ts o e v e r, t o a n y p a rt y th a t m o d ifi e s t h is d ra w in g w ith o u t
A E
C O
M ’s e x p re s s w ri tt e n c o n s e n t.
D o n o t s c a le t h is d o c u m e n t.
A ll m e a s u re m e n ts m u s t b e o b ta in e d f ro m t h e s ta te d d im e n s io n s
CLIENT
ARCHITECT/DESIGNER
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
L a s t
P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E
"x
P ro je c t
M a n a g e m e n t
In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
B-3 SUBMITTAL - FINAL
KEY PLAN
PROJECT
©2023 AECOM Corporation
M R
PAYNE BLVD.
CHARLOTTE, NORTH CAROLINA 28208
277 W NATIONWIDE BLVD
COLUMBUS, OH 43215
614-464-4500
FJRP229030
/2
/2
:1
:3
P
M
B
IM
/B
P -A
M E
R
U S
A
-S F
N C
A N
G
/6
S
F -N
C A
N G
R
A
.r v t
LIFE-SAFETY PLANS
G101
60637899
C h e c k e r
D e s ig n e r
A p p ro v e r
5/30/2025
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD - 145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
-G
E N
E R
A L -0
.0
-G
-L
IF
E
-S A
F E
T Y
P L A
N S
A201 Scale: 1/8" = 1'-0"
1 FIRST FLOOR - LIFE SAFETY PLAN
A201 Scale: 1/8" = 1'-0"
2 SECOND FLOOR - LIFE SAFETY PLAN
SECOND FLOOR OCCUPANCY TABLE
ROOM / SPACE OCCUPANT
LOAD
FACTOR
OCCUPANCY
COUNT USE TYPENUMBER NAME AREA
200 CONF. ROOM 309 SF 15 NET 21 ASSEMBLY
201 COMMANDER 130 SF 150 GROSS 1 BUSINESS
202 EXECUTIVE OFFICER 81 SF 150 GROSS 1 BUSINESS
203 FIRST SERGEANT 76 SF 150 GROSS 1 BUSINESS
204 SECURITY MGR/INVEST S2 78 SF 150 GROSS 1 BUSINESS
205 SECURITY FORCES MGR 78 SF 150 GROSS 1 BUSINESS
206 UNISEX TOILET 69 SF 150 GROSS 1 BUSINESS
207 COFFEE 26 SF 150 GROSS 1 BUSINESS
208 PRINT/COPY/ ELEV.EQ.RM. 49 SF 150 GROSS 1 BUSINESS
209 FLIGHT CHIEFS 191 SF 150 GROSS 2 BUSINESS
210 VEST 89 SF 150 GROSS 1 BUSINESS
211 QC/STAN/ EVAL/ TESTING 99 SF 150 GROSS 1 BUSINESS
213 COMMANDER SUPPORT STAFF 116 SF 150 GROSS 1 BUSINESS
214 HOTELING STATIONS 231 SF 150 GROSS 2 BUSINESS
215 HOTELING STATIONS 116 SF 150 GROSS 1 BUSINESS
216 SUPPLY MOBILITY MANAGEMENT 64 SF 150 GROSS 1 BUSINESS
217 OPERATIONS SUPERVISOR 67 SF 150 GROSS 1 BUSINESS
218 S5 66 SF 150 GROSS 1 BUSINESS
219 HOTELING STATION 68 SF 150 GROSS 1 BUSINESS
220 TRAINING MANAGER 79 SF 150 GROSS 1 BUSINESS
221 PROGRAM MANAGER 82 SF 150 GROSS 1 BUSINESS
222 CORR 1,052 SF 150 GROSS 8 BUSINESS
FIRST FLOOR OCCUPANCY TABLE
ROOM / SPACE OCCUPANT
LOAD
FACTOR
OCCUPANCY
COUNT USE TYPENUMBER NAME AREA
100 VEST 89 SF 150 GROSS 1 BUSINESS
101 ID ENTRY 202 SF 150 GROSS 2 BUSINESS
102A ACTIVE TRAINING 601 SF 15 NET 40 ASSEMBLY
102B TRAINING 589 SF 15 NET 40 ASSEMBLY
103 PASS ID 174 SF 150 GROSS 2 BUSINESS
104 PPE STO/WEAPONS CLEANING 132 SF 300 GROSS 1 STORAGE
105 ELEC ROOM 86 SF 300 GROSS 1 STORAGE
106 BREAK 96 SF 150 GROSS 1 BUSINESS
107 MECH ROOM 111 SF 300 GROSS 1 STORAGE
109 HOUSE KEEPING 51 SF 300 GROSS 1 STORAGE
110 MENS 307 SF 150 GROSS 3 BUSINESS
111 WOMENS 221 SF 150 GROSS 2 BUSINESS
112 WEAPONS VAULT 427 SF 300 GROSS 2 STORAGE
113 LOCKERS 145 SF 150 GROSS 1 BUSINESS
114 COMMUNICATIONS ROOM 142 SF 300 GROSS 1 STORAGE
115 BDOC 319 SF 150 GROSS 3 BUSINESS
115A UNISEX TOILET 65 SF 150 GROSS 1 BUSINESS
116 CORR 880 SF 150 GROSS 6 BUSINESS
P.O.T. GROUND FLOOR
DESCRIPTION DISTANCE
TRAVEL PATH A 117' - 0 101/256"
TRAVEL PATH B 94' - 10"
164 8268
SCALE: 1/8"=1'-0"
I/R DATE DESCRIPTION
TOTAL OCCUPANT LOAD ON THE SECOND FLOOR: 51
TOTAL OCCUPANT LOAD ON THE FIRST FLOOR: 109
REMOVE AND PATCH
CURB AND PAVEMENT
AS REQUIRED
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
La st
P lo tte d:
Fi le na m e:
Printed on ___% Post-Consumer Recycled Content Paper
AR
C
H E
"x
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
KEY PLAN
PROJECT
©2016 AECOM Corporation
/1
3/
1:
:4
AM
c:
\u se rs \h er na nd ez ro dr ig ue zc \o ne dr iv e
- a ec om \g en er al
-s f n c an g
5\
0_ ca d_ gi s\
0_ ca d\ ci vi l\c
-s he et s\ c0 d em ol iti on p la n.
dw g
60637899
FJRP229030
G H
F M
C L
JR
O
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD-145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
-A
R C
H
IT
EC
TU
R E-
A3
-B U
IL
D
IN
G
S
EC
TI
O
N S
I/R DATE DESCRIPTION
277 W NATIONWIDE BLVD
COLUMBUS, OHIO 43215
614-464-4500
PAYNE BLVD
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
B-3 SUBMITTAL - FINAL05/30/25
N
DEMOLITION PLAN
C001
CODED NOTES
1. REMOVE CURB & GUTTER INCLUDING UNDERLYING BASE
2. FULL DEPTH ASPHALT PAVEMENT REMOVAL INCLUDING UNDERLYING BASE
3. CONCRETE SIDEWALK REMOVAL INCLUDING UNDERLYING BASE
4. REMOVE SANITARY SEWER MANHOLE
5. REMOVE SANITARY SEWER PIPE
6. SAWCUT PAVEMENT FULL DEPTH
7. REMOVE CONCRETE WINGWALL AS NEEDED TO INSTALL WATER MAIN
8. TEMPORARY PROTECT AND/OR PLUG EXISTING UTILITY LINE.
REMOVAL LEGEND
CURB AND GUTTER REMOVAL
SITE REMOVAL NOTES
1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION. ANY
DISCREPANCIES FOUND ARE TO BE BROUGHT TO THE ENGINEER'S ATTENTION PRIOR TO
COMMENCEMENT OR CONTINUATION OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL
REGULATIONS (OSHA) SAFETY STANDARDS. IF REQUESTED BY THE INSPECTOR, THE
CONTRACTOR SHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION.
3. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER
REPRESENTATIVE 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN
ADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK. ALL
WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS. WHERE OVERTIME
INSPECTION IS NEEDED, SUBJECT TO THE AVAILABILITY OF AN INSPECTOR, AND
APPROVED BY THE ENGINEER, THE CONTRACTOR WILL BE BILLED FOR SAID INSPECTION
SERVICES AS PROVIDED IN THE MOST RECENTLY ADOPTED RESOLUTION WHICH
ESTABLISHES THE FEES FOR SUCH SERVICES.
4. UTILITY LOCATIONS AND DEPTHS SHOWN HEREON HAVE BEEN PLOTTED IN ACCORDANCE
WITH DATA FURNISHED BY THE UTILITY COMPANIES, THE MUNICIPALITIES, AND A SITE
SURVEY. ANY DISCREPANCIES DISCOVERED IN THE FIELD DURING CONSTRUCTION THAT
HAVE AN IMPACT ON THE DESIGN INTENT ARE TO BE BROUGHT TO THE ATTENTION OF THE
ENGINEER.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE
PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS. ALL COSTS FOR
PROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE,
SOLELY, BY THE CONTRACTOR.
6. CONSTRUCTION WORK ZONE TRAFFIC SIGNS AND STRIPING SHALL BE FURNISHED,
INSTALLED, AND MAINTAINED IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCIES
HAVING JURISDICTION. A TRAFFIC CONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY
BE REQUIRED BY THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER
REPRESENTATIVE. "CONSTRUCTION AHEAD" WARNING SIGNS ARE TO BE INSTALLED
ALONG ADJACENT DRIVEWAYS OR ROADS. FLASHERS WITH CAUTION TAPE ARE TO BE
INSTALLED WHERE ANY CONSTRUCTION ACTIVITY CROSSES A SIDEWALK OR
PEDESTRIANS PATH IN ACCORDANCE WITH THE SPECIFICATIONS AND ANY/ALL LOCAL
REGULATIONS.
7. NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC
STREETS OR ANY DRIVEWAY.
8. CONTRACTOR SHALL CONTACT NC811 AT 1-800-632-4949, AT LEAST 3 WORKING DAYS
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO SCHEDULE THE
MARKING OF EXISTING UTILITY LOCATIONS. CONTRACTOR RESPONSIBLE FOR LOCATE
PRIVATE UTILITIES LINES.
9. CONTRACTOR SHALL REMOVE, ABANDON IN PLACE, ADJUST OR RECONSTRUCT EXISTING
UNDERGROUND PUBLIC & PRIVATE INFRASTRUCTURE INCLUDING WATER MAIN, SANITARY
SEWER AND STORM SEWER WITHIN THE PROJECT AREA.
10. EXISTING BELOW GROUND UTILITIES TO REMAIN SHALL BE LOCATED BY THE
CONTRACTOR, INCLUDING HAND EXCAVATION AND OTHER MEANS NECESSARY, PRIOR TO
CONSTRUCTION.
11. UTILITY STRUCTURES WITHIN REMOVAL BOUNDARY TO REMAIN SHALL BE RAISED OR
LOWERED TO MATCH FINISHED GRADE. REFER TO SHEET C301 FOR GRADES. THIS
INCLUDES, BUT IS NOT LIMITED TO, SANITARY, STORM, WATER, ELECTRICAL, TELECOM
STRUCTURES, GATE VALVE BOXES, & HAND HOLES.
12. ELECTRICAL & TELECOM UTILITIES SERVICING ITEMS TO REMAIN SHALL BE FIELD VERIFIED
& RELOCATED, AS NECESSARY, PRIOR TO DEMOLITION SUCH THAT THE OWNER DOES NOT
EXPERIENCE ANY "OUTAGES" OR "FAILURES" WITH THEIR INTERNAL ELECTRICAL,
TELEPHONE, SECURITY OR COMPUTER SYSTEMS. DAMAGE TO ANY OF THESE
UNDERGROUND UTILITIES OR ELECTRICAL SYSTEMS SHALL RESULT IN THE CONTRACTOR
HAVING TO MAKE THE NECESSARY REPAIRS TO THE OWNER'S SATISFACTION & AT NO
COST TO THE OWNER.
13. COORDINATE ALL ELECTRICAL, GAS, AND TELECOM UTILITY REMOVAL/RELOCATION WITH
APPROPRIATE UTILITY COMPANY.
14. UNDERGROUND SERVICE UTILITIES SHOWN TO BE REMOVED SHALL BE DONE SO ENTIRELY
WITH THE REMAINING PORTIONS TO BE CAPPED/BULKHEADED (WHEN APPLICABLE) PER
CITY/MUNICIPAL/UTILITY COMPANY STANDARDS.
15. CONCRETE WALKS & CURB & GUTTER SHOWN TO BE REMOVED SHALL BE DONE SO TO
FULL DEPTH & SHALL BE SAWCUT AT THE NEAREST EXISTING JOINT.
16. CONCRETE & BITUMINOUS PAVEMENT AREAS SHOWN TO BE REMOVED SHALL BE DONE SO
TO FULL DEPTH & SHALL BE SAWCUT ALONG THE REMOVAL BOUNDARY UNLESS
OTHERWISE NOTED.
17. EXISTING TRAFFIC SIGNS ARE NOT TO BE REMOVED WITHOUT PRIOR NOTIFICATION AND
APPROVAL OF THE CONTRACTING OFFICER OR CONTRACTING OFFICER'S
REPRESENTATIVE. ANY SIGNS DAMAGED DURING CONSTRUCTION ACTIVITY SHALL BE
REPLACED TO THE GOVERNMENT'S SATISFACTION, AT THE CONTRACTOR'S EXPENSE.
18. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL MEASURES AND PEDESTRIAN DETOUR
SIGNAGE.
19. CONTRACTOR SHALL PROVIDE TEMPORARY SANITARY SEWER BYPASS DURING REMOVAL
OF SANITARY SEWER AND CONSTRUCTION OF NEW SANITARY SEWER, SEE SANITARY
SEWER LAYOUT ON UTILITY PLAN SHEET.
Know what's below.
before you dig.Call
R
ASPHALT PAVEMENT REMOVAL
CONCRETE PAVEMENT REMOVAL
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SANITARY SEWER REMOVAL
UNDERGROUND POWER REMOVAL, REFER TO ELECTRICAL PLANS
SANITARY MANHOLE REMOVAL
TRAILER RELOCATED BY OWNER
PRIOR TO CONSTRUCTION
REMOVE AND RELOCATE
UNDERGROUND ELECTRICAL
REFER TO ELECTRICAL PLANS
LAYDOWN AREA
05/30/2025
C W
O
IP
IP INLET PROTECTIONIP INLET PROTECTION
CONCRETE WASHOUTCWO
SILT FENCE
STABILIZED CONSTRUCTION ENTRANCE
SEE DETAIL SHEET CE501
LIMITS OF DISTURBANCE
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
La st
P lo tte d:
Fi le na m e:
Printed on ___% Post-Consumer Recycled Content Paper
AR
C
H E
"x
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
KEY PLAN
PROJECT
©2016 AECOM Corporation
/1
3/
1:
:4
AM
c:
\u se rs \h er na nd ez ro dr ig ue zc \o ne dr iv e
- a ec om \g en er al
-s f n c an g
5\
0_ ca d_ gi s\
0_ ca d\ ci vi l\c
-s he et s\ c0 e ro si on c on tro l pl an
.d w g
60637899
FJRP229030
G H
F M
C L
JR
O
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD-145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
-A
R C
H
IT
EC
TU
R E-
A3
-B U
IL
D
IN
G
S
EC
TI
O
N S
I/R DATE DESCRIPTION
277 W NATIONWIDE BLVD
COLUMBUS, OHIO 43215
614-464-4500
PAYNE BLVD
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
B-3 SUBMITTAL - FINAL05/30/25
EROSION CONTROL PLAN
C002
N
Know what's below.
before you dig.Call
R
PROPOSED SITE LEGEND
CODED NOTES
1. REFER TO DETAILS ON SHEETS C-003.
NOTE: CONTRACTOR IS TO SWEEP STREET IMMEDIATELY
SHOULD SEDIMENT FROM SITE BE TRACKED ONTO
STREET. PROVIDE CATCH BASIN INLET FILTERS AS
NECESSARY WITHIN STREET AND DOWNSTREAM OF SITE.
SITE LAYOUT NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THE SOIL EROSION PERMIT FROM THE
PROPER GOVERNING AUTHORITY.
2. THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER REPRESENTATIVE SHALL
INSPECT THE SOIL EROSION/SEDIMENT CONTROL DEVICES ONCE EACH WEEK AND/OR
WITHIN 24 HOURS OF A PRECIPITATION EVENT WHICH RESULTS IN A STORM DISCHARGE
FROM THE SITE.
3. ALL DISTURBED NON-PAVEMENT AREAS MUST BE RESTORED WITH TOPSOIL, SEED,
FERTILIZER, AND MULCH UNLESS SODDED. (SEE LANDSCAPE PLAN)
4. ALL SLOPES STEEPER THAN 1V:4H SHALL USE AN EROSION CONTROL BLANKET ACCORDING
THE SLOPE. UNLESS INDICATED OTHERWISE ON PLANS.
5. SEEDING SHOULD BE PREPARED ACCORDING TO THE MANUFACTURER'S
RECOMMENDATIONS. THE CONTRACTOR / INSPECTOR SHALL INSPECT THE AREA AFTER
SEEDING IS COMPLETED. AREAS THAT ARE BARE OR NOT MULCHED PROPERLY WILL NEED
TO BE SPOT SEEDED AND/OR RE-MULCHED.
6. SILT FENCE SHOULD BE TRENCHED IN, BACKFILLED, AND STAPLED OR STAKED ACCORDING
TO THE MANUFACTURER'S SPECIFICATIONS. MAINTENANCE INCLUDES THE REMOVAL OF
BUILT-UP SEDIMENT WHEN THE SEDIMENT ACCUMULATES TO 1/3 TO 1/2 THE HEIGHT OF THE
FENCE. CONTRACTOR SHALL REMOVE, REPLACE, RETRENCH, OR REBACKFILL THE FENCE IF
IT FAILS. CONTRACTOR SHALL REINSTALL IF ANY PORTION OF THE FENCING IS DAMAGED BY
CONSTRUCTION MACHINERY.
7. INLET FILTERS SHALL BE SILT SACKS, DANDY BAGS, OR APPROVED EQUAL. INLET FILTERS
SHALL BE INSPECTED FOR BUILDUP OF SILT AND OTHER DEBRIS. THIS IS EVIDENT IF
STRUCTURE IS CAUSING FLOODING. MAINTENANCE SHALL CONSIST OF REMOVING OF
SEDIMENTS OR REPLACING FILTER AS NECESSARY.
8. SOIL EROSION CONTROL METHODS SHOWN ARE A GUIDELINE AND DO NOT RELIEVE THE
CONTRACTOR FROM ADDITIONAL METHODS THAT MAY BE REQUIRED BY THE SOIL EROSION
CONTROL PERMIT.
9. THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER REPRESENTATIVE WILL
ENGAGE A CERTIFIED STORM WATER OPERATOR IN ACCORDANCE WITH EPA PHASE II RULES
TO MEET REQUIREMENTS OF THE PERMIT. THIS OPERATOR WILL INSPECT THE JOB SITE AS
REQUIRED BY RULE, NOTIFY JOB SITE SUPERINTENDENT OF ANY DEFICIENCIES, AND ENTER
FINDINGS IN THE JOB SITE INSPECTION JOB BOOK.
10. TOTAL DISTURBED AREA = 0.68 ACRES.
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
La st
P lo tte d:
Fi le na m e:
Printed on ___% Post-Consumer Recycled Content Paper
AR
C
H E
"x
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
KEY PLAN
PROJECT
©2016 AECOM Corporation
/1
3/
1:
:5
AM
c:
\u se rs \h er na nd ez ro dr ig ue zc \o ne dr iv e
- a ec om \g en er al
-s f n c an g
5\
0_ ca d_ gi s\
0_ ca d\ ci vi l\c
-s he et s\ c-se sc d et ai ls .d w g
60637899
FJRP229030
G H
F M
C L
JR
O
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD-145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
-A
R C
H
IT
EC
TU
R E-
A3
-B U
IL
D
IN
G
S
EC
TI
O
N S
I/R DATE DESCRIPTION
277 W NATIONWIDE BLVD
COLUMBUS, OHIO 43215
614-464-4500
PAYNE BLVD
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
B-3 SUBMITTAL - FINAL05/30/25
SESC DETAILS
C003
VA
N
10.0'
10.0'
6.0' 13.6'
5.0'
10.0'
22.3'
9.0' 8.0'
8.0' 8.0'
PROPOSED BUILDING
5,713 SF
FFE.: 711.75
1.8
3'
1.8
3'
55.20'
55.20'
RADIO
TOWER
BR
ID
GE
F
OO
TP
RI
NT
STAIRS FOOTPRINT
COCO
18.0'
71.2'
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
La st
P lo tte d:
Fi le na m e:
Printed on ___% Post-Consumer Recycled Content Paper
AR
C
H E
"x
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
KEY PLAN
PROJECT
©2016 AECOM Corporation
/1
3/
1:
:5
AM
c:
\u se rs \h er na nd ez ro dr ig ue zc \o ne dr iv e
- a ec om \g en er al
-s f n c an g
5\
0_ ca d_ gi s\
0_ ca d\ ci vi l\c
-s he et s\ c1 s ite la yo ut p la n.
dw g
60637899
FJRP229030
G H
F M
C L
JR
O
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD-145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
-A
R C
H
IT
EC
TU
R E-
A3
-B U
IL
D
IN
G
S
EC
TI
O
N S
I/R DATE DESCRIPTION
277 W NATIONWIDE BLVD
COLUMBUS, OHIO 43215
614-464-4500
PAYNE BLVD
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
B-3 SUBMITTAL - FINAL05/30/25
SITE LAYOUT PLAN
C101
ASPHALT PAVEMENT
CONCRETE PAVEMENT
N
Know what's below.
before you dig.Call
R
PROPOSED SITE LEGEND
SITE LAYOUT NOTES
1. SEE ELECTRICAL PLANS FOR LOCATION AND DETAILS ON SITE LIGHTING & ELECTRICAL
FEATURES.
2. SEE ARCHITECTURAL PLANS FOR CONCRETE STOOP CONNECTION DETAILS.
3. SEE ARCHITECTURAL FOUNDATION PLAN FOR DETAILING OF BUILDING AND EXACT BUILDING
DIMENSIONS.
4. COORDINATE WITH IRRIGATION AND ELECTRICAL CONTRACTOR FOR SIZE AND PLACEMENT
OF ALL SLEEVES PRIOR TO PAVING, CONCRETE AND LANDSCAPE WORK.
5. CONCRETE GUTTER PAN SHALL TIP IN THE SAME DIRECTION AS THE ADJACENT PAVEMENT.
6. SMOOTH, GRADUAL FLOW LINE TRANSITIONS SHALL BE CONSTRUCTED BETWEEN
STANDARD GUTTER PAN AND INVERTED GUTTER PAN AND MAINTAIN DRAINAGE.
7. ALL DIMENSIONS SHOWN TO CONCRETE CURB & GUTTER ARE TO FRONT/FACE OF CURB
UNLESS NOTED OTHERWISE. BC = BACK OF CURB, FC = FACE OF CURB, EOP = EDGE OF
PAVEMENT
8. THE LAST THREE FEET OF ALL CURBS SHALL BE DUBBED DOWN UNLESS NOTED OTHERWISE.
9. ALL NCDOT REFERENCES ARE TO THE 2018 EDITION OF STANDARD SPECIFICATIONS FOR
ALL CURB/GUTTER, PAVEMENT, ETC. THE AUTHORITY HAVING JURISDICTION FOR ALL
CONSTRUCTION ON BASE IS THE CONTRACTING OFFICER OR CONTRACTING OFFICER'S
REPRESENTATIVE.
12. CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL SITE UTILITY CONNECTIONS AND
INSPECTIONS WITH THE PROPER JURISDICTION AND PAY ALL ASSOCIATED FEES.
13. THE CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING WATER,
SANITARY SEWER, AND STORM SEWER CROSSINGS AND CONNECTION POINTS PRIOR TO
CONSTRUCTION. CONTACT ENGINEER WITH ANY DISCREPANCIES.
14. ALL PAVEMENT MARKINGS SHALL BE 4" WIDE. STANDARD PARKING SPACES SHALL BE
MARKED IN WHITE AND BARRIER FREE SPACES IN BLUE. EACH BARRIER FREE SPACE SHALL
BE PROVIDED WITH A PAINTED PAVEMENT SYMBOL, A PRECAST CONCRETE BUMPER BLOCK,
AND A SIGN PER THE MANUAL OF UNIFORM TRAFFIC CONTROLS.
CATCH BASIN
SANITARY MANHOLE
STORM MANHOLE
CODED NOTES
1. CONCRETE TURNED DOWN SIDEWALK DETAIL #1C / C-501
2. SIDEWALK FLUSH TURN DOWN EDGE DETAIL #2C / C-501
3. BUILDING MOUNTED ACCESSIBLE PARKING SIGN DETAIL #1A / C-502
4. PREFABRICATED CAR PORT FOR TWO VEHICLES
5. PREFABRICATED PEDESTRIAN BRIDGE WITH EXTERIOR STAIRS, REFER TO STRUCTURAL PLANS
6. ROHN SSV SELF-SUPPORTING TOWER, SECTIONS 1WB AND 2W
AS BASIS OF DESIGN. FOUNDATIONS TO BE DESIGNED BY THE MANUFACTURER
AND COORDINATED WITH THE GEOTECHNICAL AND STRUCTURAL ENGINEER.
7. CONCRETE PAVEMENT STANDARD DUTY DETAIL #1D / C-501
8. CONCRETE SIDEWALK DETAIL #1A / C-501
9. ASPHALT PAVEMENT STANDARD DUTY DETAIL #1B / C-501
10. CONCRETE CURB. DETAIL #3D / C-501
11. CONCRETE WINGWALL, CAST IN PLACE (REPLACE IN KIND)
12. SIDEWALK CURB RAMP DETAIL #848.05 / C-501
13. CONCRETE CURB AND GUTTER DETAIL #2A / C-501
14. CONCRETE SPILLWAY DETAIL #4C / C-501
15. SEGMENTAL BLOCK RETAINING WALL WITH HANDRAIL OR EQUAL DETAIL #4A / C-502
16. CONCRETE STAIRS WITH HANDRAILS DETAIL #3C / C-501
17. ASPHALT PAVEMENT HEAVY DUTY DETAIL #2B / C-501
SIDEWALK CURB RAMP
CURB & GUTTER
BUILDING MOUNTED ACCESSIBLE PARKING SIGN
UTILITY SYSTEM INLINE CLEANOUT
LIMITS OF DISTURBANCE
CO
CURB36.5'
ST
OR
M
SE
W
ER
IN
FI
LT
RA
TI
ON
T
RE
NC
H
LIMITS OF STORM SEWER INFILTRATION TRENCH
VEGETATED SWALE
LAYDOWN AREA
PROPOSED BUILDING
5,713 SF
FFE.: 711.75
1.8
3'
1.8
3'
55.20'
55.20'
RADIO
TOWER
BR
ID
GE
F
OO
TP
RI
NT
STAIRS FOOTPRINT
COCO
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
La st
P lo tte d:
Fi le na m e:
Printed on ___% Post-Consumer Recycled Content Paper
AR
C
H E
"x
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
KEY PLAN
PROJECT
©2016 AECOM Corporation
/1
3/
1:
:0
AM
c:
\u se rs \h er na nd ez ro dr ig ue zc \o ne dr iv e
- a ec om \g en er al
-s f n c an g
5\
0_ ca d_ gi s\
0_ ca d\ ci vi l\c
-s he et s\ c1 la nd sc ap in g pl an
.d w g
60637899
FJRP229030
G H
F M
C L
JR
O
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD-145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
-A
R C
H
IT
EC
TU
R E-
A3
-B U
IL
D
IN
G
S
EC
TI
O
N S
I/R DATE DESCRIPTION
277 W NATIONWIDE BLVD
COLUMBUS, OHIO 43215
614-464-4500
PAYNE BLVD
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
B-3 SUBMITTAL - FINAL05/30/25
LANDSCAPING PLAN
C102
ASPHALT PAVEMENT
CONCRETE PAVEMENT
N
Know what's below.
before you dig.Call
R
PROPOSED SITE LEGEND
SURFACE STRUCTURES
SIDEWALK CURB RAMP
CURB & GUTTER
BUILDING MOUNTED ACCESSIBLE PARKING SIGN
LIMITS OF DISTURBANCE
CO
CURB
VEGETATED SWALE
LAWN, 4" MIN. OF TOPSOIL
OSTRYA VIRGINIANA
LIRIOPE MUSCARI
SPOROBOLUS HETEROLEPIS
LM
SH
ELEC
5,713 SF
FFE.: 711.75
1.8
3'
1.8
3'
55.20'
55.20'
GENERATOR
RADIO
TOWER
BR
ID
GE
F
OO
TP
RI
NT
STAIRS FOOTPRINT
COCO
125' - 6" WATER MAIN
COMBINED FIRE &
DOMESTIC SERVICE
6" 90° BEND
CONNECT TO EXISTING SEWER
S1, 48" DIA DROP MANHOLE
RIM=716.50
INV N=714.69
INV N=710.67
INV E=710.57
S2, 48" DIA
RIM=714.00
8" INV W=709.40
8" INV S=709.30
CONNECT TO EXISTING SEWER
S3, 48" DIA
RIM=709.5
8" INV N=707.662
6" INV E=708.57 +/- (EXISTING)
8" INV SW=707.55
S4, 48" DIA
RIM=708.00
8" INV N= 706.00
8" INV NE=705.91
8" INV S=705.08
CORE AND CONNECT TO EX
MH 8" INV = 704.84
ADJUST RIM ELEVATION
PER DETAIL #4A / C-502
6" 45° BEND
12" X 6" TAPPING SLEEVE AND VALVE
SEE DETAIL #2A / C-502
BUILDING CONNECTION
SEE DETAIL #2C / C-502
UTILITY SYSTEM CLEANOUT
SEE DETAIL #2B / C-502
8" INV=709.50
COORDINATE W/ PLUMBING
17' - 6" SAN SWR @ 2.00%
SEWER PIPE DROP DETAIL #2C / C-502
12' - 8" SAN SWR @ 2.00%
58' - 8" SAN SWR @ 2.01%
8" S
AN
S
W R
2.
8"
SA
N SW
R @
2.
%DOWNSPOUT CONNECTION
SEE DETAIL #3B / C-502
UTILITY SYSTEM CLEANOUT
SEE DETAIL #2B / C-502
COORDINATE W/ PLUMBING
2 EA - 4" CONDUIT SECURE TO BRIDGE OR
DIRECT BURIED AND CORE THROUGH RETAINING
WALL, COORDINATE BUILDING CONNECTION
LOCATION WITH COMMUNICATION PLANS
EX TOP OF BERM
17.7'
5.7'
REROUTE UNDERGROUND
ELECTRICAL SHOWN
SCHEMATICALLY
COORD WITH ELECTRICAL
REROUTE UNDERGROUND
ELECTRICAL SHOWN
SCHEMATICALLY
COORD WITH ELECTRICAL
PROTECT EX SANITARY
& UNDERGROUND POWER
DURING FOUNDATION
CONSTRUCTION
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
La st
P lo tte d:
Fi le na m e:
Printed on ___% Post-Consumer Recycled Content Paper
AR
C
H E
"x
Pr oj ec t M an ag em en t I ni tia ls
D es ig ne r:
C he ck ed
Ap pr ov ed
KEY PLAN
PROJECT
©2016 AECOM Corporation
/1
3/
1:
:0
AM
c:
\u se rs \h er na nd ez ro dr ig ue zc \o ne dr iv e
- a ec om \g en er al
-s f n c an g
5\
0_ ca d_ gi s\
0_ ca d\ ci vi l\c
-s he et s\ c2 u til ity p la n.
dw g
60637899
FJRP229030
G H
F M
C L
JR
O
AECOM
NEW SECURITY FORCES
BUILDING
NORTH CAROLINA AIR NATIONAL
GUARD-145TH AIRLIFT WING
145th AIRLIFT WING
4930 MINUTEMAN WAY
CHARLOTTE, NORTH CAROLINA 28208
-A
R C
H
IT
EC
TU
R E-
A3
-B U
IL
D
IN
G
S
EC
TI
O
N S
I/R DATE DESCRIPTION
277 W NATIONWIDE BLVD
COLUMBUS, OHIO 43215
614-464-4500
PAYNE BLVD
CHARLOTTE, NORTH CAROLINA 28208
http://www.aecom.com
B-3 SUBMITTAL - FINAL05/30/25
UTILITY PLAN
C201
WATER LINE
SANITARY SEWER LINE
N
Know what's below.
before you dig.Call
R
PROPOSED UTILITY LEGEND
ELECTRIC LINE
SITE UTILITY NOTES
1. PRIOR TO PROCEEDING WITH UTILITY CONSTRUCTION, CONTRACTOR SHALL UNCOVER ALL
EXISTING UTILITIES TO REMAIN AND REPORT TOP OF PIPE ELEVATION TO OWNER AND
ENGINEER.
2. CONTRACTOR SHALL ADJUST ALL UNDERGROUND STRUCTURES AND CORRESPONDING
SURFACE FEATURES TO PROPOSED GRADES IN ACCORDANCE WITH THE SPECIFICATIONS.
3. COMMUNICATIONS & ELECTRICAL CONDUITS, PLACEMENT OF ELECTRICAL LIGHT POLES,
AND LOCATION OF COMMUNICATION & ELECTRICAL SURFACE FEATURES ARE SHOWN FOR
REFERENCE ONLY. CONTRACTOR SHALL COORDINATE THESE UTILITIES WITH ELECTRICAL
DRAWINGS.
4. CONTRACTOR SHALL COORDINATE PLACEMENT OF ALL ELECTRICAL/ COMMUNICATION AND
IRRIGATION CONDUITS & HAND HOLES AS SHOWN ON ELECTRICAL AND IRRIGATION
DRAWINGS.
5. CONTRACTOR SHALL REFER TO PLUMBING DRAWINGS FOR BUILDING CONNECTIONS.
6. ALL PERFORATED STORM PIPE, STORM UNDERDRAIN, BELL AND SPIGOT ENDS AS CALLED
OUT ON THE PLANS SHALL COMPLY WITH ASTM F2306 AND ASTM F2648.
7. ALL MANHOLE STRUCTURE JOINTS WITH PIPES SHALL HAVE MANHOLE WATERSTOP
CONSISTING OF A CONNECTOR CONFORMING TO ASTM C923.
8. ALL BUILDING FOOTING UNDERDRAINS SHALL BE RIGID, PERFORATED PVC PIPE.
9. MANHOLE NORTHING AND EASTING IDENTIFIES CENTERLINE OF PIPE AND MANHOLE
STRUCTURE. CONTRACTOR SHALL ASSURE THAT MANHOLES WITH ECCENTRIC CONES ARE
ADJUSTED AS NECESSARY TO ASSURE THAT THE CASTING IS INSTALLED PER PLAN.
10. FOR STORM CATCH BASINS (CB), REFER TO DETAILS 1A/C502.
11. FOR STORM MANHOLES (MH), REFER TO DETAIL 1B/C502.
12. STORM MANHOLE CASTINGS SHALL BE AS FOLLOWS:
- STORM MANHOLE CASTINGS AND COVERS SHALL BE EJIW #1040 WITH TYPE "A" SOLID
COVER LABELED "STORM".
- STORM CATCH BASIN CASTINGS AND GRATES IN 6" BARRIER CURB AND GUTTER
(PUBLIC STREETS) SHALL BE EJIW #7045 FRAME WITH TYPE M1 GRATE AND T1 BACK.
- STORM CATCH BASIN CASTINGS AND GRATES IN PAVED SUMP AREAS SHALL BE EJIW
#1040 WITH TYPE "M" FLAT GRATE LABELED "STORM".
- STORM CATCH BASIN CASTINGS AND GRATES IN LANDSCAPED SUMP AREAS SHALL
BE EJIW #1000 WITH TYPE "M" GRATE.
16. CONTRACTOR SHALL CLEAN ALL ON-SITE STORM DRAIN PIPE & BASINS PRIOR
TO CLOSE OF CONSTRUCTION WITHIN LIMITS OF DISTURBANCE.
17. FOR ALL WATERMAIN VALVES AND VALVE BOXES REFER TO DETAIL 2A/C502,
TYPICAL VALVE BOX INSTALLATION.
18. CONTRACTOR WILL FURNISH TAPPING SLEEVE , WITH A FULL-OPEN DOUBLE DISC GATE
TAPPING VALVE AND BOX. THE CONTRACTOR WILL INSTALL AND PRESSURE TEST THE
SLEEVE.
19. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER OR CONTRACTING
OFFICER'S REPRESENTATIVE PRIOR TO SHUT-DOWN OF ANY WATER LINE.
20. FOR ALL UTILITY CROSSING, 10 FEET OF NO JOINT IN ANY DIRECTION IS REQUIRED.
21. TRENCHING FOR PROPOSED UNDERGROUND UTILITIES SEE DETAILS 3C AND 3D ON SHEET
C-502.
STORM LINE (WITH 6" PERFORATED UNDERDRAIN UNDER PAVEMENT)
B
A
C
D
E
F
G
H
I
UTILITY CROSSING TABLE
VEGETATED SWALE
PROPOSED PIV
ELEC
5,713 SF
FFE.: 711.75
1.8
3'
1.8
3'
55.20'
55.20'
GENERATOR
RADIO
TOWER
BR
ID
GE
F
OO
TP
RI
NT
STAIRS FOOTPRINT
COCO
FLUSH CURB
MATCH EXISTING GRADE
MATCH EXISTING GRADE
MATCH EXISTING GRADE
8.3% 5.0%
1.9
7.0
3.7%
2.9%
2.3
7.7%
.0%
707707
712713714716
CB1
CONNECT TO EXISTING
SEE PROPOSED STORM STRUCTURE
TABLE FOR INFORMATION
SEE DETAIL #3A / C-502
CB3
SEE DETAIL #1B / C-502
CB4
SEE DETAIL #1B / C-502YD1YD2
YD3
CB2
SEE DETAIL #1B / C-502
FOUNDATION
DRAIN LEADER
6" INV = 707.75'
REFER TO PLUMBING PLANS
FOR CONTINUATION
CO1
ROOF DRAIN LEADER
6" INV = 707.75'
REFER TO PLUMBING PLANS
FOR CONTINUATION
INFILTRATION TRENCH
SEE DETAIL 3C / C502
6.1%
2.4%
8.3
711.25
711.25
711.55
711.68
711.67
710.80
706.75
707.59
710.63
709.61
710.79
711.75
711.75
709.17 708.67
706.56
710.46
710.55
711.68
711.59
711.70
711.65
711.64 711.31
71…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .